Plant Isolation Lock out/tag out Procedure

Similar documents
LOCK-OUT / TAG-OUT SYSTEM & PROCEDURE

LOCKOUT/TAGOUT PLAN August 2015

WHS PROCEDURE P Plant Isolation. Approved by: Ruth Hampton Review Date: 6 th December 2015

Lockout Tagout Program

Lockout/Tagout Program Occupation Safety & Health Standards for General Industry 29 CFR

Isolation Lockout and Tagging

Project & Task Work Health and Safety Risk Management Procedure

Safety Manual: Hazardous Energy. January, 2017

Lock Out/Tag Out Control of Hazardous Energy

LO/TO LOCKOUT/TAGOUT PROGRAM

Lockout/Tagout - Energy Control Program

Lockout / Tag out Program

PAGE 1 OF 7 HEALTH, SAFETY & ENVIROMENTAL MANUAL PROCEDURE: S230 Lock-Out Tag-Out (LOTO) Program REV 4.0 8/13/2012

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAG OUT PROGRAM) Washington State University Tri-Cities (all departments)

Lockout/Tagout Safety Policy

Policy Redesign Project. Plant Safety Policy. Table of Contents

PART Q CONTROL OF HAZARDOUS ENERGY (LOCKOUT-TAGOUT)

H. Control of Hazardous Energy: Lockout/Tag Out

SAFETY DIRECTIVE 2.0 DEPARTMENTS AFFECTED. This Administrative Directive shall apply to all Town of Marana departments and employees.

DRAFT LOCKOUT/TAG OUT PROGRAM (CONTROL OF HAZARDOUS ENERGY)

RiskTopics. Lockout/Tagout October 2017

PRESCOTT SCHOOL DISTRICT NO South A Street Prescott, WA The Control of Hazardous Energy (Lockout/Tagout)

Lockout/Tagout Program

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT)

Lockout/Tagout Training Overview. Safety Fest 2013

Control of Hazardous Energy. Environmental Health and Safety

Lockout/Tagout Program

University of Arkansas Office of Environmental Health and Safety

Control of Hazardous Energy Lockout / Tagout Program

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT) PROGRAM

2523-LDG-E. Leader s Guide

ISOLATION ISSUE 2 1 AIM 2 4 REASONS FOR INCLUSION 3 6 PLANT AND EQUIPMENT REQUIREMENTS 3 7 SYSTEM & PROCEDURAL REQUIREMENTS 4 8 PEOPLE REQUIREMENTS 6

General Isolation Procedures

LOCKOUT/TAGOUT: Operating Procedure TABLE OF CONTENTS

LOCKOUT-TAGOUT PROGRAM

Health & Safety Policy & Plan. Rightway Roofing.

Confined Spaces. This procedure applies to all workers of the Diocese of Maitland Newcastle (DoMN).

Issue: Issued By: Environment, Health & Safety Part: Hazard Identification and Assessment Revision #: 2 Revision

Lockout. HealthandSafetyOntario.ca. What is Lockout? How is a Lockout Done? Why is a Lockout Necessary?

List all key terms and acronyms used in the procedure, and their definitions.

Lockout - Tagout. Control of Hazardous Energy OSHA Standard

Product Information Report Lockout/Tagout Hazardous Energy Control

Lockout/Tagout Program

Hazardous Energy Control (Lockout-Tagout)

Gettysburg College. Energy Control Program

LOCK-OUT/TAG-OUT (LO/TO) SAFETY PROGRAM

Lockout/Tagout Manual

SAINT MARY S COLLEGE OF CALIFORNIA STANDARD HAZARDOUS ENERGY CONTROL PROGRAM INCLUDING LOCKOUT/TAGOUT. Prepared by

230-LOCKOUT/TAGOUT PROGRAM

Energy Control Procedures Lockout/Tagout 29 CFR

Chief Operating Officer Approved by. Responsible Officer. Vice-Chancellor Approved and commenced 25 September, 2017 Review by September, 2020

