Blueprint for Better Transportation in Northern Virginia

Similar documents
What if YOU could help plan Northern Virginia s transportation future?

Public Opinion about Transportation Issues in Northern Virginia

Corridor 1 - Dulles/VA 7 TransAction 2040 Projects

FY 2018 I-66 Commuter Choice Program Presentation to the Northern Virginia Transportation Commission May 3,

Evaluation of Significant Transportation Projects in Northern Virginia Transportation District

Keynote. Shannon Valentine Secretary of Transportation

TRANSIT PERFORMANCE IN THE I-66 INSIDE THE BELTWAY CORRIDOR

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017

TransAction Plan Project List

Transportation. Pages E-3 to E-145 PROPOSED FY CAPITAL IMPROVEMENT PLAN (CIP) CCCRC Presentation Thursday, June 14, 2018

PERFORMANCE ANALYSIS of The Draft 2015 CLRP

NORTHERN VIRGINIA TRANSPORTATION AUTHORITY

Dulles Area Transportation Association. October 11, Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation

FY Transportation Capital Improvement Plan Update Arlington Committee for Transportation Choices

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director

Appendix F: Detailed Modeling Results

BRIEFING ON PROPOSED ADDITIONS AND CHANGES Additions and Changes to Projects Proposed for Inclusion in the 2015 CLRP Update

MCA Member Meeting: Tysons Update. Fairfax County Department of Transportation November 13, 2017

2045 Long Range Transportation Plan. Summary of Draft

HOW OUR REGIONAL TAX DOLLARS ARE BEING SPENT THE HONORABLE MARTY NOHE CHAIRMAN, NORTHERN VIRGINIA TRANSPORTATION AUTHORITY

Table of Contents. 2.0 Land Use and Transportation Inputs Land Use Factors Transportation Factors

I-395 Express Lanes Northern Extension Project Arlington County Board October 18, 2016

Project Description Form 8AA

Project Description Form 6V

Public Information and Participation Comments

County of Fairfax, Virginia. Department of Transportation

VIRGINIA RAILWAY EXPRESS

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

I-395 Express Lanes Northern Extension Project Crystal City Civic Association September 21, 2016

Washington DC Section of ITE Project Briefing

I-395 Express Lanes Northern Extension Project Public Hearings

I-395 Express Lanes Northern Extension Project Fairlington Citizens Association September 12, 2016

Chapter 5 Future Transportation

NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association

Proposed White Flint Separated Bike Lane Network September 2015

Public Opinion about Transportation Issues in Northern Virginia A Report Prepared for the:

ITEM 7 Action April 19, 2017 Approval of Regional Bike to Work Day 2017 Proclamation. None

Transportation Master Plan Advisory Task Force

Planned Improvements from Sector & Area Plans that have been added to the MTP

RTA 2013 Leadership Briefing and Tour Report

The Year Ahead: Virginia Department of Transportation Northern Virginia District

Capital Beltway HOT Lanes Project

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

Arlington County 10-Year Transit Development Plan & Premium Transit Network Briefing. May 2016

Land Use and Transportation Town Hall September 17, 2018

South King County High-Capacity Transit Corridor Study

CHAPTER 3: Service and System Evaluation

Bus Rapid Transit Plans

Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10

Ridership in Virginia by System FY2017

Project Description Form 8EE

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

Basalt Creek Transportation Refinement Plan Recommendations

VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment. Staff Recommendations

City of Atlanta-MARTA Sales Tax Referendum Draft Project List. Atlanta City Council Work Session May 19, 2016

The following item was handed out at the December 6, 2018 NVTC Meeting.

SPRINGFIELD REVITALIZATION REPORT

Transform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies

Integrating Community Development and Transportation Strategies. November 13, 2014

Executive Summary Route 30 Corridor Master Plan

STUDY ADVISORY COMMITTEE. October 8, 2015

Giles Run Connector Road

Crystal City Citizen Review Council Meeting. July 10, 2013

Bicycle and Pedestrian Plans and Improvements

Working Group Meeting

Interstate 66 Tier 1 Environmental Impact Statement (EIS)

Crystal City-Potomac Yard Transitway Extension

Clackamas County Comprehensive Plan

Update of the Master Transportation Plan s (MTP) Bicycle Element

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

Transit and Rail Funding in the Commonwealth

TRANSPORTATION TRAINING TOPICS. April 6, 2010

Mobility Greater Johnson County Transportation Coalition. May 23, 2018

Copyright by Home by School.com (Third Conversion, LLC). All rights reserved. Published by Third Conversion, LLC

