Chinatown Broadway Street Design Summary of Public Comment Workshop #1

Similar documents
Chinatown Broadway Street Design Summary of Public Comment Workshop #3

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

MASONIC AVENUE STREET DESIGN STUDY Community Workshop 2. Masonic Ave Street Design Study Community Workshop 2 August 10, 2010

Polk Streetscape Project

Outreach Approach RENEW SF served as the primary liaison with the North Beach community; the Chinatown. Executive Summary

RANKED LIST OF PROJECT AREAS: 1) Stockton Street from Sacramento Street to Broadway 2) Broadway from Powell Street to Kearny Street 3) Columbus

Southside Pilot Proposal

Memo. Ocean Avenue Corridor Design Project Public Workshop #2 Summary

SURVEY minutes to complete this questionnaire. Your feedback will help the City determine a future design for Ocean Avenue and Geneva Avenue. Thanks!

Multi-Modal Traffic Analysis. Parisi and Associates

TRAFFIC ACTION PLAN. North Central Neighborhood CITY OF SAN MATEO

WORKSHOP 2 SUMMARY OVERVIEW GENERAL COMMENTS. Walking and Biking. Greening & Stormwater. Transportation & Parking. Lighting, Art and Identity

FOLSOM-HOWARD STREETSCAPE OVERVIEW

MASONIC AVENUE STREET DESIGN STUDY Community Workshop 3. Masonic Ave Street Design Study Community Workshop 3 September 30, 2010

50 Avenue S.W. Corridor Study Glenmore Aquatic Centre Drop-In Event

Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns.

Executive Summary Route 30 Corridor Master Plan

Telegraph Avenue Complete Streets DRAFT Recommendations. Oakland Public Works Department September 11 and 13, 2014 Open Houses

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

UNIVERSITY AVENUE CORRIDOR REDESIGN. January 8, 2017 PUBLIC OPEN HOUSE

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

City of Davis East Covell Corridor Plan

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

5 Transit & Traffic. Overview

Why invest in the 1 Street S.W. Corridor?

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street)

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Replace century-old sewer & water pipes Pedestrian-scale sidewalk lighting

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

San Jose Transportation Policy

FONTAINE AVENUE STUDY Final Report

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

HELM RANCH ROUND 2 - COMMUNITY WORKSHOP AND OPEN HOUSE SUMMARY

Chapter 3 BUS IMPROVEMENT CONCEPTS

12/4/2016 VIA . RE: Grocery Outlet Del Paso (DR16-328)

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

Active Transportation Facility Glossary

Vision Zero Priority Projects (March 2017)

ABOUT THIS STUDY The Tenderloin-Little Saigon Community-Based Transportation Plan

Lawrence Avenue Streetscape Concepts August 30, 2011

Corridor Vision Workshop Summary James Madison Elementary February 22,2018

Ann Arbor Downtown Street Plan

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

WELCOME Mission-Geneva Transportation Study

The Wiggle Route in Context

Project Goal and Description. Why Broadway? Broadway SFMTA.COM/BROADWAY. The goal of the Broadway Safety Improvement

Mission Bay Loop (MBL) Public Meeting

95 th Street Corridor Transportation Plan. Steering Committee Meeting #2

Transportation Assessment

SETTINGS AND OPPORTUNITIES MOBILITY & ACCESS

7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811

STONY PLAIN ROAD STREETSCAPE

City of Wilsonville 5 th Street to Kinsman Road Extension Project

Station 1: Street & Sidewalk Upgrades

Welcome! Thank you for joining us today for a Geary Rapid project open house. Geary Rapid Project. SFMTA.com/GearyRapid

East 12 th Street Bikeway Feasibility Study

Chapter 3: Multi-Modal Circulation and Streetscapes

POWELL STREETSCAPE IMPROVEMENT PROJECT COMMUNITY MEETING 3 JULY 31,2017

Austin Avenue Bridges Project. Public Meeting Summary

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation

Clarkson Walkability Audit: Results and Recommendations Summary

5. Automobile Circulation, Wayfinding and Signage

Tonight is for you. Learn everything you can. Share all your ideas.

