PETONE TO GRENADA LINK ROAD OPTIONS NORTH OF TAWA

Similar documents
Western Corridor Plan 2012

2. Context. Existing framework. The context. The challenge. Transport Strategy

Community engagement guide May 2018

Western Corridor Plan. Adopted August 2012

13. Traffic and transport

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017

WHANGAREI IMPROVEMENTS

Ngauranga to Petone Cycleway

CAMBRIDGE SOUTH WEST PARK & RIDE

Technical note. 1. Introduction

Developing a Birmingham Transport Space Allocation policy. David Harris Transport Policy Manager Economy Directorate Birmingham City Council

CUERDEN TRANSPORT PROPOSALS

BELFAST RAPID TRANSIT. Ciarán de Búrca Director, Transport Projects Division Department for Regional Development

Bristol City Council has produced a draft Bristol Transport Strategy document.

Note this page is intentionally left blank for page layout purposes

Route 7 Corridor Study

Harriet Fraser Traffic Engineering & Transportation Planning

US 69 RELIEF ROUTE STUDY

SH3 Waitara to Bell Block

APPLICATIONS LODGED FOR MAJOR TRANSPORT UPGRADES

Regional Cycling Plan

9. Parking Supporting Statement

Wellington to Hutt Valley Cycle and Pedestrian Link

Design Workshops Summary of all Feedback January 2017

Peka Peka to North Ōtaki Expressway Integrated Transport Assessment

M6 Junction 10 Public Consultation

HAMILTON BIKING PLAN OUR VISION: A BIKE FRIENDLY CITY

Wellington s transport history. April 2016

Congestion Evaluation Best Practices

Transportation Corridor Studies: Summary of Recommendations

Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR. Consultation open from 24 September to 5 November 2018 SAY

Nixon, Green, and Dhu Varren Roads. Intersection Improvement Study

Auckland Transport s responses to feedback on proposed upgrades to the intersection of Mercari way and Don Mckinnon Drive

ONE SIZE DOESN T FIT ALL RECONCILING OVERLAPPING TRANSPORT NETWORKS IN A CONSTRAINED URBAN ENVIRONMENT

Welcome. Moturoa Shops Minor Safety Improvements. Community Consultation on Options. Please complete the feedback form.

Post Implementation Review

Auckland Council: Electric bicycle CBD trial

5 REQUEST FOR GRADE-SEPARATED PEDESTRIAN UNDERPASS CROSSINGS OF LESLIE STREET AND ST. JOHN S SIDEROAD TOWN OF AURORA

WELCOME TO OPEN HOUSE # 1 June 14, 2017

Meet the Regional Land Transport Committee (RLTC)

Project Description Form 6V

Keeping you connected

Congestion Management Report

REGIONAL ARTERIAL ROAD PLAN FEBRUARY

Anniedale - Tynehead NCP. Transportation Highway 15 & Golden Ears Way Analysis

February 10, 2015 Project: P

AMETI PANMURE: A SUSTAINABLE TRANSPORT SOLUTION - OR NOT? Phil Harrison, Opus International Consultants

Frome Street Bicycle Route

MILTON ROAD LLF PROJECT UPDATE

6. BREENS/GARDINERS/HAREWOOD INTERSECTION - SAFETY IMPROVEMENT PROJECT

Wellington City Council. Cycle Network Development Programme Business Case

National Transport Awards Cambridge Park & Ride

Regional Transportation Needs Within Southeastern Wisconsin

Congestion Management Report

APPENDIX F: TECHNICAL NOTE 22 (VICARAGE ROAD JUNCTION)

SH1 Western Belfast Bypass Transportation Assessment

CAMBOURNE TO CAMBRIDGE BETTER PUBLIC TRANSPORT PROJECT PHASE 2 PUBLIC CONSULTATION MADINGLEY MULCH ROUNDABOUT TO CAMBOURNE

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

Copenhagen Cycling Map. Red Lines Cycling facilities

Access Management Regulations and Standards for Minor Arterials, Collectors, Local Streets

Transportation Master Plan Advisory Task Force

PAEKĀKĀRIKI HILL ROAD / BEACH ROAD / SH1 INTERSECTION PROGRESS REPORT

NORTH TURNAROUND. Recommended Design: Expand the existing transit terminal

Guildford Borough (Draft)

