Glove Box with Gas Purification System and Digital Control VGB-6. MTI Corporation

Similar documents
Glove Box Installation Manual

Equipment Operating Procedure Glove Box

MB-SP Series Solvent Purification System

School of Chemistry SOP For Operation Of Glove Boxes

Manual Solvent Purification System. Innovative Technology, Inc.

University of Minnesota Nano Center Standard Operating Procedure

Standard Operating Procedure

OPERATION MANUAL NTF-15

Standard Operating and Maintenance Instructions for Pumping System Model PS-90

WIDDER TOOLS. HPICAL Calibration Station 1 (203)

INSTALLATION. and INSTRUCTION MANUAL. for QUALITY AIR BREATHING SYSTEMS. Model 50 Systems Outfitted with ABM-725 Monitor C O M P A N Y

OPERATION MANUAL NTF-60 Plus

NGP-250/500 Nitrogen Generator Quick Start Guide

Operation Manual - PN A MENSOR MODEL 73 SHOP AIR BOOSTER

Nitrogen Tyre Inflator Owner s Manual

NTF-230 OPERATION MANUAL

ACV-10 Automatic Control Valve

Procedure for Operating Columbia (Nevis) LHe Electron Bubble Chamber Cryostat. Version 5.1

VACUUM REGULATORS CONTENTS

Operation Instruction Manual

Vacuum Pumpdown and Venting Procedure, CRaTER Thermal Vacuum System. Dwg. No

Ventam 85 Installation & Commissioning Instructions

OPERATION MANUAL RTI RHS650 RTI TECHNOLOGIES, INC East Market Street York, PA Manual P/N

NTF-515. Operation Manual

STANDARD OPERATING PROCEDURES. Andersen Instruments Federal Reference Method (FRM) Ambient Particulate (PM 10 /PM 2.

OWNER S TECHNICAL MANUAL

Instructions for SILEX 1C Mixed bed cartridge filter

OPERATION MANUAL Please read this Operation Manual carefully before use, and file for future reference.

PRS(TC)4,8 USER MANUAL. Read the complete manual before installing and using the regulator.

Instruction Manual Recovery Station

450P- RV AUTOMATIC PORTABLE COMPRESSOR EXTREME SERIES

42045 Heavy Duty ADA Base Model Kit: 85/105 PSI (ADA Compressor Only) Heavy Duty ADA Base Model Kit: 110/145 PSI (ADA Compressor Only)

User s Guide. Vacuum Controller for liquid delivery systems

RS(H)10,15 USER MANUAL. Read the complete manual before installing and using the regulator.

AQUARIUS. Operating Instructions for the. Type 70 Electrolytic Gas Soldering / Welding Unit. Table of Contents

450P AUTOMATIC PORTABLE COMPRESSOR EXTREME SERIES

OXY Integral. INTERCON ENTERPRISES INC Tel: Fax: Internet:

MoveRoll Conveyor Operating and Maintenance Manual

LRS(H)4 USER MANUAL. Read the complete manual before installing and using the regulator.

Code AWC20HP Air Compressor

SERVICE MANUAL MODEL BA050BMST BREATHING AIR PANEL

Superconducting Susceptometer (MPMS-5S) Quantum Design Room 296 (MPMS)

SERVICE MANUAL MODEL BA100BMST 100 SCFM PORTABLE AIR PANEL

Information Sheet. About this information sheet. Floor and wall loadings. Attachment of process module to floor. PlasmaPro Estrelas100

OPERATION & MAINTENANCE MANUAL NG6/1 YOUR RELIABLE PARNTER IN LABORATORY GAS HANDLING

O P E R ATING INSTRUCTIONS FOR MODEL SPR-45 Automatic Screen and Stencil Printer

OPERATOR S MANUAL Ar-Gone Weld Gas Analyzer

FILTER REGULATORS MODEL NO: CAT155 & CAT156 FITTING & MAINTENANCE INSTRUCTIONS PART NO: & ORIGINAL INSTRUCTIONS

Basic & Controlled Atmosphere Glove Boxes

Model Series 62 Constant Differential Relay

Universal Valve Company Inc

3 GALLON, OILLESS PANCAKE COMPRESSOR INSTRUCTIONS. Item #31289

SPECIFICATIONS Type: Twin stack, single phase Tank: 4 gallon Air Output: PSI; PSI Max PSI: 125 PSI HP: 1.

