G IG-2. INSTALLATION AND INSPECTION OF GAS SERVICE REGULATOR VENT LINE PROTECTORS (VLPs) [Interim Guideline]

Similar documents
Residential and Small Commercial

TECHNICAL DATA. TRIMPAC Model B-5 & B-5B

TECHNICAL DATA. Trimpac 244a. September 16, 2013

TECHNICAL DATA. Trimpac 251a. Spetember 16, 2013

G REQUIREMENTS FOR THE INSTALLATION OF GAS BOOSTERS, MICROTURBINES AND ASSOCIATED SYSTEM PROTECTIVE DEVICES

How Do I Install My Garden Master Bucket Garden?

INSTALLATION COMMISSIONING, OPERATION & MAINTENANCE MANUAL

FOR INSTALLING CO 2 BLENDER KIT (P/N IN BEER SYSTEM

Service Regulator Requirements

TECHNICAL DATA MAINTENANCE AIR COMPRESSOR MODEL G-1

INSTALLATION, OPERATION AND MAINTENANCE GUIDE

OPERATING AND MAINTENANCE MANUAL

Type 1367 High-Pressure Instrument Supply System with Overpressure Protection

TECHNICAL DATA. Trimpac 257a. September 16, 2013

TECHNICAL DATA. Trimpac 256a. October 31, 2013

GM Series Dual-Block Multi-Function Gas Control Valves

MUELLER. A Wall Type. Indicator Post. Reliable Connections. General Information 2. Technical Data/ Dimensions 3. Installation 4-5.

MUELLER A A Non-Adjustable. Vertical Indicator Posts. Reliable Connections. General Information 2. Technical Data 3.

Installation Instructions

INSTALLATION INSTRUCTIONS. CVS 67CFR Pressure Reducing Instrument Supply Regulator INTRODUCTION

22. Specialty Valves.

Speed control assembly model A-1

BP48-1 AND SSP48-1 IN-GROUND POST INSTALLATION INSTRUCTIONS

Premium Series. Economical Price & Reliable Performance. High Quality. Rust-Resistant. Long Life. Tamper-Resistant locking Screw.

Manual Actuated Boiler Blowdown Valves

S Surge Arresters

Types 749B and R130 Changeover Manifolds

Installation Operating Instructions for Duplex Manual Manifolds PX-TMD Series

1800C and 1800C-HC Series Service Regulators

Flange Bolt Torquing. for Resistoflex Plastic-Lined Piping Products. Torquing. Retorquing. Hydrotesting. Annual retorquing

ATD LB PRESSURE BLASTER INSTRUCTION MANUAL

Medical Gas Control Panel

64 Series Pressure Reducing Regulators

Anti-flood device Model B-1

1805 Series Relief Valves

G196 Series BASOTROL Redundant Combination Gas Valve with Manual Shutoff Valve

Water Weir Flow Controller. Introduction. Safety Precautions. Mounting the Hardware

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM

INSTRUCTIONS FOR CONVERTING CONDENSING GAS MOBILE HOME FURNACES MODEL SERIES: CMA3*, CMC1*, VMA3*, VMC1*

G196 Series BASOTROL Redundant Combination Gas Valve with Manual Shutoff Valve

INSTALLATION, MAINTENANCE & OPERATING INSTRUCTIONS 2-4 REDUCED PORT/ FULL PORT (5700/6700) ANSI CLASS 150/300/600/900/1500/2500 TRUNNION BALL VALVES

Types S100K and S102K Pressure Regulators

Summary of Substantive Changes between the 2004 e1 and 2017 editions of ASSE 1011, Hose Connection Vacuum Breakers

61R2 STANDARD REGULATOR COMPACT REGULATOR. Phone Fax

G REQUIRMENTS FOR BRANCH LINES SUPPLYING MULTIPLE REGULATORS AND / OR METERS. 3 and Gas Blue Book

SECTION VEHICLE SERVICE EQUIPMENT

Tri-Tech Medical Inc.

CITY AND COUNTY OF DENVER CR&CF RISK UNIT Compressed Gas Safety Standard

Model MTB-ASME Vertical Bladder Tanks

DF-5 48 Inch Gas Train 10/09/2012

ASSE International Product (Seal) Listing Program. ASSE Performance Requirements for Air Valve and Vent Inflow Preventer

1213B2 Service Regulators Maximum Inlet Pressure 125 PSIG

Rain Barrels. Did You Know?

