Pedestrian Improvements Duck Town Council Retreat

Similar documents
Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

WHITE STREET/ ENGLISH PLAZA STREETSCAPE IMPROVEMENT PROJECT

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

INDEX. Geometric Design Guide for Canadian Roads INDEX

Bicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1)

9/21/2016 VIA . RE: The Knot (DR16-270)

Design Criteria. Design Criteria

Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs

Explanation of Draft Scheme of The Project for Upgrading of Kukum Highway

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Clarkson Walkability Audit: Results and Recommendations Summary

RC-67M has been updated to include more details to be consistent with both ADAAG and PROWAG. The following slides discusses the general notes found

WHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building.

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Cross Street Corridor Non-Motorized Enhancement Project Project Description

3/10/2016 VIA th Street, Suite 203 Sacramento, CA

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

A. Arlington County Master Transportation Plan Pedestrian Element B. Arlington County Horizontal Standards H-3.1 Driveway Entrances

Ballston Station Multimodal Study WMATA and Arlington County. Meeting Minutes

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

11/28/2016 VIA

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

5/7/2013 VIA . RE: University Village Safeway Expansion (P13-019)

Frome Street Bicycle Route

Water Street Promenade Engineering and Design Services

Ocean Park Boulevard Green Street Project Community Workshop

DISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (17-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

8/31/2016 VIA . RE: Freeport Arco Fuel Station (P16-039)

ADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT

Montgomery County Life Sciences Center Loop Trail

7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811

APPENDIX F DESIGN STANDARDS REVIEW SUMMARIES AND REDLINES


Lincoln Neighborhood Corridor Plan The LiNC

STAKING TRAFFIC CONTROL SIGNAL SYSTEMS

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

REPORT CONCURRENCE. City Manager. The General Manager concurs with the recommendation of this report.

YOUR GUIDE TO A SOUTH BETHANY, DELAWARE VACATION Shhhhhhhh... the quietest beach resort

Transportation Planning Division

RE: Park Plaza Walgreens (P12-016)

Lincoln Highway Streetscape Plan Concept Plan

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

George Washington Bridge Restoring the George Construction Program Supplemental Information on Bicycle and Pedestrian Access

10/30/2012 VIA

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

12/13/2018 VIA

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS

CHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems

RIVERSIDE, Newton MA BH NORMANDY RIVERSIDE LLC. Riverside Station. A green, transit-oriented community

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

Broad Street Bicycle Boulevard Design Guidelines

GEOMETRIC DESIGN STANDARDS FOR NEW RESIDENTIAL SUBDIVISION STREETS TABLE 1A CG-6 CURB AND GUTTER SECTION

Microscale Audit of Pedestrian Streetscapes (MAPS), Mini Version

Geary Bus Rapid Transit Project

ALBERTA AVENUE WHAT WE HEARD REPORT BUILDING GREAT NEIGHBOURHOODS

6.4 RECOMMENDED IMPROVEMENTS

Bar Harbor Route 3 Gateway Project Advisory Committee September 21, 1-3 PM Atlantic Oakes Hotel Minutes

ADA on Construction. Guidance for Section C Plan Preparers

6/14/2013 VIA . Evan Compton, Associate Planner Community Development Department City of Sacramento 300 Richards Blvd Sacramento, CA 95814

CROSSNORE BICYCLE & PEDESTRIAN PLAN UPDATE

Victoria Park Master Plan

Accommodating Pedestrians in the Work Zone

San Rafael School District. Task Force Meeting Notes. November 5, 2012

Hospital Link Project Project Update November 2017

Anne Arundel County BICYCLE, PEDESTRIAN, TRANSIT ASSESSMENT GUIDELINES

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

What Is a Complete Street?

CITY OF ROHNERT PARK CITY COUNCIL AGENDA REPORT

Observations of Pedestrian Behavior and Facilities at Diverging Diamond Interchanges

Make Lincoln Highway an economically vibrant corridor that is safe, efficient, and beautiful for local residents and visitors.

Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements Advertisement for Construction - Progress Report

NAPIER AVENUE PEDESTRIAN AND BICYCLE PLAN

PEDESTRIAN SAFETY STUDY

Transportation Planning Division

IMPLEMENTATION. PEDESTRIAN USERS (Continued /) A: Class 2 Pedestrian / Cycle Ways. Pedestrian and Cycle Ways:

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

North Avenue Corridor Study

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

Appendix 3 SACRAMENTO COUNTY DEPARTMENT OF TRANSPORTATION

THE ALAMEDA CONCEPT DESIGN COMMUNITY MEETING 3. A Plan for The Beautiful Way JANUARY 28, 2010

SAFE SCHOOL WALK ROUTES (SSWR) TASKFORCE ADVISORY COMMITTEE 7 TH MEETING MEETING AGENDA

Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements 100% Engineering Design - Progress Report

DRAFT. A fifth objective, other considerations, has been added to capture considerations not captured by the four primary objectives.

Omaha s Complete Streets Policy

Bicycle + Pedestrian Connectivity Gap Analysis

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Complete Streets Funding Program Project Prioritization Plan

4APNOIPF Vh, YII PTC CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. 8K TH 63 River Crossing Bridge Replacement Project

Rebuilding Highway 7 Town Centre Boulevard to Sciberras Road

Multi-Modal Traffic Analysis. Parisi and Associates

Designing Complete Streets: What you need to know

INTERCHANGES. Module 7

Tonight is for you. Learn everything you can. Share all your ideas.

