FOR LOOP RAMPS-TAPERED DECELERATION LANE

Similar documents
FREEWAY, WEAVING LANE, AND SERVICE ROAD CONNECTIONS

FREEWAY AND SERVICE ROAD CONNECTIONS

INTERSECTION WITH RIGHT TURN TAPER


Edge Wedge 150 lb/ft 3

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications

The first lift, mainline, shall be placed using a spray paver.

RE: 2007 NPA Text (Clean Version)

SECTION 12 ROAD MARKINGS AND DELINEATION

"Emul Asph (SS-1HP) Tack".

SECTION 12 ROAD MARKINGS AND DELINEATION

Page 1 of KA

Page 1 of KA

Section 3A.04 Colors. Section 3B.10 Approach Markings for Obstructions

TRAFFIC LINE MANUAL. June 2011 TRAFFIC-ROADWAY SECTION

SIGN PLACEMENT-ELEVATION VIEW: FREEWAY (FORESLOPE) ROADSIDE SIGN LOCATIONS & SUPPORT SPACING MICHIGAN DEPARTMENT OF TRANSPORTATION (MIN.

BI-DIRECTIONALS FREE-ACCESS

PERMANENT PAVEMENT MARKING PLAN

PERMANENT PAVEMENT MARKING PLAN

PERMANENT PAVEMENT MARKING PLAN

TRAFFIC LINE MANUAL Edition Revision 1 June 2012 TRAFFIC-ROADWAY SECTION

Tract or Parcel Project Name PCN Checked By Date

Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA

CHAPTER 1 STANDARD PRACTICES

Presented By: Jim Roth, P.E. Signing Engineer Office of Traffic Engineering Ohio Department of Transportation 1980 West Broad Street Columbus, Ohio

CHAPTER 3A. GENERAL PAGE CHAPTER 3B. PAVEMENT AND CURB MARKINGS PAGE

General References Definitions. (1) Design Guidance. (2) Supporting Information

PERFORMANCE ACTIVITY 613 IMPACT ATTENUATOR WORK DESCRIPTION 3

Markings Technical Committee Chapter 3H: Roundabout Markings APPROVED IN NCUTCD COUNCIL ON JANUARY 20, 2006

Updated There is no park access points beyond the limit of the phase I work. roadway to be constructed Viewport has been along full limits of the park

CHAPTER 3 SIGNS, SIGNALS AND PAVEMENT MARKINGS. Responsible Driving (Red book) NOTES & STUDY GUIDE

PERMANENT PAVEMENT MARKING PLAN

September 2008 REVISIONS (1) SYMMETRICAL VERTICAL CURVE EQUATIONS 12.5(12) VERTICAL CURVE COMPUTATIONS 12.5(14) TURNING LANE LENGTHS 15.

Figure 1: Graphical definitions of superelevation in terms for a two lane roadway.

Characteristics of. Entering & Exiting High Speed Considerations

(PLANT MIXED ASPHALT PAVEMENT (MSCR)). REVISED 02/03/17 DO NOT REMOVE THIS. IT NEEDS TO STAY IN FOR THE CONTRACTORS.

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET 1 COUNTY

CW20-1D 48" X 48" (Flags- See note 1) G " X 24" (See note 2)

Traffic Control Devices

SECTION 1A NEW JERSEY TURNPIKE GEOMETRIC DESIGN

Updated There is no park access roadway to be constructed points beyond the limit of along full limits of the park's the phase I work. Phase 1. Revise

General Notes. Project No /15/2018 Page 1 of 1

Minnesota Manual on Uniform Traffic Control Devices

CHAPTER 6H. TYPICAL APPLICATIONS

General Notes. Project No /15/2018 Page 1 of 1

PERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 4

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET 1 COUNTY

PERFORMANCE ACTIVITY 405 LIMB MANAGEMENT

ATTACHMENT NO. 18 GMI-C. National Committee on Uniform Traffic Control Devices GMI SIGNS TECHNICAL COMMITTEE RECOMMENDATION

CHAPTER 2C. WARNING SIGNS AND OBJECT MARKERS Section 2C.01 Function of Warning Signs

REVISION 2 VIRGINIA WORK AREA PROTECTION MANUAL. Ginger Quinn & Paul Kelley April 11, 2018

CHAPTER 6H. TYPICAL APPLICATIONS

TURN ARROW. LANE-REDUCTION ARROW (RIGHT) (For Left Lane, Use Mirror Image) LANE-REDUCTION ARROW MARKING DETAIL

