EZY Chek Systems CERTIFICATION EXAM COVER SHEET

Similar documents
Exhibit 4. Determination of Static Pressure Performance of the Healy Clean Air Separator (Executive Orders VR-201-N and VR-202-N)

KWA. Evaluation of the MassTech 001 Tank Integrity Test System. EPA Forms Obtained From

TOPIC: KNOWLEDGE: K1.01 [2.5/2.7] An atmospheric pressure of 15.0 psia is equivalent to... A psig. B psig. C psig.

Appendix A 1. -STATIC LEAK TEST (taken from BAAQMD test procedure ST-30)

September 2018 Pressure Test

ETHANOL BLENDS & WATER INGRESS

FE Petro vs. New Red Jacket Competitive Comparison

Health and Safety at Work (Hazardous Substances Reduced Secondary Containment for Certain Above Ground Stationary Tanks) Safe Work Instrument 2017

Operating Instructions

628 Differential Pressure Decay Leak Tester

product manual HM-4140, HM-4150, HM-4160 HM-4160A HM-4150 Humboldt FlexPanels

Presents the following instructional slide show:

Diagnosing EVAP systems By: Bernie Thompson

FLAMMABLE GASES AND FLAMMABLE CRYOGENIC FLUIDS

Liquid Level Measurement

Evaluation of the Mass Technology Precision Mass Measurement System on Bulk Field-Constructed Tanks (120,000 Gallon Vertical Tank Evaluation)

Study Guide IADC WellSharp Driller and Supervisor

SPECIFICATIONS PARTICLE SENSOR KS-18F Higashimotomachi, Kokubunji, Tokyo , Japan

8.1 Calibration of gas sensors

Auto EVAP Quick Start Guide

CO 2. (R744) Service Station Presentation. Contents. Goals Basic functions Specification Recovery R477 Vacuum Charge Safety Other features Prototype

STANDARD FOR CONTROL VALVE SEAT LEAKAGE

Bubble Tube Installations

Annual Inspection and Calibration Checklist VAF Oilcon MK-6(M) MEPC.108(49) Page 1 of 5

1 Scope... 2 Functions of cementing float equipment... 3 Definitions... 4 Calibration... 5 Test Categories... 6 General...

RC 195 Receiver-Controller

SPECIFICATIONS PARTICLE SENSOR KS-19F Higashimotomachi, Kokubunji, Tokyo , Japan

LPG, LEG, LNG tankers & Chemical and Product tankers

Valve Inspection & Testing

CTG Certification Protocol -- Version 3.0 SUMMARY

Issue Date: Effective Date: Supersedes: V-15 (rev. 2)

Warning: NEVER ALTER TEST EQUIPMENT

Compiled by: B Beard. Approved by: SH Carstens. Description of requirements and procedures for compact provers to be used as verification standards.

Best Practices in Measuring Tank Level

We measure it. For gas and water installers. testo hpa. bar

CanNeed-DSST-100 Digital Secure Seal Tester --- To evaluate the secure seal quality of PET bottles, glass bottles and cans

METHOD 25A - DETERMINATION OF TOTAL GASEOUS ORGANIC CONCENTRATION USING A FLAME IONIZATION ANALYZER

L 100. Bubble-Tube Level System. Installation, Operation and Maintenance Instructions

Early evap monitors. Photo courtesy Toyota Motor Sales, U.S.A., Inc.; diagram courtesy University of Toyota

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack)

Piped Air SCBA Refilling System Standard

RE: PROPANE SYSTEM & REGULATOR TESTING/INSPECTION PROCEDURE

Heat Pump Connections and Interior Piping

Testing Procedures of Watertight Compartments

Service Call: Vacuum Prevention System Testing on Category A and B Aerial Devices. Tools Required: 1. Atmospheric Vent Test Set (P/N )

SAFETY MANUAL FOR FLAMMABLE PRODUCT TRANSFER

Level MEASUREMENT 1/2016

METHOD 21 - DETERMINATION OF VOLATILE ORGANIC COMPOUND LEAKS. 1.2 Scope. This method is applicable for the

Inert Air (N2) Systems Manual

METHOD 2E - DETERMINATION OF LANDFILL GAS PRODUCTION FLOW RATE. NOTE: This method does not include all of the

Industrial Compressed Air. Ultrasonic Leak Detection Survey Guide

VACUUM TESTING PRECAST CONCRETE MANHOLES

HOT OILING OPERATIONS ALL HSE PRC 172. Approved By: Manager, HSE Performance Assurance. Table of Contents

Modeling Case Study: Surge Tanks, Valves, Level sensors, and modeling

LESER Deutschland Standard Functional Tightness Test (Cryo) Content

Instrumentation Catalogue

Tex-914-K, Calibrating Motorized Gyratory-Shear Molding Asphalt Press

Product Test Report F.A. Lennon Drive December 2015 Solon, Ohio U.S.A. Page 1 of 7. Valve Series Description Test Pressure Test Qty.