ABOUT THIS OPEN HOUSE

Transportation Planning in Western SoMa

UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS

Neighborhood Walking, Biking, and Transit Tours Summary BACKGROUND

Cross Street Corridor Non-Motorized Enhancement Project Project Description

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

Eliminate on-street parking where it will allow for a dedicated bus only lane %

Providence Downtown Transit Connector STAKEHOLDER MEETING #2. Stakeholder Meeting #1 October 24, 2016

Queensboro Bridge Bus Priority Study: Summary of Recommendations. Presentation to Manhattan Community Board 8 May 4, 2011

RIVERSIDE, Newton MA BH NORMANDY RIVERSIDE LLC. Riverside Station. A green, transit-oriented community

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

Open House #1 Summary

KEARNY MESA COMMUNITY PLAN UPDATE

Centennial Neighbourhoods Transportation Management Plan Summary of Phase 1 Consultation. Overview of Issues

Corporate. Report COUNCIL DATE: May 25, 1998 NO: R1500 REGULAR COUNCIL. TO: Mayor & Council DATE: April 27, 1998

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

Protected Bike Lanes in San Francisco Mike Sallaberry SFMTA NACTO Workshop - Chicago IL

Table #6 VISION CHARACTERISTICS

Palou Complete Street Project Barneveld Avenue to Crisp Road Project overview and concept design Community Meeting #2 May 13, 2015

MARTIN LUTHER KING JR. WAY

Lincoln Neighborhood Corridor Plan The LiNC

PRIORITIES RESULTS YOUR PRIORITIES FOR BRIDGEPORT 5% 4% 13% RESIDENTIAL CHOICES TRAILS & PARKS

6/14/2013 VIA . Evan Compton, Associate Planner Community Development Department City of Sacramento 300 Richards Blvd Sacramento, CA 95814

Pedestrian Survey Report

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

Figure 4-10: Pedestrian Improvements Types of Potential Station Area Improvements - Place-Making Improvements

Orange Center Elementary School

APPENDIX A. Outreach Summary

Open House Summary INTRODUCTION COMMUNITY COMMENTS

State Street Workshop Summary September 26, 2012 SITE A. - INTERSECTION OF STATE AND HOLLY TOTAL ATTENDEES = ~29

Options. Agenda. Program

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

11/3/2017 VIA . RE: River Oaks Phase 2 (P17-051)

Transcription:

Chinatown Broadway Street Design Summary of Public Comment Workshop # Workshop Details: The first community workshop for the Chinatown Broadway Street Design project took place at Bayside Elderly Housing on May 4, 0 from 4:30 6:30pm. 80 participants were in attendance. The majority of the participants lived on Broadway within the study area, and other participants included residents from Chinatown, North Beach, and Russian Hill. Other stakeholders included Chinatown merchants, East West Bank, Jean Parker Elementary School, Lady Shaw Senior Housing, the San Francisco Police Department, and members from the Chinatown Adopt An Alleyway Youth Empowerment Project. The workshop began with a presentation that included an overview of existing conditions and examples of streetscape projects in San Francisco. Following the presentation, participants were divided into 6 small groups to complete two hands on exercises. 5 facilitators were present to guide the small group exercises. The workshop was conducted in Cantonese and/or English with bilingual materials. Small Group Exercise : Likes/Dislikes Exercise The purpose of this exercise was for participants to identify what they like and what they dislike about Broadway. The facilitator asked participants to draw from their own experiences walking along or around Broadway. Each participant was given two green dots and two red dots, and asked to place the green dots on locations that they like (work well), and to place the red dots on locations that they dislike (not working well). At the end of the exercise, each group produced a map with red/green dots indicating locations that they perceive as opportunity sites or problem areas. Participants were asked to write directly on the map to give more information. Likes/Dislikes Game Board Summary of Community Workshop # Public Comment Page