El Paso County 2040 Major Transportation Corridors Plan

Christchurch 3 years on: - growing resilience

SELECTED ROADWAY CAPACITY ANALYSIS

HISTON ROAD Have your say on better public transport, cycling and walking journeys

21.07 TRANSPORT CONNECTIVITY AND INFRASTRUCTURE

Nottingham Cycle City Frequently Asked Questions

CYCLING CHARTER ACTION PLAN EXECUTIVE SUMMARY

Cycle Lanes Dixon Street (Worksop Road to Crayne Street)

Phone: Ref No: 06/2018/0884

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

Sixth Line Development - Transit Facilities Plan

CAMBOURNE TO CAMBRIDGE Better Bus Journeys: Phase One

New Seward and 36 th Avenue Intersection Conceptual Design

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Golden s Plan. For the Highway 6 & 93 Corridor

Access Management Regulations and Standards

MARKHOUSE ROAD IMPROVEMENTS

Roundabouts along Rural Arterials in South Africa

RESTRICTED ROADS (20 MPH SPEED LIMIT) (SCOTLAND) BILL. 1. Is reducing the speed limit to 20mph the best way of achieving the aims of the Bill?

Frascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation

Exhibit B: Proposed amendments to the Transportation Element of the Oakland Comprehensive Plan

Auckland Transport Monthly Indicators Report 2018/19

Presentation of Staff Draft March 18, 2013 COUNTYWIDE TRANSIT CORRIDORS FUNCTIONAL MASTER PLAN

EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY

Berwick Health and Education Precinct: Casey Amendment C207 (Part 1) Submission to Planning Panels Victoria

MIXED USE AND STREETSCAPE INTEGRATION Avondale Will Basil Juliana Zannotto

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Wellington Transport Strategy Model (WTSM) Update 2006

Launceston's Transport Futures. Greater travel options for the people of Launceston

RIGHT-OF-WAY INTERSECTIONS

Highway Engineering, second edition: Martin Rogers 2008 by Blackwell Publishing Ltd

DYNAMIC LANES FOR AUCKLAND

Walking and Cycling Action Plan Summary. A Catalyst for Change The Regional Transport Strategy for the west of Scotland

Tel: Karime Hassan Chief Executive Exeter City Council Civic Centre Paris Street Exeter EX1 1JN

RAA Submission to: The City of Adelaide Draft Integrated Movement Strategy Moving Adelaide

Transcription:

PETONE TO GRENADA LINK ROAD OPTIONS NORTH OF TAWA

THE QUICK FACTS Will keep the Hutt Valley Connected in an earthquake, slip or crash Creation of up to 550 brand new jobs Facilitates growth in areas like Lincolnshire Farm, Porirua & Seaview Mostly in cut through Horokiwi, so it will not be readily visible from Horokiwi or much of the Hutt Valley Every commuter between Porirua & the Hutt Valley will save around 30 minutes per day in peak travel A new interchange at Petone will make everyone s journey faster Better connections for communities, like Grenada North Facilitates improved connections & access to Belmont Regional Park Fill could be used to make a cycleway between Petone & Wellington

WHY WE NEED TO CONSIDER NORTH OF TAWA

OPTION 1 NO CHANGE OPTION 2 WIDEN SH1 3OPTIONS OPTION 3 TAKAPU LINK

OPTION 1 NO CHANGE FREIGHT EFFICIENCY NO EFFICIENCY GAIN RESILIENCE NO IMPROVEMENT COST $0M SOCIAL IMPACT NO DIRECT IMPACT PROPERTY IMPACT NO IMPACT ECOLOGY NO DIRECT IMPACT PUBLIC TRANSPORT NO IMPACT ON PATRONAGE NETWORK MODEL SUGGESTS SIGNIFICANT CONGESTION BETWEEN TAWA & TRANSMISSION GULLY BY 2031