City of Fairfax, Virginia City Council Work Session

MONTGOMERY COUNTY COUNCIL

Appendix P (Version 2) Bikeway Projects in Currently Approved Plans. Planned Improvements from Sector & Area Plans that have been added to the MTP

York Region Population and Employment Growth

Sketch Level Assessment. of Traffic Issues. for the Fluor Daniel I-495 HOT Lane Proposal. Ronald F. Kirby

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

Perryville TOD and Greenway Plan

San Jose Transportation Policy

Washington Metropolitan Area Transit Authority Board Action/Information Summary

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Regional Transportation Needs Within Southeastern Wisconsin

Fairfax County Bicycle Program

Vision Public Workshop: Findings

Fitting Light Rail through Well-established Communities

Commuter Connections Regional TDM Marketing Group Meeting

Transportation Corridor Studies: Summary of Recommendations

Hennepin County Bicycle and Pedestrian Planning

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

Presentation of Staff Draft March 18, 2013 COUNTYWIDE TRANSIT CORRIDORS FUNCTIONAL MASTER PLAN

CHAPTER 7 OF THE COMPREHENSIVE PLAN TRANSPORTATION Mobility for all Modes

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

Chapter 6 Transportation Plan

I-95 Transit/ TDM Study. LRTP Advisory Committee Meeting April 20, 2017

Building a Liveable Ottawa 2031 Backgrounder 5: Barrhaven/Riverside South/Leitrim

Linking Transportation and Health in Nashville & Middle Tennessee

Transcription:

It is time for a more effective approach for achieving better transportation in Northern Virginia. Central to better transportation is creating mixed use, walkable and bikeable, transit oriented communities so that people have more affordable travel choices, reduce the burden on our roadways, and use our available assets more efficiently. The provides a framework for expanding transportation choices, more effectively addressing our transportation challenges and creating better communities. Guiding Principles Land use and transportation are completely interrelated. Focusing growth so that homes, stores, and offices are close by reduces trip lengths and auto trips and maximizes transportation assets. Mixed use, walkable and bikeable, transit oriented communities must be the priority approach to land use in order to leverage limited transportation funds, reduce demand on our roadways, and expand choices. Metro is the backbone of the regional transit system, and funding the capital rehabilitation of the system must be the first transportation priority. Improving connections to transit stations by foot, bike, and bus are relatively low cost investments that have a regional impact on our transportation system. They also create better communities and strengthen local economies. A transit oriented future is essential for sustainability, human health, and fighting climate change. Using land more efficiently, it contributes to preserving vital habitats and protecting wildlife corridors to maintain biodiversity. With parks, trails, community gardens, recreation spaces, and green buildings it enhances human health. With green stormwater practices and reduction in lane miles of pavement it will help restore streams. Strategic expansions of road capacity should be chosen carefully to manage current stresses, such as through spot improvements and connecting the street grid, while recognizing that induced demand is a real problem that causes expanded roadways to fill up again in as little as five years. The most cost effective approach to infrastructure is to focus on fixing it first: maintaining our existing road network rather than embarking on costly new capital investments. More effective than reliance on large arterial roads and costly interchanges is to improve the connectivity of the local street grid and roundabouts in lieu of signals and road expansion.

What is the Blueprint? Why now? The region s elected leaders sitting on the Northern Virginia Transportation Authority (NVTA) are deciding how to spend more than $1 billion in transportation funds during the next six years decisions that will shape the future of our communities. The Blueprint for Better Transportation in Northern Virginia provides a framework and illustrative range of investments for both the near term of 6 years and over a 20 year horizon in transportation. It takes the approach of tying most of our transportation investment to more efficient and competitive communities throughout the region. NVTA identified $43 billion in potential transportation projects, far beyond foreseeable revenues. In a similar exercise, the regional Transportation Planning Board (TPB) identified $70 to $100 billion in capital projects beyond the current regional Constrained Long Range Plan but showed it failed to have a substantial effect on congestion, while increasing commute distances and auto travel. The lesson of both studies is the need for a fundamentally different set of transportation projects. In fact, a subsequent Long Range Transportation Plan study by the TPB showed that balanced land use (transit oriented development and balanced jobs/housing), demand management, bus rapid transit networks, and Metro core capacity, were the four top performing approaches to addressing transportation, followed by High Occupancy Toll lanes to address peak hour delay. Our draws from the findings of the long range transportation plan study and past scenario studies. The investments we have outlined will provide more transportation choices, so we can walk, bicycle and use transit for more everyday trips; reduce driving demand; promote economic development that benefits all parts of the region; and preserve green space and rural areas. The Blueprint focuses on expanding transportation choices through the following three goals: Goal 1 Prioritize Transit Oriented Development and access to regional transit, including on foot and by bike. Revitalize activity centers by building walkable street grids. Goal 2 Expand transit capacity through investing in Metro, VRE, Bus Rapid Transit, and expanded express bus service, supporting a network of transit oriented development. Goal 3 Make the road network more efficient, by improving street connections and strategically adding capacity at key areas. Page 2 of 12