Below is the aggregate number of dots by intersection or street segment, as well as the comments written directly on the map. Broadway/Columbus/Grant Intersection Total Green Dots = 0 Art Books Public Art Better view Front of Wells Fargo Building Generous sidewalk in front of Sun Hong Kong Music/Activities/Lively Broadway from Grant Avenue to Stockton Street Total Green Dots = 5 Always convenient Food! Tutti Mellon Good pho, dim sum, cheap food Gold Mountain restaurant is lively and has good food Sun Hong Kong has cheap food Stockton/Broadway Intersection Total Green Dots = 5 Wide sidewalks north of Broadway on Stockton Opportunity to have scramble for pedestrians Familiar to Stockton, close to shopping and transit Come to Chinatown for shopping LOOK sign is good in front of East West Bank Best Foods Produce Total Red Dots = Complicated pedestrian crossing Improve lane designation Countdown too short Crosswalk at New Sun Hong Total Red Dots = 5 Cars turn a lot, not in an organized fashion Clutter at sidewalk in front of bus stop People in front of Yuet Lee blocking the sidewalk and smoking Total Red Dots = 34 Traffic (x) Narrow sidewalks south of Broadway along Stockton Street Too many people blocking the sidewalk playing games Remove newstands at East West Bank Long trip to get here No seating in front of bus stop Stockton/Broadway countdown too short Clutter on the sidewalk/boxes/poles in front of Kum Luen grocery store Too crowded Crowded in front of Existing 0/ Bus Stop in front of Best Foods Produce Blind intersection Long time Almost died here Dangerous Summary of Community Workshop # Public Comment Page

Broadway from Stockton Street to Powell Street Total Green Dots = 5 Add bench Put up radar flashing sign for westbound traffic Put up radar flashing sign to show speed for east bound traffic (put on the southwest corner) Bayside Elderly and Kum Luen Produce Nice people at Bayside East West Bank Powell/Broadway Intersection Total Green Dots = 5 Turn lanes Apply a green median Jean Parker building is beautiful More peaceful Broadway from Powell Street to Mason Street Total Green Dots = 6 Trees in front of Jean Parker Kam Po Kitchen dad s place, rice plate, food tastes good Fast for bikes Total Red Dots = Cars traveling in two direction illegally on Cordelia Street Laundry in the window Garbage in front of Ping Yuen Restaurant with a lot of outdoor smokers Hobos in front of Ping Yuen Buses go to fast Too many cars Ping Yuen North Total Red Dots = 5 Not enough time to cross the street Bad air quality from the tunnel Dangerous intersection Cars going too fast 40mph in front of school No place or parents/grandparents to pick up children No landscaping on building facade of health center SPEED of cars Countdown too short only 0 seconds Total Red Dots = 0 Robbery Robbery near stairways (Wayne Alley) Grocery store (used to be there?) Takes forever Traffic/cars too fast Traffic/ too many cars Summary of Community Workshop # Public Comment Page 3

Small Group Exercise : Your Ideal design for Broadway The goal of this exercise was to develop a design for Broadway and to identify the top three improvements for the corridor. Participants were given a variety of game pieces and were invited to place the pieces on the map (see below) to illustrate the types of improvements they would like to see on the corridor. The facilitator guided the participants through a series of questions to develop an ideal street design. The questions included: How would you like the lane closest to the sidewalk used? On a scale of to 0, how important is adding bike lanes? What street improvements should occur and where? What streetscape amenities should be added and where? What are your TOP 3 most important improvements? Ideal Design for Broadway Game Board Top 3 Improvements: Improve Broadway and Stockton intersection scramble signal & corner bulb outs (4 groups) Improve and add lighting throughout the project area ( groups) More landscaping and greenery throughout the project area ( groups) Improve Broadway from Powell to Mason, in front of Jean Parker and Wu Yee ( groups) Sidewalk widening, landscaping, lighting, and restrict car travel in front of Wu Yee Landscaping, lighting, and benches in front of Jean Parker Elementary School Columbus/Grant/Broadway Intersection scramble signal ( groups) Widening sidewalks Longer crosswalk signal times Move 0/ bus stop on Broadway to mid block location Improve Powell/Broadway intersection scramble system & corner bulb out Parklet on the north side of Broadway east of Stockton Street with tables and seating Scramble signal at Mason/Broadway intersection in front of Health Center No bike lanes on Broadway/Stockton Summary of Community Workshop # Public Comment Page 4

