Evaluation of Significant Transportation Projects in Northern Virginia Transportation District

Similar documents
NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association

FY 2018 I-66 Commuter Choice Program Presentation to the Northern Virginia Transportation Commission May 3,

What if YOU could help plan Northern Virginia s transportation future?

Dulles Area Transportation Association. October 11, Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director

Keynote. Shannon Valentine Secretary of Transportation

Corridor 1 - Dulles/VA 7 TransAction 2040 Projects

Public Opinion about Transportation Issues in Northern Virginia

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017

County of Fairfax, Virginia. Department of Transportation

Route 28 Widening (PW County Line to Old. Old Centreville Road) Scored HB 2 Application

TRANSIT PERFORMANCE IN THE I-66 INSIDE THE BELTWAY CORRIDOR

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

Table of Contents. 2.0 Land Use and Transportation Inputs Land Use Factors Transportation Factors

Appendix F: Detailed Modeling Results

The Year Ahead: Virginia Department of Transportation Northern Virginia District

I-395 Express Lanes Northern Extension Project Public Hearings

I-395 Express Lanes Northern Extension Project Crystal City Civic Association September 21, 2016

Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10

HOW OUR REGIONAL TAX DOLLARS ARE BEING SPENT THE HONORABLE MARTY NOHE CHAIRMAN, NORTHERN VIRGINIA TRANSPORTATION AUTHORITY

I-395 Express Lanes Northern Extension Project Fairlington Citizens Association September 12, 2016

Project Description Form 8AA

Route 28 Corridor Safety and Operations Study Public Information Meetings. July 20 and 22, 2015

Project Description Form 6V

Washington DC Section of ITE Project Briefing

Project Description Form 8EE

Blueprint for Better Transportation in Northern Virginia

I-395 Express Lanes Northern Extension Project Arlington County Board October 18, 2016

BRIEFING ON PROPOSED ADDITIONS AND CHANGES Additions and Changes to Projects Proposed for Inclusion in the 2015 CLRP Update

TransAction Plan Project List

Public Information Meeting

NORTHERN VIRGINIA TRANSPORTATION AUTHORITY

Interstate 66 Tier 1 Environmental Impact Statement (EIS)

City of Fairfax, Virginia City Council Work Session

Capital Beltway HOT Lanes Project

US Bicycle Route 1 Summary Report: Selection of Preferred Route

Sketch Level Assessment. of Traffic Issues. for the Fluor Daniel I-495 HOT Lane Proposal. Ronald F. Kirby

Route 7 Corridor Study

City of Fairfax, Virginia City Council Work Session

Basalt Creek Transportation Refinement Plan Recommendations

Viewing SMART SCALE Application

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway

Transportation. Pages E-3 to E-145 PROPOSED FY CAPITAL IMPROVEMENT PLAN (CIP) CCCRC Presentation Thursday, June 14, 2018

Giles Run Connector Road

Interstate 66 Tier 1 Environmental Impact Statement. Cooperating and Participating Agencies Meeting March 19, 2012

MCA Member Meeting: Tysons Update. Fairfax County Department of Transportation November 13, 2017

VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment. Staff Recommendations

Route 28 Corridor Safety and Operations Study

Appendix B: Forecasting and Traffic Operations Analysis Framework Document

Route 28 Corridor Safety and Operations Study

Transit and Rail Funding in the Commonwealth

NVTA FY Program Project Status

Highway 217 Corridor Study. Phase I Overview Report

Rio Mills Rd/Berkmar Dr Extended Connection

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

TRASBURG RANSPORTATION

STAFF REPORT. Comprehensive Plan Amendment CPA #PLN

Public Information and Participation Comments

Public Opinion about Transportation Issues in Northern Virginia A Report Prepared for the:

NVTA FY Program Project Status

Federal Highway Administration Pedestrian Safety Guidance for Transit

Fairfax County Parkway Widening Fairfax County

Arterial Management Plan for US Route 250 and State Route 623

Route 29 Solutions Projects

The Route 29 Corridor Study was initiated at the request of Virginia s Commonwealth

Transform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies

FY Transportation Capital Improvement Plan Update Arlington Committee for Transportation Choices

ITEM 15 Notice March 29, 2017

Work Zone Awareness Week

Bluffdale/ UDOT South High-T Intersection Project Type Operations

TRANSPORTATION AND TRAFFIC TECHNICAL REPORT

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

Welcome to the first issue of Nuts and Bolts, a monthly overview of VDOT activities for elected officials in Northern Virginia.

INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION ALTERNATIVES ANALYSIS TECHNICAL REPORT SEPTEMBER 2016

Preliminary Transportation Analysis

I-66 Corridor Improvements Route 15 to I-495. November 2014

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9.

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

PERFORMANCE ANALYSIS of The Draft 2015 CLRP

I-105 Corridor Sustainability Study (CSS)

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

SPRINGFIELD REVITALIZATION REPORT

Portland International Airport Bicycle and Pedestrian Plan (October 2003) Staff Acknowledgements

The following item was handed out at the December 6, 2018 NVTC Meeting.

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN

Development of Arlington County s Marked Crosswalk Guidelines. Jon Lawler, P.E. Design Engineer Arlington County, VA

Regional Transportation Needs Within Southeastern Wisconsin

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

June Dear Colleagues:

CALL for information about clinic locations or to leave a message for a nurse.

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

Interstate 66 TRANSPORTATION TECHNICAL REPORT. From US Route 15 in Prince William County To Interstate 495 in Fairfax County FEBRUARY 2013

Bus Rapid Transit Plans

Santa Clara I-280 CORRIDOR STUDY

Application to AASHTO to recognize six suggested relocations of U.S. Bicycle Route 1 in the Northern Virginia District.

Capital Beltway HOT Lanes - Frequently Asked Questions

STUDY ADVISORY COMMITTEE. October 8, 2015

Chapter 5 Future Transportation

495 EXPRESS LANES NORTHERN EXTENSION STUDY COMMENT SUMMARY REPORT JUNE 11, 2018 PUBLIC INFORMATION MEETING

Transcription:

Evaluation of Significant Transportation s in Northern Virginia Transportation District Fact Sheet Spring 2014 Virginia Department of Transportation Study Update April 2014 Since the fall 2013 update, the Virginia Department of Transportation (VDOT) and the Department of Rail and Public Transportation (DRPT) (the study team ) have worked closely with the Commonwealth Transportation Board (CTB), the Northern Virginia Transportation Authority (NVTA), and local/regional transportation and transit representatives, to develop the methodology to select, evaluate and rate significant transportation projects in Northern Virginia. This effort (referred to below as the Rating Study or study ) was mandated by legislation passed by the Virginia General Assembly in July 2012. The enacting legislation (Code of VA, 33.1-13.03:1) requires that the study evaluate significant highway, transit and technology projects and rate them in terms of their ability to reduce congestion and improve mobility during a homeland security emergency. Although the legislative requirement is for the Rating Study to evaluate at least 25 projects, NVTA and CTB have together nominated 37 projects for evaluation and rating. VDOT has sufficient resources to evaluate and rate 40 projects as part of this effort. This spring update focuses on the Selection analytical framework that was established to examine each candidate project to determine its significance from a regional perspective and its potential to reduce congestion and improve mobility during a homeland security emergency. This framework can also be used as a screening tool in the event that many more projects are nominated than there are resources to evaluate. Available online at: www.virginiadot.org/projects/resources/ NorthernVirginia/Significant_s_-_ Fact_Sheet.pdf Read our Fall 2013 Fact Sheet to learn about: The Study and Its Framework Legislative Requirements Study Team, Tasks & Process Schedule Highlights STUDY OVERVIEW Solicitation Nomination Selection (Pages 2-7) We Are Here Evaluation (Page 8) Rating

