DEVELOPMENT FRAMEWORK

Similar documents
IMPLEMENTATION. PEDESTRIAN USERS (Continued /) A: Class 2 Pedestrian / Cycle Ways. Pedestrian and Cycle Ways:

IMPLEMENTATION. PEDESTRIAN USERS (Continued /) Building Frontages: A: Stair Applications. Geometry (Accessed from the Sidewalk) Refer to A:

Hennepin County Pedestrian Plan Public Comment Report

This objective implies that all population groups should find walking appealing, and that it is made easier for them to walk more on a daily basis.

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

IAN WHITE ASSOCIATES. Crawley Station Gateway Public Realm

Frascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation

Transportation Master Plan Advisory Task Force

PennDOT Access Management Model Ordinances Training

Classification Criteria

10 SHERFORD Town Code

Roadways. Roadways III.

ONE SIZE DOESN T FIT ALL RECONCILING OVERLAPPING TRANSPORT NETWORKS IN A CONSTRAINED URBAN ENVIRONMENT

TRANSPORT AND MOVEMENT

Nomination. Halton Region in Context

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

ADOT Statewide Bicycle and Pedestrian Program Summary of Phase IV Activities APPENDIX B PEDESTRIAN DEMAND INDEX

DRAFT for a State Policy for Healthy Spaces and Places

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

1 VicRoads Access Management Policies May 2006 Ver VicRoads Access Management Policies May 2006 Version 1.02

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

9. Parking Supporting Statement

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

Footpath design. A guide to creating footpaths that are safe, comfortable, and easy to use

Access Management Guidelines February 2013 THE CITY OF

Phone: Ref No: 06/2018/0884

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

PEDESTRIAN ACTION PLAN

Bicycle Master Plan Goals, Strategies, and Policies

Integrated Corridor Approach to Urban Transport. O.P. Agarwal World Bank Presentation at CODATU XV Addis Ababa, 25 th October 2012

E4 Cycle Route Exeter University to Redhayes Bridge. - Recommendations from Exeter Cycling Campaign

Services Department A September 18, 2006 Region of Durham Recommended Arterial Corridor All Wards Guidelines Study

Transportation Assessment

Highway 111 Corridor Study

SUPPORTING DOCUMENTATION PROPOSED TRAILS DEVELOPMENT AND IMPLEMENTATION PLAN

TGSI Tactile Ground Surface Indicators

CITY OF SASKATOON COUNCIL POLICY

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

Planning for tennis in your Local Government Area. A resource from Tennis Australia

6.0 PEDESTRIAN AND BICYCLE FACILITIES 6.1 INTRODUCTION 6.2 BICYCLE DEMAND AND SUITABILITY Bicycle Demand

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Transit boulevard: A new road type for Sydney s Growth Centres

Response to further information request Ministry of Education Notice of Requirement (200 & 252 Park Estate Road)

4. Guided Bus Explained

Developing a Birmingham Transport Space Allocation policy. David Harris Transport Policy Manager Economy Directorate Birmingham City Council

INTRODUCTION THOROUGHFARE SYSTEM CLASSIFICATIONS

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN

TRAFFIC IMPACT STUDY CRITERIA

Launceston's Transport Futures. Greater travel options for the people of Launceston

21.07 TRANSPORT CONNECTIVITY AND INFRASTRUCTURE

Strategy for Walking & Cycling Action Plan

Issues at T junctions:

Douglas Land Use and Transportation Strategy (DLUTS) Summary. August 2013

Management of Multi-Lane Highways in Jordan (Case Study)

Cycle network linking Wolverhampton city centre and Bilston town centre with employment sites and residential areas:

Appendix N(b): Portishead Station Outline Travel Plan

12 RECOMMENDATIONS Road Improvements. Short Term (generally the next five years)

City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines

Minta Farm Berwick S96A Transport Impact Assessment

Planning Guidance in the 2012 AASHTO Bike Guide

CONNECTING PEOPLE TO PLACES

1.3.4 CHARACTERISTICS OF CLASSIFICATIONS

Route 7 Corridor Study

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

September 2017 I City of New Westminster

EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY

Sixth Line Development - Transit Facilities Plan

HISTON ROAD Have your say on better public transport, cycling and walking journeys

ADA Transition Plan. City of Gainesville FY19-FY28. Date: November 5, Prepared by: City Of Gainesville Department of Mobility

CHAPTER 7.0 IMPLEMENTATION

I write in response to the current consultation. I am copying this to Derrick Ashley and I will be posting this online.