TECHNICAL DATA. than the water inlet pressure to the concentrate

GMA FUNCTIONAL TEST SETTING & TESTING OF SPIN UP PARAMETERS. P0586 REV -- 20, June 2000 GPB SCIENCE MISSION PROCEDURE

The Discussion of this exercise covers the following points:

Fluid Sealing Association

Leak Checking Large Vacuum Chambers

911A Summa Canister Sampler

METHOD 2A - DIRECT MEASUREMENT OF GAS VOLUME THROUGH PIPES AND SMALL DUCTS. NOTE: This method does not include all of the

Vortex Dual. Refrigerant Recovery Machine

Alternative Test Procedures for Evaluating Leak Detection Methods: For Bulk Fieldconstructed

O NEof Premium tools for professionals!

N2 Blanketing Valve DST100 / DST200 TYPE INSTRUCTION MANUAL CONTENTS K.S.P.C. General Description Operation. Installation Maintenance

Periodical surveys of cargo installations on ships carrying liquefied gases in bulk

B. Assemble the Method-25 sample train with a heated probe/filter.

APPENDIX B TESTING PROTOCOLS. Method A: Straight Test Method B: Angular Deflection Test. Method C: Shear Load Test

BUBBLER CONTROL SYSTEM

86BSD Backside Digital Output

Leak testing of Valves. Standards for acceptable Rates of Valve Leakage

RP920A-D Modular Pneumatic Controller

INTERNAL LEAKAGE CHECK OF THE FLIGHT GMA

S & M Water Consultants

1 Exam Prep NFPA 99 Health Care Facilities Questions and Answers (Plumbing Contractor)

Installation of Ballast Water Management Systems

Florida Method of Test for MEASUREMENT OF WATER PERMEABILITY OF COMPACTED ASPHALT PAVING MIXTURES

Air Eliminators and Combination Air Eliminators Strainers

WATER MADE EASY MARINE ENERGY MUNICIPAL INDUSTRIAL

Flammability Chart. Gas Formula Ignition

Hydraulic comparison test pump Models CPP1000-X, CPP1600-X

WHP Operations and Methods { July William M. Smethie, Jr. Lamont Doherty Geological Observatory Palisades, New York U.S.A.

STANDARD OPERATING PROCEDURES

Steam System Best Practices 14 Best Practices for Guide Lines for Boiler Plant Log Books

Water Mist Systems Inspection, Testing, and Maintenance of Water Mist Systems

COSMO INSTRUMENTS CO., LTD.

Positive displacement proportioning of two-component epoxy intumescent coatings for passive fire protection

TECHNICAL MANUAL CALIBRATION PROCEDURE FOR PRESSURE GAUGE. This publication replaces T.O. 33K dated 30 January 2012.

Torque Tube TB300 Digital Transmitters

MLS Series Liquid Level Switches. Installation and Operations Manual Section 15

Instrumentation & Data Acquisition Systems

Stratomaster Smart Single

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

Hydraulic hand spindle pump Models CPP1000-M, CPP1000-L

EXAMPLES OF COMPLIANCE METHODS FOR MONITORING AND RECORDKEEPING RCRA SUBPARTS BB AND CC. Tennessee Operations Eastman Chemical Company

Transcription:

CERTIFICATION EXAM COVER SHEET PLEASE CHECK ALL METHODS THAT APPLY EZY 3 LOCATOR PLUS PRODUCT LINE TESTING LEAK DETECTOR TESTING Contact Name: Company Name: Technician Name: Company Address: Company Phone: Company Fax: E-Mail Address Technician SSN: (Last 6 digits - ONLY!) INITIAL I agree to completely and without deviation follow the protocol set forth by Estabrook s, Inc. regarding the procedures and practices instructed by and certified by Brad Estabrook when using the Estabrook s, Inc. EZY Chek Systems. I agree to follow Estabrook s, Inc. protocol regarding certification and calibration. I agree to renew my certification biannually; I understand that it is my responsibility to contact Estabrook s, Inc. to arrange my recertification prior to my certification expiration date. I agree to calibrate my equipment annually; I understand that equipment is defined as the Acoustic Signal Processor, In-Tank Microphone, Pressure Sensor, Water Sensor Display, Water Sensor Probe and Negative Pressure Gauge. I understand that it is my responsibility to contact Estabrook s, Inc. to arrange the annual calibration of my equipment prior to the expiration date. I have read the above requirements and agree to the terms and conditions there to. Technician Signature Date 1/10

