NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association

Similar documents
FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway

Project Description Form 6V

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

Evaluation of Significant Transportation Projects in Northern Virginia Transportation District

Washington DC Section of ITE Project Briefing

The Year Ahead: Virginia Department of Transportation Northern Virginia District

Dulles Area Transportation Association. October 11, Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation

What if YOU could help plan Northern Virginia s transportation future?

Transform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies

County of Fairfax, Virginia. Department of Transportation

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director

I-395 Express Lanes Northern Extension Project Fairlington Citizens Association September 12, 2016

I-395 Express Lanes Northern Extension Project Public Hearings

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017

Public Opinion about Transportation Issues in Northern Virginia

Route 28 Corridor Safety and Operations Study Public Information Meetings. July 20 and 22, 2015

Fairfax County Parkway Widening Fairfax County

Welcome to the first issue of Nuts and Bolts, a monthly overview of VDOT activities for elected officials in Northern Virginia.

I-395 Express Lanes Northern Extension Project Crystal City Civic Association September 21, 2016

Commuter Connections Regional TDM Marketing Group Meeting

FY 2018 I-66 Commuter Choice Program Presentation to the Northern Virginia Transportation Commission May 3,

TRANSPORTATION AND TRAFFIC TECHNICAL REPORT

Route 28 Corridor Safety and Operations Study

Route 28 Corridor Safety and Operations Study

Welcome to the second issue of Nuts and Bolts, a monthly overview of VDOT activities for Northern Virginia s elected officials.

Fairfax Alliance for Better Bicycling. Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation

Interstate 66 Tier 1 Environmental Impact Statement (EIS)

Work Zone Awareness Week

Supervisor Cook Announces Final Plans for Braddock Road Improvement Project

STAFF REPORT. Comprehensive Plan Amendment CPA #PLN

ARRENTON RANSPORTATION

I-395 Express Lanes Northern Extension Project Arlington County Board October 18, 2016

Project Description Form 8AA

Route 29 Solutions Projects

Transform I-66. Chief Engineer Garrett W. Moore, P.E. July 12, 2018

City of Fairfax, Virginia City Council Work Session

Capital Beltway HOT Lanes Project

BRIEFING ON PROPOSED ADDITIONS AND CHANGES Additions and Changes to Projects Proposed for Inclusion in the 2015 CLRP Update

NOVEMBER 2017 DESIGN PUBLIC HEARINGS COMMENT SUMMARY (November 13, 14, and 16, 2017)

PUBLIC COMMENT SUMMARY REPORT Public Information Meetings

HOW OUR REGIONAL TAX DOLLARS ARE BEING SPENT THE HONORABLE MARTY NOHE CHAIRMAN, NORTHERN VIRGINIA TRANSPORTATION AUTHORITY

PERFORMANCE ANALYSIS of The Draft 2015 CLRP

June Dear Colleagues:

495 EXPRESS LANES NORTHERN EXTENSION STUDY COMMENT SUMMARY REPORT JUNE 11, 2018 PUBLIC INFORMATION MEETING

TRASBURG RANSPORTATION

TRANSIT PERFORMANCE IN THE I-66 INSIDE THE BELTWAY CORRIDOR

Preliminary Transportation Analysis

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

Interstate 66 TRANSPORTATION TECHNICAL REPORT. From US Route 15 in Prince William County To Interstate 495 in Fairfax County FEBRUARY 2013

Managing Dulles Rail Construction in Tysons Corner

Corridor 1 - Dulles/VA 7 TransAction 2040 Projects

Route 28 Widening (PW County Line to Old. Old Centreville Road) Scored HB 2 Application

Public Information Meeting

City of Fairfax, Virginia City Council Work Session

Chapter 5 Future Transportation

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66.

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension

Route 15 Congestion Report Findings

Project Overview. Rolling Road Widening Fairfax County. Get Involved. Design Public Hearing. Contact Information

I-95 Express Lanes Fredericksburg Extension (Fred Ex) Public Hearing. September 25, 2017

Public Information and Participation Comments

Capital Beltway HOT Lanes Project

Keynote. Shannon Valentine Secretary of Transportation

Project Description Form 8EE

US Bicycle Route 1 Summary Report: Selection of Preferred Route

Congestion Management Report

I-66 Corridor Improvements Route 15 to I-495. November 2014

A wide variety of transportation

Public Opinion about Transportation Issues in Northern Virginia A Report Prepared for the:

Viewing SMART SCALE Application

RM 620 FEASIBILITY STUDY

Giles Run Connector Road

Capital Beltway HOT Lanes - Frequently Asked Questions

Capital Beltway HOT Lanes Project

The Route 29 Corridor Study was initiated at the request of Virginia s Commonwealth

Northern Virginia Express Lanes Design Challenges and Solutions. IBTTA Maintenance and Roadway Operations Workshop June 25, 2018

Purpose: Financial Implications and Impact Statement: It is estimated that the cost to implement:

CHAPTER 3 STUDY AREA OPERATIONAL OVERVIEW

Highway 217 Corridor Study. Phase I Overview Report

Core of Rosslyn Transportation Study Existing Conditions Report - Appendix. Appendix E: VISSIM Model Calibration Summary