Bicycle Lane: On a scale of to 0, how important is adding bike lanes? Average score:.4 Group : Group : N/A Group 3: Group 4: Group 5: Group 6: Street Improvements: Intersection/Crosswalk Re Design 5 groups asked for Columbus/Grant/Broadway intersection treatment. Of those 5 groups, 3 specifically asked for a scramble signal. 4 groups asked for improvements at Stockton/Broadway. All 4 groups asked for a scramble signal. group asked for a scramble signal at Powell/Broadway and Mason/Broadway. Intersection Number of Groups (6 total) Columbus/Grant/Broadway Asked for Scramble Signal 3 Stockton/Broadway Asked for Scramble Signal 4 Powell/Broadway Asked for Scramble Signal Mason/Broadway Asked for Scramble Signal Sidewalk Widening 4 groups asked for sidewalk widening at the Stockton/Broadway intersection. groups asked for sidewalk widening at the Powell/Broadway intersection. groups asked for sidewalk widening on the north side of Broadway between Grant and Stockton. groups asked for sidewalk widening on the south side of Broadway between Powell and Mason. group asked for a sidewalk widening at the median between Powell and Mason. Intersection/Street Segment Stockton/Broadway Intersection North corners South corners All 4 corners Powell/Broadway Intersection North corners South corners All 4 corners Northside Broadway between Grant and Stockton Columbus/Broadway Bus Stop (8AX) Just east of Stockton Street Broadway between Powell and Mason Number of Groups (6 total) Summary of Community Workshop # Public Comment Page 5

Wu Yee/Wayne Alley Existing median between Powell and Mason Use of Sidewalk Adjacent Lane 4 groups asked for sidewalk widening that would require removal of the eastbound rush hour lane. groups asked for sidewalk widening that would require removal of the westbound rush hour lane. 3 groups asked for parking/loading on the north side of Broadway. groups asked for parking/loading on the south side of Broadway. groups called to maintain the eastbound rush hour lane. group asked to restrict car travel on south side Broadway between Powell and Mason. group called to maintain the westbound rush hour lane. Street Segment Number of Groups (6 total) Remove eastbound rush hour lane 4 Remove westbound rush hour lane on north side of Broadway between Stockton and Powell Parking/Loading North side of Broadway 3 South side of Broadway Restrict car travel on south side Broadway between Powell and Mason (near Wayne Alley) Streetscape Amenities: Bus Stop Improvements Three groups asked for improvements at the two existing bus stops. For the 8AX bus stop at Columbus/Broadway, one group called for a transit bulb out with more seating, shelter, and NextMuni indicator. For the 8AX bus stop at Columbus/Broadway, one group asked for added seating and landscaping. For the 0/ bus stop on Stockton Street, one group asked to move the bus stop further east to the middle of the block in front of VIP Café and the addition of a mid block bulb out. Bus Stop 8AX Bus Stop Transit bulb out More seating, shelter, landscaping 0/ bus stop on Stockton Street Move bus stop mid block Transit bulb out Number of Groups (6 total) Beautification All six groups called for more lighting and landscaping along Broadway in order to create a distinctive identity for the Broadway corridor. Hot spots for lighting include in front of Ping Yuen public housing, Bayside Elderly Housing, Wu Yee Child Infant Center, and Jean Parker Elementary School. Summary of Community Workshop # Public Comment Page 6

Hot spots for landscaping include in front of Sun Hong Kong, Yuet Lee and Gold Mountain restaurants, Best Foods Produce, Bus Stops, East West Bank, and Wu Yee Child Infant Center. Improvement & Location Seating In front of Sun Hong Kong In front of Sam Wong In front of 0/ bus stop In front of Ping Yuen/Bayside Elderly In front of East West Bank In front of Wu Yee In front of Jean Parker Lighting In front of Sun Hong Kong In front of Sam Wong Hotel In front of Ping Yuen/Bayside In front of Wu Yee In front of Jean Parker Inside and outside of Tunnel Landscaping In front of Sun Hong Kong In front of East West Bank In front of Ping Yuen In front of Wu Yee In front of Jean Parker Existing median between Powell/Mason Reduce Newstand Clutter Between Grant and Stockton In front of East West Bank Public Art In front of Wells Fargo Gateway to Chinatown on south side of Broadway Broadway Tunnel facade Number of Groups (6 total) 3 Summary of Community Workshop # Public Comment Page 7