2 PROJECT SELECTION FRAMEWORK ESTABLISHED The Selection framework adopted for the study provides guidelines for the NVTA and the CTB to nominate transportation projects for evaluation and rating. October - December 2013 CTB Sets Overarching Principles to Guide Rating Study In October 2013, the CTB endorsed six guiding principles that establish priorities for the Rating Study. These priorities were derived from the Virginia Statewide Transportation Plan (VTrans 2035 Update). Prior to a project being selected for evaluation and rating, the project must pass a first step: it must be consistent with at least one of six CTB Study Priorities. Preserve and Enhance Statewide Mobility Through the Region Increase Coordinated Safety and Security Planning Improve the Interconnectivity of Regions and Activity Centers Reduce the Cost of Congestion to Virginia s Residents and Businesses Increase System Performance by Making Operational Improvements Increase Travel Choices to Improve Quality of Life for Virginians Stakeholder Engagement Commonwealth Transportation Board (CTB) General Public Transit Agencies NVTC PRTC VRE WMATA NVTA Committees Implementation Working Group Jurisdiction and Agency Coordinating Committee Transportation Advisory Committee Northern Virginia Transportation Authority (NVTA) Selection Helps Identify and Select Significant s that Reduce Congestion The second step in the screening process was to develop the approach to select projects that would move to the detailed evaluation and rating phase of the study. In partnership with the NVTA, its member jurisdictions and transit agencies, and the Peer Review Group (independent subject matter experts from outside of Virginia), the study team developed an objective and quantitative process known as the Selection model. Working collaboratively with stakeholders, the study team finalized eleven criteria and their corresponding weights to help identify and select significant transportation improvements that have the potential to reduce congestion and improve emergency mobility. The eleven criteria fall within three categories: (1) the degree of significance of a transportation improvement project, (2) the degree to which the project is likely to reduce congestion, and (3) the degree to which the project would improve mobility during a Counties Arlington Fairfax Loudoun Prince William Evaluation of Significant Transportation s in NoVA District VDOT/DRPT homeland security emergency. Cities Alexandria Fairfax Falls Church Manassas Manassas Park Towns Dumfries Herndon Leesburg Purcellville Vienna NoVA Delegation to Virginia General Assembly

Criteria to Select s (Sorted by relative importance as determined by the project stakeholders) Significance Criteria Connects Regional Activity Centers The project enhances or expands transit, HOV/HOT or roadway connections between non-contiguous regional activity centers. High Travel Volume The project is in a corridor that serves a high volume of person trips. Designated Corridors The project is on a facility in/near Northern Virginia and included in the Statewide Mobility System, Corridors of Statewide Significance, in a Super NoVA corridor or in a TransAction 2040 corridor. Connects Major Facilities The project enhances or completes connections between interstate highways, principal arterials or transit stations, park-&-ride lots and DCA or IAD airports. Type The project includes a highway, rail, bus, technology, or large scale travel demand management investment. Congestion Reduction Potential Criteria Congestion Duration The project corridor experiences moderate to heavy congestion for multiple hours of the day. Adds Capacity The project adds person moving capacity to a congested location, facility or corridor. Person Hours of Delay The project is located in a corridor with significant person hours of delay. Congestion Severity The project is located in a heavily congested corridor. Reduces Vehicle Trips - The project has the potential to reduce vehicle trips on a congested facility or corridor. Homeland Security Mobility Criteria Facility and Operational Improvements The project improves regional mobility in the event of a homeland security emergency. A selection score was calculated for each project based on the above criteria. The selection scores do not represent a project s ultimate congestion rating; they are used to help determine which projects move to the evaluation and rating phase of the study. 3 1

Selection Process A total of 37 projects nominated for evaluation 32 (NVTA) + 5 (NoVA CTB members) 1 st Step Assessed each project against the six CTB priorities 2 nd Step Applied a point value to each of the 11 project criteria Determined a total weighted selection score for each project/package Total weighted score informed the selection of projects to be evaluated Public and Agency Coordination Please visit the project website often to stay abreast of the study s progress. Website www.virginiadot.org/projects/ northernvirginia/evaluating_significant_ projects.asp Study Contact Valerie Pardo Transportation Planning Manager VDOT NOVA Transportation Planning Valerie.Pardo@vdot.virginia.gov 703-259-1736 4