Budget Range Operators Handbook

ABRASIVE REGULATOR II

Hazards associated with the gas system and how to mitigate them

B. Assemble the Method-25 sample train with a heated probe/filter.

VETROSON. OXY-GEN SYSTEMS (Oxygen Generating Systems) Question & Answer Brochure

Purge Star & Ring Purge Systems

AIR COMPRESSOR. Failure to follow all instructions as listed below may result in electrical shock, fire, and/or serious personal injury.

Table of Contents Want full page pictures with most important parts labeled in the beginning.

SRI Model H2-40 Hydrogen Generator Operation and Maintenance Nov 2006

Series IRV1000/2000/3000

User s Guide. Pressure Controller for liquid delivery systems

INSTRUCTION MANUAL. January 23, 2003, Revision 0

200 PSI COMPRESSORS - MODEL NUMBERS

Operating Manual. Model BAC-30RT30/BAC-30DC

Installation and operating manual. Pneumatic control station LK product no: PCS 1-10

AIR HAMMERS MODEL NO: CAT138/CAT139 OPERATING & MAINTENANCE INSTRUCTIONS PART NO: / GC064

ATEX VACUUM PUMPS AND GAUGES CHEMICALLY RESISTANT, OIL-FREE AND SAFE

CARTRIDGE FILTERS. Models: CF50, CF75, CF100, CF150,

Oxford Instruments Plasma Technology. PlasmaPro NGP80. Installation Data Sheet. Original Instructions.

product manual HM-4140, HM-4150, HM-4160 HM-4160A HM-4150 Humboldt FlexPanels

Operation Manual Air Saver Unit ASV5000 Series

Universal Valve Company Inc

Tank Blanketing Pressure Regulators RHPS Series

PROPORTIONING VALVE. Model 150 INSTRUCTION MANUAL. March 2017 IMS Company Stafford Road

The X-11 Molding Chamber

INTRODUCTION. The Quantum Technology system has the following advantages:, as it does not need plastic gas-bags which are volume-consuming,

RDK-408D2 Cold Head. Technical Manual. SHI-APD Cryogenics Inc Vultee Street Allentown, PA U.S.A. Revision A: September 2005

24L OIL FREE AIR COMPRESSOR MODEL NO: TIGER 7/250 PART NO: OPERATION & MAINTENANCE INSTRUCTIONS LS10/13

PRODUCT OPERATING MANUAL

2 GALLON TWIN STACK AIR COMPRESSOR W/ HOSE REEL

ABRASIVE REGULATOR II

LUBRICATOR ASSEMBLY AND OPERATING INSTRUCTIONS

Instructions for Assembly, Installation, and Operation of the Gas Addition Kit Accessory with the CEM Discover Systems

OPERATING INSTRUCTIONS MANUAL FOR QACV PNEUMATIC DOSING PUMP

Inert Air (N2) Systems Manual

SomnoSuite FAQ. Setup. Calibration 4. What are the calibration requirements for the SomnoSuite? Settings

100C Air Compressor Kit

INSTRUCTIONS FOR MODELS SG3897 AND SG3898 CROSS PURGE ASSEMBLIES

1020 Industrial Drive, Orlinda, TN fax

2 Sentry MCL Installation, Operation & Maintenance

Installation Instructions for NP100 Series Nitrogen Control Panels

ETL listed for installations within 5 ft. (1.5M) of outer edge of water

Operation Manual. Carbon Filtration Industrial Drive, Orlinda, TN fax

Operating Instructions Foreline Trap Right Angle and Inline

APPS-160 Gen 2 User Manual

420C AIR COMPRESSOR KIT PART NO C AIR COMPRESSOR KIT PART NO

250C-IG COMPRESSOR KIT 12V PART NO C-IG COMPRESSOR KIT 24V PART NO

Transcription:

Glove Box with Gas Purification System and Digital Control VGB-6 MTI Corporation 860 S 19 th Street, Richmond, CA 94804, USA Tel: 510-525-3070 Fax: 510-525-4705 E-mail: info@mtixtl.com Web site: www.mtixtl.com

Content Features... 3 Specifications... 3 Preparation... 3 Installation... 5 Operation... 14 Circulation... 18 Operation... 18 Regeneration... 21 Maintenance... 23

Features Siemens PLC control system with 6" touch screen display for easy accessing all functions. Recirculation system: closed-loop gas circulation, oil free and vacuum tight. Automatically pressure control: working pressure can be set in the range of +/-12mbar. Automatically purging for convenient operation and saving gas as well as safe for operating solvent. Equipped with 9 3/ 4" butyl gloves for immediate use. Pressure can be regulated via foots witch. Automatically log system s data. Specifications Glove-box Housing: 3mm thickness stainless steel (SS304) with removable back panel Chamber Size: 1220mm L x 900mm H x 760mm W Total dimension: 3600mm L x 900mm H x 1000mm W Leak rate: <0.05 vol%/hour Bellows Tube: Stainless Steel 304, KF40 and KF25 Glove Ports: 9 aluminum glove port Lighting: Fluorescent lamp at the top of the front window. Main Air-lock Chamber: Diameter 360mm x length 600mm, made of 3mm thick SS304 Small Air-lock Chamber: Diameter 100mm x length 300mm, made of 3mm thick SS304 Gas Purification System: Made of SS 304 and automatically regenerated One H2O/O2 purifier column designed to maintain O2 & H2O < l ppm Lindy Molecular Sieve and BASF R3-11 Copper Catalyst. Capacity of 30 liters of O2 & 1.3kg of moisture before regeneration Pressure control: Automatically controlled by PLC, Working pressure can be set in the range of +/-12mbar. Circulation system: Oil free & Vacuum tighten (0-60 CFM continuously variable blower). Regeneration: Automatically programmed regeneration Vacuum pump: RV-8 Edwards Vacuum Pump and oil mist fitter included (Vacuum Rate: 8m³/h). Power: Single phase, Standard 204-240VAC (50/60Hz), 110V is available by MTI s transformer Warranty: One year Note: Working and regeneration gas are not included in the package, please order from local gas supplier. Preparation 1. Operation Environment Temperature: 15-25 º C (air conditioner required if out of this range) Operation Room: Good ventilation and dry 2. Gas Requirement Working Gas Gas Type Nitrogen, Argon, Helium Purity 5ppm H 2 O, 5ppm O 2 Gas Amount Requirement Continuous supply Gas Regulator (Figure 10) Input: >150bar (>2175 PSI); Output (to controller inlet): 0~10bar (Atmosphere to 145 PSI) Table 1 Regeneration Gas Gas Type If N 2 as working gas, please apply mixing gas 90-95% N 2 and 5-10% H 2 If Ar 2 as working gas, please apply mixing gas 90-95% Ar 2 and 5-10% H 2 If He as working gas, please apply mixing gas 90-95% He and 5-10% H 2 Purity 5ppm H 2 O ; 5ppm O 2 Gas Amount Requirement Approximately 5000 Liter (in gas not liquid) per Regeneration Cycle Gas Regulator (Figure 10) Input: >150bar (>2175 PSI); Output (to controller inlet): 0~10bar (Atmosphere to 145 PSI) Table 2 Purge Gas Gas Type Same as working gas

