Pedestrian Improvements Duck Town Council Retreat March 8, 2016
Project Summary Four Seasons to Ship s Watch Sidewalks Bike lanes Three new crosswalks One pedestrian refuge island Crosswalk illumination One raised median Shared use paths
New Project Details Refuge islands Retaining walls North end sidewalk width Construction costs Phasing
Owner Meetings TIME MON 9/21 TUES 9/22 WED 9/23 THURS 9/24 9:00 9:30 Jim McNulty Osprey Landing Shops 1190 Duck Road Blake Buchert Ocean Atlantic Rentals 1194 Duck Road Mark Copeland Roadside Bar & Grill 1193 Duck Road John White Stan White Realty 1232 Duck Road 10:00 Ellen Davidson, Chair Duck United Methodist 1214 Duck Road Ken Flatt, Director Dare County Water Dept. 1230 Duck Road 10:30 Jim Braithwaite Waterfront Shops 1240 Duck Road 11:00 Jerry Davis Wee Winks Square 1216 Duck Road Clark Twiddy Twiddy Real Estate 1181 Duck Road Myra Ladd-Bone Atlantic Realty 1180 Duck Road Judy Fisher, Manager Aqua S Restaurant 1174 Duck Road Rick Fagersten 101 Dune Road 252-573-8000 11:30 Pat Pettit/Todd Coyle Sunset Grille 1264 Duck Road 12:00 12:30 1:00 Chris O Neil/Bob Salimbene Kellogg s Supply 1201 Duck Road 1:30 Chris Koontz Barrier Island 1245 Duck Road 2:00 2:30 **Interview** Destination Dare w/ Benny Baldwin Yaniv Super Wings 1186 Duck Road Tom Wright, Owner Cotton Gin 1183 & 1185 Duck Road Jessica Magnus, Manager Nags Head Hammocks 1212 Duck Road Jeff Shields, Prop. Manager Four Seasons Entrance 105 Four Seasons Lane 3:00 Jeff Shields, Prop. Manager Schooner Ridge Entrance Schooner Ridge Drive 3:30 Ron & Ken Forlano Duck Deli 1223 Duck Road 4:00 4:30 Janice Trotman 100 Cook Drive 261-6206 or 256-1769 (c)
Owner Letters Narrative description Graphic Identify impacts
Phasing Spread costs Constructability Logical termini Phase I Crosswalks, lighting, gateways, signs, accessibility, utility relocations Phase II East Side from Four Seasons to Duck Deli Phase III West Side from Aqua to Cook Phase IV North End
Phase I Crosswalks, lighting, gateways, signs, accessibility, utility relocations
Lighting Lighting Crosswalks/accessibility Phase I Crosswalks, lighting, gateways, signs, accessibility, utility relocations
Duck Deli Four Seasons Phase II East side from Four Seasons to Duck Deli
Landscaping Sidewalk Phase II East side from Four Seasons to Duck Deli
Cook Drive Aqua Phase III West side from Aqua to Cook Drive
Sidewalk Landscaping Bike lane markings Phase III West side from Aqua to Cook Drive
Ship s Watch Duck Deli Phase IV North End
Phasing Phase I Crosswalks, lighting, gateways, signs, accessibility, utility relocations $ 438,233 Phase II East Side from Four Seasons to Duck Deli $ 563,989 Phase III West Side from Aqua to Cook $ 592,808 Phase IV North End $ 1,249,024 Total $ 2,844,053
Gateway median Extend shared use path Schematic Design
Rework driveway Avoid trees Avoid pedestals Avoid trees Schematic Design
Reduce sidewalk to stay in R/W Avoid drains Replace wooden walk, meet new sidewalk Avoid drains Relocate utility cabinet Remove existing retaining wall, build new wall Avoid utility pedestals Schematic Design
New retaining wall with railing Meet path circle New retaining wall Relocate pedestal Remove existing retaining walls, build new walls Schematic Design
Remove existing retaining walls, build new walls Rework driveway Remove existing retaining wall, build new wall Remove drive aisle, regrade slope Schematic Design
Rework driveway New retaining wall with railing Align crosswalk with existing walkway Remove existing retaining wall, regrade area Schematic Design
Water Dept. to move fence Avoid drain, connect to site walks Remove existing retaining wall, build new wall Schematic Design
Bridge ditch with boardwalk Replace existing steps Remove existing retaining walls, build new wall Integrate walk into driveway Schematic Design
New retaining wall Schematic Design
New retaining wall Schematic Design
Avoid utility pole and pedestals Avoid utility poles New retaining wall and railing Refuge island Ramp or stairs to parking New retaining wall and railing Schematic Design
Next Steps NCDOT submittal Permitting Final Plans Funding
Questions