EZY 3 LOCATOR PLUS CERTIFICATION EXAM Read each question; write the letter to the answer you chose in the space provided next to the question number. 1) What is the PSI (weight) of water? a..036 b..032 c..026 d..033 2) What is the PSI (weight) of gas? a..036 b..032 c..026 d..033 3) What is the PSI (weight) of diesel? a..036 b..031 c..026 d..049 4) What is the PSI (weight) of kerosene? a..033 b..031 c..028 d..029 5) What is the PSI (weight) of transmission fluid? a..036 b..033 c..049 d..029 6) What is the PSI (weight) of motor oil? a..036 b..031 c..022 d..033 7) What is the PSI (weight) of brine? a..049 b..029 c..028 d..034 -Page 1-

EZY 3 LOCATOR PLUS CERTIFICATION EXAM 8) Tank capacity shall not exceed what size? a. 20,000 gallons b. 30,000 gallons c. 50,000 gallons d. 100,000 gallons 9) What is the maximum pressure place on the tank top and shall never be exceeded? a. 2.00 psi of vacuum b. 4.00 psi of vacuum c. 6.00 psi of vacuum d. 8.00 psi of vacuum 10) What is the minimum amount of ullage space required to conduct a test on a tank? a. 1% total tank volume -or- 50 gallons whichever is less b. 2% total tank volume c. 50 gallons d. 1% total tank volume -or- 50 gallons, whichever is greater 11) What is the maximum amount of ullage space required to conduct a test on a tank? a. 10,000 gallons b. 20,000 gallons c. 30,000 gallons d. 99% total tank capacity 12) Before pulling vacuum on a tank and running an acoustic test, the microphone should always be checked for proper operation? 13) After the tank is completely sealed off, what must be done before turning on the motor blower to pull vacuum on the tank? a. All safety precautions shall be made to area. b. The calculation must be completed to determine vacuum that shall be applied to the tank. c. A background base line test must be taken of the sound in the tank with no vacuum applied. d. All of the above. 14) At a minimum, how long should the motor blower run and circulate once the proper amount of vacuum has been applied to the tank? a. 1-2 minutes b. 3-5 minutes c. 5-7 minutes d. 7-9 minutes 15) At a minimum, how long must the technician run the acoustic portion of the test (with the exception of Rockland County)? a. 4 minutes b. 1 minutes c. 2 minutes d. 3 minutes -Page 2-

EZY 3 LOCATOR PLUS CERTIFICATION EXAM 16) If the acoustic equipment reveals a hiss, what portion of the tank may be leaking? a. Below the liquid level b. Above the liquid level c. The tank interstitial space d. It can only be a vent or stage II line that causes this 17) If the acoustic equipment reveals a bubble, what portion of the tank may be leaking? a. Below the liquid level b. Above the liquid level c. The tank interstitial space d. It can only be a vent or stage II line that causes this 18) If the acoustic equipment reveals no sound and there is no ground water around the tank, the tank is tight? 19) On the digital pressure sensor; where should the switches be set to monitor the tank s vacuum level? a. Slow/Fast and PSI b. Slow/Fast and H2O c. Slow/Fast and HG d. Slow/Fast and KPA 20) calculate the following minimum test length for running a water intrusion test when your average calibration is 50mL (round to the nearest minute): a. 12 minutes b. 16 minutes c. 24 minutes d. 32 minutes 21) calculate the following minimum test length for running a water intrusion test when your average calibration is 75mL (round to the nearest minute): a. 12 minutes b. 16 minutes c. 24 minutes d. 32 minutes 22) calculate the following minimum test length for running a water intrusion test when your average calibration is 125mL (round to the nearest minute): a. 30 minutes b. 32 minutes c. 40 minutes d. 48 minutes 23) calculate the following minimum test length for running a water intrusion test when your average calibration is 150mL (round to the nearest minute): a. 30 minutes b. 32 minutes c. 40 minutes d. 48 minutes -Page 3-