MARIPOSA COUNTY LOCKOUT/TAGOUT PROGRAM

Isolating plant. Guidance Note. June 2011

Lockout/Tagout Plan Environmental Health & Safety Office July 2017

Isolation and Lockout

WESTERN CONNECTICUT STATE UNIVERSITY LOCKOUT/TAGOUT PROCEDURE S-107

Health, Safety, Security and Environment

LOCKOUT/TAGOUT PROGRAM

LOCKOUT SYSTEM AND POLICIES

OKLAHOMA CITY COMMUNITY COLLEGE CONTROL OF HAZARDOUS ENERGY PROGRAM. Environmental Health and Safety. Established:

Control of Energy - Isolation Process

LOCKOUT/TAGOUT POLICY

DUQUESNE UNIVERSITY LOCKOUT/TAGOUT PROGRAM

Facilities Management

Energy Control. Suite 2A, 55 Frid Street Hamilton, ON L8P 4M3 office: cell:

Control of Hazardous Energy (Lockout/Tag-out) 29 CFR

Lock Out - Tag Out Safety Program

Isolation Standard - Tags

Lockout Tagout Policy

THE UNIVERSITY OF NORTH CAROLINA

CONTROL OF HAZARDOUS ENERGY LOCKOUT/TAGOUT PROGRAM

CONTROL OF HAZARDOUS ENERGY IN THE WORKPLACE

Health, Safety and Environment Management System. HSE-PRO-008 HSE Responsibilities Procedure

E2.14 Control of Hazardous Energy. Effective Date: 03/01/2018

Safety Guidelines for Live Entertainment and Events I Part 2. Hazard Identification and Risk Management 1

Hazardous Energy Program Lockout/Tagout

Page: 7/15/2009. Energy control procedures Use of lockout/tagout equipment to ensure safe work practices.

Lockout/Tagout - Control of Hazardous Energy Program

DuPage County Environmental, Safety, Health & Property Loss Control Program Hazardous Energy Control (Lockout/Tagout)

University of Vermont Department of Physical Plant Burlington, Vermont

SAMPLE WRITTEN PROGRAM for Control of Hazardous Energy LOCKOUT TAGOUT

PINNACLE OWNING SAFETY: Zero Fires Zero Loss Incidents 100% Employee Engagement

UCHC Lockout/Tagout Policy (4/09)

Lockout / Tagout Safety Program

General Lockout Training Briefing

Health and Fire Safety Review 2/15

Hazardous Energy Lockout Standard. Safety Resources

LOCKOUT / TAGOUT PROGRAM

Work Health and Safety Risk Management Procedures

ARKANSAS TECH UNIVERSITY FACILITIES MANAGEMENT HEALTH AND SAFETY MANUAL (LOCKOUT/TAGOUT) 30.0

Control of Hazardous Energy Program (Lockout/Tagout)

THE OSHA LOCK-OUT/TAG-OUT STANDARD

Lockout Tagout Program

This session covers the safety procedure known as lockout/tagout, which is required by Occupational Safety and Health Administration (OSHA) in its

Isolation of power supplies

Texas Department of Insurance Division of Workers Compensation. Lockout Tagout HS96-100D (8-06)

Hazardous Energy Control

LOCKOUT/TAGOUT PROGRAM

LOCKOUT/TAGOUT PROGRAM

Control of Hazardous Energy Program (LOTO)

Transcription:

Plant Isolation Lock out/tag out Procedure Related Policy Responsible Officer Approved by Work Health and Safety Policy Approved and commenced November, 2014 Review by November, 2017 Responsible Organisational Unit CONTENTS Executive Director, Infrastructure Services and Development Executive Director, Infrastructure Services and Development Infrastructure Services and Development (Infrastructure Planning and Compliance Unit) 1 Objective... 2 2 Scope... 2 3 Procedure... 2 3.1 Isolation and Tagging of Plant... 2 3.1.1 Take plant out of service (shut down)... 2 3.1.2 Identify all energy sources and other hazards... 2 3.1.3 Identify all isolation points... 2 3.1.4 Isolate all energy sources... 2 3.1.5 De-energize all stored energy... 3 3.1.6 Lock out and tag all isolation points/energy sources... 3 3.1.7 Test isolation to prove safe... 3 3.1.8 Complete the work... 4 3.1.9 Test/return plant to service... 4 3.2 Exemptions... 4 3.3 Applying and Removing Tags... 5 3.3.1 Out-of-service tags... 5 3.3.2 Danger tags... 6 3.4 Responsibilities... 6 4 Definitions and Acronyms... 7 5 Supporting Documentation... 9 6 Versioning... 9 1 Plant Isolation Lock out/tag out Procedure (November, 2014)