Model MTB-ASME Vertical Bladder Tanks

MUELLER. A A Adjustable. Vertical Indicator Posts. Reliable Connections. General Information 2. Technical Data 3.

Model MTB-ASME Horizontal Bladder Tanks

III. Identify the initial installation requirements for standpipe systems

Lab Cock. Contents. User s Manual (1) Be sure to read the following warranty clauses of our product 1. (2) General operating instructions 2

Installation Operating Instructions for Simple Duplex Manual Manifolds PX-TSD Series

Instruction Manual. PE-25/32/37 Tapping Machines. POLYTAPP Valves

Pressure Dump Valve Service Kit for Series 2300 Units

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM

New Hampshire Public Utilities Commission CFR 49 Part 192 Regulations. MINIMUM Pipeline Safety Regulations

Operating Instructions in compliance with Pressure Equipment Directive 2014/68/EU. FAS Brass Check Valve RDL

Rubber Dock Hose care, Use & Maintenance

ENERGY BLADE 3K4. Energy Blade Installation Instructions

INSTALLATION. and INSTRUCTION MANUAL. for QUALITY AIR BREATHING SYSTEMS. Model 50 Systems Outfitted with ABM-725 Monitor C O M P A N Y

Your safety and the safety of others are very important.

INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS

WATER HEATER THERMAL EXPANSION TANKS Owner s Manual. Safety Instructions Installation Maintenance Warranty. Models: 2-5 Gallon Capacity

Type ACE97. Introduction. Installation. P.E.D. Categories. Specifications. Overpressure Protection. Installation Guide English May 2002

APCO ARV CLEAN WATER AIR RELEASE VALVES. Model 50A

INSTALLATION & MAINTENANCE INSTRUCTION

TECHNICAL DATA ANTI-FLOOD DEVICE MODEL B-1 1. DESCRIPTION

Horizontal Bladder Tanks

Installation, Operation and Maintenance Instructions Buffer Vessel OM006

Check with local zoning official for property line distance requirements.

Vertical Bladder Tanks

PRO SINK -R 1 and 2. Dilution system CONTENTS

G96 Series BASOTROL Dual Operator Valve

O&M MANUAL HIGHLIGHTS

NB/NBR NITROGEN BOOSTER FOR AVIATION SERVICE

ROTATING DISK VALVES INSTALLATION AND MAINTENANCE 1. SCOPE 3 2. INFORMATION ON USAGE 3 3. VALVE TYPES 3 4. OPERATORS 5 5. VALVE CONSTRUCTION 6

Type S301 & S302 Gas Regulators INTRODUCTION INSTALLATION. Scope of Manual. Description. Specifications. Type S301 and S302. Instruction Manual

Henry Pratt Diviner Position Indicator. Operation and Maintenance Manual. Job Name: Contractor: Date: Document #:DIVPOSNOM Revision Date: 2/9/11

1200B2 Series Service Regulators. Instruction Manual

Installation and operating manual. Pneumatic control station LK product no: PCS 1-10

MST21 Stainless Steel Balanced Pressure Thermostatic Steam Trap

ABRASIVE SYSTEM ABRASIVE REGULATOR II 800# BULK ABRASIVE DELIVERY POT Abrasive Regulator II and 800# Pot Manual

4 IN. BALL LAUNCHER Engine Mounted / PTO Driven

632 Series Gas Distribution System

Seat Tightness of Pressure Relief Valves

CentriFlow Meter Integrated Air Entrainment System

Apollo Standard Port, Full Port & One Piece Flanged Ball Valves Installation, Operation, & Maintenance Manual

BGA158, BGA171 and BGA110 Series Shutoff Gas Valve

1800C and 1800C-HC Service Regulators

ASSE International Product (Seal) Listing Program

Poppetted Coaxial Drop Tube Assembly for use with Auto Limiter II. Installation Instructions

Mooney * Noise Controller Installation, Operation, and Maintenance Manual

Installation Instructions and valve Maintenance Rev. 0 of 29/09/15

Transcription:

LAST REVIEW DATE: REVIEW CYCLE: 2/17/15 5 Years INTERIM GUIDELINE: G-699-2-IG-2 TITLE: VOLUME: REGISTRATION NO. TARGET TRAINING GROUPS: INSTALLATION AND INSPECTION OF GAS [Interim Guideline] 3, 10 and Yellow Book GAS0564 Gas Measurement, Gas Distribution Services (GDS), Gas Construction, Pressure Control, Construction Management, Gas Contractors REVISIONS: (See ) 1) Section 3.7 - Added requirement to obtain customer permission prior to installing, removing, or performing maintenance on a VLP.