Goal 1 Prioritize Transit Oriented Development and access to regional transit, including on foot and by bike. Revitalize activity centers by building walkable street grids. Project/Program: Dulles Corridor Jurisdiction(s): Arlington Fairfax Loudoun County Objective: Transit oriented development and regional transit access, leveraging the region s investment in the Silver Line. TOD areas within the Dulles Corridor: East Falls Church; Tysons East; Tysons Galleria; Tysons Greensboro; Tysons Spring Hill; Wiehle Reston East; Reston Parkway/Reston Town Center; Herndon; Innovation Center; Loudoun Gateway; Ashburn Long Range Plan Compatibility/Listing: Arlington County East Falls Church plan, Fairfax County Tysons plan, Reston and Herndon TOD plans, Loudoun TOD plan and Comp Plan update 1. East Falls Church Metrorail station second entrance (Transaction project #62, Arlington) 2. Falls Church Metro station access pedestrian, bike and bus access improvements for the East Falls Church and West Falls Church Metro stations (Transaction project #334, City of Falls Church) 3. Tysons Metro Stations access improvements street grid build out, pedestrian, bus and bike improvements within 3 mile radius of each of the four stations in Tysons, per Tysons Station Area Metrorail Access Management Study (Fairfax County 6 year transportation priorities plan (TPP)). 4. Reston Metro Stations access improvements street grid build out, pedestrian and bike improvements near the two stations in Reston, per Reston Station Metrorail Access Management Study (Fairfax County TPP) 5. Herndon Metrorail Station bike/pedestrian improvements. (Transaction project #12) 6. Innovation Station area grid of streets (Fairfax County TPP) 7. Loudoun Metrorail station bike/pedestrian improvements (Transaction project #288) at Loudoun Gateway and Ashburn Stations. (2016 Bicycle and Pedestrian Metrorail Access Study, Ashburn Station and Loudoun Gateway). Page 3 of 12

8. Roadway connectivity improvements: a. Tysons Metro Station areas: i. Greensboro Drive extension (Transaction #205) ii. Grade separated interchange at Boone Boulevard and Dulles Toll Road (Transaction #5); b. Reston Metro Station areas: i. Soapstone Drive Extension across Dulles Toll Road (Transaction #7) ii. Town Center Parkway extension under Dulles Toll Road (Transaction #17) c. Loudoun Metro Station areas: i. Prentice Drive extension to Greenway (Transaction #150) ii. Lockridge Road extension, Prentice Drive to Waxpool Road (Transaction #145) iii. Shellhorn Road extension (Transaction #184) iv. Transit connector bridge over Dulles Greenway near Ashburn Metro station (Transaction #162) Project/Program: Route 1 Corridor Jurisdiction(s): Fairfax Prince William County. Objective: Implement Fairfax County s plans for Bus Rapid Transit (BRT), and extend BRT through Route 1 in Prince William. Create walking, biking, and bus connections to BRT stations and mixed use, mixed income walkable neighborhoods with a grid of streets. Proposed BRT Stations: Route 1: Huntington, Penn Daw, Beacon Hill, Hybla Valley, South County Government Center, Woodlawn, Fort Belvoir, Pohick Rd, Lorton Station, Gunston Road, Woodbridge; also Route 1 North Gateway at the Beltway (Embark Richmond Highway) Long Range Plan Compatibility/Listing : See individual project listed below. 1. BRT from Huntington Metro Station to South County Government Center, with stations at Penn Daw, Beacon Hill, Hybla Valley, South County Government Center, Woodlawn, Fort Belvoir, and Pohick Road, to Prince William line. (Transaction #39; DRPT Alternatives Analysis) 2. Widen Route 1 Jeff Todd Way/Mount Vernon Highway to Napper Road, to provide space for BRT on dedicated lanes narrow the total cross section to shorten pedestrian crossing times and reduce right of way costs and impervious surface. (Transaction #214; NVTA 6 year plan submission) 3. Huntington Metro Station pedestrian, bike and bus access improvements. (Fairfax County TPP) Page 4 of 12

