Developer s Assessment Report. Project Location and Surrounding Features GIANT MINE October Job No:

Similar documents
CCR Fugitive Dust Control Plan

FUGITIVE DUST CONTROL PLAN

Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam.

MBMG Butte Mine Flooding Monthly Report BMFOU Consent Decree BU-SEH Remedial Action Monitoring Program Contract No TO-35 September 2013

2016 Annual Inspection Report

TABLE OF CONTENTS LEGAL NOTICE

TABLE OF CONTENTS LEGAL NOTICE

COAL COMBUSTION RESIDUAL (CCR) FUGITIVE DUST CONTROL PLAN

2018 Annual Inspection Report

Closure Plan for CCR Surface Impoundments

Northside School Class I Bike Path, Cool, CA Application Attachments

Big Rivers Electric Corporation - D.B. Wilson Generating Station. Fugitive Dust Control Plan for Coal Combustion Residuals

Initial Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1

Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop San Antonio, Texas Project No

Annual Inspection Report of CCR Impoundment and CCR Landfill Wenck Project # B

2017 Annual Inspection Report

Written Closure Plan. Cherokee Station - Active CCR Impoundments Public Service Company of Colorado Denver, Colorado.

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS

Big Rivers Electric Corporation - Sebree Generating Station (R. A. Reid, R. D. Green and HMPL Station Two)

ENGINEER S CERTIFICATION OF AQUIFER SEPARATION DEMONSTRATION (40 CFR )

FOUR CORNERS POWER PLANT CLOSURE PLAN (b) UPPER RETENTION SUMP FC_ClosPlan_011_

Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1

Amended Written Closure Plan

COA-F17-F-1343 YEAR END REPORT

Coal Combustion Residuals Annual Fugitive Dust Control Report. Prepared for Montana-Dakota Utilities Company R.M. Heskett Station.

Ventilation Requirements for Uranium Mines

CCR Landfill 2017 Annual Inspection Report NC1 Ash Disposal Area

FUGITIVE DUST CONTROL PLAN

D.B. Wilson Station CCR Landfill

WIND AND SNOW FENCES

LEGAL NOTICE. Report No. SL Revision: 0 Page No. i. Ottumwa Generating Station Notification of Intent to Initiate Closure

Annacis Island Wastewater Treatment Plant OUTFALL PROJECT

Knight Piésold COMMUNICATIONS RELATING TO TRANSFER OF ENGINEER OF RECORD FROM KNIGHT PIÉSOLD LTD. TO AMEC

CLOSURE PLAN. CCR (b) GERS Landfill Area. Welsh Power Plant Pittsburg, Texas. October, 2016

Operating Plan 8a Bruce County Rail Trail Section 8 Saugeen Rail Trail to Saugeen Concession 6

CCR Landfill 2015 Annual Inspection Report NC1 Ash Disposal Area

URANIUM GOVERNANCE IN THE UNITED STATES

FOUR CORNERS POWER PLANT CLOSURE PLAN (b) COMBINED WASTE TREATMENT POND (CWTP) FC_ClosPlan_012_

Excavations and Trenches

Consulting Engineers and Scientists Annual Landfill Inspection Report. for the. Williams Station Highway 52 Class III Landfill

IGO GROUP SAFETY STANDARD 30 - WORKPLACE VENTILATION INDEPENDENCE GROUP NL

COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS. Prepared for:

ADL Attachment 1

CHOLLA POWER PLANT CLOSURE PLAN (b) SEDIMENTATION POND CH_ClosPlan_004_

CLOSURE PLAN. CCR (b) GERS East and West Bottom Ash Ponds. Pirkey Power Plant Hallsville, Texas. October, 2016

COTTER MILL SITE SUMMARY - RML

Assessment of Soil Erosion at a DC Park Facility Spring Valley Park NW Washington, DC

MASBATE PRODUCTION OVERVIEW (i)

COAL COMBUSTION RESIDUAL (CCR) FUGITIVE DUST CONTROL PLAN

Appendix J: Q1-Highway 35 Route Construction Plan

October 16, GRDA CCR Landfill Compliance Report Grand River Dam Energy Center 8142 Hwy 412B PO Box 609 Chouteau, OK Dear Mr.

