Investigation of Cultural and Environmental History on the Hudson River Superfund Site, NY February 2011

Similar documents
Telemark 2012: In Search of Dalen s Submerged History

Charlottetown Marine Terminal Pipeline Decommissioning Project Description

EPA R6 Dive Team Operations Report. San Jacinto Waste Pits Channelview, TX December 9-10, 2015

Recent Research on the Roberts Buffalo Jump (5LR100),

RE: Grand Renewable Energy Park, Haldimand County, Ontario, Licence/PIF # P , P and P , MTC File HD00565

NEWS RELEASE. Fall Treatments on Lake George Tackle Invasive Asian Clams at Norowal Marina, Middleworth Bay, and Lake George Village

* POINT OF INTEREST AT KETTLE FALLS

Exploring the Prinz Eugen Indiana Jones Goes Underwater Lesson Plan

Tracing the People of the Sea : Archaeology and History of the Eeyou Marine Region

January 2012 (Revised July 2012) US Army Corps of Engineers Savannah District South Atlantic Division

Jane C. Waldbaum Archaeological Field School Scholarship Field Report

Proposed Marine Development at Doolin Non-Technical Summary for Environmental Impact Statement

Archaeological Documentation and Reconstruction of the 17A Derelict Vessel, Back River, Georgia

Union Pacific Railroad

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 4 OVER THE BEAVER RIVER ST. LOUIS COUNTY

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

THIS PAGE INTENTIONALLY BLANK

Phase I Archaeological Investigation for the proposed Batavia Stream Restoration at Kastanis, Ashland, Township of Ashland, Greene County, New York

Map Introduction: Grimsay Map 1

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT FEDERAL AID JOB PROGRESS REPORTS F LAHONTAN CUTTHROAT TROUT EASTERN REGION

HOW TO DIG A TEST PIT

NB Power Field Report. Completed by: Austin Paul. Report covering the period from: July 4 th - 20 th, Neguac Project

FINAL PHASE I ARCHAEOLOGICAL SURVEY CARTER ROAD

Eelgrass and Macroalgae Presence/Absence Preliminary Surveys BHP Proposed Grays Harbor Potash Export Facility A Task 400

Exhibit 2 Preliminary Conceptual Site Model

Hunters Point Naval Shipyard Environmental Remediation Program Overview

Marine Renewables Industry Association. Marine Renewables Industry: Requirements for Oceanographic Measurements, Data Processing and Modelling

Map 8: Ayrshire Coast: Ardrossan North Bay to Stevenston Pier Map Content Descriptions

TECHNICAL MEMORANDUM 002 EMORANNO. 001

Underwater Archeology off the cost of Magna Graecia

Big Game Hunters 10,000 to 8,000 B.C.

Angela Lane, Lowe Environmental Impact / Karen Akuhata (WDC) The Wairoa wastewater treatment system requires a replacement consent by May 2019.

Making Dublin More Accessible: The dublinbikes Scheme. Martin Rogers Colm Keenan 13th November 2012

STUDY PERFORMANCE REPORT

REBOUND. on the. It was the winter of 2000/2001, and it seemed like the snow

3 CONSTRUCTION. 3.1 Construction Methods and Sequence. 3.2 Construction Sequence

First Nations Liaison/Field Monitor Report. Completed by: Austin Paul. Report covering the period from: July 15 th July 29 th, 2016

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL

The Challenge of Wave Scouring Design for the Confederation Bridge

Task 16: Impact on Lummi Cultural Properties

BAYKEEPER. Utilizing Volunteers in Baykeeper s Oyster Restoration Program

UNDERWATER BRIDGE INSPECTION REPORT METRO DISTRICT - ANOKA COUNTY

Ninilchik Harbor Page 2 of 11

Between East and West The Phoenician Shipwreck off Gozo

Phase I Archaeological Investigations for the proposed Woodridge Cluster subdivision Town of Chester, Orange County, New York.

Barge MM 46 Response Natchez, MS Lower Mississippi River Mile Marker 363

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 4 - OTTER TAIL COUNTY

Portage Bay Park Design Commission Review 4: 90% Design Development January 5, 2017

PCBs in Fish Tissues at the Hudson River PCBs Superfund Site: Lower and Upper Hudson River Monitoring Update

Summary of Water Access for Marinas and Public Boat Ramps

October 16, GRDA CCR Landfill Compliance Report Grand River Dam Energy Center 8142 Hwy 412B PO Box 609 Chouteau, OK Dear Mr.

