FREEWAY, WEAVING LANE, AND SERVICE ROAD CONNECTIONS

Similar documents
FREEWAY AND SERVICE ROAD CONNECTIONS

FOR LOOP RAMPS-TAPERED DECELERATION LANE

INTERSECTION WITH RIGHT TURN TAPER

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications

RE: 2007 NPA Text (Clean Version)


Edge Wedge 150 lb/ft 3

Page 1 of KA

CHAPTER 3A. GENERAL PAGE CHAPTER 3B. PAVEMENT AND CURB MARKINGS PAGE

TRAFFIC LINE MANUAL. June 2011 TRAFFIC-ROADWAY SECTION

CHAPTER 3 SIGNS, SIGNALS AND PAVEMENT MARKINGS. Responsible Driving (Red book) NOTES & STUDY GUIDE

The first lift, mainline, shall be placed using a spray paver.

Section 3A.04 Colors. Section 3B.10 Approach Markings for Obstructions

TRAFFIC LINE MANUAL Edition Revision 1 June 2012 TRAFFIC-ROADWAY SECTION

Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA

"Emul Asph (SS-1HP) Tack".

SECTION 12 ROAD MARKINGS AND DELINEATION

BI-DIRECTIONALS FREE-ACCESS

TURN ARROW. LANE-REDUCTION ARROW (RIGHT) (For Left Lane, Use Mirror Image) LANE-REDUCTION ARROW MARKING DETAIL

SIGN PLACEMENT-ELEVATION VIEW: FREEWAY (FORESLOPE) ROADSIDE SIGN LOCATIONS & SUPPORT SPACING MICHIGAN DEPARTMENT OF TRANSPORTATION (MIN.

Ch Driving on Expressways. Characteristics of Expressway Driving. Expressway. Types of Expressways. Why do they have fewer collisions?

General References Definitions. (1) Design Guidance. (2) Supporting Information

CHAPTER 6H. TYPICAL APPLICATIONS

CW20-1D 48" X 48" (Flags- See note 1) G " X 24" (See note 2)

Characteristics of. Entering & Exiting High Speed Considerations

Appendix 9.A - Interchanges Figure 9-A-1 Four-leg Interchanges between Expressways

SECTION 12 ROAD MARKINGS AND DELINEATION

Presented By: Jim Roth, P.E. Signing Engineer Office of Traffic Engineering Ohio Department of Transportation 1980 West Broad Street Columbus, Ohio

Guidance. ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions

Grade Separated Intersection

Vail Cascade Bar 11:50 PM There once was a designer with clout who designed a two-lane roundabout On its big debut a cyclist came through He got in bu

Chapter 33. Grade Separated Intersection Overview Classification of Intersection Grade Separated Intersection

ARLINGTON COUNTY PAVEMENT MARKING SPECIFICATIONS

CHAPTER 1 STANDARD PRACTICES

Background on the Revisions to VDOT s Access Management Spacing Standards

Session 1 23 CFR 772: Type I Project Definitions

Markings Technical Committee Chapter 3H: Roundabout Markings APPROVED IN NCUTCD COUNCIL ON JANUARY 20, 2006

PERFORMANCE ACTIVITY 405 LIMB MANAGEMENT

LOCATION AND DESIGN DIVISION

CHAPTER 6H. TYPICAL APPLICATIONS

Best Practices for the Design and Operation of Reduced Conflict Intersections

Updated There is no park access points beyond the limit of the phase I work. roadway to be constructed Viewport has been along full limits of the park

INDEX. Geometric Design Guide for Canadian Roads INDEX

Appendix Work Zone Traffic Control

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

Technical Memorandum. Subject: Interchange Ramp Terminal Configuration. Expiration. Implementation. Introduction