4. Pedestrian and bicycle improvements along Route 1 within 1/2 mile of 4 targeted station areas Penn Daw, Beacon /Groveton, Hybla Valley/Gum Springs, and Woodlawn (Fairfax County comprehensive plan amendment for Embark Richmond Highway, approved by Board of Supervisors, March 20 2018). https://www.fairfaxcounty.gov/planning zoning/embark richmond highway 5. Extend transit line to Woodbridge VRE, in mixed traffic within the Prince William County portion. (DRPT Alternatives Analysis) 6. Exten d transit line from Woodbridge VRE to Quantico. (Conceptual, no approved alternatives analysis, engineering or design plans) 7. Pedestrian and bicycle improvements within 1 mile of future station areas at Pohick Road, Lorton Station, Gunston Road, Woodbridge, Dale Boulevard, and Quantico. (All but last two Station areas based on DRPT Alternatives Analysis) 8. Road expansion and streetscape improvements on Route 1, South County Government Center to Quantico. (Conceptual) 9. Extend BRT from Penn Daw to Alexandria along Route 1 to connect with Metroway (Conceptual) 10. Improve local bike/ped connectivity with Safe Streets to Schools (and Open Space/Parks) program P roject/program: Blue Line Corridor Jurisdiction(s): Arlington County City of Alexandria Fairfax County Objective: To improve walking/bicycling access and build out Transit Oriented Development on existing transit line, and extend key local transit and road connections to create more connected, walkable communities. TOD areas along the Blue Line: Rosslyn, Pentagon City, Crystal City, Potomac Yard, Braddock Road, King Street, Eisenhower Avenue, Van Dorn, Franconia Springfield/Springfield Mall. Long Range Plan Compatibility/Listing : See individual project listed below. 1. Arlandia Del Ray Potomac Yard bike/pedestrian improvements (Arlington and Alexandria, Transaction project #196.) Page 5 of 12

2. Metro station improvements within Alexandria Improve access to Eisenhower Avenue and King Street stations; redesign Van Dorn Street Station for West End Transitway (Transaction #203). 3. Crystal City bike/ped network (Arlington, Transaction # 112). 4. Metroway BRT extension along Route 1 to Pentagon City Arlington (Transaction # 117). 5. West End Transitway, Alexandria. Construct a four mile segment of the dedicated bus lanes between the Van Dorn Metro station and Arlington County (Transaction # 42). 6. Frontier Drive extension Franconia Springfield Parkway to Loisdale Road (Transaction #84 and NVTA 6 year plan submission) 7. Construct new Metro station at Potomac Yard 8. Construct an improved grid network of streets in Crystal City, Pentagon City, and Potomac Yard (Transaction #83) Project/Program: VRE Corridor Jurisdiction(s): Fredericksburg Line, Alexandria Arlington Fairfax Prince William Objective: Support emerging walkable, mixed use communities in Prince William and Fairfax Counties through expanded VRE service, including reverse peak service. TOD areas along the VRE corridor: VRE Fredericksburg Line: Crystal City, Alexandria, Franconia Springfield/Springfield Mall, Lorton, Woodbridge; VRE Manassas Line Manassas Park, Manassas, Innovation/Broad Run Long Range Plan Compatibility/Listing : See individual project listed below. 1. Station access improvements at Crystal City, Alexandria, Franconia Springfield, Lorton, Woodbridge; Crystal City includes improved connectivity to both Crystal City and National Airport Metro stations. (Transaction projects #298 303) 2. VRE capacity improvements: Increase peak period frequencies to 15 minutes; institute express service; institute reverse peak service with associated capital improvements (Transaction project 324); Long Bridge expansion to Eisenhower Valley 4 tracks (Transaction #297) Page 6 of 12

