Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014

Similar documents
Traffic and Flood Control Improvements in the Transit Oriented Development District Project Updates Tuesday, November 29, 2016 Meriden Public Library

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

Lawrence Avenue Streetscape Concepts August 30, 2011

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Non-Motorized Transportation 7-1

Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013

5. RUNNINGWAY GUIDELINES

New Park Avenue Corridor West Hartford

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

San Jose Transportation Policy

S T A T I O N A R E A P L A N

Telegraph Avenue Complete Streets DRAFT Recommendations. Oakland Public Works Department September 11 and 13, 2014 Open Houses

PEDESTRIAN CIRCULATION & STREETSCAPE DESIGN

MARTIN LUTHER KING JR. WAY

NEWMARKET UPHAM S CORNER

Town of Ashland. Downtown Planning Initiative 2 nd Community Workshop. March 29, Presented by:

Bridgewater Complete Streets Prioritization Plan and Pedestrian Safety Assessment

CITY OF PORTSMOUTH PLANNING DEPARTMENT

Derby Street. Project Updates. Salem, Massachusetts

UDC Street Cross Sections

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

STONY PLAIN ROAD STREETSCAPE

Design Guidelines. Overview. Design Vision for Yellow Brick Road

14 TH STREET TRANSPORTATION & STREETSCAPE DESIGN STUDY PLAN B PLAN B TRANSPORTATION & STREETSCAPE RECOMMENDATIONS

Outreach Approach RENEW SF served as the primary liaison with the North Beach community; the Chinatown. Executive Summary

City of Wilsonville 5 th Street to Kinsman Road Extension Project

Transportation Planning Division

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

Enhancing Downtown

Prince George s County plans, policies, and projects

Miami Health District

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

Executive Summary Route 30 Corridor Master Plan

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

Community Task Force November 15, 2017

Bicycle and Pedestrian Connectivity Study. Old Colony Planning Council

Bicycle Facilities Planning

Oakland Pedestrian Master Plan Oakland Pedestrian Plan Draft Recommendations Chapter Outline

Ocean Park Boulevard Green Street Project Community Workshop

UNIVERSITY AVENUE CORRIDOR REDESIGN. January 8, 2017 PUBLIC OPEN HOUSE

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

12/4/2016 VIA . RE: Grocery Outlet Del Paso (DR16-328)

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX

Hennepin County Transportation Department

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

Fulton Market Streetscape

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

5 Circulation & Parking

Appendix C 3. Bicycle / Pedestrian Planning

About the Studio. Edward J. Bloustein School of Planning and Public Policy - Rutgers University

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

Geary Corridor Bus Rapid Transit SFMTA Citizens Advisory Committee

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

KEARNY MESA COMMUNITY PLAN UPDATE

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

Montford Drive Parking & Circulation Study

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

EXECUTIVE SUMMARY. Vision

Environment and Public Works Committee Presentation

6/14/2013 VIA . Evan Compton, Associate Planner Community Development Department City of Sacramento 300 Richards Blvd Sacramento, CA 95814

TRANSPORTATION & MOBILITY VISIONING MEETING. August 23 24, 2017

4 GENERIC COST ESTIMATING TOOL

COMPLETE STREETS PLANNER S PORTFOLIO

Improvements Infrastructure Gap Assessment and Improvements Street Striping


The Wiggle Route in Context

and older adults and people with disabilities still face barriers when using the pedestrian network and public transportation.

C C C

6/22/2018 VIA . Darcy Goulart, Planning Manager City of Rancho Cordova Planning Department 2729 Prospect Park Drive Rancho Cordova, CA 95670

THE ALAMEDA CONCEPT DESIGN COMMUNITY MEETING 3. A Plan for The Beautiful Way JANUARY 28, 2010

Existing Pedestrian Conditions. PSAC February 8, 2011

Transportation Planning Division

A Complete Streets Policy for Saratoga Springs. Presented By: Shared Access Saratoga

Public Information Centre

Broad Street Bicycle Boulevard Design Guidelines

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

2.0 Existing Conditions

Appendix A-2: Screen 1 Alternatives Report

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

5 CIRCULATION AND STREET DESIGN

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811

Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs

Technical Working Group November 15, 2017

Designing Complete Streets: What you need to know

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

Transcription:

Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014

Project Overview Coordinate roadway improvements with other major projects HUB Flood Control Train Station Transit Oriented Development District Zoning Housing (24 Colony Street, Record Journal Building)