Summary of Group Designs Group Group consisted of Cantonese speaking members from Community Tenants Association (CTA), Ping Yuen Residents Improvement Association (PYRIA), and SRO Families Collaborative. Participants were primarily seniors and mothers with children. Their top three improvements were: ) widening sidewalks; ) beautification throughout the corridor, especially lighting and greening such as hanging baskets; 3) no bike lanes on Broadway and Stockton, citing potential dangerous conflict with elderly pedestrians. Participants called for intersection re design at two locations: Broadway/Columbus/Grant and Stockton/Broadway. They specifically called for a scramble signal at Stockton/Broadway, citing that they liked the signals further south along Stockton Street and thought it would be an effective solution to minimize the short countdown signals and overcrowding of pedestrians. Sidewalk widening was seen as desirable on the south side of the Broadway/Stockton intersection, in front of Best Foods Produce and near the existing 0/ bus stop. Participants called to remove the eastbound rush hour driving lane and designate the curbside lane between Grant and Stockton as parking/loading. Participants wanted to keep parking/loading on the north side of Broadway. Participants also called for sidewalk widening on the south side of Broadway between Powell and Mason, in front of Wu Yee Child and Wayne Alley. Lighting was desirable in front of Sam Wong Hotel, Ping Yuen, Bayside Elderly Housing, and Wu Yee. Participants wanted benches in front of Jean Parker Elementary School, and landscaping in front of Wu Yee, as well as an ornate gateway to Chinatown on Grant Avenue. The importance of adding bike lanes received a score of on a scale of to 0, in which was Not Important and 0 was Very Important. Group Group consisted of Cantonese speaking tenants living in Self Help for the Elderly/Lady Shaw property at Mason and Broadway. Their top 3 improvements were: ) Scramble signal at Mason and Broadway in front of the Chinatown Health Center; ) close down the traffic lane in front of Wu Yee and at Wayne Alley; 3) scramble signal at Powell/Broadway and corner bulb outs. Participants called for pedestrian scramble signals at two locations: Powell/Broadway and Mason/Broadway. Participants wanted to see a better defined pedestrian crosswalk at Stockton/Broadway and Powell/Broadway. Sidewalk widening was desired along Stockton Street between Pacific and Broadway, 4 corner bulb outs at the Stockton/Broadway, and 4 corner bulb outs at the Powell/Broadway intersection. This implies that the eastbound tow away lane would need to be removed along the south side of Broadway, as well as the westbound tow away lane north side of Broadway east of Powell. After experiencing incidents of robbery on Broadway between Powell and Mason, participants wanted to see safety improvements on the south side of Broadway in front of Wu Yee Child Infant Center and the north side in front of Jean Parker Elementary School. In front of Wu Yee, they wanted to see sidewalk widening with restricted car access, more landscaping, benches, and lighting. In front of Jean Parker, they wanted to see more landscaping, benches, and lighting. Participants also wanted to see Summary of Community Workshop # Public Comment Page 8