SECTION 1A NEW JERSEY TURNPIKE GEOMETRIC DESIGN

JCE 4600 Transportation Engineering. Traffic Control

PERMANENT PAVEMENT MARKING PLAN

444 North Capitol Street NW, Suite 249, Washington, DC (202) Fax: (202) ERRATA

Tract or Parcel Project Name PCN Checked By Date

CHAPTER 2G. PREFERENTIAL AND MANAGED LANE SIGNS

PERMANENT PAVEMENT MARKING PLAN

Traffic Control Devices

Minnesota Manual on Uniform Traffic Control Devices

PERMANENT PAVEMENT MARKING PLAN

Traffic Control Inspection Checklist Segment:

BUREAU OF LOCAL ROADS & STREETS 42-3(12) BICYCLE FACILITIES Jan 2006

CHAPTER 2B. REGULATORY SIGNS

Access Management Standards

2C-3 Placement of Warning Signs

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

Vermont Permit Test Flash Cards

TRAFFIC CONTROLS FOR BICYCLE FACILITIES

Chapter 2B. REGULATORY SIGNS

Attachment No. 17 GMI No. 1. National Committee on Uniform Traffic Control Devices GMI SIGNS TECHNICAL COMMITTEE RECOMMENDATION

Highway Safety Manual (HSM) Freeway Training Course

Plan prepared for: Brennan Paving and Construction. Plan prepared by: Direct Traffic Management

Page 1 of KA

Module 5: Navigating Roadways

Business Access and Associated Benefits Provided by Roundabouts

General Notes. Project No /15/2018 Page 1 of 1

Roadway Design Manual

Dr. Naveed Anwar Executive Director, AIT Consulting Affiliated Faculty, Structural Engineering Director, ACECOMS

PERFORMANCE ACTIVITY 613 IMPACT ATTENUATOR WORK DESCRIPTION 3

CHAPTER 2F. TOLL ROAD SIGNS. Table 2F-1. Toll Road Sign and Plaque Minimum Sizes

Off-road Trails. Guidance

Figure 1: Graphical definitions of superelevation in terms for a two lane roadway.

City of Prince Albert Statement of POLICY and PROCEDURE. Department: Public Works Policy No. 66. Section: Transportation Issued: July 14, 2014

Freeway System Considerations

INTERSECTIONS AT GRADE INTERSECTIONS

Roadway Safety Design

General Notes. Project No /15/2018 Page 1 of 1

Access Management Design Standards for Entrances and Intersections

Santa Clara County Expressways Complete Streets & Design Challenges

PERMANENT PAVEMENT MARKING PLAN

Pedestrian Safety at Roundabouts

Road Markings. Lecture Notes in Transportation Systems Engineering. Prof. Tom V. Mathew

REVISION 2 VIRGINIA WORK AREA PROTECTION MANUAL. Ginger Quinn & Paul Kelley April 11, 2018

Updated There is no park access roadway to be constructed points beyond the limit of along full limits of the park's the phase I work. Phase 1. Revise

Staff Report Text Amendment Case #: TA

Snohomish County Fire Chiefs Association Document #

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES

Temporary Traffic Control for Highway Work Zones

APPENDIX F. Access Management Design Standards for Entrances and Intersections

UNCURBED INTERSECTIONS APPROACH TREATMENT DETAIL I

Speed Control & Limits

Safety Implications of Managed Lane Cross Sectional Elements (Buffer Width vs. Shoulder Width vs. Lane Width)

NOT TO SCALE PUBLIC WORKS STANDARD DETAILS CURB DETAILS DATE: MARCH 2013 FILE NAME: CURB.DWG

Transcription:

EDGE LINE WHITE STOP LINE SERVICE ROAD EDGE LINE 6" X 5 WHITE DOTTED LINE WITH 20 GAPS EDGE LINE 4" WHITE BROKEN LINE EDGE LINE 1/3 Y v SERVICE ROAD Y 900 X ( 5 0 12" SOLID WHITE CHANNELIZING LINE X EDGE LINE FREEWAY, WEAVING LANE, AND SERVICE ROAD CONNECTIONS NOTES: 1. If Y 900 feet, refer to Note 3 on Sheet 2. v 2. Refer to notes on Sheet 2. File: PW: D/RD/TS/TYP/Signs/PM/mdot PAVE925A.dgn Rev. ajm Michigan Department of Transportation PREPARED BY TRAFFIC AND SAFETY ENGINEER OF DELIVERY ENGINEER OF DEVELOPMENT FOR FREEWAY AND RAMP PAVEMENT MARKINGS DRAWN BY: KBK CHECKED BY: JGM SPECIAL DETAIL 1 of 5

