DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director

Similar documents
I-66 Corridor Improvements Route 15 to I-495. November 2014

Washington DC Section of ITE Project Briefing

City of Fairfax, Virginia City Council Work Session

Dulles Area Transportation Association. October 11, Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation

Transform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies

Transform I-66. Chief Engineer Garrett W. Moore, P.E. July 12, 2018

Interstate 66 Tier 1 Environmental Impact Statement (EIS)

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017

I-395 Express Lanes Northern Extension Project Fairlington Citizens Association September 12, 2016

I-395 Express Lanes Northern Extension Project Crystal City Civic Association September 21, 2016

I-395 Express Lanes Northern Extension Project Public Hearings

I-395 Express Lanes Northern Extension Project Arlington County Board October 18, 2016

FY 2018 I-66 Commuter Choice Program Presentation to the Northern Virginia Transportation Commission May 3,

TRANSIT PERFORMANCE IN THE I-66 INSIDE THE BELTWAY CORRIDOR

Public Information and Participation Comments

BRIEFING ON PROPOSED ADDITIONS AND CHANGES Additions and Changes to Projects Proposed for Inclusion in the 2015 CLRP Update

VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment. Staff Recommendations

Commuter Connections Regional TDM Marketing Group Meeting

Alternatives Development Technical Report

PUBLIC COMMENT SUMMARY REPORT Public Information Meetings

Interstate 66 Tier 1 Environmental Impact Statement. Cooperating and Participating Agencies Meeting March 19, 2012

Fairfax Alliance for Better Bicycling. Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation

TYSONS CORNER BICYCLE MASTER PLAN

MnPASS System Today and the Future

NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association

MCA Member Meeting: Tysons Update. Fairfax County Department of Transportation November 13, 2017

Public Information Meeting

Arlington County 10-Year Transit Development Plan & Premium Transit Network Briefing. May 2016

Capital Beltway HOT Lanes Project

FY Transportation Capital Improvement Plan Update Arlington Committee for Transportation Choices

PERFORMANCE ANALYSIS of The Draft 2015 CLRP

County of Fairfax, Virginia. Department of Transportation

Table of Contents. Acknowledgements...

Table of Contents. 2.0 Land Use and Transportation Inputs Land Use Factors Transportation Factors

Interstate 66 TRANSPORTATION TECHNICAL REPORT. From US Route 15 in Prince William County To Interstate 495 in Fairfax County FEBRUARY 2013

495 EXPRESS LANES NORTHERN EXTENSION STUDY COMMENT SUMMARY REPORT JUNE 11, 2018 PUBLIC INFORMATION MEETING

Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements 100% Engineering Design - Progress Report

Transit and Rail Funding in the Commonwealth

What if YOU could help plan Northern Virginia s transportation future?

Project Description Form 6V

VIRGINIA RAILWAY EXPRESS

Capital Beltway HOT Lanes Project

Appendix B: Forecasting and Traffic Operations Analysis Framework Document

Evaluation of Significant Transportation Projects in Northern Virginia Transportation District

Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements Advertisement for Construction - Progress Report

Capital Beltway HOT Lanes - Frequently Asked Questions

EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives

Presentation of Staff Draft March 18, 2013 COUNTYWIDE TRANSIT CORRIDORS FUNCTIONAL MASTER PLAN

Capital Beltway HOT Lanes Project

Public Opinion about Transportation Issues in Northern Virginia

Fairfax County Parkway Widening Fairfax County

North Coast Corridor:

Managed Lanes. Steve Schilke, P.E. Major Projects Unit Head District 1. Illinois Traffic Engineering and Safety Conference October 2016

Keynote. Shannon Valentine Secretary of Transportation

NOVEMBER 2017 DESIGN PUBLIC HEARINGS COMMENT SUMMARY (November 13, 14, and 16, 2017)

Congestion Reducing Activities. Toby Carr GDOT Director of Planning April 10, 2014

2. What concepts do you think would address the problem?

395 Express Lanes Extension

Managing Dulles Rail Construction in Tysons Corner

I-105 Corridor Sustainability Study (CSS)

UPC Design / CN Locally Administered PE Phase VDOT Administered CN Phase

Charlotte Region Fast Lanes Study Phase III

ITEM 15 Notice March 29, 2017

Durham Region Long Term Transit Strategy

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

Measuring and Communicating Mobility:

PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia

INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION ALTERNATIVES ANALYSIS TECHNICAL REPORT SEPTEMBER 2016

Highway 217 Corridor Study. Phase I Overview Report

Regional Transportation Needs Within Southeastern Wisconsin

Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10

Managed Lanes: A National Perspective Managed Lane Strategies

Land Use and Transportation Town Hall September 17, 2018

RapidRide Roosevelt Seat Sea t t le t le Depa De r pa t r men men t of Sept T an r sp an or sp t or a t t a ion

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Corridor Advisory Group and Task Force Meeting #10. July 27, 2011

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

CHAPTER 7 OF THE COMPREHENSIVE PLAN TRANSPORTATION Mobility for all Modes

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

FM #: ETDM #: 11241

Appendix F: Detailed Modeling Results

ITEM 13 - Information March 19, Briefing on Final Report of the TPB Regional Value Pricing Study

Route 7 (East Market Street) Interchange at Battlefield Parkway Town of Leesburg Project No: UPC Presentation to Town Council

Bicycle Master Plan Goals, Strategies, and Policies

Freeway Improvement Project

North Shore Transportation Improvement Strategy

Geary Corridor Bus Rapid Transit SFMTA Citizens Advisory Committee

San Jose Transportation Policy

Thank you for attending

!!!!!!!!!!!!!!!!!! Metro!Denver!MTD!Governance!Committee! October!23,!2013!!9:00!AM!to!10:00!AM! Denver!Regional!Council!of!Governments!

