EAS Basic Soil Gas Sampler

Similar documents
B. Assemble the Method-25 sample train with a heated probe/filter.

Evaluation of Leak Check Procedures. Suzie Nawikas, Dave Balkenbush H&P Mobile Geochemistry, Inc. AEHS San Diego - March 20, 2013

STANDARD OPERATING PROCEDURES

Vapor Intrusion. Sampling Solutions VAPOR INTRUSION. Sampling Solutions

STANDARD OPERATING PROCEDURES

STANDARD OPERATING PROCEDURES

911A Summa Canister Sampler

Manual Solvent Purification System. Innovative Technology, Inc.

PXRF- Tracer Helium Flow Control System

Gas Conversion Kits CERAMIC HEATER SERIES (1, 2, 3, 4 Burner Units)

CS Controlled Dissolved Gas assembly with optional CS Air Aspirator assembly. Installation and Operation information

SomnoSuite FAQ. Setup. Calibration 4. What are the calibration requirements for the SomnoSuite? Settings

DETERMINATION OF TETRAHYDROTHIOPHENE IN AMBIENT AIR BY GAS CHROMATOGRAPHY WITH A PFPD DETECTOR COUPLED TO A PRECONCENTRATION TECHNOLOGY

Warning: NEVER ALTER TEST EQUIPMENT

Operation Manual. Diaphragm Sensed Gas Pressure Regulators

OPERATION MANUAL RTI RHS650 RTI TECHNOLOGIES, INC East Market Street York, PA Manual P/N

Water Weir Flow Controller. Introduction. Safety Precautions. Mounting the Hardware

Environmental. Gas Canister sampling and analysis. EQLF, Cambridge, July 20 th Right Solutions Right Partner

SRI Model H2-40 Hydrogen Generator Operation and Maintenance Nov 2006

Operation and Maintenance Manual for GENTEC Model 881VR Continuous/Intermittent Digital Suction Regulators

STANDARD OPERATING PROCEDURES. Andersen Instruments Federal Reference Method (FRM) Ambient Particulate (PM 10 /PM 2.

ARC Unofficial Manual to the Solvent Dispensing System. Designed by J. C. Meyer

BPS-2, Rev TABLE OF CONTENTS

A Conceptual Understanding of Leakage During Soil-Gas Sampling

Installation Procedure for your Disco Double Kit, by Airgun Lab, LLC.

SOIL GAS PROBE. In-Ground Radon Detection Accessory for the RAD7. DURRIDGE Hardened Steel Soil Gas Probe AMS Stainless Steel Soil Gas Probe

Florida Method of Test for MEASUREMENT OF WATER PERMEABILITY OF COMPACTED ASPHALT PAVING MIXTURES

DURRIDGE STAINLESS STEEL SOIL GAS PROBE

Quick run through of the four projects

CalCheck. Instrument User Manual V1.8

Table Top and Convertible Anesthesia Machine Models: M3000 and M3100 (SHOWN WITH OPTIONAL EQUIPMENT)

1.060 Set-Up and Priming of the Bypass Circuit. Perfusion Technology Department. Perfusionists

Section 3- Repair and Calibration Procedures

Figure 1: Plug in ion inlet of mass spec

Contact Person(s) : Isabel M. Fisenne APPLICATION

METHOD 204F--VOLATILE ORGANIC COMPOUNDS CONTENT IN LIQUID INPUT STREAM (DISTILLATION APPROACH) 1.1 Applicability. This procedure is applicable for

Please refer F 90 of the present manual for the identification of the valves used in the detector.

General Specifications: Forensic. Petrochemical Environmental. Lab Quality Analyses in the Field, It Goes with you Anywhere!

PCS 340 Core Saturator : 115 Volt : 230 Volt. Instruction Manual

Basic & Controlled Atmosphere Glove Boxes

Urgent Next visit Not urgent. All customers Selection of customers No customers

USER MANUAL CALIBRATED LEAK STANDARDS

Supporting Information for Micro-Collection of. Gases in a Capillary Tube: Preservation of Spatial

OMCL Network of the Council of Europe QUALITY ASSURANCE DOCUMENT

Welker Sampler. Model GSS-1. Installation, Operation, and Maintenance Manual

Inert Air (N2) Systems Manual

QUICK START GUIDE TO DRINKING WATER MONITORING

METHOD 2E - DETERMINATION OF LANDFILL GAS PRODUCTION FLOW RATE. NOTE: This method does not include all of the

Automated Determination of Dissolved Gases in Water Anne Jurek. Abstract: Discussion:

GSE CAGING BALLAST SYSTEM INSTALLATION

Product Test Report F.A. Lennon Drive December 2015 Solon, Ohio U.S.A. Page 1 of 7. Valve Series Description Test Pressure Test Qty.