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

Attachment No. 17 GMI No. 1. National Committee on Uniform Traffic Control Devices GMI SIGNS TECHNICAL COMMITTEE RECOMMENDATION

Use of Acceleration-Deceleration Lanes

CHAPTER 2G. PREFERENTIAL AND MANAGED LANE SIGNS

PENNDOT HPMS DATA COLLECTION GUIDE. Bureau of Planning and Research Transportation Planning Division April 2016 (Updated March 2018)

Vermont Permit Test Flash Cards

ARLINGTON COUNTY PAVEMENT MARKING SPECIFICATIONS

CHAPTER 2: SIGNALS, SIGNS AND PAVEMENT MARKINGS

Appendix A-6. Signing and Marking Guidelines. Number Name Pages. 2B.06 Signing at T Intersections 1. 2B.12 Pedestrians in Crosswalk 1

Design Criteria. Design Criteria

PENNDOT HPMS DATA COLLECTION GUIDE

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

c. continue onto the expressway and use the next exit ramp.

2003 Edition Page 2C-1

Identify the letter of the choice that best completes the statement or answers the question.

Pavement Markings (1 of 3)

ECAT Example Exercises

Module 5: Navigating Roadways

Session 1 23 CFR 772: Type I Project Definitions

RAILROAD CROSSING AT TWO LANE ROADWAY

LOCATION AND DESIGN DIVISION

TRAFFIC CONTROLS FOR BICYCLE FACILITIES

I-95 NORTHBOUND AT US 1 (EXIT 126) ALTERNATIVES DESIGN ANALYSIS

Homework Module 7.01 Drivers Manual Study Questions

PART 2. SIGNS Chapter 2C. Warning Signs and Object Markers

2C-3 Placement of Warning Signs

SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS

TRAFFIC AND SAFETY NOTE 608A. Spacing for Commercial Drives and Streets. To Promote a Uniform Practice in Determining Access Spacing

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

County of Sacramento Standard Construction Specifications January 1, 2008 TECHNICAL PROVISIONS

WORK ZONE TRAFFIC CONTROL PROCEDURES

Ch Driving on Expressways. Characteristics of Expressway Driving. Expressway. Types of Expressways. Why do they have fewer collisions?

INDEX. Geometric Design Guide for Canadian Roads INDEX

CHAPTER 2: SIGNALS, SIGNS AND PAVEMENT MARKINGS

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET NUMBER

Appendix Work Zone Traffic Control

Road Markings. Lecture Notes in Transportation Systems Engineering. Prof. Tom V. Mathew

Sign Design Manual (TEM 295-2)

Why do you think the chances of a collision are greater at an intersection than at any other point on the roadway?

Chapter 2B. REGULATORY SIGNS

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)

UNCURBED INTERSECTIONS APPROACH TREATMENT DETAIL I

CHAPTER 2D. GUIDE SIGNS CONVENTIONAL ROADS Section 2D.01 Scope of Conventional Road Guide Sign Standards Standard:

guide signs or groups of signs. General provisions are given in Sections 2A.07, 2A.08, and 2A.10. Standard:

Pavement Markings: Past, Present, and Future. TxDOT Short Course October 2016

Road Safety Audit training course. Motorways - safety issues of the motorway design

CHAPTER 2D. GUIDE SIGNS CONVENTIONAL ROADS Section 2D.01 Scope of Conventional Road Guide Sign Standards Standard:

Transcription:

6" WHITE DOTTED LINE: 5 MARK, 20 SKIP 6" WHITE CRYSTAL MONO-DIRECTIONAL MAIN LINE END (EVERY 50 FEET) 50 FEET BEYOND LAST CRYSTAL PAVEMENT MARKER 5 AMBER MONO-DIRECTIONAL 50 FEET BEFORE LAST CRYSTAL PAVEMENT MARKER AT 50 FOOT SPACING WRONG WAY ARROW (OPTIONAL) RAISED AND PAVEMENT MARKINGS FOR LOOP RAMPS-TAPERED DECELERATION LANE Note: See notes on sheet 5. File: PW: D/RD/TS/TYP/Signs/PM/mdot PAVE915A.dgn Rev. ajm Michigan Department of Transportation PREPARED BY TRAFFIC AND SAFETY ENGINEER OF DELIVERY ENGINEER OF DEVELOPMENT FOR RAISED FOR INTERCHANGES DRAWN BY: KBK SPECIAL DETAIL CHECKED BY: JGM 1 of 5