more landscaping and lighting in front of Ping Yuen. This group did not answer the question about whether adding bike lanes were important to them. Group 3 Group 3 consisted of Cantonese speaking Chinatown residents who are primarily seniors. Their top three improvements were: ) scramble systems on Broadway/Stockton and Broadway/Columbus; ) longer crossing signal times; 3) move the 0/ bus stop on Broadway closer to the middle of the block, in front of VIP Café before Royal Pacific Motel. Participants called for intersection re design at two locations: Broadway/Columbus/Grant and Stockton/Broadway. They specifically called for a scramble signal at both locations, citing that pedestrians needed longer crossing signals. Sidewalk widening was desired on the south side of Broadway just east of Stockton Street at the current 0/ bus stop. This would remove the current eastbound rush hour driving lane. Participants called for parking/loading throughout the entire corridor on both sides of Broadway. Participants called to improve two bus stops along the south side of Broadway: the 0/ bus stop on Kearny Street and the 0/ bus stop on Stockton Street. Participants wanted to move the existing 0/ bus stop on Stockton Street closer to VIP Café (but before reaching the Royal Pacific driveway) and away from the current congested corner at Best Foods Produce. Benches and landscaping was seen as desirable in front of Sun Hong Kong restaurant, as well as general improvements to the existing median between Powell and Mason. The importance of adding bike lanes received a score of on a scale of to 0, in which was Not Important and 0 was Very Important. Group 4 Group 4 consisted of youth from the Chinatown Adopt an Alleyway (AAA) Empowerment Project, and the facilitation was conducted in English. Their top three improvements were: ) street lighting along the entire corridor; ) parklet/sidewalk extension on the north side of Broadway east of Stockton with tables and seating; 3) intersection improvement at Stockton/Broadway, especially a pedestrian scramble and bulb outs. Participants called for intersection re design at two locations: Broadway/Columbus/Grant and Stockton/Broadway. They specifically called for a scramble signal at both locations. The group called for sidewalk widening at 3 locations: Broadway/Columbus in front of Sun Hong Kong (a bus bulb), Stockton/Broadway intersection (corner bulb outs), and a parklet on the north side of Broadway east of Stockton. Implicitly, this would remove the current eastbound rush hour driving lane. The group called for bus stop improvement at the existing 8AX bus stop at Broadway/Columbus in front of Sun Hong Kong. They wanted to see a bus bulb with the addition of seating, shelter, and NextMuni indicator. The group expressed that they wanted to see the addition of street lighting along Broadway. The importance of adding bike lanes received a score of less than 3 on a scale of to 0, in which was Not Important and 0 was Very Important. The answers ranged from to 6. High schools were based on need for access. Low ratings were based on bike lanes being dangerous if put on Broadway. There was a specific concern over right hook collisions when cars turn right through bike lanes. Summary of Community Workshop # Public Comment Page 9

Group 5 Group 5 consisted of an English speaking group with representation from the SFPD, Broadway merchants, CCDC Property Management, Jean Parker Elementary School, Russian Hill, and RenewSF. Their top three improvements were: ) Jean Parker: the Broadway Tunnel Block; ) the Columbus/Grant intersection; and 3) the Stockton/Broadway intersection. Participants called for intersection re design at two locations: ) Broadway/Columbus/Grant and ) Stockton/Broadway. They specifically called for a better north south connection from the Language of Birds plaza to North Beach and special lighting at the Broadway/Columbus/Grant intersection. They called for a scramble signal at Stockton/Broadway. Sidewalk widening was desirable in four locations: ) corner bulb outs at Stockton/Broadway in front of Yuet Lee Restaurant and East West Bank; ) corner bulb outs on Powell/Broadway on the north side of Broadway; 3) Wayne Alley to Powell, and 4) the current skinny median between Powell to Mason. The group wanted to maintain the eastbound rush hour traffic lane (parking at other times) on the south side of Broadway, with parking/loading lane on the northbound side. The group called for corner bulbouts at Powell/Broadway, which would remove the westbound rush hour travel lane between Stockton and Powell. The group called for public art in front of Wells Fargo and in front of the Broadway Tunnel entrance (the building façade?). More benches were desired in front of East West Bank and Bayside Elderly Housing, and more landscaping in front of East West Bank and the skinny median. The group wanted to reduce newsstand clutter in front of East West Bank and between Grant and Stockton. The importance of adding bike lanes received a score of on a scale of to 0, in which was Not Important and 0 was Very Important. Group 6 Group 6 consisted of Cantonese speaking Chinatown residents who are primarily seniors. Their top three improvements were: ) improve the Broadway/Stockton intersection for pedestrians; ) improve lighting throughout the corridor; and 3) more landscaping throughout the corridor. Participants called for intersection re design at two locations: Broadway/Columbus/Grant and Stockton/Broadway. They specifically called for a scramble signal at both locations and cited Oakland s Chinatown as an example of effective decorative sidewalk art. The group did not call for sidewalk widening, but they cited that the Stockton/Broadway intersection is too crowded. The group wanted to keep the eastbound and westbound rush hour travel lanes on both sides of Broadway. Participants called to improve the existing 8AX bus stop by adding benches and landscaping. Landscaping and lighting were major themes for this group. Lighting was desirable both inside and outside of the Tunnel. They also wanted to see benches in front of the existing 0/ bus stop and Ping Yuen public housing. The importance of adding bike lanes received a score of on a scale of to 0; in which was Not Important Summary of Community Workshop # Public Comment Page 0