EZY 3 LOCATOR PLUS CERTIFICATION EXAM 24) What is the leak threshold for water intrusion? a..05 inches b. 0 gallons c..0140 inches d..05 gallons 25) If.0100 gallons of water did intrude into the tank during a test, does the tank pass or fail? a. Pass b. Fail 26) What is the minimum amount of calibrations that must be preformed prior to setting your water intrusion sensor and conducting a water intrusion test? a. None b. 1 calibration c. 2 calibrations d. 3 calibrations 27) Estabrook s recommends what test solution when calibrating your conductive water sensor? a. A water/antifreeze mix b. A water/biocide mix c. A antifreeze/biocide mix d. Straight water 28) It is critically important to accurately determine water table prior to conducting a tank tightness test? 29) All tank testing equipment is required to be calibrated annually by the manufacturer, Estabrook s, Inc.? 30) How often shall a technician recertify with the manufacturer of the EZY 3 Locator Plus test equipment? a. Every 2 years b. Every 4 years c. Every 5 years d. Certification does not need to be renewed -Page 4-

EZY 3 LOCATOR PLUS CERTIFICATION EXAM Data Sheet Instructions On the following pages you will find three Estabrook s, Inc. EZY 3 Locator Plus Pressure Calculation Data Sheets. We have provided you with the necessary information on the Data Sheet to complete the Pressure Calculations and the Calculation for the Test Period. Product Information: u Using the data provided in the Product Type located at the top left of the Pressure Calculation Sheet, enter the WEIGHT OF PRODUCT into the coorosponding space provided in the Pressure Sensor Calculation box. u Use this data to complete the Pressure Calculations along with the other Data provided. Pressure Calculations: u Data is provided on the Tank Diagram located on the bottom right of the Pressure Calculation Sheet. u u Enter this data into the corresponding space in the PRESSURE SENSOR CALCULATION box. Complete all calculations; 1-7 to achieve the TEST PRESSURE. Water Sensor Calibration: u Data is provided in the WATER SENSOR CALIBRATION box located on the bottom left of the Pressure Calculation sheet. u u Average the three Water Sensor Calibrations and enter it in to the corresponding space marked Average. Complete the Calculations for Test Period to achieve the Time of Test.

PRESSURE CALCULATION & WATER SENSOR CALIBRATION DATA SHEET Test Date MANUFACTURED BY: ESTABROOK'S INC. 1 877 368 7215 Location TOTAL TANK VOL. PRODUCT VOL. ULLAGE VOL. Address City/State/Zip Location Contact PRODUCT TYPE DIESEL OR #2 OIL Location Phone PBS # (NEW YORK) Depth of Groundwater Determined: TANK # TEST #1 By: Where: PRESSURE SENSOR CALCULATION INCHES OF PRODUCT INCHES OF WATER IN TANK x = PSI (1) WEIGHT OF PRODUCT x = PSI (2) Line 1 + Line 2 = Total Positi ve Head Pressure I n Tan k = PSI (3) x = PSI (4) INCHES OF WATER OUTSIDE TANK To inus ut de tal Head Pressure M O si Water Pressure = +/-PSI (5) ways add. P + PSI (6) Al 5 SI NOTE: If Line 6 is Less Than.5 PSI Line 7 Shall be.5 PSI TEST PRESSURE = +/-PSI (7) ACOUSTIC TEST TIME Equipment Calibration due date and serial numbers Baseline Background: Time Pressure Serial Number Callibration Due Date Blower Started: In-Tank Microphone Test Pressure Reached: Acoustic Signal Processor Blower Turned Off: Pressure Sensor Test Began: Water Sensor Display Test Ended: WATER SENSOR CALIBRATION Water Sensor Probe Height Dia. Added: 30 30 30 20" " 48" " Cal #1 Cal #2 Cal #3 Bottom to Average: Grade 68" " Product in Tank Calculation for Test Period: " Ground Water 3780.05 x 60 = 20" Avg. Cal. "A" Factor Min. Time of Test 45" Water Intrusion Test Period Began: 1" Ended: Water in Tank