PROJECT OBJECTIVES. Improve vehicle capacity for the intersection. Improve pedestrian and bicycle access

THE VDOT STARS PROGRAM AN OVERVIEW FOR DESIGNERS. Integrating Transportation Planning, Project Development, and Project Programming

Appendix F: Detailed Modeling Results

INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION ALTERNATIVES ANALYSIS TECHNICAL REPORT SEPTEMBER 2016

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

I-95 NORTHBOUND AT US 1 (EXIT 126) ALTERNATIVES DESIGN ANALYSIS

Table of Contents. 2.0 Land Use and Transportation Inputs Land Use Factors Transportation Factors

Providing an Efficient and Multi-modal Transportation System

Hampton Roads Pedestrian and Bicycle Advisory Committee

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015

Route 7 (East Market Street) Interchange at Battlefield Parkway Town of Leesburg Project No: UPC Presentation to Town Council

ITEM 15 Notice March 29, 2017

Sketch Level Assessment. of Traffic Issues. for the Fluor Daniel I-495 HOT Lane Proposal. Ronald F. Kirby

I 10 Phoenix to California Border Multimodal Corridor Profile Study

Foothill Expressway Improvements Between El Monte and San Antonio

City of Wilsonville 5 th Street to Kinsman Road Extension Project

Public Meeting #1 Comment Summary

Huntington Station Metro Zone / North Kings Highway Concept Plan

Access Management Regulations and Standards

VIRGINIA RAILWAY EXPRESS

Transcription:

NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association June 20, 2012 Garrett Moore VDOT District Administrator, Northern Virginia

Paving Program 2012 This season's paving program will cover 536 lane miles in Alexandria, Arlington, Loudoun and Prince William counties Valued at $76.5 million

Route 29/Linton Hall Road Interchange New interchange in Gainesville eliminates at-grade railroad crossings, improves congestion and stop-and-go traffic. Two new overpasses will carry Route 29 over the Norfolk Southern Railroad, and Linton Hall and Gallerher Roads over the railroad and Route 29. Route 29 will be widened to six lanes, and eliminate several driveway entrances and signals. $267 million Completion Dec. 2014 Underway

Underway Route 28 and Wellington Road Improving traffic flow and increasing rail access in Manassas This project is constructing Route 28 over Wellington Road and the Norfolk Southern Railroad in the City of Manassas. The new four-lane overpass will eliminate the need for vehicles to stop for trains (about 20 each weekday), which creates a bottleneck into Manassas. It will also allow more trains to move through the area each day, at higher speeds, and provide room for two additional tracks. $44 million Completion Nov. 2012

Underway Route 50 Widening Widening Route 50 to reduce congestion 3.7-mile widening to six lanes from Poland Road in Loudoun County to Route 28 in Fairfax County. $100 million Completion end 2014

I-66/Route 28 Interchange Bottlenecks During a.m. rush, traffic stacks up on westbound 66 to exit at Route 28 North Southbound 28 left-turn movement to I-66 East creates major backups and safety problems. Coming Soon The northbound 28 right-turn lane that ends at Walney will be extended 1,750 feet. Construction begins this summer. Extend dual-left turn from southbound 28 to 66 East (advertise for construction spring 2013)

I-66 and Route 28 Long-term solutions Currently seeking community input and developing scope for an interchange study Study will identify interchange alternatives and constraints (i.e. Elleanor C. Lawrence Park, community s wish to maintain access to Braddock and Walney Roads) Identify funding for study and construction; phased improvements likely

Tri-County Parkway and Route 606 Nov. 2005: The Commonwealth Transportation Board approved the location area for a 10.4-mile north-south link connecting Manassas with the Dulles corridor. The location of the new road would be from the I- 66/Route 234 interchange in Prince William County to Route 50 in Loudoun County. Known as the West Two alternative, the precise location of the roadway would be decided during the design. Environmental Impact Statement and FHWA Record of Decision by end of 2012. The road will connect to the Loudoun County Parkway (Route 606) which serves the west side of Dulles. Loudoun County s comprehensive plan calls for widening the two-lane road to six lanes to improve access to Dulles Airport and also connect with Tri County. Funding has not been identified for Tri-County or Route 606.

Manassas Battlefield Park Bypass Federal Highway Administration is administering the study for the National Park Service. Draft DEIS approved in Jan. 2005; location public hearing held May 2005 June 2006 - CTB approved D as preferred alternative which generally parallels Pageland Lane from 66 to Sudley Road near Catharpin. Because the corridors for the preferred alternatives for both this project and the Tri-County Parkway project overlap, it is assumed that the two projects would be co-located within the overlap portion. Project does not currently have funding to complete the Final Environmental Impact Statement.

I-66 Inside the Beltway VDOT has completed a multimodal study for I-66 from the Beltway to D.C., per the Transportation Planning Board s request Study recommends a number of multimodal improvements for bus, bike and pedestrians. Ultimately, long-term, a third travel lane at selected locations on 66 would maximize mobility for long-term demand.