PROJECT NOMINATIONS February March 2014 NVTA Endorses Nominations After the study team and stakeholders concurred on the methodology of how to select and evaluate proposed projects, VDOT/DRPT issued a call for nominations. This presented an opportunity for NVTA member jurisdictions to complete the necessary documentation and forward their potential projects to VDOT/DRPT through the NVTA. At their February 20th meeting, NVTA approved a list of project nominations to undergo Selection analysis for the Rating Study. s recommended for nomination included individual projects and project packages. All projects were considered for inclusion in the NVTA nomination process except for mass-transit projects that increase capacity, as these are legally exempt from the rating required by 2013 legislation (HB 2313). What is a? For the purposes of this study, a project is defined as one or more complementary investments that attempt to provide a comprehensive solution to a congestion problem. A project may include a combination of highway, transit, technology and/or travel demand management improvements and any access components, such as pedestrian, bicycle and parking improvements which enhance the project s effectiveness in reducing congestion. In March, the study team assessed the NVTA and CTB nominated projects with regard to each project s significance and potential to reduce congestion using the Selection approach endorsed by the NVTA (second step in Selection Framework). Using the project selection scores as one of its considerations, the NVTA then recommended that all of the 37 projects be included in the study s detailed evaluation and rating exercise. Please refer to the map of nominated projects and their descriptions on pages 6 and 7. In this first cycle of project nominations and rating, it was not necessary to screen any projects from the detailed evaluation and rating because there are enough resources to analyze all 37 projects. In future updates of the study, there could be more projects nominated for evaluation and rating than available resources will permit. In that situation, the Selection model will be a valuable tool to screen projects for regional significance and congestion reducing potential. In total, there were 37 projects nominated by the NVTA and CTB for evaluation and rating. Twenty-five were roadway widenings, ten were interchange/intersection projects, and two were intelligent transportation projects. All nominated projects met at least one of the six CTB Priorities, passing the first step in the Selection Framework. 5 1

s Nominated for Evaluation and Rating Ü NVTA-23 NVTA-25 NVTA-13 NVTA-26 NVTA-8 CTB-2 NVTA-27 NVTA-9 NVTA-22 NVTA-10 NVTA-7 NVTA-16 NVTA-19 NVTA-15 NVTA-14 NVTA-30 NVTA-1 NVTA-18 NVTA-4 NVTA-29 NVTA-3 NVTA-32 CTB-3 NVTA-17 NVTA-2 NVTA-18 NVTA-5 NVTA-21 NVTA-31 NVTA-6 NVTA-24 NVTA-18 NVTA-20 CTB-4 CTB-5 CTB-1 NVTA-12 NVTA-28 NVTA-11 Location (Not to scale) 6 0 2.5 5 10 Miles