Project Overview Implement two-way traffic on West Main Street / East Main Street, Cook Ave, Hanover Street and Perkins Square Benefit downtown businesses Improved traffic circulation Pedestrian and bicycle networks Better strategies for intracity and intercity bus travel

Project Overview Mitigate traffic impacts associated with High Speed Rail crossings Enhance Vehicular and Pedestrian Safety Enhance existing Streetscape Brick pavers Street trees Pavement condition

Public Input Public informational meeting at Lincoln M.S. Public meeting at library Stakeholders Streetscape / Pedestrian / Biking Stakeholders Parking and Loading Business owners at Café Dolce Parking Authority and Police Department Wells Fargo

Challenges Physical Constraints Limited Right of Way Utilities Railroad crossings

Challenges Competing interests Motorists Parking Public transportation Pedestrians Bicyclists Businesses

Challenges Parking and Loading Management On-street Off-Street Loading zones Bus stops

Challenges Maintenance Design an attractive downtown Minimize long-term maintenance costs Funding Identify sources of $$$ Significant costs Work within existing curb saves $$ Minimize acquisitions We get one shot at this. Let s do it right.

Streetscape Elements Preliminary Design Roadway configuration Changing One-Way Streets to Two-Way Streets Curb Extensions Raised Medians Wide travel lanes to accommodate bicycles

Streetscape Elements Preliminary Design Pedestrian Facilities Mid-Block Crosswalks Pedestrian & Bicycle Crossing Signals Pedestrian Refuge Islands Shared Use Trails Countdown Signals Bicycle Facilities Shared Lane Markings Parking

Streetscape Elements Final Design Visual Treatments Sidewalks Replacement of bricks with standard concrete Color at key locations / interest centers / intersections Maintain Personalized Bricks Crosswalks High Visibility Crosswalks Stamped concrete Bus stops / loading zones Differentiated with textured pavement

Mid-Block Crosswalks High Visibility Crosswalks Location: Hartford, CT, USA Photo Credit: Dave Sousa Location: Portsmouth, NH, USA Photo Credit: Dave Sousa Location: Williamstown, MA, USA Photo Credit: Dave Sousa Location: Albany, NY, USA Photo Credit: Dave Sousa

Curb Extensions (Bulb-outs) Location: Dublin Ireland Photo Credit: Dave Sousa Location: Vancouver, BC, Canada Photo Credit: Dave Sousa

Raised Medians / Pedestrian Refuge Islands Location: Banff, B.C., Canada Photo Credit: Dave Sousa Location: West Hartford, CT Photo Credit: Dave Sousa Location: Unknown Photo Credit: Dan Burden, Walkable Communities

Shared Use Trails Location: Florence, Italy Photo Credit: Dave Sousa Location: Simsbury, CT Photo Credit: Dave Sousa Location: Calgary, Alberta, Canada Photo Credit: Dave Sousa

Proposed Improvements MAJOR IMPROVEMENTS Cook Ave West Main Street East Main Street Hanover Street Perkins Square Pratt Street Colony Street LEGEND RED - New Concrete DARK BLUE - Removal GREEN Ped / Bike LT BLUE - Parking ORANGE - Bus / Loading

Cook Avenue

West Main Street

West Main Street / East Main Street

East Main Street

Hanover Street

Hanover Street

Perkins Square

Pratt Street

Pratt Street

Pratt Street

Pratt Street

Colony Street

Proposed Improvements OTHER IMPROVEMENTS Church Street Barristers Court Grove St / South Grove St Butler Street State Street

Wayfinding

Wayfinding

Project Phasing Short Term West Main Street Colony Street to Cook Ave Removal of bumpouts Colony Street - West Main to Church Street Removal of bumpouts Pedestrian enhancements at Colony St and Church St

Project Phasing Short Term East Main Street Pratt St to St Casimer Dr Bus stop at St Casimer Dr Cook Ave Hanover St to West Main St Conversion from one-way to two way traffic Church Street Colony St to Barristers Court Conversion from one-way to two way traffic Better access to parking garage

Project Phasing Long Term State Street State Project Hanover Street Cook St to Colony St Pratt Street East Main St to Broad St Perkins Square West Main Street Colony St to Cook Ave East Main Street

Funding Sources Bonds Grants Nationally Competitive TIGER Regional Council of Governments Routine Capital Improvements Paving Sidewalks

Looking Forward Address comments, questions and concerns regarding this plan Finalize part or all of the design work Explore and secure funding for project phases Coordinate construction activities with the businesses to minimize impacts

Question and Answer General Whole Audience Specific Separate Sections