Purity 5ppm H 2 O ; 5ppm O 2 Gas Amount Requirement 2.5 bottle of gas with pressure 2400 PSI (read from gas regulator s input) Gas Regulator (Figure 10) Input: >150bar (>2175 PSI); Output (to controller inlet): 0~10bar (Atmosphere to 145 PSI) Table 3 3. Gas pressure requirement 3-a. Working gas needs 4-5 bar (<70 PSI) input pressure with respect to atmosphere 3-b. Regeneration gas needs 0.5-0.6 bar (<7 PSI) input pressure with respect to atmosphere Note: Higher than above may damage the glove box system!!! 4. Safety 4-a. MTI does not suggest customer use radioactive or toxic material. 4-b. The device should be well grounded. 4-c. Customer must have fume hood or other waste gas disposal system connecting to the outlet of the regeneration gas. 5. Gloves Installation 5-a. One o-ring is wrapped inside the end of the glove; please put it to the o-ring groove closest to the window: 5-b. Install another two o-rings onto the outer grooves. Figure A Figure B Note: Put the gas into glove box and wait for 20-24 hours to check if any leaks (the glove would have little change in inflation status if no leaks, how to put gas will be discussed in Operation Chapter from 1-a to 1-h):

Figure C 6. Connection MTI has labeled all the parts need to be connected together, follow the letters from A to O to set up the connection: 7. Power Cable Figure D MTI leaves the naked power cable for customer because different countries have different power setup requirement, please ask a local licensed electrician to do the power setup for you, here, two power cables requires AC220V plug:

Figure E Power Extension on the back Figure F Power Cable for Controller 8. Sample Preparation Put the sample into the glove box via big or small transition chamber, if the sample or other equipment is much larger than the big transition chamber, please loosen the screws around front window to put it/them in and then reinstall the windows back. Note: You need at least 2 persons to remove the frond window glass and the frame; it is very heavy and fragile!!! Installation

1. Follow below picture to finish the tube connection: To figure 1-b Pressure Sensor Big Transition Chamber To Bottom of Glove Box High Pressure Hose Pump Mist Filter (KF25 Fitting) Vacuum Pump Figure 1-a

2 Spare KF40 (Hard to be noticed) To figure 1-a Figure 1-b To Pump Power Socket To Regenerating Gas Inlet To Regenerating Gas Outlet To Water Cooling Outlet To Working Gas To Water Cooling Inlet

Figure 2 Note: Working gas should be connected all the time when you are using the glove box, and its purity should be over 99.999% if you need the H 2 O and O 2 content lower than 1ppm. Water cooling is optional if your room temperature under 25C but a must when doing circulation, because it is used for cooling down the fan which is the impetus of circulation. Regenerating gas should be closed when working but a must when regeneration. Customer must have fume hood or other waste gas disposal system connecting to the outlet of the regeneration gas. Inside the controller Connect these two KF40 Figure 3-a Figure 3-b Right Side View Figure 3-c Left Side View

Back of the glove box: Attention: Proper use and storage of Oxygen Analyzer Power Extension Oxygen Analyzer Sensor Spare KF40 Figure 4 Please seal the Oxygen Sensor head by the blank flange and quick clamp after the completion of each experiment, the Oxygen Sensor head should not expose in the air for a long period of time, otherwise its lifespan would be affected. Working pressure range is 550~950torr, pressure beyond this range is not allowed. Please use proper valve to reduce pressure when pressure is too high Please disconnect the Oxygen Analyzer from Vacuum devices to avoid Oxygen sensor broken The use of acidic gas such as CO2 and HCl is prohibited If gas contain plenty of oily cent or impurity particles, please filter the gas before using Avoid big vibration when using Transition Chamber (One is big and one is small) Figure 4 Big Transition Chamber Small Transition Chamber This way to open this valve (For gas filling, discussed later) Figure 5-a

Ball Valve (Lift up to close) Left side of controller Figure 5-b To Pressure Sensor To Oxygen Analyzer Light Power To Light Power Cable Figure 6-a

Light Power Cable Figure 6-b To Light Power Power Input To Pedal To Power Socket to AC220V 50/60Hz

Figure 7 Note: A 1500W transformer is in standard packing to convert AC110V to AC220V for power input if you only have AC110V power supply. How to assemble KF40 fitting (Similar to the Bellows Tube) O-ring Mount the Blank Flange Mount Clamp Tighten the Screw The same way to install the valve on the spare port: Figure 8-1 Figure 8-2 Note: Keep the pump power button on 1, and the controller will automatically control its on/off via power cable.