1 Objective The objective of this Procedure is to articulate the system by which plant in University of Tasmania (University) workplaces shall be isolated, locked out and tagged to provide protection from the uncontrolled release of energy sources and in so doing, to either eliminate, or if not reasonably practicable, minimise the risk of damage or harm. 2 Scope This Procedure applies to all isolation, lock out and tagging activities performed by workers and other persons at the University, including when undertaking maintenance, repair, installation, service, cleaning and inspection of plant. 3 Procedure 3.1 Isolation and Tagging of Plant The procedural steps required to isolate, lock out and tag plant so that work may be performed are outlined below. Isolations that involve fire protection equipment shall be performed in accordance with the University Fire Protection Systems Impairment Procedure. 3.1.1 Take plant out of service (shut down) Cease using and shut down the item of plant. Complete and attach an out-of-service tag (see paragraph 3.3.1). 3.1.2 Identify all energy sources and other hazards Conduct a risk assessment in accordance with the University Minimum Standard Work Health and Safety Project and Task Risk Management. The assessment must: identify all potential sources of energy associated with the item of plant identify all other hazards and control measures required to perform the work safely, including any permit to work (PTW) procedures to be applied (e.g. hot work) and requisite training and competency be approved by relevant Managers, along with any other required documentation (e.g. permits) prior to work commencing. 3.1.3 Identify all isolation points Determine the isolation points for each energy source identified. If available/used, record each point on an isolation checklist for the task (particularly for isolations that are repeated). 3.1.4 Isolate all energy sources Isolate all energy sources at the isolation points identified, in accordance with the task isolation checklist if available. With the exception of simple electrical equipment connected via a plug and socket, all electrical isolations must be carried out by a licensed electrical contractor. 2 Plant Isolation Lock out/tag out Procedure (November, 2014)

Wherever practicable, the isolation of plant is to include mechanical locks and whole current isolators. 3.1.5 De-energize all stored energy Stored energy in the plant must be discharged/de-energised by: inspecting plant to ensure all parts have stopped moving isolating and proving dead all electrical power supply to the plant lowering suspended equipment with stored potential energy to its rest position blocking moveable parts that may be affected by gravity, pressure or other forces draining or bleeding hydraulic and air lines to remove pressure releasing or blocking spring energy draining process piping systems and closing valves to prevent the flow of hazardous material purging tanks and process lines and/or dissipating extreme cold or heat (and/or provide appropriate personal protective equipment). 3.1.6 Lock out and tag all isolation points/energy sources Wherever practicable, all potential energy sources must be tagged and locked out as follows: each worker intending to work on an item of plant shall complete and attach a Personal Danger Tag (see paragraph 3.3.2) and lock to each isolation point for all energy sources; and any plant designed to be operated from more than one location shall be fitted with lock outs that effectively isolate the power source. The authorised person who locks out the plant shall: retain the key to the safety lock(s) or ignition ensure the relevant PTW Register is updated and notify the relevant Officer of the isolation. 3.1.7 Test isolation to prove safe The worker(s) performing the task shall re-check all energy sources are isolated, deenergised and tagged effectively. Without exposing the tester or others to risk, test that plant is safe by: pushing start buttons (with guards in place where required) inspecting moveable parts to see they are at rest 3 Plant Isolation Lock out/tag out Procedure (November, 2014)