2012 INDUSTRY DAY Society of American Military Engineers - Omaha Post

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 101 OVER THE MINNESOTA RIVER DISTRICT 8 - REDWOOD COUNTY

CCR Closure Plan Ash Impoundment

Vieques Munitions Response: Current Issues

Maine Department of Environmental Protection (MEDEP) Stone Farm, Arundel Sample Collection - Data Report Summary Report Date: June 15, 2017

Fish population survey report

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 1 PINE COUNTY

Long Beach Island Holgate Spit Little Egg Inlet Historical Evolution Introduction Longshore Transport Map, Survey and Photo Historic Sequence

2016 Annual Work Plan

Friends of the Detroit River Habitat Restoration Project Update

A Nautical View of Vermont. Christy Leonard LS07055

LAKKOPETRA (GREECE) EUROSION Case Study. Contact: Kyriakos SPYROPOULOS. TRITON Consulting Engineers. 90 Pratinou Str Athens (GREECE)

JANUARY 2017 STUDY UPDATE. Logan City, Cache Co., CMPO

The Effects of Seasonal Stream Dewatering on Bull Trout, Salvelinus confluentus

APPENDIX G DREDGING STUDIES. G.1: Fish Related Dredgi g I pacts a d Mitigatio

Marine Environment Plans

In-situ preservation In Tropical Seas: Case Study on the Avondster Shipwreck

MDX SR 836/DOLPHIN EXPRESSWAY SOUTHWEST EXTENSION Project Development and Environment PD&E Study Miami-Dade County, Florida

50 th Annual CSU Archaeology Field School June-July, 2017

Standing Committee on Policy and Strategic Priorities. Mount Pleasant Industrial Area Parking Strategy and Access Improvements

A Remote-sensing Survey of Key West Harbor and Approaches,

Wrecking barge Petrus

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 4 - OTTER TAIL COUNTY

Cat Island Chain Restoration

MASER ASSOCIATES. Engineers Planners Surveyors TRAFFIC IMPACT ANALYSIS FOR PROPOSED RESIDENTIAL MULTI-FAMILY SEA GULL VILLAGE TOWNSHIP OF COLTS NECK

Kids College ~ Summer 2017 Copiah-Lincoln Community College ~ Natchez Campus

Scott L. Carpenter Recent Project List

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO OVER THE STRAIGHT RIVER DISTRICT 6 - RICE COUNTY

Know Your River River Loughor Salmon and Sea Trout Catchment Summary

MBMG Butte Mine Flooding Monthly Report BMFOU Consent Decree BU-SEH Remedial Action Monitoring Program Contract No TO-35 September 2013

SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA

Information for File # SEW

MINNESOTA FRESHWATER MUSSEL SURVEY AND RELOCATION PROTOCOL

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 7 OVER THE SNAKE RIVER DISTRICT 1 - PINE COUNTY

Comparison of Predicted and Measured Shoaling at Morro Bay Harbor Entrance, California

Inlet Management Study for Pass-A-Grille and Bunces Pass, Pinellas County, Florida

Figure79. Location map for the 10 NJBPN profile sites in Atlantic County, NJ 155

Assessment: Investigating the Past

Hydraulic Modeling of Stream Enhancement Methods

APPENDIX H. Risk-Based Disposal Application. Revised EE/CA. Lower Duwamish Waterway Superfund Site: T-117 Early Action Area

SHOOTING ISLAND RESTORATION: LIVING SHORELINE AND HABITAT CONSTRUCTION

APPENDIX R-2 VIBRATION AND OVERPRESSURE SOUND ASSESSMENT. RAINY RIVER PROJECT Final Environmental Assessment Report

ARCHEOLOGICAL REMAINS ON THE COAST OF NORTHERN BRITISH COLUMBIA AND SOUTHERN ALASKA

Proposed Sand/ Moram Mining Project at Gata No.- 17/1 Village- Sehjana, Tehsil & District- Hamirpur, U.P. RISK ASSESMENT RISK ASSESSMENT

Kasaan to Goose Creek Road Project Project Description U.S. Army Corps of Engineers Permit The following table presents the mile point of the culverte

Does DFO Need to Review My Project?