G-699-2-IG-2 Gas Operations Interim Guideline TITLE: INSTALLATION AND INSPECTION OF GAS [Interim Guideline] Effective immediately Gas Operations Standard G-699-2 is revised as follows: (added text is underlined) 3.0 GENERAL 3.7 Obtain permission from the customer prior to installing, removing, or performing maintenance on a VLP. If access is denied, install a Class C warning tag in accordance with G-11837. ### ENVIRONMENTAL REVIEW BY: J. Fox SAFETY REVIEW BY: J. Fox PREPARED BY: APPROVED BY: DATE: VOLUME: 3, 10 and YB PAGE 1 OF G. Ludwig Patrick R. Williams General Manager Technical Operations 2/17/15 Metering Specs and Procedures; O&M Manual; Yellow Book 1

LAST REVIEW DATE: REVIEW CYCLE: 2/12/15 5 Years INTERIM GUIDELINE: G-699-2-IG TITLE: VOLUME: REGISTRATION NO. TARGET TRAINING GROUPS: INSTALLATION AND INSPECTION OF GAS [Interim Guideline] 3, 10 and Yellow Book GAS0564 Gas Measurement, Gas Distribution Services (GDS), Gas Construction, Pressure Control, Construction Management, Gas Contractors REVISIONS: (See ) 1) Section 4.6 - Revised to allow alternatives to pipe strap (mounting bracket) and its location. 2) Section 4.7 - Added new section allowing installation of a VLP without the U-shaped pipe providing 18" ground clearance is maintained. 3) Section 5.4 - Added new section providing instruction in cases where 18 ground clearance cannot be maintained for outdoor regulator installations.

G-699-2-IG Gas Operations Interim Guideline TITLE: INSTALLATION AND INSPECTION OF GAS [Interim Guideline] Effective immediately Gas Operations Standard G-699-2 is revised as follows: (added text is underlined) 4.0 INSTALLATION FOR INDOOR REGULATORS 4.6 Screws or other hardware used to attach the mounting bracket to the building face shall be hardened and corrosion resistant. Variations to Figure 1 pipe strap (mounting bracket) location and type are allowed as long as the VLP is adequately secured so it cannot be rotated. 4.7 If 18" ground clearance can be maintained, it is acceptable to install the VLP head section without the U-shaped pipe. At the vent terminus, install a 1 elbow and 1 nipple into the VLP. Avoid getting dirt/debris inside the VLP. 5.0 INSTALLATION FOR OUTDOOR REGULATORS 5.4 If 18" ground clearance cannot be maintained, attach the VLP to the building face as in Figure 1 and run 1" pipe and fittings from the regulator to the VLP. ### ENVIRONMENTAL REVIEW BY: J. Fox SAFETY REVIEW BY: J. Fox PREPARED BY: APPROVED BY: DATE: VOLUME: 3, 10 and YB PAGE 1 OF G. Ludwig James Lucente Acting General Manager Technical Operations 2/12/15 Metering Specs and Procedures; O&M Manual; Yellow Book 1

LAST REVIEW DATE: REVIEW CYCLE: 10/17/14 5 Years SPECIFICATION: TITLE: VOLUME: REGISTRATION NO. TARGET TRAINING GROUPS: REVISIONS: (See ) G-699-2 INSTALLATION AND INSPECTION OF GAS 3, 10 and Yellow Book GAS0564 Gas Measurement, Gas Distribution Services (GDS), Gas Construction, Pressure Control, Construction Management, Gas Contractors 1) This revision incorporates the provisions of Interim Guideline G-699-1a-IG dated 10/16/14, which is hereby rescinded. 2) Cover Page - Revised title to include inspection of VLPs. Added specification to the Yellow Book. 3) Table of Contents - Added Sections 6.0 and 7.0. Renumbered subsequent sections. 4) Section 1.0 - Revised Scope to include inspection of VLPs. 5) Section 4.1 - Revised VLP selection table for indoor regulators. 6) Section 4.3 - Revised elbow selection table. 7) Section 5.1 - Revised VLP selection table for outdoor regulators. 8) Section 6.0 - Added new section covering Vent Line Terminus 2 and Greater. Renumbered subsequent sections. 9) Section 7.0 - Added new section covering annual inspections. Renumbered subsequent sections. 10) Section 8.2 - Deleted GEHSI S11.01. 11) Section 9.0 - Deleted GEHSI S11.01.