2017 Temporary traffic control guidelines for pedestrians. v.2

RURAL ROAD IMP R OV EM ENT STAN DARDS

Bar Harbor Route 3 Gateway Project Context Sensitive Solutions

Multimodal Design Guidance. October 23, 2018 ITE Fall Meeting

Transcription:

Pedestrian Improvements Duck Town Council Retreat March 8, 2016

Project Summary Four Seasons to Ship s Watch Sidewalks Bike lanes Three new crosswalks One pedestrian refuge island Crosswalk illumination One raised median Shared use paths

New Project Details Refuge islands Retaining walls North end sidewalk width Construction costs Phasing

Owner Meetings TIME MON 9/21 TUES 9/22 WED 9/23 THURS 9/24 9:00 9:30 Jim McNulty Osprey Landing Shops 1190 Duck Road Blake Buchert Ocean Atlantic Rentals 1194 Duck Road Mark Copeland Roadside Bar & Grill 1193 Duck Road John White Stan White Realty 1232 Duck Road 10:00 Ellen Davidson, Chair Duck United Methodist 1214 Duck Road Ken Flatt, Director Dare County Water Dept. 1230 Duck Road 10:30 Jim Braithwaite Waterfront Shops 1240 Duck Road 11:00 Jerry Davis Wee Winks Square 1216 Duck Road Clark Twiddy Twiddy Real Estate 1181 Duck Road Myra Ladd-Bone Atlantic Realty 1180 Duck Road Judy Fisher, Manager Aqua S Restaurant 1174 Duck Road Rick Fagersten 101 Dune Road 252-573-8000 11:30 Pat Pettit/Todd Coyle Sunset Grille 1264 Duck Road 12:00 12:30 1:00 Chris O Neil/Bob Salimbene Kellogg s Supply 1201 Duck Road 1:30 Chris Koontz Barrier Island 1245 Duck Road 2:00 2:30 **Interview** Destination Dare w/ Benny Baldwin Yaniv Super Wings 1186 Duck Road Tom Wright, Owner Cotton Gin 1183 & 1185 Duck Road Jessica Magnus, Manager Nags Head Hammocks 1212 Duck Road Jeff Shields, Prop. Manager Four Seasons Entrance 105 Four Seasons Lane 3:00 Jeff Shields, Prop. Manager Schooner Ridge Entrance Schooner Ridge Drive 3:30 Ron & Ken Forlano Duck Deli 1223 Duck Road 4:00 4:30 Janice Trotman 100 Cook Drive 261-6206 or 256-1769 (c)

Owner Letters Narrative description Graphic Identify impacts

Phasing Spread costs Constructability Logical termini Phase I Crosswalks, lighting, gateways, signs, accessibility, utility relocations Phase II East Side from Four Seasons to Duck Deli Phase III West Side from Aqua to Cook Phase IV North End

Phase I Crosswalks, lighting, gateways, signs, accessibility, utility relocations

Lighting Lighting Crosswalks/accessibility Phase I Crosswalks, lighting, gateways, signs, accessibility, utility relocations

Duck Deli Four Seasons Phase II East side from Four Seasons to Duck Deli

Landscaping Sidewalk Phase II East side from Four Seasons to Duck Deli

Cook Drive Aqua Phase III West side from Aqua to Cook Drive

Sidewalk Landscaping Bike lane markings Phase III West side from Aqua to Cook Drive

Ship s Watch Duck Deli Phase IV North End

Phasing Phase I Crosswalks, lighting, gateways, signs, accessibility, utility relocations $ 438,233 Phase II East Side from Four Seasons to Duck Deli $ 563,989 Phase III West Side from Aqua to Cook $ 592,808 Phase IV North End $ 1,249,024 Total $ 2,844,053

Gateway median Extend shared use path Schematic Design

Rework driveway Avoid trees Avoid pedestals Avoid trees Schematic Design

Reduce sidewalk to stay in R/W Avoid drains Replace wooden walk, meet new sidewalk Avoid drains Relocate utility cabinet Remove existing retaining wall, build new wall Avoid utility pedestals Schematic Design

New retaining wall with railing Meet path circle New retaining wall Relocate pedestal Remove existing retaining walls, build new walls Schematic Design

Remove existing retaining walls, build new walls Rework driveway Remove existing retaining wall, build new wall Remove drive aisle, regrade slope Schematic Design

Rework driveway New retaining wall with railing Align crosswalk with existing walkway Remove existing retaining wall, regrade area Schematic Design

Water Dept. to move fence Avoid drain, connect to site walks Remove existing retaining wall, build new wall Schematic Design

Bridge ditch with boardwalk Replace existing steps Remove existing retaining walls, build new wall Integrate walk into driveway Schematic Design

New retaining wall Schematic Design

New retaining wall Schematic Design

Avoid utility pole and pedestals Avoid utility poles New retaining wall and railing Refuge island Ramp or stairs to parking New retaining wall and railing Schematic Design

Next Steps NCDOT submittal Permitting Final Plans Funding

Questions