OPTION 2 WIDEN SH1 FREIGHT EFFICIENCY NO EFFICIENCY GAIN RESILIENCE MINOR IMPROVEMENT DUE TO ADDITIONAL LANES ON SH1 PUBLIC TRANSPORT NO IMPACT ON PATRONAGE COST $25M $50M ECOLOGY MODERATE IMPACT PROPERTY IMPACT NETWORK MANAGES PREDICTED CONGESTION SOCIAL IMPACT CONSTRUCTION IMPACT ON PROPERTIES ALONGSIDE SH1 6 30 HOUSES AFFECTED LAND PARCELS AFFECTED

OPTION 3 TAKAPU LINK FREIGHT EFFICIENCY 20% EFFICIENCY GAIN RESILIENCE SIGNIFICANT IMPROVEMENT DUE TO THE ALTERNATE ROUTE PROVISION PUBLIC TRANSPORT NO IMPACT ON PATRONAGE COST $30M $60M ECOLOGY SIGNIFICANT IMPACT NETWORK MANAGES PREDICTED CONGESTION SOCIAL IMPACT CONSTRUCTION IMPACT ON PROPERTIES PROPERTY IMPACT 1 21 HOUSE AFFECTED LAND PARCELS AFFECTED

PETONE TO GRENADA FREQUENTLY ASKED QUESTIONS What are the benefits of improving journeys between Tawa/Porirua and Petone? By improving these journeys we can provide an additional route in and out of Wellington in the event of a crash or earthquake and we can open land for housing and industrial development. We can make freight movement more efficient, which can reduce the cost of your goods at the shops. The Petone to Grenada Link Road also has the potential to facilitate the construction of the Wellington to Hutt Valley Walking and Cycling Link. What does Petone to Grenada do to address congestion on the Esplanade? A new Petone interchange will improve the flow of travel onto State Highway 2 and as a result improve travel on the Esplanade. The interchange will ensure traffic can merge onto the highway more efficiently and will provide smoother travel along the Esplanade at peak times. This interchange could be built first to improve traffic sooner and facilitate further construction of the new Link Road. We will consider this possibility in the coming months. A Seaview Link could also assist traffic flow, which is something we are working with Hutt City Council to consider. Why not improve State Highway 58 instead? We need both a Petone to Grenada Link Road AND a safer State Highway 58. This will significantly improve Wellington s east and west connections, especially if there s an earthquake, slip or major crash affecting State Highway 1 or State Highway 2 near Wellington City. Isn t it too steep for freight? The gradient is similar to Ngauranga Gorge and because the Link Road will be more direct and efficient, modelling and feedback from the freight industry show it will be more attractive for freight operators. Is the road going through the Korokoro Valley? No, we re not touching the Korokoro Valley or Belmont Regional Park. A route on a fault line can t help us to be more resilient, can it? The Link Road avoids the Wellington fault, unlike State Highway 2, which is much closer. Also, the way we design and build roads now ensures that they can be opened again quickly after an earthquake helping us to get help faster. Why do we need to improve travel on State Highway 1 North of Tawa? Our information indicates we could need more capacity on the highway between Transmission Gully and the Link Road once both projects are built. So, we need to plan for what people could need in future as opposed to what we need right now. We are still working on how we could accommodate this anticipated future growth with three options to consider and then decide if we should make changes now as part of the full project, build it later or wait and see what happens in future. Isn t Petone to Grenada going to encourage more people to use their cars? What it s really doing is encouraging more people to do business and live in the region and growing our economy. While some people may drive more, new transport capacity also offers potential for new public transport links. Will walking and cycling be provided on the new Link Road? We re considering how to best accommodate walking and cycling on the route. This can boost people s travel options and enjoyment of the region when combined with the Wellington to Hutt Valley Walking and Cycling Link. How does Petone to Grenada connect with the Wellington to Hutt Valley Walking and Cycling Link? The Link Road could support the Walking and Cycling Link (if a Seaside Option is ultimately preferred) by providing surplus soil and rock to reclaim the shoreline, making the Walking and Cycling Link less expensive to construct. Among the project s benefits is that it improves the transport network s resilience between Petone and Ngauranga. What s the point of the Link Road? It s about making the region more resilient to major events and helping our economy to grow. It gives us more travel options and makes the region more attractive to live and do business in. It can generate up to 550 brand new jobs, improve travel to/from Wellington City on State Highway 2 and State Highway 1 and cut around 30 minutes off a Tawa/Porirua to Hutt Valley return journey.