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

Measuring the Distribution and Costs of Congestion. Tim Lomax Texas Transportation Institute

Tunnel Reconstruction South 5 th Street Association October 16, 2018

Core of Rosslyn Transportation Study Existing Conditions Report - Appendix. Appendix E: VISSIM Model Calibration Summary

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer

Sacramento Grid 2.0. The Downtown Transportation Study

Transportation Master Plan Advisory Task Force

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Typical Rush Hour Commute. PennyforTransportation.com

Sketch Level Assessment. of Traffic Issues. for the Fluor Daniel I-495 HOT Lane Proposal. Ronald F. Kirby

Transcription:

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, 2015 Susan Shaw, P.E., VDOT, Megaprojects Director

I-66 Corridor Conditions Steady population growth Employment growth in activity centers Congestion and mobility demands 8-10 hours of congestion in 2040 Safety concerns Lack of coordinated transit service and modal choices 2

Purpose and Need Improve multimodal mobility along the I-66 corridor by providing diverse travel choices in a cost-effective manner Enhance transportation safety and travel reliability 3

I-66 Outside the Beltway Improvement Area 4

Project Scope Assumptions Maintain current number of regular lanes during rush hours Rapid bus service will be studied along with recommendations from the 2009 I-66 Transit / TDM Study Safety and operational improvements can move forward independently or in conjunction with capacity improvements Will not preclude other concepts Feasible to implement in a reasonable timeframe 5

Project Scope Elements Two Express Lanes (convert existing HOV lane & add one lane) HOV-3 and buses travel free Non-HOV tolled Congestion-based tolls (similar to other Express Lanes in region) Converting HOV-2 to HOV-3 by 2020, consistent with the region s Constrained Long Range Plan Three regular lanes Open to all traffic No tolls Ramp-to-ramp connections (auxiliary lanes) Rapid bus service and other multimodal improvements High frequency of service beyond peak hours Travel in express lanes for predictable travel times Park-and-Ride lots, Transportation Demand Management 6

Typical Section Alternatives 290 Alt. 1 Concrete Barrier with Full Shoulders and Median for Future Center Transit (with auxiliary lanes, if needed) 246 Alt. 2A Flexible Barrier with Buffer and Median for Future Center Transit (with auxiliary lanes, if needed) 206 Alt. 2B Flexible Barrier with Buffer and No Median (with auxiliary lanes, if needed) 7

Access Points and Interchange Improvements Locating potential access points near key activity centers or park-andride lots Identified locations for connections between express and general lanes Studying existing interchanges to address recurring congestion at bottlenecks and safety concerns at hot-spot locations Evaluating needs for ramp-to-ramp connections between interchanges Replacing or widening I-66 overpasses and bridges, where needed In coordination with interchange and overpass construction, identifying bicycle and pedestrian access needs to improve multimodal connectivity 8

Express Lanes Access Alternatives 9

Identifying the Best Solution Mainline Alternatives Access Alternatives Interchange Alternatives Universe of Alternatives for Roadways and Interchanges Environmental Draft Alternative 2A Preferred Alternative (combination of best elements from each alternative) Environmental Draft Alternative 2B 10

Current Project Activities Gathering data Survey Environmental Geotechnical Traffic Developing preliminary designs Completing traffic projections and analyses Assessing potential impacts Presenting findings to the public Identifying a preferred alternative 11

Multimodal Solutions Transit Services Commuter Bus Services Rapid Bus Service Park-and-Ride Facilities Transportation Demand Management (TDM) 12

US 15 / James Madison Hwy. University Blvd. VA 234/Prince William Pkwy. Balls Ford Rd. Stringfellow Rd. Monument Dr. Vienna Metro Station Park-and-Ride Facilities P P P P P P P P New P Existing with planned or proposed expansion I-66 Park-and-Ride Focus Locations P Existing 13

Corridor Operations Operations Goals Improve travel time reliability (predictability) Improve person throughput Provide travelers with options Improve safety Strategies Sharing real-time information Displaying travel times Implementing active traffic management during & after construction Transportation Management Plan and effective incident management Establishing high bandwidth and redundant communications backbone Enabling connected/automated vehicles in the future I-66 Operations Working Group Developing corridor vision, Concept of Operations and needs 14