s Nominated for Evaluation and Rating ID Name Agency Description NVTA-1 Columbia Pike Multimodal Streets Arlington Improve Columbia Pike with left turn lanes, signalized intersections, bicycle & ped improvements and removal of 2 loop ramps at VA 27 interchange. NVTA-2 Rolling Road Widening Fairfax Co. Widen Rolling Rd from 2 to 4 lanes between Old Keene Mill Rd and Springfield/Franconia Pkwy. Will include pedestrian and bike facilities. NVTA-3 US 29 Widening Fairfax Co. Widen Lee Highway (US 29) from Union Mill Rd to Buckley's Gate Drive including bicycle and pedestrian improvements. NVTA-4 Braddock Road HOV Widening Fairfax Co. Widen Braddock Road to include a HOV lane in each direction from Burke Lake Rd to I-495 and improve bicycle and pedestrian facilities. NVTA-5 South Van Dorn St & Franconia Rd Fairfax Co. Construct a grade-separated interchange at Franconia Road /South Van Dorn St. Interchange NVTA-6 Frontier Dr Extension Fairfax Co. Extend Frontier Dr from Franconia - Springfield Pkwy to Loisdale Rd including access to Metro Station. NVTA-7 Fairfax Co. Pkwy Improvements Fairfax Co. Widening from 4 to 6 lanes of segments of Fairfax Co. Parkway between Rolling Rd and the Dulles Toll Rd. NVTA-8 Belmont Ridge Rd Loudoun Co. Widen Belmont Ridge Rd (VA 659) from 2 lanes to 4 lanes between Turo Parish Rd and Croson Ln including turn lanes and signalization. NVTA-9 Loudoun Co. Pkwy Loudoun Co. Construct 4-lane Loudoun Co. Pkwy between Creighton Rd and US 50. NVTA-10 Route 7 Bridge Widening Fairfax Co. Widen VA Route 7 Bridge over Dulles Toll Road from 4 to 6 lanes, including pedestrian/bike facilities. NVTA-11 US 1 Widening and Relocation - Dumfries Town of Dumfries Widen US 1 from 2 to 3 lanes in each direction, while relocating southbound US1 to the same alignment as the northbound lanes. NVTA-12 US 1 Widening - Fairfax Fairfax Co. Widen US 1 from 4 lanes to 6 lanes between Napper Rd and Mt. Vernon Memorial Hwy (VA235) in Fairfax Co. NVTA-13 Route 15 Bypass/Edwards Ferry Leesburg Construct a grade-separated interchange at the Route 15 Bypass and Edwards Ferry Road. Road Interchange NVTA-14 Northfax Intersection (US29/50 @ VA123) City of Fairfax Geometric improvements at Route 29/50 at Route 123 including extension of a third NB lane on Route 123 and a dual left turn from SB Route 123. NVTA-15 Jermantown/US 50 Roadway Improvements City of Fairfax Geometric improvements at US 50 and Jermantown Rd including addition of a third WB lane to Bevan Lane and widening of NB Jermantown Rd. NVTA-16 Frying Pan Road Widening Fairfax Co. Widen Frying Pan Road to 4 lanes between VA 28 and Centreville Rd. NVTA-17 Kamp Washington Intersection (US 50/29 @ VA236) City of Fairfax Geometric and signalization improvements at US 29/50 and VA 236, including addition of a third southbound lane on VA 236. NVTA-18 Real-Time Adaptive Traffic Control & Management Alexandria Phase II of the Real-Time Adaptive Traffic Control & Data Management System to monitor congestion in real-time and redirect traffic. NVTA-19 Glebe Rd Corridor ITS Arlington Adaptive Traffic Control System on Glebe Road in Arlington Co. Improvements NVTA-20 Pohick Road Widening Fairfax Co. Widen Pohick Road from 2 to 4 lanes between Richmond Highway (US1) and I-95. NVTA-21 Shirley Gate Road Extension Fairfax Co. Extend Shirley Gate Road from Braddock Rd to Fairfax Co. Parkway. NVTA-22 Northstar Blvd Extension Loudoun Co. Extend Northstar Blvd from Evergreen Mills Rd to US 50. NVTA-23 Route 7/690 Interchange Loudoun Co. Construct an interchange at VA 7 and VA 690 in Purcellville. NVTA-24 Route 234/Grant Avenue Reconstruction Manassas Reconstruct VA 234/Grant Ave between Lee Ave and Wellington Rd to include wider travel lanes, a dedicated turn lanes, and ped/bike improvements. NVTA-25 Main St & Maple Ave Intersection Purcellville Intersection improvements at Maple Ave and Main St in Purcellville, including the addition of dedicated turn lanes. NVTA-26 Route 7/Battlefield Pkwy Leesburg Construct a grade-separated interchange VA 7 and Battlefield Parkway. Interchange NVTA-27 East Elden Street Widening Herndon Widen East Elden St from Fairfax Co. Parkway to Van Buren St in Herndon. NVTA-28 Route 1 Widening - Prince William Prince William Widen US 1 from 4 lanes to 6 lanes between Featherstone Rd and Marys Way in Prince William Co. NVTA-29 Route 15 Widening Prince William Widen US 15 from 2 to 4 lanes between US 29 and VA 55, including construction of a new railroad overpass. NVTA-30 Route 28 Widening - Fairfax Fairfax Co. Widen VA 28 from 4 to 6 lanes south of US 29 in Fairfax Co. NVTA-31 Route 28 Widening - Prince Manassas/PWC Widen VA 28 from 4 to 6 lanes between Godwin Drive and Linton Hall Rd. William NVTA-32 Route 28 - Godwin Drive Extension Manassas Extend Godwin Drive north from VA 234 Business to a new interchange with I-66. Also includes grade separation of Godwin Drive at Sudley Rd. CTB-1 Route 294 (PW Pkwy) Grade Separation NoVA CTB Construct two grade separated interchanges along VA294 (Prince William Pkwy): at Minnieville Rd and Smoketown Rd. CTB-2 Route 7 Widening NoVA CTB Widen VA 7 from 4 to 6 lanes and add shared-use paths between Reston Parkway and Jarrett Valley Dr. CTB-3 I-395 Southbound Widening NoVA CTB Add a fourth through lane on southbound I-395 between Duke Street and Edsall Rd. CTB-4 Fairfax Co. Pkwy - I-95 to US1 NoVA CTB Improve Fairfax Co. Pkwy/I-95 interchange, widen from 4 to 6 lanes between I-95 and US 1, and grade-separations at US1 and John Kingman Rd. CTB-5 Fairfax Co. Pkwy I-95 to US 1 (Co. Alternative) NoVA CTB Improve Fairfax Co. Pkwy/I-95 Interchange, intersections at Loisdale Rd. and Terminal Rd., and grade separations at John Kingman Rd. and US 1 For additional details on Selection results, please visit: www.virginiadot.org/projects/northernvirginia/evaluating_significant_projects.asp 7 1