Risk Assessment for Stone Quarry Mining is among the most hazardous activities all around the world, being always accompanied with different

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

Annual CCR Landfill Inspection. Lansing Landfill. Interstate Power and Light Company. Prepared for:

Written Closure Plan. Comanche Station - Active CCR Surface Impoundment Public Service Company of Colorado Denver, Colorado

HISTORY OF CONSTRUCTION

Drilled Intercept (m)**

Blowdown vessels Meeting the requirements of HSE PM60

ATTACHMENT O WIPP MINE VENTILATION RATE MONITORING PLAN

2016 Annual Inspection Report

Written Closure Plan. Pawnee Station - Active CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016

Cambrian Slate Mine 13 June 2008 by Simplyexploring & Gaz

FDOT Treasure Coast Traffic Report

CCR CLOSURE PLAN Sibley Slag Settling Impoundment Sibley Generating Station East Johnson Rd Sibley, Missouri

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)

CLOSURE PLAN. CFR (b) GERS Bottom Ash Pond. Northeastern 3&4 Power Station Oologah, Oklahoma. October, 2016

USING THE MILITARY LENSATIC COMPASS

Armistice Resources Signs Definitive Option Agreement to Acquire Former Kerr-Addison Mine Property

NORTH AMERICAN PALLADIUM

Mixing of Fly Ash in Coal Mine Overburden Dump: An Eco-friendly Method of Fly Ash Disposal

La Crescent Township Zoning Ordinance

SECTION 3 STREET DESIGN

SCHEDULE 08 Public Safety Plan

Big Spring Creek Habitat Enhancement and Fishery Management Plans

APPENDIX R-2 VIBRATION AND OVERPRESSURE SOUND ASSESSMENT. RAINY RIVER PROJECT Final Environmental Assessment Report

COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS. Prepared for:

1)Dir,,oht MEMORANDUM. Tabled at rnoilo TABLED DOCUMENT. Mar-16. Current Infrastructure projects/upgrades and other Council activities within the Ward

STRUCTURAL STABILITY ASSESSMENT

Monitoring Surfing Quality below the Jordan River Generating Station (Year 2)

An Introduction to the Boulby Underground Labs. An Overview of the Health & Safety Structure

2009 WMU 328 Moose and Elk

CLOSURE PLAN. CFR (b) Bottom Ash Pond Complex Cardinal Plant Brilliant, Ohio. September, 2016

CTH M HIGHWAY PROJECT CTH Q to STH 113

AMEC010570_0001. Via . Mt. Polley Mine Tailings Facility Optimization Potential- Follow Up from Dam Safety Review 1.

BLACK WARRIOR-TOMBIGBEE RIVER

nhc northwest hydraulic consultants water environment solutions VIA VIA COURIER December 8, 2003

BLACK WARRIOR-TOMBIGBEE RIVER

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

Angela Lane, Lowe Environmental Impact / Karen Akuhata (WDC) The Wairoa wastewater treatment system requires a replacement consent by May 2019.

Winter Drawdown Issues of Concern

CCR Closure Plan Ash Impoundment

Stevens Creek Corridor

ANNUAL EVALUATION OF 2017 WATER LEVEL MONITORING DATA FROM THE CITY OF LAS CRUCES WATER SUPPLY WELLS, NEW MEXICO

Inspector MUST Sign and Date Each Inspection

CCR Landfill 2018 Annual Inspection Report North Omaha Ash Landfill

ANNUAL EVALUATION OF 2016 WATER-LEVEL MONITORING DATA FROM THE CITY OF LAS CRUCES WATER SUPPLY WELLS, NEW MEXICO

Becker* Products Below Ground Ball Valve Regulators

Written Closure Plan. Pawnee Station - North CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016

Cat Island Chain Restoration

TRAPLINE VC34 Land Use Before the La Grande Complex

Transcription:

Developer s Assessment Report Project Location and Surrounding Features Job No: 350047-004 Filename: GIANT MINE October 2010 TB 1.1.1

r. 5. S 4.. -- - -. ~. ~. - k ~tj :-. ~ ~ -- - 4 c ~ ~ -~ c 4 - A - 1 - - 2.~_4) t. I:.. ~ C - ~ A u t4re ~~-e ~ a N~ - I ~: ~ : r -.- C t_ :t.. _r ~ - -r~ -:- a I~T ~ - I LEGEND._CITY F 0 NFE site study A~ t~ien n Site Study Area -p -. 3 4 + ~r$srkconsuitin~ 500 1000 t500 2000 2500 ~ GIANT MINE Dev:Ioper s Assessment Report S I Mote fl-i ~ Studykee.dwg Mar 20t5 ~ 3.4.1