Public-Private Partnership Process Similar to the 95 and 495 Express Lanes projects, the I-66 Project is advancing as a Public Private Partnership (P3) The Virginia Office of Public-Private Partnerships (VAP3) is working with VDOT and DRPT to evaluate the project as a P3 initiative, following Virginia s updated 2014 P3 Guidelines The Project is being evaluated for risk, cost, benefit to the users and other project specific elements that bring value Overall project cost expected to be $2B - $3B 15

Public Outreach & Agency Coordination Briefings to key stakeholder groups more than 60 meetings to date Proactively scheduling briefings to impacted HOAs Project team available to brief interested groups upon request Media and stakeholder engagement Ongoing e-mail updates to interested stakeholders Dedicated website with up to date information New, interactive community discussion board on the project website coming soon Transform66.org New Project Website 16

Key Milestones Key Milestones Dates Public Information Meetings January/February 2015 Continued Public Outreach Ongoing Environmental Public Hearing May 2015 Final Environmental Document End of 2015 Design Public Hearing TBD Final contract and funding December 2016 Construction Start 2017 Open to traffic 2021 17

PROJECT OVERVIEW 18

I-66 Multimodal Improvements Beltway to US 29 Rosslyn 19

I-66 Multimodal Improvements Beltway to US 29 Rosslyn I-66 Issues Reported in 2012: Eastbound & Westbound roadway congestion Congestion at interchanges Non-HOV users during HOV restricted period Orange / Silver Line Metrorail congestion Bus service impacted by roadway congestion Challenges to intermodal transfers W&OD and Custis Trail bottlenecks Limitations / gaps in Bike & Ped accessibility and connectivity 20

I-66 AM Period Existing Conditions Results of MWCOG s 2014 Analysis Eastbound Travel Lanes 13% hybrid vehicles 1 21% is single occupant vehicle (in addition to hybrids) 1 Regularly congested conditions between: VA 267 and George Mason Dr / Fairfax Dr US 29 and Roosevelt Bridge Speeds average 15 50 mph Queue lengths of 3 5.5 miles Westbound Travel Lanes Regularly congested conditions between: Fairfax Dr and Westmoreland St Speeds average 20 50 mph Queue lengths of 2 3 miles 1 June 2014 21

I-66 PM Period Existing Conditions Results of MWCOG s 2014 Analysis Westbound Travel Lanes 18% hybrid vehicles 1 30% single occupant vehicles (in addition to hybrids) 1 Regularly congested conditions between: George Mason Dr and Sycamore St VA 7 and I-495 Speeds average 10 45 mph Queue lengths of 2 3 miles Eastbound Travel Lanes Regularly congested conditions between: VA 7 and Fairfax Drive Speeds average 15 50 mph Queue lengths of 3 4 miles 1 September 2013 22

Baseline assumptions for 2040 from Multimodal Study HOV changes from HOV-2+ to HOV-3+ throughout region I-66 westbound SPOT improvements 1, 2, and 3 Silver Line Phase I and II (to Dulles) New and enhanced Priority Bus services on I-66, US 29, and US 50 Transportation Demand Management (TDM) elements from the I-66 Transit/TDM Study Metrorail core capacity improvements 8 car trains 23

I-66 Multimodal Improvements Beltway to US 29 Rosslyn Corridor activity since 2012: August 2013 Supplemental Report Refined Package Completed or Active Projects Active Traffic Management (ATM) underway Spot 1 Widening WB Completed December 2011 Spot 2 Widening WB Under Construction Bus on Shoulder Under implementation, operational in 2015 Outside the Beltway project development Dec 9 letter from Secretary Layne Multimodal package of solutions CLRP project submission, Jan 2015 24

I-66 Multimodal Improvements Beltway to US 29 Rosslyn The purpose of the I-66 Multimodal Project inside the Beltway is to move more people and enhance connectivity in the corridor by improving transit service, reducing roadway congestion, and increasing travel options. 25

Project Scope Identify and prioritize improvements from 66 Multimodal Study (2012/2013) Quickly implementable corridor improvements Tolling Transit Bicycle / Pedestrian Transportation Demand Management Integrated Corridor Management Future Widening 26

Environmental Documentation Environmental documentation to include: Tolling Element Multimodal improvements that require environmental clearance Future widening 27

Outreach Project Working Group (PWG) VDOT, DRPT, Arlington County, Fairfax County, City of Falls Church Inside Stakeholder Technical Advisory Committee (istag) Arlington County City of Fairfax City of Falls Church DDOT Fairfax County FHWA FTA Loudoun County MWAA MWCOG NVRPA NVTA NVTC PRTC Prince William Co. Town of Vienna VRE WMATA MDOT Elected Officials briefings Public Outreach Public Information Meetings, Public Hearing(s), Neighborhood groups Website under development 28

Major Project Milestones Key Milestones Dates Submit Multimodal project to CLRP January 2015 Level 2 Traffic & Revenue Study Mid 2015 Prioritize Multimodal solutions 2015 Environmental document and hearing 2015 Tolling Design-Build procurement Late 2015 Tolling Construction 2016 Begin first phases of multimodal solutions 2016-2017 Toll Day One 2017 29