RHIC CRYOGENIC SYSTEMS MAINTENANCE PROGRAM

Similar documents
Safety in Cryogenic Operations at RHIC *

MECHANICAL EQUIPMENTS: COMPRESSORS, PUMPS, SEALS, SPEED DRIVES, CONTROL VALVES & ACTUATORS & SAFETY RELIEF VALVES

Vacuum. Dry Turbo Pumping Stations. Roughing Pumps for 1 K Helium Pots and Lambda Refrigerators. Hermetically Sealed Pumps for He3 Recirculation

Periodical surveys of cargo installations on ships carrying liquefied gases in bulk

FAILURE SCENARIOS AND MITIGATIONS FOR THE BABAR SUPERCONDUCTING SOLENOID

Earlier Lecture. In the earlier lecture, we have seen Kapitza & Heylandt systems which are the modifications of the Claude System.

Improve Reliability of Turbomachinery Lubrication and Sealing Systems

Hydro Plant Risk Assessment Guide

Water Mist Systems Inspection, Testing, and Maintenance of Water Mist Systems

RDK-408D2 Cold Head. Technical Manual. SHI-APD Cryogenics Inc Vultee Street Allentown, PA U.S.A. Revision A: September 2005

Screw Gas Compressors & Dry Gas Seals Applications. Singapore, Mandarin Orchard Singapore. Training Course : Training Course For One Week In

Overview. SEMEMI216 SQA Unit Code HF4G 04 Carrying out fault location on fluid power equipment and circuits

Record of Assessment OFFICER IN CHARGE OF AN ENGINEERING WATCH

SEMPEO SQA Unit Code FP2P 04 Maintaining fluid power equipment

PRad Target. Chris Keith JLab Target Group

v. Size shall be specified on drawings.

hydro-pac, inc. Low-Pressure Gas Compressors 1500 to 6000 PSI

Revision 2013 Vacuum Technology 1-3 day Good Vacuum Practice 1 Day Course Outline

Design. Pompetravaini-NSB API SB Liquid Ring Compressor for Gas Processing. Working Principle

CO 2 and O 2 scrubbers

V-Major, V-Compact. Reciprocating Compressors. Intelligent Air Technology

LESER Deutschland Standard Functional Tightness Test (Cryo) Content

SAFETY & MAINTENANCE. Thermal Equipment Corporation

Detector Carrier Gas Comments Detector anode purge or reference gas. Electron Capture Nitrogen Maximum sensitivity Nitrogen Argon/Methane

Oxford Instruments Austin, Inc.

Unit 24: Applications of Pneumatics and Hydraulics

Premium Solutions for Gas and Biogas Handling

D C P L OXYGEN / NITROGEN PLANT

Chapter 8: Cryo-sorption pumps

Crab and Lobster Live Holding System Part II (Water Pumps, Air Pumps and Pipework)

CO 2. (R744) Service Station Presentation. Contents. Goals Basic functions Specification Recovery R477 Vacuum Charge Safety Other features Prototype

Test pumps. Pressure sources. Good reasons for proper and reliable calibration

Figure 1 The LHC cryogenic islands and plants layout

SRL SEries. Oil Free Scroll Air Compressors hp kw

Trillium US Inc. Cryo-Plex 10 Cryogenic High Vacuum Pump User s Manual Rev A / November 2015

Gas Compressor Operation and Control

E SC 412 Nanotechnology: Materials, Infrastructure, and Safety Wook Jun Nam The Pennsylvania State University

Cryogenics of SRF Spoke Cavity Development at SMTF

R-410A 50% R-32 50% R-125.

TECHNOLOGIES. M Series. Positive return metering pumps [API675]

Applied Compression s nitrogen generator packages offer users a cost-effective alternative to costly bottled nitrogen.