Developer s Assessment Report Local Study Area Job No: 350047-004 Filename: GIANT MINE October 2010 TB 3.4.2

Source: http://wiki.nwtresearch.com/getfile.aspx?file=res earchguide%2fnorthslave_map.gif Developer s Assessment Report Regional Study Area Job No: 350047-004 Filename: GIANT MINE October 2010 TB 3.4.3

Mine Ownership 1945 1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005 Ventures Ltd. Falconbridge Nickel Mines Ltd. Pamour Inc. Royal Oak Mines Inc. Miramar Giant Mine Ltd. DIAND Mine Development 1945 1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005 AShaft B Shaft C Shaft Official start Gravel backfill Tailings backfill Tailings & cement backfill Minewater treatment with Minewater direct discharge to Baker Cr after mill treatment Minewater treatment in ETP B1 pit tailings supernatant in ETP Open pitting operations Diversion of Baker Creek around C1 Pit Processing 1945 1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005 Mercury Amalgamation Edwards Roaster No1DorrcoRoaster No.1 Cold Cottrell (1) No.2 Dorrco Roaster Hot Cottrell (1) Hot Cottrell (2) Baghouse Refurbished baghouse New emission stack Precipitation unit for tailings solution Water treatment circuit to precipitate arsenic from tailings using lime Stack emission reduction Tailings Retreatment Project (TRP) Milling discontinued due to improved baghouse operation Tailings Disposal 1945 1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005 Arsenic Trioxide Disposal Surface impoundment Back Bay disposal Bow Lake impoundment (evolves to North, Central and South Ponds) NW Tailings Pond Effluent Treatment Plant (ETP) Calcine storage pond built Phase I dam reconstruction Dam upgrades to properly impound effluents Phase II dam construction NW Pond dam raise Pilot treatment study to meet effluent standards of Water License 1945 1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005 Airborne Low grade ore mined to create Old production stopes Purpose built As storage chambers release arsenic trioxide storage Dust shipments to Koppers in Georgia - no emissions control Regular inspections of storage chambers begins Arsenic Related Studies Integrated t Site Remediation Plan Submitted 1945 1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005 Effect of arsenic fume discharge Literature search for better dust disposal arsenic suppression & environmental control in mill Dust flow properties WAROX Review of closure options Pre-feasibility study of closure options Efforts to control effluents & stack emissions Dust reclamation Recovery of arsenic from baghouse flue dust Initial groundwater modelling arsenic analysis of Baker Cr, drinking water & snow arsenic trioxide upgrading project Study of temporary storage options arsenic trioxide disposal options CPHA arsenic trioxide task force report Field test to remove dust from underground VANCOUVER Developer s Assessment Report Milestones in Site Development Job No: 1CI001.013 Giant Mine Filename: Fig 4.3.1_Milestones_20100211.ppt October 2010 431 4.3.1

I ~r ~ ~ - -.,-...~ POCKET I - - V 4-4;. S OAR LAKE bc -0 tt~ti5cl FORM C4C ~tno Ut 0i_ no 4 I. - OAM21O oam2lc:c -:4. - ~ 5- c ~- ((AIUNGS) DAM 21B -. :: NORTHWEST POND DAM 22 -to. \ TRAPPER LAKE 22B 0AM12 - TIL NOS SS,nCH AREA DAMS ((Alit US) SOUTH POND OAM.K 1 (T US P C OHD POLS G TO D SETTLING POND j:cq~ stip c NORTH YELLOWKNIFE BAY DAM OR EFFLuENT POD ~ TtET (TAIL OS p T L000tion of Undergroond Arsenic Charnber or Slope Boild log Rood Footpath Fence K Consulting e~*reeswm~ Atfaires lndtholn_ Developers Assessment Report 0$ Affairs Caneta et do Nord Canada Major Site Features I 40,000 InecJteoo.: tciooi,013,0012 5 tn_c scan ranier site teoturee dog GIANT MINE I Feb 20101 432