PRESSURE CALCULATION & WATER SENSOR CALIBRATION DATA SHEET Test Date MANUFACTURED BY: ESTABROOK'S INC. 1 877 368 7215 Location TOTAL TANK VOL. PRODUCT VOL. ULLAGE VOL. Address City/State/Zip Location Contact PRODUCT TYPE GASOLINE Location Phone PBS # (NEW YORK) Depth of Groundwater Determined: TANK # TEST #2 By: Where: PRESSURE SENSOR CALCULATION INCHES OF PRODUCT INCHES OF WATER IN TANK x = PSI (1) WEIGHT OF PRODUCT x = PSI (2) Line 1 + Line 2 = Total Positi ve Head Pressure I n Tan k = PSI (3) x = PSI (4) INCHES OF WATER OUTSIDE TANK To inus ut de tal Head Pressure M O si Water Pressure = +/-PSI (5) ways add. P + PSI (6) Al 5 SI NOTE: If Line 6 is Less Than.5 PSI Line 7 Shall be.5 PSI TEST PRESSURE = +/-PSI (7) ACOUSTIC TEST TIME Equipment Calibration due date and serial numbers Baseline Background: Time Pressure Serial Number Callibration Due Date Blower Started: In-Tank Microphone Test Pressure Reached: Acoustic Signal Processor Blower Turned Off: Pressure Sensor Test Began: Water Sensor Display Test Ended: WATER SENSOR CALIBRATION Water Sensor Probe Height Dia. Added: 0 0 0 36" " 96" " Cal #1 Cal #2 Cal #3 Bottom to Average: Grade 132" " Product in Tank Calculation for Test Period: " Ground Water 3780.05 x 60 = 63" Avg. Cal. "A" Factor Min. Time of Test 0" Water Intrusion Test Period Began:.5" Ended: Water in Tank

PRESSURE CALCULATION & WATER SENSOR CALIBRATION DATA SHEET Test Date MANUFACTURED BY: ESTABROOK'S INC. 1 877 368 7215 Location TOTAL TANK VOL. PRODUCT VOL. ULLAGE VOL. Address City/State/Zip Location Contact PRODUCT TYPE GASOLINE Location Phone PBS # (NEW YORK) Depth of Groundwater Determined: TANK # TEST #3 By: Where: PRESSURE SENSOR CALCULATION INCHES OF PRODUCT INCHES OF WATER IN TANK x = PSI (1) WEIGHT OF PRODUCT x = PSI (2) Line 1 + Line 2 = Total Positi ve Head Pressure I n Tan k = PSI (3) x = PSI (4) INCHES OF WATER OUTSIDE TANK To inus ut de tal Head Pressure M O si Water Pressure = +/-PSI (5) ways add. P + PSI (6) Al 5 SI NOTE: If Line 6 is Less Than.5 PSI Line 7 Shall be.5 PSI TEST PRESSURE = +/-PSI (7) ACOUSTIC TEST TIME Equipment Calibration due date and serial numbers Baseline Background: Time Pressure Serial Number Callibration Due Date Blower Started: In-Tank Microphone Test Pressure Reached: Acoustic Signal Processor Blower Turned Off: Pressure Sensor Test Began: Water Sensor Display Test Ended: WATER SENSOR CALIBRATION Water Sensor Probe Height Dia. Added: 75 75 75 36" " 120" " Cal #1 Cal #2 Cal #3 Bottom to Average: Grade 156" " Product in Tank Calculation for Test Period: " Ground Water 3780.05 x 60 = 78" Avg. Cal. "A" Factor Min. Time of Test 72" Water Intrusion Test Period Began: 1" Ended: Water in Tank

LEAK DETECTOR TESTER CERTIFICATION EXAM Read each question; write the letter to the answer you chose in the space provided next to the question number. 1) A 3 gallon per hour leak rate is equivalent to how many ml in one minute? a. 1000 ml b. 50mL c. 189mL d. 50mL 2) Estabrook leak detector testers should be periodically tested for proper calibration; by maintaining line pressure at 10 psi (using a bleed off valve), inducing a leak through each jet valve (one at a time) and measuring.05 gallons/min (equivalent to 189 ml/min & 3 gph) in a calibrated burette. If the jet valve produces.05 gallons or 189 ml in one minute, the jet is inducing the proper leak rate on the piping system? 3) When conducting a 3 gph functionality test of an electronic LLD, only one jet valve shall be left open (2 closed) to simulate a leak into an approved container. The electronic LLD only passes if it detects the leak and signals an alarm with the leak induced on the line? 4) Line pressure shall always be reduced to 1 psi or less prior to conducting a functionality test of a mechanical LLD 5) FePetro and Red Jacket (Veeder Root) mechanical LLD s go into their leak sensing position at about 10-14 psi? 6) Vaporless Manufactured mechanical LLD s go into their leak sensing position at about 18-20 psi? 8) After failing an existing mechanical LLD and installing a brand new mechanical LLD in the submersible transfer pump; there is no need to test the new leak detector for proper operation because they never fail out-of-the-box.? 9) When hooking up test equipment at the dispenser shear valve when installing a new mechanical LLD; proper lockout/ tag-out procedure shall always be followed to prevent personal injury and environmental damage due to a submersible pump being accidentally turned on while work is being conducted? 10) A technician shall always check to see that no leaks are present after removing his test equipment and putting the system back into full operation?