Solvent System Walkthrough

Generating Calibration Gas Standards

2 Sentry MVS Installation, Operation & Maintenance

Gas Diluter Portable Gas Dilution System User s Manual

Natural Gas to L.P. Gas Conversion Kit

OPERATING INSTRUCTIONS

Calcimeter Instruction Manual

Title: Standard Operating Procedure for Dasibi Model 5008 Gas Dilution Calibrator

SCF Enviro-Friendly. Back-up Ring. Endcap. #7141 (for both) O-Ring. Back-up ring and O-ring fit onto end cap.

DynaPak 2000L System Support Manual Version

Superconducting Susceptometer (MPMS-5S) Quantum Design Room 296 (MPMS)

GCMSD-Headspace Analysis SOP

OPERATING INSTRUCTIONS

Installation Instructions

EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax:

Owners Manual. Durham Geo-Enterprises,Inc. Triaxial Panel Phone: Fax: Web site:

UNITY 2 TM. Air Server Series 2 Operators Manual. Version 1.0. February 2008

Applications of a Magnetic Sector Process Mass Spectrometer to the Analysis of Variable Vacuum Samples

For Biogeochemistry at ICEX 2011

Environmental Petrochemical, Pharmaceutical, Foods & Flavors, Chemicals, Personal Care, Forensics,...and more!

OXY FUEL SYSTEM SET UP & SHUT DOWN PROCEDURE CHECKLIST ACETYLENE FUEL GAS

Procedure for Operating Columbia (Nevis) LHe Electron Bubble Chamber Cryostat. Version 5.1

NCASI METHOD IM/CAN/WP IMPINGER/CANISTER SOURCE SAMPLING METHOD FOR SELECTED HAPS AND OTHER COMPOUNDS AT WOOD PRODUCTS FACILITIES

TANK MATE INCLUDES: TOOLS REQUIRED: CONRADER VALVES 3/4 WRENCH **TUBING CUTTERS TEE PETCOCK TEE ASSEMBLY 8 FOOT NYLON TUBING

Exhibit 4. Determination of Static Pressure Performance of the Healy Clean Air Separator (Executive Orders VR-201-N and VR-202-N)

Description Advanced Features Typical Applications

Schroeder Check Test Point System

Inflatable Packer Single & Double. Single & Double Packer Dimension. Wireline Packer. Water Testing Packer (WTP) Packer

Digital Vacuum Regulator

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER COMPOSITE GAS SAMPLER

AKTA MC SOP Page 1 9/27/04 AKTA METAL CHELATING SOP

VALVE INNOVATIONS. Split Ball Valve series. The patented split ball valve design is a one stop shop for all your portal access needs.

Chemical Injection Technologies Installation/Service Bulletin

Twin & Triple Control Concealed Thermostatic Shower Valve

Variable Temperature Storage Dewar Mount Inserts

Heat Pump Connections and Interior Piping

36H SERIES Combination Gas Valve

ENSURING AN ACCURATE RESULT IN AN ANALYTICAL INSTRUMENTATION SYSTEM PART 1: UNDERSTANDING AND MEASURING TIME DELAY

Demystifying the Process of Calibrating your Thermal Desorption Gas Chromatography System using Compressed Gas Standards.

Constant Pressure Inlet (CCN) Operator Manual

DynaPak Gas Sampler S Y S T E M S U P P O R T M A N U A L DP-2000

MANUAL. Sesame. Thermoplastic Tank Technologies

MB-SP Series Solvent Purification System

Hydraulic Piston Accumulators

Installation Instructions WARNING: WARNING: WARNING: LP AND HIGH ALTITUDE LP GAS CONVERSION KIT FOR UNITED STATES INSTALLATIONS

The Discussion of this exercise covers the following points:

TECHNIQUES OF COMPOSITE SAMPLING. Kris Kimmel. YZ Systems, Inc Pollok Drive Conroe, Texas 77303

LESER Deutschland Standard Functional Tightness Test (Cryo) Content

Yoke Block Instruction Manual

Transcription:

EAS Basic Soil Gas Sampler Please Read The Following Important Information before Starting The EAS Basic Soil Gas Sampler has the traditional design where a pump or evacuated canister can be to purge the probe through the flow regulator. This configuration is not set up for a direct syringe purge of the probe. This sampler is used where a field measurement of the tracer gas is not required. Tracer will be measured by laboratory. The Soil Gas Sampler is fragile and should be handled with care. Make sure all connections are snug, but do not over tighten fittings. The instructions are based on the 2015 DTSC Advisory and are designed to provide general guidance for most projects. For projects where the procedure is critical, be sure to follow the regulators protocol or your approved project plan. When sampling is completed, put the samplers back in the original boxes to protect them. The EAS Basic Soil Gas Sampler has the traditional, easy to use design for the rapid collection of soil gas samples where the leak check compound is not going to be measured in the field and a syringe is not going to be used for purging the probe. This sampler connects directly to the ¼ probe tube and uses an evacuated canister or pump to purge the probe through the flow controller at a flow rate of 100 ml/min. This sampler can be used with any leak check compound including Helium but it does not have the three-way valve needed to make a field measurement of the leak check compound from the probe. If you need the 3 way-valve, call us and we will send one that can be easily attached to the sampler in front of the flow regulator. Do not try to reconfigure the sampler in the field without calling us or you risk damaging it or creating leaks. Summary of Steps for Collection of Sample Connect Flow regulator to : Remove the cap from the canister and connect the canister to the gauge end of the soil gas sampler. Keep the ball valve capped when not in use. See Figures. Shut In Test: Conduct the Shut In test to check for leaks in the canister/sampler system before connecting the sampler to the well tubing.

Probe Purge: After the Shut In test the probe needs to be purged before sampling. Leak Check: The soil probe is leak checked by using a leak check compound placed on a rag or in a shroud during sample collection and measuring it in each canisters at the laboratory. Let the laboratory know which leak check compound was used. Shut In Test The Shut In test leak checks the sampler system with the canister connected. To prepare for this test connect the sampler to the canister that will be used for sample collection. The correct configuration is shown in the Figures. Place a cap on the inlet to the soil gas sampler. Connect an evacuated purge canister or vacuum pump to the ball valve that is used to flush the sampler. Open the ball valve and put a vacuum on the sampler to at least 100 in water (about 7 in Hg). After a few seconds close the valve, tap the gauge gently and wait for the reading to stabalize. After stabilization, the gauge reading should remain stable for 1 minute. If there is a leak, check the connection to the canister and the sampler and make sure the cap on the sampler is tight. Use two wrenches to tighten the fittings especially on the flow orifice. Do not over tighten fittings. If this does not fix the problem call Steve Hoyt at (805) 781-3585 cell (805) 801-5660. Purging Probe and Sampler The 2015 guidance document does not recommend a purge volume test. It recommends a purge volume of three times the volume of the tubing, and the void space in the well. This applies to both old and new wells. The flow regulator on the soil gas sampler has a flow rate of about 100 ml/min, so the purge time can be calculated using the equation below. Time (min) = Purge Volume ml / 100 ml/min

To purge the probe, first make sure that the canister valve is closed, then turn on the purge pump or open the valve on the evacuated purge canister. Open the Purge Shut Off Valve (see Figure 1). Purge the system for the calculated purge time and close the value. Collecting Sample Make sure the probe has been purged and the Purge Shut Off valve is closed. You can remove the pump or purge canister at this time and put the cap back on the ball valve. Open the sample canister valve to start collecting the sample. Record the initial vacuum, sample time, canister number, and sampler number on the Chain of Custody along with the other information. The flow rate into the canister is approximately 100 ml/min. The sample time in porous soil for a 3 liter canister would be about 30 minutes. If the soil is not permeable then the sampling time may be longer. Fill canister to about 5 vacuum and close the valve on the sampling canister. The vacuum in the canister can be between 15 and 2 of mercury for a valid sample. Close the canister valve and remove the canister from the sampler and send back to the lab. NOTE: The current DTSC guidance document specifies a holding time of 30 days for the SUMMA canisters. If your project plan has a different holding time be sure to record it on the Chain of Custody form. When Done: Ship the Sampler and back to Environmental Analytical Service, Inc. Sample Control Environmental Analytical Service, Inc. 173 Cross Street San Luis Obispo, CA 93401 (805) 781-3585

Attaching Soil Gas Sampler to Cap Flow Regulator 100 ml/min Two Way Purge Valve Vacuum Attach Purge Pump/Purge Can to Valve for Purge Screw Soil Gas Sampler to. Tighten Until Snug Cap Valve Sample

Flow Path for Leak Check Cap on Inlet for Leak Check Flow Regulator 100 ml/min Vacuum Two Way Purge Valve OFF Position Cap on Valve Valve Open for Leak Check Sample

Flow Path for Probe Purge Purge Through Flow Regulator at 100 ml/min Connect to ¼ Teflon Soil Gas Probe Line Flow Regulator 100 ml/min Vacuum Two Way Purge Valve OPEN Position Valve Closed for Leak Check Purge Port Connect to Purge Pump or Evacuated Sample

Flow Path for Sample Collection Connect to ¼ Teflon Soil Gas Probe Line Flow Regulator 100 ml/min Vacuum Two Way Purge Valve OFF Position Cap on Valve Valve Sample

EAS Soil Gas Sampler Connect to ¼ Teflon Soil Gas Probe Line. Pressure/Vacuum Purge Shut Off Valve To Vacuum Pump