testing electrical circuits to make sure power is off checking tags and locks are in place and performing any other test specific to task. Work shall only commence when tests confirm it is safe to do so. If the plant engages or moves, work must not commence and workers shall: turn the item of plant off at the main isolator where possible remove personal danger tags and locks (if leaving the work area), but leave out-of-service tags in place and inform the relevant Officer of the incident to determine appropriate action, which may include completion of a University Incident Report Form. 3.1.8 Complete the work Work must be completed in accordance with the task risk assessment and all relevant procedures and permits. 3.1.9 Test/return plant to service When testing or returning plant to service, the following steps must be observed: notify all personnel involved with the plant ensure all personal danger tags have been removed remove all locks ensure all tools are out of the plant and guards are in place ensure braces, pins, blocks, chains etc. are removed and ensure all personnel are clear at start-up. If plant is to be re-energised temporarily for testing purposes, all energy sources must be isolated, locked and tagged out again in accordance with this procedure before work recommences. If work is complete and plant is safe to return to service and is to be re-energised, the out-of-service tag can be removed and the relevant PTW Register can be completed after the above steps have been performed. 3.2 Exemptions Lock out or danger tags do not need to be applied in the following circumstances: minor adjustments and other minor servicing activities that take place during normal operations where: o the plant is under the control of an authorised person o the authorised person has a line of sight to all access points of the plant that would place a person at risk if the plant commenced operation and o there is no risk of contact with electricity when undertaking the task 4 Plant Isolation Lock out/tag out Procedure (November, 2014)

cord and plug-connected electrical plant if: o exposure to unexpected start-up is controlled by unplugging the plant from its energy source and o the plug is under the exclusive control of the worker carrying out the servicing, maintenance or cleaning of the plant. situations where isolating the plant will also isolate essential services, provided that: o continuity of services is essential and shutdown of the system is impractical o equipment is used that will provide proven effective protection for workers and other persons o a Take5 risk assessment has been conducted and o an approved safe work procedure (SWP) is being followed. In all circumstances outlined above, out-of-service tags must still be applied. 3.3 Applying and Removing Tags 3.3.1 Out-of-service tags Out-of-service tags shall be completed and affixed to isolation points of plant, or where an isolation point is not available or practical to a readily visible part of the plant, to identify that the plant has been taken out of service. Out-of-service tags are available from the Infrastructure Planning and Compliance (IPAC) Unit and/or Health and Safety Representatives (HSRs). All information on the tag must be completed in ink pencil is not acceptable. Attached tags must be clearly visible from the position from which the plant is started/operated to identify that it must not be used. Where possible, tags should obstruct the method of starting the plant. In the case of small items of plant, the plant should also be removed from service. The relevant Officer (or IPAC Supervisor if the plant is controlled or maintained by IPAC), shall be notified so that they can ensure that a job request and/or purchase order is raised for the repair, maintenance or replacement of the plant. Details of the tagging shall be recorded in the relevant PTW Register. Tagged-out plant is not to be operated unless by an authorised person for the purpose of maintenance, testing or repair. No maintenance or cleaning of plant shall be conducted while the plant is operating unless written authorisation has been given. Where such permission is given, the plant may only be operated by the person carrying out the work. When plant is safe to return to service, out-of-service tags shall only be removed by an authorised and competent person, who has confirmed that the plant is safe to return to service. If there is disagreement between a worker and an Officer regarding the application or removal of an out-of-service tag, the matter shall be referred to the area HSR. 5 Plant Isolation Lock out/tag out Procedure (November, 2014)