9 0 0-300 SOLID LINE 4" WHITE EDGE LINE 300 PC 12" SOLID WHITE CHANNELIZING LINE EDGE LINE LANE-DROP EXIT NOTES: 1. All "broken lines" on sheets 1, 2, 3 and 4 are 4 in wide 12 ft - 6 in line, 37 ft - 6 in gap. 2. All "dotted lines" on sheets 1, 2, 3 and 4 are 12 in wide 5 ft line, 20 ft gap, except for tapered exit, use 6 in wide line. 3. For long weaving lanes (greater than 900 ft) where a RIGHT LANE MUST EXIT sign is normally used, pavement marking should conform to the lane-drop exit treatment shown on this sheet. 4. For detail of pavement marking arrow application at ramp terminals to discourage wrong way movement, see sheet 5. 5. Solid white channelizing line shall be 12 in wide for 1/3 Y ft to 300 ft prior to the gore. If a longer solid white line is used, it may be 6 in wide. File: PW: D/RD/TS/TYP/Signs/PM/mdot PAVE925A.dgn Rev. ajm 2 of 5

STOP LINE SEE DETAIL A SEE DETAIL C SEE DETAIL D SEE DETAIL B SEE DETAIL E NOTE: For Details B, C, D and E see Sheet 4. ENTRANCE AND EXIT RAMPS y PT BROKEN LINE FOR ONE HALF THE LENGTH OF THE FULL WIDTH ACCELERATION LANE DETAIL A - PARALLEL ACCELERATION LANE File: PW: D/RD/TS/TYP/Signs/PM/mdot PAVE925A.dgn Rev. ajm 3 of 5

4" WHITE DETAIL B - TAPERED ACCELERATION LANE DOTTED LINE PC (5 MARK, 20 GAP) TAPER LENGTH DETAIL C - PARALLEL DECELERATION LANE DOTTED LINE (5 MARK, 20 GAP) 16" DETAIL D - TAPERED DECELERATION LANE 4" OR 6" SOLID WHITE BEGINS WHERE THE RAMP WIDTH IS SUFFICIENT TO ACCOMMODATE TWO LANES OF TRAFFIC 24 CROSSROAD STOP LINE LOCATED 4 TO 30 FROM THE EDGE OF THE CROSSROAD (EXACT LOCATION TO BE DETERMINED BY ENGINEER) 16" DETAIL E - RAMP TERMINAL File: PW: D/RD/TS/TYP/Signs/PM/mdot PAVE925A.dgn Rev. ajm 4 of 5

C OF CROSSROAD L EDGE OF ROADWAY STOP LINE (EXACT LOCATION TO BE DETERMINED BY THE TRAFFIC ENGINEER) 4 TO 30 APPROX. 200 WRONG WAY ARROW (OPTIONAL) SINGLE LANE EXIT RAMP TERMINAL STOP LINE (EXACT LOCATION TO BE DETERMINED BY THE TRAFFIC ENGINEER) C OF CROSSROAD L EDGE OF ROADWAY 4 TO 30 25 ONLY ONLY LANE USE ARROWS AND LEGENDS (SEE PAVE-900-SERIES 3) 12 12 4" OR 6" SOLID WHITE LINE WRONG WAY ARROW (OPTIONAL). IF USED, LOCATE AT THE "NECK" OF THE RAMP WHERE IT BEGINS TO WIDEN TO TWO OR MORE LANES MULTILANE EXIT RAMP TERMINAL NOTE: Double-headed arrows may be required where a service road or city street is located opposite a ramp terminal. File: PW: D/RD/TS/TYP/Signs/PM/mdot PAVE925A.dgn Rev. ajm 5 of 5