G-699-2 Gas Operations Standards TITLE: INSTALLATION AND INSPECTION OF GAS EFFECTIVE DATE: November 17, 2014 TABLE OF CONTENTS SECTION TITLE PAGE 1.0 SCOPE 2 2.0 LEGAL REQUIREMENTS 2 3.0 GENERAL 2 4.0 INSTALLATION FOR INDOOR REGULATORS 3 5.0 INSTALLATION FOR OUTDOOR REGULATORS 5 6.0 VENT LINE TERMINUS 2 INCHES AND GREATER 5 7.0 ANNUAL VLP INSPECTIONS 6 8.0 MERCURY CONTAMINATION PRECAUTIONS 6 9.0 REFERENCES 7 ENVIRONMENTAL REVIEW BY: J. Fox SAFETY REVIEW BY: J. Fox PREPARED BY: APPROVED BY: DATE: VOLUME: 3, 10, YB PAGE 1 G. Ludwig Liliana Gonzalez General Manager Technical Operations 10/17/14 Metering Specs and Procedures; O&M Manual; Yellow Book

TITLE: INSTALLATION AND INSPECTION OF GAS 1.0 SCOPE This specification details the installation and inspection of Vent Line Protectors (VLPs) on new and existing gas service regulator (indoor and outdoor) vent outlet terminus. VLPs are devices that prevent the flow of water into a gas service regulator vent outlet terminus. 2.0 LEGAL REQUIREMENTS This specification is in compliance with the applicable sections stipulated in: 2.1 Code of Federal Regulations, Title 49, Part 192, "Transportation of Natural and Other Gas by Pipeline: Minimum Federal Safety Standards." 2.2 Rules and Regulations of the State of New York, Public Service Commission, 16 NYCRR Part 255, "Transmission and Distribution of Gas." 3.0 GENERAL 3.1 Specification G-8217, "Flood-Prone Areas for the Installation of Gas Service Regulator Vent Line Protectors (VLPs)" lists the areas by M&S plate where VLPs shall be installed. Local management may determine other areas where VLPs may be required. 3.2 Where the installation of VLPs is impractical, the vent line terminus shall be raised to a minimum of 3 feet above the Base Flood Elevation (BFE) provided on the Federal Emergency Management Agency (FEMA) maps. 3.3 Gas service regulator vents shall be installed per Drawing EO-17118, "Regulator Vent Installation." Where the installation of a VLP will not provide the required 18" clearance from the lower end of the VLP to final outdoor grade, provisions must be made to elevate the vent outlet terminus. 3.4 The VLP shall be installed perpendicular to the ground and shall not exceed 10 degrees in the vertical position. 3.5 All threaded joints on pipe and pipe fittings shall be sealed with Teflon tape or approved pipe dope. 3.6 All uncoated outdoor piping and fittings shall be painted with suitable nonlead outdoor paint for use on metal surfaces. NUMBER: DATE: VOLUME: 3, 10 and YB PAGE 2 G-699-2 10/17/14 Metering Specs and Procedures; O&M Manual; Yellow Book

TITLE: INSTALLATION AND INSPECTION OF GAS 4.0 INSTALLATION FOR INDOOR REGULATORS 4.1 Using the table below, select a VLP properly sized to the existing service regulator vent or vent line. Vent Outlet Terminus Size VLP ½", ¾", 1", 1 ¼", 1 ½" 1" 2" and above See Section 6.0 4.2 Remove the existing vent line cap. 4.3 Using the table below, select a properly matched 90 elbow to adapt from the vent line terminus to the VLP. Vent Line Terminus Elbow Size ½" male thread ½" female to 1" female ¾" male thread ¾" female to 1" female 1" male thread 1" female to 1" female ½" female thread ½" male to 1" female ¾" female thread ¾" male to 1" female 1" female thread 1" male to 1" female 1 ¼" male thread 1 ¼" female to 1" female 1 ½" male thread 1 ½" female to 1" female 1 ¼" female thread 1 ¼" male to 1" female 1 ½" female thread 1 ½" male to 1" female 4.4 Attach the VLP with 90 o elbow to the existing vent line terminus. The VLP should be in the vertical position with the screen section closest to the ground. Ensure 18" clearance from the lower end of the VLP to final outdoor grade. 4.5 Attach the 2-hole pipe strap (supplied with the VLP) to the VLP. Ensure the VLP is securely in place. (Figure 1) NUMBER: DATE: VOLUME: 3, 10 and YB PAGE 3 G-699-2 10/17/14 Metering Specs and Procedures; O&M Manual; Yellow Book