3.3.2 Danger tags Danger tags are used in addition to out-of-service tags to provide personal protection to workers. Each worker working on or near plant that could place them at risk of injury if operated must complete and attach their own danger tag to the item of plant. Danger tags are available from the IPAC Unit. All information on the tag must be completed in ink pencil is not acceptable. Danger Tags must be placed on the plant isolation control to make it clear to other workers that the plant is not to be started or operated. Danger Tags may only be removed by the person who applied the tag at the completion of a task or before leaving work at the end of a shift. The out-of-service must remain attached unless the plant is safe to return to service. Failure to remove a danger tag before leaving the place of work will result in that worker being called back at their own expense to remove the danger tag. If plant must be returned to service and a worker has become incapacitated or has left the job and cannot be located, an authorised person from the IPAC Unit can inspect the job, declare the situation safe, remove the worker s Danger Tag and complete the relevant PTW Register. The authorised person shall continue to try and contact with the worker to advise that the worker s personal danger tag has been removed. Failure to comply with danger tag removal protocols may lead to disciplinary action. 3.4 Responsibilities Officers are responsible for ensuring that: this Procedure is implemented effectively within their area of responsibility, including the provision of appropriate supervision and equipment for isolation and tagging Organisational Unit-specific guidelines are developed where necessary and that these are consistent with this Procedure authorised personnel with relevant qualifications and training are designated to carry out plant isolation PTW Registers are updated and completed Records relating to the maintenance, repair and servicing of plant under their control are retained in accordance with the provisions of the University Records Management Policy and the Work Health Safety Records Management Guidelines and appropriate resources and processes are available and used to eliminate or minimise risks associated with plant at the University. The Infrastructure Planning and Compliance Unit is responsible for ensuring that records relating to the maintenance, repair and servicing of plant under its control are retained in accordance with the provisions of the University Records Management Policy and the Work Health Safety Records Management Guidelines. All Workers are responsible for ensuring that: this Procedure is implemented when undertaking work at the University, in accordance with any information, training or instruction they have received 6 Plant Isolation Lock out/tag out Procedure (November, 2014)

plant identified as unsafe/faulty: o is not used o has an out-of-service tag is attached to it and o a Responsible Officer is notified all energy sources are effectively isolated, tagged, de-energised and restrained prior to work commencing and PTW permits and registers associated with the work are completed when required. 4 Definitions and Acronyms Term/Acronym Authorised Persons Contractor Danger Tag Employee Energy Sources Fire protection equipment Definition Authorised persons are IPAC personnel and workers who have been authorised by the relevant Officer to carry out repairs, maintenance or servicing work and who have undertaken suitable training to be able to apply this procedure. For the purposes of this procedure, a contractor is any worker engaged by UTAS to perform work for gain or reward other than an employee. Danger Tags indicate that the worker whose name appears on the tag is working on the item of plant, and that the item must not be operated as operation could result in an incident occurring (e.g. injury). Each worker that is working on any type of plant must complete and attach a personal Danger Tag to an appropriate type of isolation device. It is recognisable as a red and white tag with the wording Danger Do Not Operate. Tags shall only be removed by the person who placed and signed the tag. Where more than one person or a group is working on the same isolated energy source, multiple tags shall be used on a suitable multiple lockout device. For the purposes of this procedure, employee refers to any University staff member or to any student or visitor using plant. An energy source is a form of energy e.g. electrical, mechanical, chemical, hydraulic, radiation, thermal (heat, steam), gravitational, pneumatic, and kinetic energy systems, that has the potential for uncontrolled or catastrophic release, which can result in an incident occurring. The energy source must be rendered safe using isolation measures to avoid injury. Fire protection equipment includes: automatic sprinkler systems; special dump systems (foam, CO2 etc); fire pumps; fire doors; fire indicator panels (FIP s) including detectors and circuits; early warning information systems (EWIS); fire hydrants; hose reels; external fire plugs; water mains and valve arrangements; backflow prevention systems; and 7 Plant Isolation Lock out/tag out Procedure (November, 2014)