This is 1 Keep it on 1 Figure 9-1 Figure 9-1 Operation 1. Purge the glove box 1-a. Make sure the gas source is well connected, for your reference, MTI use a gas regulator as below: To Gas tube of controller (Shown in Figure 2) To Gas Supply Figure 10 1-b. Adjust the working gas pressure around 25~40 PSI. 1-c. Adjust the power knob to the right to power on the controller.

Figure 11 1-d. You will see the controller self-testing for a few seconds and enter the main menu: Figure 12 Figure 13 (Do not touch these buttons; they are for factory setting only!!!)

Progress Bar to Display Air Pressure in Glove Box (Unit: mbar) (H 2 O Content in PPM) (O 2 Content in PPM) Figure 14 Main Menu Cycle: Slightly press once to do circulation (should enable after purge!!! Otherwise, may damage the circulation system) Pump: Slightly press once to manually power on the pump; press again to stop it. Light: Slightly press once to power on the light on the front top of the glove box. Set: Slightly press once to enter the setting menu. 1-e. Press Set to enter the setting menu:

1-f. Press the number after up pressure to enter the key pad: Figure 15 Setting Menu ESC: Exit BSP: Backspace +/-: Positive or negative the number Figure 16 Key Pad : Enter (Confirm) / : Move the curse to left or right 1-g. Please set up pressure to 6 and press Enter to confirm, and then down pressure to 4 (Unit is mbar, these two numbers are very important for purging!!!). 1-h. Press OK in setting menu and you will hear the solenoid valve inside the controller enables and the pressure in the glove box will increase until to 5mbar (by the progress bar) and the two gloves are put out by inside positive pressure, then, the solenoid valve will disable to balance the pressure there. Note: Wait for at least a few minutes to see if there is any gas leak; if yes, the pressure solenoid valve will anyhow open again to let gas in, check any possible points (for example by suds) where may leak such as KF40 fittings, doors of big/small chamber both inside and outside. If no leak, a. Close the gas source b. Shut down the controller power c. Open the valve to release the gas inside glove box to atmosphere. d. Put the all the research stuff into the glove box. e. Close the valve.

This way to open Figure 17 Gas Valve 1-i. Repeat 1-g and 1-h and then, half open the valve above to purge the glove box. You will hear solenoid valve inside the controller keeping on and off (It will be on to let gas in when pressure goes below 4 mbar and be off when new gas filling in until 5 mbar). With the on and off, the H2O and O2 will be driven out through the half-open valve. 1-j. Wait until H 2 O<50ppm and O 2 <200ppm and start the circulation. Circulation 1. Make sure H 2 O<50ppm and O 2 <200ppm by the display in the main menu. 2. Close the gas valve on the back of the glove box (in figure 17). 3. Go to setting menu (figure 15) and set back to default (up is 3 and down is -1 mbar). 4. Press Cycle to do circulation. 5. Wait for 8-12 hours, both O 2 and H 2 O will reach <1ppm even lower. Note: 1. Never close the working gas though no fresh working gas will go into the glove box from the gas source, keep the gas pressure there to enable the circulation fan, otherwise, the circulation fan will not work if pressure is 0. 2. See blow circulation schematic: Glove Box Purification System Circulation Fan Figure 18 Operation 1. Big Transition Chamber: Customer may need to put some big samples in the main chamber via big transition chamber while not disturbs the operation in the glove box. 1-a. Make sure the inner door of the big transition chamber in the glove box is well tighten.

