Vicinity Map. Proposed Roosevelt Street Sidewalk Project OVERLAND ROAD TO CASSIA STREET W ROSE HILL ST W ALBION ST S OWYHEE ST W CASSIA ST

Similar documents
Committed to Service

NORTH DOWNTOWN N EAST WEST

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan

122 Avenue: 107 Street to Fort Road

Building Great Neighbourhoods LANSDOWNE

Fairview and Main Local Streets Improvement Plan

Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs

Re: Boise s Annual Transportation Requests Reviewing the List of Projects and Listening to Public Input

Safe Routes to School Action Plan Aberdeen, Idaho

MASTER BICYCLE AND PEDESTRIAN PLAN

Hidden Oaks Elementary School

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Chapter 5 Future Transportation

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

Fifth & Kirkham Traffic-Calming Project. 5 th Avenue and Kirkham Street Presented at the UCSF Quarterly Parnassus Community Meeting May 3, 2018

Committed to Service

Fleur Drive Reconstruction

Board of Supervisors February 27, 2017

Orange Center Elementary School

Building Great Neighbourhoods QUEEN ALEXANDRA

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

About the study. North Milwaukee Ave. Key goals of this study are to: Achieve Vision Zero* by. Harmonize the space and improve walkability

Lake Whitney Elementary School

Item No. 14 Town of Atherton

BICYCLE FACILITIES FULL BUILD PLAN

A copy of the draft plan is available at:

Giles Run Connector Road

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Welcome. Thank you for attending tonight s open house. The purpose of this open house is to give you an opportunity to:

Wood and Cortland Neighborhood Greenways

Plant City Walk-Bike Plan

Montgomery County Life Sciences Center Loop Trail

WELCOME PETTIT AVENUE SPEED CONTROL REVIEW NIEGHBOURHOOD OPEN HOUSE. City of Niagara Falls Transportation Services

This chapter describes the proposed circulation system and transportation alternatives associated with

Improvements Infrastructure Gap Assessment and Improvements Street Striping

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

Building Great Neighbourhoods BONNIE DOON

Committed to Service

5 CIRCULATION AND STREET DESIGN

In Collaboration with: City of Belton Cass County FHWA Johnson County KDOT MoDOT City of Olathe City of Overland Park


Meadow Woods Elementary School

DRAFT. A fifth objective, other considerations, has been added to capture considerations not captured by the four primary objectives.

AGENDA ITEM G-2 Public Works

Durrance Elementary School

ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

Getting Your SRTS Project Funded. Ryan Snyder

Welcome. If you have any questions or comments on the project, please contact:

San Jose Transportation Policy

North Avenue Corridor Study

9/22/2014 VIA . RE: Butano Apartments Pre App (PAMP )

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

Little Italy Parking District Street Parking Conversions. Maps created by John Li Mandri; Little Italy Assn.

Outer Cape Bicycle & Pedestrian Master Plan. PUBLIC WORKSHOP #2 March 26, 2015

Application of a Complete Street

State Highway 16 Kuna-Mora Road to Ada/Gem County Line

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

Appendix B - Street Sections

Souder, Miller & Associates 401 W. Broadway Farmington, NM

Pre-Construction Meeting

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

State Highway 16/McDermott Road Kuna-Mora Road to Ada/Gem County Line

Final Sidewalk Feasibility Study

Traffic Circulation & Pedestrian Safety Study

State Highway 16 Kuna-Mora Road to Ada/Gem County Line

AND GUIDING PRINCIPLES. Boise, Idaho 1997

City of Lafayette Public Meeting Agenda Downtown Street Improvement Master Plan Implementation Committee Thursday, April 21, :00 PM

Reference number /VP. Lafayette Downtown Congestion Study - Additional Traffic Analysis

Sixth Line Development - Transit Facilities Plan

9.1 FUNCTIONAL HIGHWAY SYSTEMS IN URBANIZED AREAS Principal Arterial Interstate Principal Arterial Non-Interstate

83 AVENUE PRE-CONSTRUCTION MEETING

Route 47 (North Main Street) Reconstruction


CITY OF ROHNERT PARK CITY COUNCIL AGENDA REPORT

Chapter 4: Funding and Implementation

Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue

Public Open House #2. THE CITY OF NORTH VANCOUVER CHESTERFIELD AVENUE CYCLING IMPROVEMENTS (4th - 13th STREET) JULY 2013

SCHOOL ROUTE PLAN. For HUNTER S CREEK ELEMENTARY SCHOOL LOCATION 14 ORANGE COUNTY. Prepared for:

RIVERSIDE, Newton MA BH NORMANDY RIVERSIDE LLC. Riverside Station. A green, transit-oriented community

Vehicular and Pedestrian Access to Herndon Metrorail Station. Robert B. Boxer, Director John Stuart, Clark Nexen October 28, 2015

State Highway 44/State Street High Capacity Corridor

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

TRANSPORTATION STANDARDS

10A. DATE: October 5, Pedestrian and Bicycle Advisory Committee. Kevin Colin, Deputy Planning Manager Curt Bates, City Engineer

BPP / SUB

Pennsylvania Avenue (CR 484) Design Alternatives Study

SAFE ROUTES TO SCHOOL

Traffic Impact Memorandum. May 22, 2018

Cyclists and Bikeways: What s your match? A guide to bikeway options for a variety of cyclists

APPENDIX F DESIGN STANDARDS REVIEW SUMMARIES AND REDLINES

Figure 4-10: Pedestrian Improvements Types of Potential Station Area Improvements - Place-Making Improvements

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St.

Transcription:

Vicinity Map W ROSE HILL ST Cassia Park W CAMAS ST LEGEND W ALBION ST S ROOSEVELT ST W CASSIA ST Sacred Heart W KOOTENAI ST Monroe Elementary S OWYHEE ST South Junior High S SHOSHONE ST Project area Bus stop School N W OVERLAND RD

Project Background The Roosevelt Street project was requested by the Boise School District ACHD, the City of Boise and the Boise School District have been working together to develop the alternatives shown tonight

Project Purpose Provide a safe route to school for children walking to local schools Increase safety for pedestrians using Roosevelt Street Improve neighborhood connectivity

Project Description Potential alternatives being explored: Proposed Alternative 1 Install curb, gutter, sidewalk on both sides of Roosevelt On-street parking on east side only Sidewalk Curb Street Parking Curb Buffer Sidewalk 49' Buffer between sidewalk and parking on east side Approximate construction cost: $600,000 Proposed Alternative 2 Install curb, gutter and sidewalk on both sides of Roosevelt On-street parking on both sides Sidewalk Buffer Curb Parking Street Parking Curb Buffer Sidewalk Buffer between sidewalk and parking on both sides 58' Approximate construction cost: $660,000 Proposed Alternative 3 Install curb, gutter and sidewalk on both sides of Roosevelt On-street parking on east side only Bike lanes on both sides Buffer between sidewalk and parking on east side Sidewalk Curb Bike lane Street Bike lane Parking Curb Buffer Sidewalk 59' Approximate construction cost: $800,000 *There are no plans to rebuild the roadway +Portion of ACHD right-of-way **Illustrations are not to scale

Considerations in developing project Safety Elementary school attendance boundaries and school district bussing zones Minimizing impacts to landscaping and adjacent properties On-street parking & bike lanes Construction costs Requests from residents, City of Boise and the Boise School District Location of utilities and cost of moving them

Proposed Alternative 1: Pros & Cons Install curb, gutter, sidewalk on both sides of Roosevelt; onstreet parking on east side only Pros Cons Fits within existing right-of-way Least expensive Does not provide facilities for all modes of transportation

Proposed Alternative 2: Pros & Cons Install curb, gutter and sidewalk on both sides of Roosevelt; on-street parking on both sides of street Pros Cons On-street parking on both sides of street Right-of-way impacts Significant utility impacts Does not provide facilities for all modes of transportation

Proposed Alternative 3: Pros & Cons Install curb, gutter, sidewalk and bike lanes on both sides of Roosevelt; on-street parking on east side of street Pros Cons On-street parking on east side Provides facilities for all modes of transportation Fits within existing right-of-way Impacts landscaping in the public right-of-way Significant utility impacts Most expensive

What s Next? Evaluate and consider comments from open house Take concept and public comments to ACHD Commissioners who will determine whether project should move forward If project moves forward, design will begin and a construction year will be determined