DECELERATION LANE (SEE DETAIL ON 5) ACCELERATION LANE (SEE DETAIL ON 5) CRYSTAL MONO-DIRECTIONAL WRONG WAY ARROWS (OPTIONAL) (SEE DETAIL ON 3) WRONG WAY ARROW (OPTIONAL) ONLY 24" WHITE STOP LINES, TO BE USED AT STOP CONTROLLED OR SIGNALIZED INTERSECTION ONLY ARROW & "ONLY" LEGEND MARKING (OPTIONAL) 4" WHITE LANE LINE RAISED AND PAVEMENT MARKINGS FOR NON-LOOP RAMPS Notes: 1. Refer to PAVE-925-Series Sheet 5 for location of exit ramp pavement markings. 2. See notes on sheet 5. File: PW: D/RD/TS/TYP/Signs/PM/mdot PAVE915A.dgn Rev. ajm 2 of 5

BEGIN FIVE AMBER MONO-DIRECTIONAL (EVERY 50 FEET) AT 50 FEET BEYOND LAST CRYSTAL PAVEMENT MARKER 50 (TYP.) PAVEMENT MARKERS (EVERY 50 FEET) TERMINATE 12" WHITE S SHALL END AT EDGE OF PAVED GORE AREA GORE MARKINGS AT THE TANGENT POINT OF THE TWO 12" LINES PAVED GORE AREA 12" WHITE 50 24" GORE & RAMP MARKING DETAIL (OFF-RAMP SHOWN) NOTES: 1. Crystal mono-directional pavement markers to be placed every 50 ft along both 12 in white gore markings, 2 in offset (on the traffic side) from the gore marking. 2. 5 amber mono-directional pavement markers to be placed along yellow ramp edge line beginning 50 ft beyond last crystal pavement marker, 2 in offset (on the traffic side) from the yellow ramp edge line. 3. See notes on sheet 5. File: PW: D/RD/TS/TYP/Signs/PM/mdot PAVE915A.dgn Rev. ajm 3 of 5

6" WHITE MAINLINE & 6" RAMP YELLOW S TERMINATE AT POINT OF GORE PAVEMENT 6" WHITE 4" WHITE BROKEN LINE EDGE OF PAVED SHOULDER MAINTAIN FULL RAMP WIDTH (16 ) (EVERY 50 ) ALONG BOTH 12" GORE MARKINGS (EVERY 50 ) AT 50 BEYOND LAST CRYSTAL PAVEMENT MARKER GOING UP STREAM. Note: See notes on Sheet 5. TAPERED ENTRANCE (EVERY 50 ) ALONG BOTH 12" GORE MARKINGS EDGE PAVED SHOULDER 6" WHITE MAINLINE AND 6" RAMP YELLOW EDGE LINES TERMINATE AT POINT OF GORE PAVEMENT (EVERY 50.) AT 50 BEYOND LAST CRYSTAL PAVEMENT MARKING GOING UP STREAM. CONTINUE AT NORMAL SPACING (SEE PAVE-92O-SERIES) Note: See notes on sheet 5. TAPERED ENTRANCE WITH ADDED LANE File: PW: D/RD/TS/TYP/Signs/PM/mdot PAVE915A.dgn Rev. ajm 4 of 5

CONSTRUCTION JOINT 2" PAINT LINE 4" (EVERY 50 ) AT 50 BEYOND LAST CRYSTAL PAVEMENT MARKER. 6" WHITE BROKEN LINE WITH (EVERY 100 ) FOR ONE HALF LENGTH OF FULL WIDTH ACCELERATION LANE (SEE DETAIL SHOULDER (TYP.) ON 2) END LEFT END WITH (SEE DETAIL ON 2 OF VIII-915E) BEGIN BEGIN LEFT 6" WHITE DOTTED LINE = 5 MARK, 20 GAP SHOULDER (EVERY 50 ) AT 50 6" BEYOND LAST CRYSTAL PAVEMENT MARKER NOTES: RPM 1. Raised pavement markers shall match adjacent edge line color. 2. Install edge line and gore pavement markers at a 2 in offset from the inside edge of the edgeline or gore marking. The inside edge is toward the median along the mainline and toward the lane along ramps. 3. Install lane line pavement markers along the centerline of the 4 in white broken lines at a 4 in offset left of the pavement marking. 4. Refer to PAVE-920-Series for additional information. File: PW: D/RD/TS/TYP/Signs/PM/mdot PAVE915A.dgn Rev. ajm 5 of 5