2. Clockwise rotate to tighten the door 1. Make sure you can not press down this handle more which means here is interlocked Figure 19 1-b. Open the outer door of the big transition chamber: 2. Lift up this handle to open the door 1. Clockwise rotate the handle Sealing O-ring here Pull out the sample holder Figure 20 1-b. Put the sample on the holder and close the door then tighten the screws by the handle. 1-c. Keep the Gas Filling Valve closed as shown in figure 5-a. Open the ball valve (Figure 5-b) under the big chamber and press pump on the main menu (Figure 14) to vacuum the big chamber until the meter to -1, then close the ball valve and stop the pump by another press on main menu. Please note: If open valve, always power on pump first and then open valve. If close valve, always close valve first and then stop the pump.

Atmosphere Vacuum Limit Gas Filling Limit Figure 21 Pressure Gauge 1-d. Slowly open the gas filling valve (figure5-a) to let the gas inside the glove box be sucked into the big transition chamber. Please note that the reason why you should not fast open the valve is that the gloves may get blown out. 1-e. Close the valve until the gloves like in figure C (page 5) and then, wait until the new working gas goes into the glove box to meet the gas range you set (remember, -1 to 3 mbar you set in Step 3 in Circulation). 1-f. Repeat 2-3 times from step 1-c to 1-e. 1-g. Open the inner door of the big transition chamber and pull out the sample holder to get the sample. 2. Small Transition Chamber: Customer may need to put some small samples in the main chamber via small transition chamber while not disturbs the job in the glove box. 2-a. Open the outer door of the small transition chamber and put the sample in. Lift up this handle to open the door Push this handle to make sure this door is tighten well Figure 22-a Figure 22-b 2-b. Close the door. 2-c. Adjust the T-valve (Figure 23-a) under the small transition chamber to Vacuum and then enable pump to vacuum the chamber to -1 by the pressure gauge. 2-d. Adjust the T-valve to close. 2-e. Adjust the T-valve to Gas Open to flow gas into the small transition chamber to 0 by the pressure gauge. 2-f. Repeat 1-2 times from step 2-c to 2-e. 2-g. Open the inner door to get the sample out.

This is valve close Vacuum Filling Figure 23-a Arrow to Vacuum means vacuum the chamber by pump Arrow to Filling means gas from glove box to this chamber Figure 23-b Figure 23-c Regeneration/Reactivation 1. The purification system which is used in circulation (Figure 18) needs to be reactivated when you find circulation time to your target PPM becomes much longer than usual, we suggest an empirical value as blow: 1-a. Go to Record View from System Set (figure 15) and get the value in third row T (Distance last time: Hour). Figure 23 1-b. Then the empirical interval between two regenerations is T-10 in hours. 2. Regeneration Gas

2-a. Choose proper regeneration gas by following the table 2. 2-b. Connect the regeneration gas source to Regeneration Gas Inlet (in Figure 2) and outlet to gas disposal system (MTI do not provide disposal machine/system, please dispose the gas according to your local gas disposal regulation) 2-c. Adjust input pressure to 0.04-0.06 Mpa (5-8 PSI) and set pressure range, up to 3mbar and down to 1mbar in main menu. 2-d. Make sure the circulation is off and turn gas ballast on vacuum pump to 0 and then press the pump in main menu to enable the pump. I 0 II Ballast Adjustor Figure 24 2-e. Press Regeneration/Off in setting menu and it will become Regeneration/On which means the regeneration is on. 2-f. The program will give customer 2 minutes to adjust the input gas pressure to let the gas flow between 15-20L/min by floating flow meter: Adjust the pressure to let float in this range Float Figure 25 Note: Please check the gas source if flow meter has no response within 2 minutes after you enable regeneration. 2-g. The system will enable first section of regeneration program after the 2-mintue adjustment and at the same time, stop the gas flowing. 2-h. Every 2-3 hours, the gas will flow for a few minutes and then stop to enable new section of regeneration and the whole