C1 PIT B2 PIT Highway No. 4 C212 #14 #12 #11 BAKER CREEK "C" SHAFT #10 #9 BAKER area-ar1 "B" SHAFT CREEK 92153 nd area-ar2 MILL 92155 653 Roaster Complex B230 B233 B234 B208 B1 PIT B214 92151 nd B213 B212 92154 50 B236 92152 696 B235 area-ar4 area-ar3 INGRAHAM TRAIL LEGEND Chamber or Stope containing Arsenic Trioxide dust Chamber empty Backfill Pit or Fill Notes: 2.5m Contour interval 2003 Aerial survey base map. 0 25 50 75 100 125 150 Scale in Metres Vancouver B.C. GIANT MINE Developer's Assessment Report Dust Storage Chambers and Stopes 5.1.1

1F rmi 82 PIT 4 ~. 4. TS ai4*1~liel4 4 7,0 ft BAKER #1 ~. 1, - -4 ~- S 0,ft * * ~ 7 CREEK -. \ 4:: Ca. 1. I C212 Raise Buried Pipes Red dashed line 7-8230 TO SURFACE VERTiCAL RAiSE - 4 a 4 B233 81 PIT 8214 B213~ B212~. ~: If- r -ti. 8236 8234 2-08 AD DRIFT e234 RAISE TO SURFACE Oo -4 -~ 4 CHAMBER OR STOPE CONTAINiNO ARSENIC TRiOXiOE OUST EMPTY CHAMBER SURFACE DISTRIBUTION PIPE UNDEROROUNO ARSENIC DISTRIBUTION DRIFT 25 50 75 in Melres

B208 Job No: 1CI001.013.D12.06 VANCOUVER Filename: Fig 5.3.1_StopeBlock_20100913.ppt Giant Mine Nov. 2009 Developer s Assessment Report Schematic of Chamber and Stope Dimensions KYK 5.1.3

#15 (empty) #12 #11 #14 Notes: 1) Empty chamber #15 added to figure for clarity 2) Red tunnels and raises contain arsenic distribution lines or arsenic trioxide dust. VANCOUVER Developer s Assessment Report 3D View of AR1 Chambers Job No: 1CI001.013.D12.06 Filename: Fig 5.1.4-8_3D-Stopes_200901103.ppt Giant Mine Nov. 2009 KYK 5.1.4

#10 C212 #9 Note: Red tunnels and raises contain arsenic distribution lines or arsenic trioxide dust. Job No: 1CI001.013.D12.06 VANCOUVER Filename: Fig 6.4.1_Frozen Soil B1_20090831.ppt Giant Mine Nov. 2009 Developer s Assessment Report 3D View of AR2 Chambers and Stopes KYK 5.1.5

B234 B235 B233 B236 B230 Note: Red tunnels and raises contain arsenic distribution lines or arsenic trioxide dust. Job No: 1CI001.013.D12.06 VANCOUVER Filename: Fig 6.4.1_Frozen Soil B1_20090831.ppt Giant Mine Nov. 2009 Developer s Assessment Report 3D View of AR3 Chambers (without B208) KYK 5.1.6

B208 Note: Red tunnels and raises contain arsenic distribution lines or arsenic trioxide dust. Job No: 1CI001.013.D12.06 VANCOUVER Filename: Fig 6.4.1_Frozen Soil B1_20090831.ppt Giant Mine Developer s Assessment Report 3D View of Stope B208 Nov. 2009 KYK 5.1.7

B214 B213 B212 VANCOUVER Developer s Assessment Report 3D View of AR4 Stopes Job No: 1CI001.013.D12.06 Filename: Fig 6.4.1_Frozen Soil B1_20090831.ppt Giant Mine Nov. 2009 KYK 5.1.8

Legend Accessible Upper Bulkhead Non-accessible Upper Bulkhead 0 25 50 75 Scale in Metres Vancouver B.C. GIANT MINE Developer's Assessment Report Upper Bulkheads All Areas 5.1.9

Legend (Type 4) Accessible Lower Bulkhead Non-accessible Lower Bulkhead Lower Bulkhead Design Type 0 25 50 75 Scale in Metres Vancouver B.C. GIANT MINE Developer's Assessment Report Lower Bulkeads All Areas 5.1.10