NEXT STEPS: DETAILED PROJECT EVALUATION Evaluation Framework Identifies Performance Measures of Effectiveness After a nominated project has passed the CTB Priorities and Selection screens, the next step of the process is to analyze the project in the Evaluation phase of the study. At this stage, each will be evaluated using appropriate technical tools, including travel demand and traffic simulation models. A set of performance measures will be extracted from the analysis and used to assess the project s ability to reduce congestion and, to the extent possible, improve mobility during a homeland security emergency. Throughout January, the study team worked with representatives from Northern Virginia jurisdictions, transit agencies, and the Peer Review Group and discussed the technical methods and tools that will be used in analyzing the projects selected for evaluation. Open dialogues focused on the potential performance measures that best represent (1) the project s impact on congestion and mobility, (2) the quantitative rating for a project, and (3) the relative importance of each performance measure (weights). The study team reviewed all of the comments on the proposed Evaluation framework and made significant changes in response to these discussions. The revised approach was endorsed by stakeholders, including members of the NVTA. Performance Measures to Evaluate and Rate s (Sorted by relative importance as determined by the project stakeholders) Congestion Duration The reduction in the number of hours of the day auto and transit passengers experience heavily congested travel conditions. Person Hours of Delay The reduction in the number of person hours of travel time above free flow travel time. Person Hours of Congested Travel in Automobiles The reduction in the number of person hours of travel in automobiles and trucks on heavily congested facilities. Person Hours of Congestion Travel in Transit Vehicles The reduction in the number of person hours of travel in buses and trains on heavily congested facilities or in crowded vehicles. Transit Crowding The reduction in the number of transit route miles experiencing crowded conditions. Accessibility to Jobs The increase in the number of jobs that can be reached from each household based on a 45 minute travel time by automobile and a 60 minute travel time by transit. Emergency Mobility The increase in the person hours of travel time resulting from a 10 percent increase in peak hour trip making. NEXT STEPS Initial Ratings and Basic Modeling Detailed Technical Analysis and Simulation Modeling July 1 October 30 Final Ratings and Study Report December 2014 Detailed Evaluation and Ratings of s Selection Technical Analysis and Transportation Modeling March June March 2014 We Are Here June 30 8 4/2014