High Pressure Compressed Air and Gas Solutions

Record of Assessment OFFICER IN CHARGE OF AN ENGINEERING WATCH

DRAFT. Operating Procedures for the NPDGamma Liquid Hydrogen Target in TA-53, Building MPF-35

Cryomodule Maintenance Workshop Maintenance, Repair Strategies, and Fault Scenarios. J. Ozelis Senior SRF Coordinator

TURBO OXYGEN NITROGEN PLANT

4m Blanco Glycol Chiller system: history, recent events, present status and plans

Application of Double Vs Tandem Dry gas seal Advantages.

Helium recovery at the National High Magnetic Field Laboratory

Hydraulic Reliability & Preventive Maintenance Report

Fundamentals of Turboexpanders Basic Theory and Design

THE DELIVERY OF GAS SUPPLY

INTRODUCTION. The Quantum Technology system has the following advantages:, as it does not need plastic gas-bags which are volume-consuming,

Major Design Features

Precision Rotary Airlocks and Diverter Valves

Copyright, 2005 GPM Hydraulic Consulting, Inc.

TWC Services, Inc. Structured On-The-Job Training for JT- 1, 2, 3

Diffused Aeration Systems Installation Operating Maintenance Guidelines

EU minimum requirements. Training and certification for personnel and companies

Basic & Controlled Atmosphere Glove Boxes

Pressurised Oxygen Supply for CO 2 Capture Applications

SEMEM3-73 Maintaining medical gas pipeline systems and equipment

NPDGamma LH2 Target OJT Lesson Plan: Senior Operator for the NPDGamma LH2 Target Operators

Vacuum Systems and Cryogenics for Integrated Circuit Fabrication Technology 01

Short Introduction to Cryo-Pumps and Refrigerators. Dr Graham Rogers Leybold UK Ltd.

Advanced Management of Compressed Air Systems Pre-Workshop Assignment

CompAir provide high quality and reliable Nitrogen solutions

TECHNICAL DATA. Q = C v P S

KAYDON RING & SEAL, INC.

D R A F T. Operating Procedures for the NPDGamma Liquid Hydrogen Target at the BL 13. Version 1.00

SEMEM SQA Unit Code HWAW 04 Carrying out maintenance activities on fluid power equipment

SEMPEO SQA Unit Code FP2M 04 Maintaining mechanical devices and equipment

COMPRESSOR REPLACEMENT PROCEDURE (R-134A)

SAMSON SOLUTIONS Energy and Power (Critical Applications)

The Model L1410 can be counted on for many years of trouble-free, reliable operation.

LPG, LEG, LNG tankers & Chemical and Product tankers

Jaime Perez Espinos on behalf of all contributors to LHC insulation vacuum (TE/VSC, AL4030 and ICIT)

Bulletin TCR-104 & 109 Filling and adding to the Glycol pressure system

Contents. Foreword. Acknowledgements. General Introduction

Transferring and Storage

Cryogenics The Basics. Lesson 2 D. Kashy

TECHNICAL DATA. Q = C v P S

TECHNICAL INSTRUCTION

HAUG Kompressoren AG. Founded in Design & manufacturing in St. Gallen Switzerland. Own sales subsidiaries in Frankfurt and Shanghai

P5513. Users Manual. Pneumatic Comparison Test Pump. Test Equipment Depot Washington Street Melrose, MA TestEquipmentDepot.

Simplicity in VRU by using a Beam Gas Compressor

Lubricating Oils Hydraulic Oils Turbine Oils Cutting and Cooling Mineral Oils Compressor Oils Synthetic Fluids Insulating Oils Quenching Oils

Training Fees 4,000 US$ per participant for Public Training includes Materials/Handouts, tea/coffee breaks, refreshments & Buffet Lunch.

FLUID POWER FLUID POWER EQUIPMENT TUTORIAL ACCUMULATORS. This work covers part of outcome 2 of the Edexcel standard module:

JUL 2 1 WV STI. Support and Control Systems of the Waste Isolation Pilot Plant Gas Generation Experiment Glovebox

Linde Cryogenics. Helium Recovery Systems.