regeneration will last for 15 hours, as below: Adjust Flowing Stops Flowing Stops Gas First Gas Section Flowing Flowing Second Section. Regeneration Finish (2 minutes) (2-3 hours) (2 minutes) (2-3 hours). Around 15 hours Figure 26 2-i. When the whole regeneration stops, please go to vacuum pump and turn gas ballast on vacuum pump to 1 to release the vapor in the pump, turn back to 0 after 15 minutes. During the regeneration procedure, please be kindly advised: Make sure the gas source is enough for 15-hour regeneration; check the gas supply amount every 1-2 hours. Adjust the pressure as in step 2-f every time when gas flowing enables shown in figure 26. It is OK to leave the machine auto-run when in section of regeneration. Do not enable the new circulation within 6 hours after a whole regeneration finishes. Do not attempt to resume regeneration within 6 hours if the regeneration stops abnormally, which means you could take a break for 6 hours and then restart the regeneration from step 2-d; otherwise, it may damage the controller. Keep the pump on during the regeneration. Do not touch the controller during the regeneration in case any burn. Maintenance 1. Glove Box 1-a. Make sure there is enough gas source. 1-b. If power failure during the process, you must press pump on main menu to enable the pump again after power recovery. Note: If above still can not start the pump, please disassemble the KF25 clamps to let air go into the vacuum hose, then reassemble it to enable the pump. 1-c. Use small transition chamber as possible as you can for sample delivery when working. 1-d. Do not wear watch, rings or any other sharp items to keep gloves from any penetration or worn-out. 1-e. Regularly check the oil level of the pump, refill the oil if the level lower than 2/3 of full scale. 2. Vacuum Pump Oil Change 2-a. Keep the pump running for 10 minutes to decrease the viscosity of the pump oil which will help it be poured out more easily. 2-b. Close the ball valve between the pump and big transition chamber. 2-c. Unplug the power cable from the pump and disassemble the KF25 clamp. 2-d. Remove either of the two caps of oil inlet and incline the pump body to pour the oil from the oil outlet (remove the cap) to a proper container underneath. Exhaust Used from Oil Outlet Fill New form Oil Inlet 2-e. Close the outlet and fill new oil from the inlet until the oil level to the 2/3 of the full scale and fill more if the oil goes lower than the 2/3 after a few minutes. Note 1: If you find the oil from the pump is too dirty, fill the new oil from the inlet to flush away the contamination stuff inside the pump to the container, repeat this purge process for a few times by refill the oil poured in the container, and then, fill new oil. 2-f. Close the inlet and reinstall the pump back to the glove box. Any other questions, please feel free to call us at 1-510-525-3070 or email info@mtixtl.com.

Packing List for VGB-6 Item Quantity Image Glove Box Main Chamber 1 pcs ( with power extension but without gloves) Gas Controller Pump 1 pcs (with pedals, gas tubes, oxygen analyzer Ethernet port, pump power cable and controller power cable, light power cable) 1 pcs Vacuum Pump Exhaust Filter 1 pcs Vacuum Pump Oil 1 bottle Glove 1 pair 31 L x 9-3/4 Diam. O-ring for Sealing Gloves 4 pcs O-ring for Big Transition Chamber 3 Pcs (2 has been installed on the big transition chamber for immediate us) O-ring for Small Transition Chamber KF40 Fitting Vacuum Bellows with 2 Clamps and Sealing O-ring 3 pcs (2 has been installed on the small transition chamber for immediate us) 2 pcs KF25 Fitting Vacuum Bellows with 2 Clamps and Sealing O-ring 1 pcs Oxygen Analyzer Sensor 1 pcs 1 O.D. Vacuum Tube 1 pcs 5/16 O.D. Gas Pipe 1 pcs

3/8 O.D. Gas Pipe with Swagelok Fitting 1 pcs Teflon for sealing the gas pipe (if applicable) 1 roll