Project/Program: Route 7 Jurisdiction(s): Alexandria Fairfax Objective: Revitalize communities as mixed use, walkable centers in Alexandria and Fairfax and connect to Fairfax s new downtown at Tysons through building Bus Rapid Transit. TOD areas along Route 7: Mark Center, Baileys Crossroads, Seven Corners, downtown Falls Church, Pimmit Hills, Tysons Corner Long Range Plan Compatibility/Listing: See individual project listed below. 1. BRT along Route 7, from Mark Center in Alexandria to Spring Hill Metro Station in Tysons. Dogleg along 29, Fairfax Drive and Sycamore Street to East Falls Church Metro. Dedicated bus lanes most of the route, but in mixed traffic in areas with right of way constraints. (Transaction #31). Stations include Mark Center, Baileys Crossroads, Seven Corners, East Falls Church Metro, Broad Street in downtown Falls Church, Tysons Spring Hill Metro station. 2. City of Falls Church Multimodal Improvements. (Transaction Project #66) 3. Install on road bicycle lanes on Route 7 from Fairfax County boundary to Seven Corners (Transaction #21) 4. Roadway improvements: a. Seven Corners interchange improvements create Ring Road with pedestrian/bicycle facilities (Transaction project #18 ; NVTA 6 year plan submissio n) Project/Program: Columbia Pike Jurisdiction(s): Arlington Fairfax Objective: Revitalize communities as mixed use, walkable centers in Annandale and along Columbia Pike, and connect to Tysons through Gallows Road TOD areas along Columbia Pike: Columbia Pike, Bailey s Crossroads Long Range Plan Compatibility/Listing: See individual project listed below. 1. Columbia Pike express transit network: Provide enhanced bus service from Annandale to Crystal City via Pentagon City, including limited stop bus service, improved headways, related bus fleet and facility requirements, and transit stations (Transaction project #40). 2. Columbia Pike urban bike/pedestrian network (Transaction project #102). 3. High capacity transit on Annandale and Gallows Road, Annandale to Tysons. (Transaction #37). Page 7 of 12

Project/Program: Orange Line Corridor/Route 50/I 66 Jurisdiction(s): Arlington County, Fairfax County, Prince William County Objective: Revitalize communities as mixed use, walkable centers centers along the Orange Line corridor (Route 50/I 66) TOD areas along Orange Line Corridor/Route 50/I 66: West Falls Church, Merrifield/Dunn Loring, Vienna, Government Center/Fair Oaks Long Range Plan Compatibility/Listing: See individual project listed below. 1. Merrifield bike improvements (Fairfax County TPP) 2. Install bike/pedestrian bridge on north side of Route 50 over 495 from Fairview Park Drive to Gallows Road (Fairfax County TPP) 3. Northfax street network improvements, City of Fairfax, at Routes 50 and 123. (Transaction #140) 4. Implement priority bus service along US 29 and US 50 between Fair Oaks and Washington DC. (Transaction #46) 5. Government Center area bike/pedestrian improvements (Fairfax County TPP) 6. Fairfax County I 66 parallel bikeway (included but not fully funded in I 66 Outside the Beltway project) 7. Prince William bike/ped path parallel to I 66 and crossing Bull Run, connecting with Fairfax County parallel bikeway. (conceptual plans) 8. Arlington Boulevard (Rte. 50) trail, Potomac River to Fairfax City eastern border (WABA 2014 report, http://www.waba.org/advocacy/priorities/arlington boulevard trail/ ) 9. Construct shared use path on Route 28 from Prince William/Fauquier border to interchange with Dulles Toll Road. (Transaction #47 ) Project/Program: Route 236 Jurisdiction(s): Alexandria Fairfax County Fairfax City Objective: Revitalize communities as mixed use, walkable centers centers along Route 236 in Alexandria, Fairfax City and Annandale. TOD areas along Route 236: Old Town Alexandria, Landmark Mall, Lincolnia, Downtown Fairfax City; with connection to NOVA Community College Long Range Plan Compatibility/Listing: See individual project listed below. 1. Duke Street BRT and bike/pedestrian improvements, Alexandria to Landmark Mall, 4 miles (Transaction #41) 2. VA 236 priority bus, Fairfax, Alexandria to Fairfax City (Transaction #43) Page 8 of 12

3. VA 236 bike/pedestrian improvements, Alexandria border to Fairfax City. 7 miles (Fairfax County Route 236 study, 2016) 4. On road bike facilities (cycletracks) in Annandale business district (Fairfax County Bicycle Master Pl an) Project/Program: Manassas and Manassas Park downtowns and VRE station area Jurisdiction(s): Manassas, Manassas Park, Prince William County Objective: Revitalize communities as mixed use, walkable centers in Manassas; develop activity centers TOD areas within the area: Downtown Manassas, Manassas Park 1. VRE station access improvements, including expanded parking (including Manassas Park garage), improved walking and bicycling connections, PRTC bus connections Page 9 of 12