Request Number IR1-12: Flow Passage. Information Request

OPPORTUNITIES & CONSTRAINTS

Federal Railroad Administration. HUDSON TUNNEL PROJECT: WEEHAWKEN COMMUNITY MEETING January 18, 2018

Transcription:

Investigation of Cultural and Environmental History on the Hudson River Superfund Site, NY February 2011

Summary Waterline Design / Pre-construction Phase I Archeological Survey Phase II Archaeological Evaluation Phase III Archaeological Mitigation Waterline Construction Monitoring Hudson River Dredging, Fort Edward (Impact Mitigation)

Construction of Troy - Halfmoon Waterline There was a public concern in the downstream communities that dredging could resuspend PCBs in bottom sediments and affect the potable water. In response, the EPA constructed a new waterline from Troy on the east side of the Hudson River to Waterford and Halfmoon on the west side. The Waterline project traversed both banks of the Hudson River and associated riverine terraces and took place in an area of great archaeological sensitivity, thus requiring extensive archaeological efforts.

Construction of Troy - Halfmoon Waterline Waterford and Halfmoon use the river for drinking water. EPA built new water line from Troy for alternate water supply. Village of Stillwater has well field next to river. EPA built and operated GAC treatment for Village. Stillwater Halfmoon Waterford

Construction of Troy - Halfmoon Waterline: Route of Waterline

Construction of Troy - Halfmoon Waterline: Phase IA Documentary Research The proposed waterline route was mapped on historical maps in order to evaluate archaeological sensitivity of various segments. Source: Beers 1866

Construction of Troy - Halfmoon Waterline: Phase IB Survey Archaeological survey along the proposed waterline utilized various investigative procedures, including shovel testing at 50-foot intervals.

Construction of Troy - Halfmoon Waterline: Phase IB Survey In urban areas, archaeologists had to test between road beds and sidewalks.

Dickerson Street Site A prehistoric stone quarry was located on the east side of the Hudson River, at a location of bedrock outcrops and rock drumlins. Detailed archaeological investigations were conducted at the site and investigations discovered the presence of a 5,000-year-old alluvium approximately 20 feet above the current river level.

Dickerson Street Site Dickerson Street Site looking west toward the river.

Dickerson Street Site: Artifacts Chert fragments (byproducts of ancient stone tool manufacturing) observed on the ground surface on the floodplain within the Dickerson Street Site

Dickerson Street Site: Test Pits (Phase II/III) Phase II evaluation and Phase III mitigation were conducted concurrently due to time critical nature of the project Systematic testing at 15-foot intervals allowed the development of a site density map.

Dickerson Street Site: Phase II/III Trenching through prehistoric chert mine tailings.

Dickerson Street Site: Artifact Density Map Artifact Density Map Revealed Distinct Activity Areas

Dickerson Street Site Artifact Mining wedge

Water Works Site The Water Works Prehistoric Archaeological Site is located on the west side of the Hudson River. It lies on an alluvial terrace with a complex depositional history. Phase IA indicated that this site was historically an industrial site.

Water Works Site: Phase IB Phase IB investigation encountered significant amounts of fill on the site. Phase IB was expanded to include an effort to better understand the geomorphological history of the area.

Water Works Site A prehistoric occupational site was discovered 4 to 7 feet bgs, below the layer of fill

Water Works Site: Prehistoric Hearth

Water Works Site: Artifacts Bifaces and scrapers

Water Works Site: Artifacts Flakes Hammerstone

Archaeological Monitoring Additional archaeological recording can be conducted during construction Where access to the site is restricted until removal action is initiated When predictable archaeological resources are likely to be discovered during construction but are not likely to require full scale mitigation

Waterline Construction Archaeological Monitoring The proposed waterline traversed sections of the Old Champlain Canal (shown on historical maps).

Archaeological Monitoring Excavation was monitored by archaeologists when it crossed the canal.

Archaeological Monitoring Exposed section of the canal wall was mapped and photographed.

Investigation of Fort Edward Dredging near Roger s Island (2009)

Investigation of Fort Edward Section of shoreline at historical timbers recovery area (2009)

Investigation of Fort Edward Exposed Timber

Investigation of Fort Edward Underwater Investigation

Investigation of Fort Edward Underwater Investigation

Investigation of Fort Edward Excavation above timbers

Investigation of Fort Edward Timber Excavation

Investigation of Fort Edward Dewatering

Investigation of Fort Edward Clean gravel fill delivered by barge and clam dredge

Investigation of Fort Edward Timbers removed during dredging

Investigation of Fort Edward Timber PCB Sampling

Investigation of Fort Edward Interpretation of Finds: 1757 map N Historical research shows configuration of SW bastion and associated dock feature

Investigation of Fort Edward Georeferencing

Timber Curation Timber curation at LCMM

Dendrochronology Extracting samples