municipal council connection water meters and valve arrangements. Hierarchy of control The ways of controlling risk can be ranked from the highest level of protection and reliability to the lowest. This ranking, known as the hierarchy of control, is as follows: Eliminate the hazard Level 1 Substitute the hazard with something safer Isolate the hazard from people Level 2 Engineering controls to reduce the risks Administrative actions to reduce the level of harm; Level 3 Personal Protective Equipment. If it is not reasonably practicable to eliminate a hazard, you must minimise the risk by working through the other alternatives in the hierarchy. Incident Isolation Isolation measures Permit to Work (PTW) Register Lockouts Lock out/tag out Officer An incident includes injury, near miss and damage; i.e. An event which causes, or has the potential to cause, an injury to a person, and/or damage to plant. Isolation is the removal of the energy source from an item of plant to prevent the possibility of accidental or unplanned energisation of the whole, or a specific section of that plant, so that the plant does not move or start up. Isolation must also prevent the introduction of contaminants or conditions through equipment such as piping, ducts, vents, drains, conveyors, service pipes and fire protection equipment. Isolation of plant also ensures that entry to a restricted area is controlled while the specific task is being carried out. Isolation measures to isolate plant include locks, clasps, tags, closing and blanking devices, removal of mechanical linkages, blocks, slings, and removal from service. An appropriate measure that is high on the hierarchy of controls must be used where practicable to isolate the energy source(s). Registers are available to record PTW activities in each Organisational Unit, including the application of lockouts and tags. PTW Registers shall be readily accessible by all workers. For more information refer to the University Permit to Work (PTW) Registers Guidelines. Lockout is where a positive isolator is turned to the OFF position and secured in that position by removal of a key or having a physical block fitted such as a padlock and the key removed. This stops the plant being turned on accidentally or in an unplanned circumstance. The term used to identify the combined process of lock out of plant and application of an out-of-service tag. Any person at the University who makes, or participates in making, decisions that affect the whole, or a substantial part, of the University is an Officer. As such, members of UTAS Council, Boards, Committees, Senior Management Team, Heads of 8 Plant Isolation Lock out/tag out Procedure (November, 2014)

Organisational Unit Out-of-Service Out-of-Service Tag Person Conducting Business or Undertaking (PCBU) Plant Worker Colleges, Deans of Faculties, Organisational Unit heads and Directors/Principals of Institutes are deemed to be Officers at the University. College, Faculty, School, Centre, University Institute, other University Entity, Division, Section or University Business Enterprise. Plant that is deemed to be unsafe to operate can be taken out-ofservice by the placement of an Out-of-Service Tag. Out-of-Service Tags are placed on plant to indicate it may be unsafe, as it is not operating correctly or is not ready to be operated, and use of that plant could cause an incident. It is recognisable as a yellow and black tag, with the wording Caution Out of Service. Out-of-Service plant must not be operated until all faults have been rectified and an authorised person has removed the tag. PCBUs are the principal duty holder, with primary duty of care for the operation of the University. As such, Members of UTAS Council, Board members, Executive Deans and Heads of Academic Units, are deemed to be PCBUs at the University. Plant includes any machinery, equipment, appliance, container, implement and tool, any component of any of those things, and anything fitted or connected to any of those things. Any person carrying out work in any capacity at the University, including work as an employee, contractor or sub-contractor, employee of a labour hire company, outworker, apprentice or trainee, work integrated learning or work experience student and volunteer. 5 Supporting Documentation AS/NZS 4024.1:2000 Safety of Machinery University Fire protection systems impairment permit system University of Tasmania Permit to Work Procedure University Minimum Standard Work Health and Safety Project and Task Risk Management University Records Management Policy and Procedure University Work Health Safety Record Management Guidelines Relevant Codes of Practice (e.g. Managing Risks of Plant in the Workplace) 6 Versioning Former Version(s) Current Version(s) Version 1 Isolation Procedure, approved September, 2000; and Out-of-Service Lock out/tag out Procedure, approved September 2000. Version 2 Plant Isolation and Tagging Procedure (current document); approved by Responsible Officer, November, 2014. Amended in December 2016 to incorporate Colleges. 9 Plant Isolation Lock out/tag out Procedure (November, 2014)

Version 3 Plant Isolation Lock out/tag out Procedure (current document); approved November 2014, amended in December 2017 to incorporate final academic structures and a change in nomenclature for the owning organisational unit. 10 Plant Isolation Lock out/tag out Procedure (November, 2014)