Automated Mass Handling for High Performance Pressure Balances

CLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD. 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems.

Maintaining mechanical devices and equipment. Outcome one

SEPARATION SEAL UPGRADE TO OVERCOME REPETITIVE FAILURES

Steam System Best Practices 14 Best Practices for Guide Lines for Boiler Plant Log Books

TECHNICAL DATA OBSOLETE

Oxford Instruments Austin, Inc.

Compressor Seal Replacement and Upgrades SERVICES

/ /

Transcription:

RHIC CRYOGENIC SYSTEMS MAINTENANCE PROGRAM Brookhaven National Laboratory

Major Plant Equipment Categories / Locations Compressor Refrigerator Service Buildings

The Maintenance program is based on the following Preventive. Physical inspection and Measurements. Manufactures requirements. On demand maintenance (breakdowns)

Compressor Plant The Heart of the Cryo- system! 20 First Stage compressors arranged 2 units per skid. 4 Second Stage compressors arranged 1 unit per skid. A Redundant Compressor, this unit can be configured as a 1 st or 2 nd stage compressor. A Utility Compressor, this unit is used for gas clean-up and gas management operations. Other equipment in the compressor building : oil distribution system, filtering media, valves, instrumentation, a purifier station and vacuum station.

Maintenance Program for the compressors Bearing replacement on the main compressor motors (2250 and 600 hp). Compressor shaft seal replacement. Compressor to motor alignment check. Suction valve actuator replacement. Filter replacement (oil). Oil analysis and oil pump repair. Cleaning of motor vents. Major over-haul on the compressor and motors.

Howden Compressor Reliance Electric motor

Refrigerator and Cold Boxes Turbo-expanders and lube oil skids.ge Rotoflow type. Gas Recovery Compressors. Regeneration equipment. Vacuum stations. Valves and Instrumentation. Contamination removal equipment.

Maintenance Program for the Expanders and oil-lube skids Bearing replacement. Shaft and seal replacement. Heat barrier replacement. Rotor replacement. Guide vane replacement. Filter replacement Oil analysis. Pump maintenance Transducers and pneumatic controllers

Other Refrigerator equipment Gas Recovery Compressor: (Dunn&Bush)(Sullair) Filter replacement, oil analysis and shaft seal replacement. Regeneration Skid: Filter and Absorbent media, blower maintenance and valve seal replacement. Vacuum Skids: Oil replacement, pump and instrumentation repairs. Process valves and Instrumentation: Seal replacement, entire valve replacement, valve calibration, transducer calibration or replacement, power supply replacement. Contamination Monitors: Instruments to monitor undesirable elements such as moisture,oxygen and nitrogen. Cell calibrate or replacement.

Oxygen Monitor Hygrometer Nitrogen detector

Service Buildings and Tunnel Equipment Control and Process valves. Circulators (Barber-Nichols Co.). Vacuum Equipment. Relief valves. Instrumentation.

Maintenance performed Valve seal replacement. Vacuum pump refurbish or replacement. Valve calibrations. Instrumentation power supply repair or replacement. Relief Valve certification (ASME Code). Circulator maintenance. 1005E equipment (Two stage Sullair, model 1660 refrigerator)

Summary: Maintenance done in-house. (equipment repair and replacement, the calibration of instrumentation and electronic component repair) Contract Maintenance ( major over haul of compressors,instrument air compressors) The maintenance done to our equipment plays a vital role in providing the refrigeration that is required for the RHIC project.

Summary: continued Maintenance done in house is based on the following criteria. Daily physical inspection of equipment. Review of shift log data on equipment. Equipment status is monitor and controlled in the control room during the physics run.

RHIC CRYOGENIC SYSTEMS MAINTENANCE PROGRAM Brookhaven National Laboratory 631-344-3172 Email sardzinski@bnl.gov