Goal 2 Expand transit capacity through investing in Metro, VRE, Bus Rapid Transit, and expanded express bus service, supporting a network of transit oriented development 1. Expand Metrorail fleet to enable operations of 100 percent eight car trains during peak period. Expansion, upgrades, and replacements of the rail car fleet, traction power substations, power cabling, third rail, train control systems, and storage facilities. 2. Expand capacity of VRE Fredericksburg line through following phased activities: a. Increase frequencies to 20 minutes in peak period. In support of this improvement: i. Construct/expand VRE equipment storage and maintenance facilities in Fredericksburg and midday storage in Washington, D.C.; ii. Construct station/platform, parking and access improvements at VRE Fredericksburg Line stations; iii. Purchase additional rolling stock in support of 8 car trains and peak service improvements. b. Improve frequencies to 15 min. peak period and new reverse peak period service. In support of this improvement: i. Purchase additional rolling stock ii. Construct/expand VRE equipment storage and maintenance facilities iii. Rail Line capacity improvements iv. Station/Parking Access improvements v. ITS/TSM improvements c. Implement peak period express service on VRE Fredericksburg Line: i. One express train and three local trains per hour during AM and PM peak periods ii. Stops at Spotsylvania, Leeland Rd, Woodbridge, Alexandria, Crystal City, L'Enfant, and Union Station. Assumes construction of Long Bridge expansion to 4 tracks, a DC Dept. of Transportation project. 3. Implement or expand peak period express bus service on 66, 95, 495, Rte. 28, and Fairfax County Parkway, for commuters to employment centers in Dulles Corridor, Tysons, Washington DC. Expand access to regional bus service through improved parking access, including: a. Constr uct new park and ride lots along Route 7 corridor at Dulles Town Center and near intersection of Route 7 and Route 659. (Transaction #9) b. Construct 300 space Leesburg North park and ride Lot at Crosstrail Boulevard. (Transaction #15) c. Construct 200 space park and ride lot at One Loudoun near the corner of Route 7 and Loudoun County Parkway. (Transaction #16) Page 10 of 12

d. Construct 50 Dulle s park and ride east of Loudoun County Parkway. (Transaction #132) 4. Construct high capacity transit service on 495 and American Legion Bridge from Tysons to Maryland side of Potomac, with connections to the Red Line and job centers at Bethesda, Rock Spring, White Flint, etc. Near term can be express bus, but planning should begin for a Metrorail or Light Rail connection, extending the Purple Line. (Transaction #36) 5. Expand Potomac Regional Transportation Commission intra county routes between Woodbridge/Occoquan, Quantico, Manassas/Manassas Park, Innovation,and Gainesvil le. Page 11 of 12

Goal 3 Make the road network more efficient, by improving street connections and strategically adding capacity at key areas. Priority Corridor Improvement(s): Route 28 Jurisdiction(s): Prince William County Fairfax County Loudoun County 1. Route 28 / New Braddock Road interchange (Transaction #27) 2. Create grade separated interchange at 28 and I 66 (included in I 66 Outside the Beltway project) Priority Corridor Improvement(s): Route 234 Jurisdiction(s): Prince William County 1. Route 234 interchange at Balls Ford Road (funded by I 66 Outside the Beltway concession) 2. Route 234 interchange at Sudley Manor Drive, Wellington Road (6 year plan submission) 3. Widen 234 to six lanes, from Route 28 to I 66 Priority Corridor Improvement: Route 15 Jurisdiction(s): Prince William County, Loudoun County 1. Rte. 15 traffic calming, north of Leesburg to Point of Rocks preserve as 2 lanes while adding roundabouts at key intersections (proposed alternative to Transaction #285) Priority Corridor Improvement(s): Route 7 Jurisdiction(s): Loudoun County, Fairfax County 1. Route 7 hot spot and safety improvements in Loudoun 2. Route 9 traffic calming improvements, Loudoun County border to Rte. 7 Priority Corridor Improvement(s): Improvements to Loudoun road network 1. Construct four lanes of western segment of Russell Branch Parkway from Belmont Ridge Road to Tournament Parkway. (Transaction #234) 2. Widen Evergreen Mills Road from 2 to 4 lanes from Northstar Boulevard to Loudoun County Parkway. (Transaction #179) Please visit our website for more information, to view a copy of the Northern Virginia Blueprint map, or get contact information at VASierra.club/blueprint. Photo credit: Pg 1, 3, 4, 7 photos by Aimee Custis for the Coalition for Smarter Growth. Photo credit: Pg 5 photo by Karen Campblin Page 12 of 12