TITLE: INSTALLATION AND INSPECTION OF GAS 4.0 INSTALLATION FOR INDOOR REGULATORS (Continued) Figure 1 4.6 Screws or other hardware used to attach the mounting bracket to the building face shall be hardened and corrosion resistant. 4.7 For curb valve location tag installation requirements, see Specification G-8028, "Requirements for Indicating the Location of the Curb Valve Box on a Gas Service with an Indoor Regulator." NUMBER: DATE: VOLUME: 3, 10 and YB PAGE 4 G-699-2 10/17/14 Metering Specs and Procedures; O&M Manual; Yellow Book

TITLE: INSTALLATION AND INSPECTION OF GAS 5.0 INSTALLATION FOR OUTDOOR REGULATORS 5.1 Using the table below, select a VLP properly sized to the existing service regulator vent or vent line. Vent Outlet Terminus Size VLP ½", ¾", 1", 1 ¼", 1 ½" 1" 2" and above See Section 6.0 5.2 Remove the existing vent cap from the regulator. 5.3 Using appropriately sized pipe and elbows, install only the head section of the VLP such that the screen section is closest to the ground. Ensure 18" clearance from the lower end of the VLP to final outdoor grade. 6.0 VENT LINE TERMINUS 2 INCHES AND GREATER 6.1 For industrial regulator installations with (4) 2 inch vent terminus, a single 1 inch VLP is required for each 2 inch vent terminus. Industrial regulators include Fisher models 99, 133HP, 133L, 1098, and EZR. 6.2 For a vent line terminus equal to or greater than 2 inches in diameter, a VLP manifold (Figure 2) should be used with (5) 1 inch VLPs. Figure 2 NUMBER: DATE: VOLUME: 3, 10 and YB PAGE 5 G-699-2 10/17/14 Metering Specs and Procedures; O&M Manual; Yellow Book

TITLE: INSTALLATION AND INSPECTION OF GAS 6.0 VENT LINE TERMINUS 2 INCHES AND GREATER (Continued) 6.3 When installing vent line manifold with VLPs, ensure that is adequately supported. 6.4 When encountering multiple 2 inch and above vent terminus, strong consideration should be given on raising existing vent line to a minimum of 3 feet above the Base Flood Elevation (BFE) provided on the Federal Emergency Management Agency (FEMA) maps. 7.0 ANNUAL VLP INSPECTIONS 7.1 Starting in 2015 per rate case approval, the PSC requires that 5% of the VLP population be independently inspected for operability annually. 7.2 Gas Measurement shall send a list of VLPs to be inspected at the beginning of each year to each GDS operating area. 7.3 VLP s removed by GDS shall be returned to Gas Measurement. Gas Measurement will ensure VLPs are tested and report the result of VLP testing in the 4 th Quarter AIP report. 8.0 MERCURY CONTAMINATION PRECAUTIONS 8.1 All personnel performing work on regulators and associated piping shall be aware of potential mercury contamination and have of knowledge of the notification/reporting requirements in the event of a mercury find or spill. 8.2 When potential mercury-containing equipment such as gas regulators and gas vent lines are worked on or handled, proper mercury spill protection and PPE shall be used in accordance with CEHSP S11.00, "Mercury Management Program". 8.3 If mercury is discovered or if a mercury spill occurs, immediate notifications to the Gas Emergency Response Center (GERC) and Chem Lab shall be made. Cleanup shall only be performed by the Chem Lab in accordance with GEHSI E02.23, "Mercury Spill Containment." NUMBER: DATE: VOLUME: 3, 10 and YB PAGE 6 G-699-2 10/17/14 Metering Specs and Procedures; O&M Manual; Yellow Book

TITLE: INSTALLATION AND INSPECTION OF GAS 9.0 REFERENCES G-8208 Requirements for Indicating the Location of the Curb Valve Box on a Gas Service Regulator with an Indoor Regulator G-8217 Flood-Prone Areas for the Installation of Gas Service Regulator Vent Line Protectors (VLPs) EO-17118 CEHSP S11.00 GEHSI E02.23 Regulator Vent Installation Mercury Management Program Mercury Spill Containment NUMBER: DATE: VOLUME: 3, 10 and YB PAGE 7 G-699-2 10/17/14 Metering Specs and Procedures; O&M Manual; Yellow Book