Chapter 5 Future Transportation

Executive Summary Route 30 Corridor Master Plan

Living Streets Policy

Liveable Neighbourhoods Design Code and Policy

Chapter 5 FUNCTIONAL CLASSIFICATION

COMMITTEE RECOMMENDATIONS. That Council approve:

High frequency bus services operating to Little Island; Creation of a new Park and Ride site and train station at North Esk;

City of Ottawa s Complete Streets Approach to Transportation Projects

CITY MANUALS AND STANDARDS REVIEW

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Regional Cycle Programme Update

NMT SAFE STUDY APPROACH

TRANSPORTATION STUDY REPORT DRAFT - APRIL 2015 A BLUEPRINT FOR HOW WE CAN GET AROUND GREATER SUDBURY, FROM NOW UNTIL 2031

EXECUTIVE SUMMARY Callan Park accommodates travel from a wide range of transport modes, including walking, cycling, bus and light rail.

TRAFFIC STUDY GUIDELINES Clarksville Street Department

WELLINGTON CITY COUNCIL CYCLING NETWORK DRAFT FRAMEWORK

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

CHAPTER 4 TRANSPORTATION IMPACT STUDY TABLE OF CONTENTS

KIGALI CITY, RWANDA MODERNIZATION OF TRANSPORT INFRASTRUCTURE AND SERVICES. Presentation to ITC, UTwente Enschede 13 June 2018

CHECKLIST 2: PRELIMINARY DESIGN STAGE AUDIT

South King County High-Capacity Transit Corridor Study

ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS

University Hill Transportation Study Technical Memorandum Alternatives Modeling and Analysis May 2007

Transcription:

DEVELOPMENT FRAMEWORK 2.3.3 Advantages and Disadvantages Whilst PTAL is a simple calculation (easily performed by a spreadsheet) that offers an obvious indication of the density of public transport provision in an area, it suffers two key problems: It does not take into account where services actually go to for example, a bus that runs every 10 minutes to the bottom of the road is considered better than a bus that runs every twelve minutes to the city centre. The use of arbitrary cut-offs to exclude more distant service access point s underestimates the ability to access locations just outside those cut-off distances. For example, a point 960m from King s Cross Station (a major public transport station) could have a PTAL of 6, whilst a point 961m from the same station could have a PTAL of 1 or 2. Accessibility modelling has been proposed as a solution to these problems. It uses GIS to calculate door-to-door travel times by public transport to a grid of points around the point of interest, resulting in a set of isochrones journey time contours within which the number of workplaces, households or residents can be calculated using census data. This method takes into account many more factors than PTAL, however is much more time-consuming and requires expensive software. 2.3.4 Other Similar Models Applied Internationally Land Use and Public Transport Accessibility Index State of Queensland, Australia 19 Queensland Transport has been developing an innovative planning tool that assists planners, policy makers and development assessors make decisions about future growth and transport. Called the Land Use and Public Transport Accessibility Index (LUPTAI), the planning tool measures how easy it is to access health, education, banking, shopping and employment through walking or public transport, within a specific geographic area. The concept of 'accessibility' has become increasingly important to transport planning in recent years. It takes into account people's opportunities to reach commonly used services. Successful consideration of accessibility, therefore, could result in reduced car use and contribute to a more sustainable transport system. The tool uses Geographical Information System (GIS) software to generate a map that gives a visual representation of the opportunity to reach destinations through public transport, walking or a combination of both. A five-colour scale shows the level of access for any given area. Data sets about the locations of services are entered into the system, which produces a map that highlights areas of None, Poor, Low, Medium or High accessibility. 19 The State of Queensland (Queensland Transport) 2005 94

DEVELOPMENT FRAMEWORK The State of Queensland LUPTAI will assist planners and decision-makers at the state and local level to: determine where to focus urban growth maximise land use and transport integration assess large scale developments assist in writing policy, and establish funding priorities. Users will be able to visualise the impact their projects will have on achieving accessible communities. LUPTAI is an ideal way to aid decisions about targeting population densities. Contrasting the traditional method of measuring accessibility by road distance, it is the first of its kind to consider public transport as a means of access, rather than a facility to be accessed. LUPTAI is being piloted through a number of applications and is being developed to become "leading edge" new technology. 2.4 Precinct Roads Masterplan The requirements as set out in the previous paragraphs emphasize the urgent need for the development of a roads masterplan for the Marlboro GRRL precinct area. A comprehensive roads master plan for the Marlboro area should be developed within the framework as provided by this document. The roads masterplan will be used with the development of a traffic impact assessment as well as with the development of a travel plan. It must protect the existing and future function of each road and should span the entire road reserve to include all modes. It should highlight the areas where upgrades are required and where restrictions should be imposed. The plan should be developed in the context of existing zoning and land-use as well as future zoning and land-use. The City s functional road hierarchy should also serve as primary input although it may be revised as part of the masterplan development process. The masterplan should furthermore take cognisance of the park and ride sites, the estimated carrying capacity of all modes (spare capacity), pedestrian walking contours, access management strategies, planned road upgrades and planned public transport upgrades. The Gauteng Policy for Traffic Impact Assessments as discussed in section 0, does allow for a prospective developer to undertake such a study on behalf of the municipality in its absence. The fees for this study would be deductible from the developer s bulk contribution. It is therefore prudent that the City takes control of this process pro-actively, before development pressures catch up on this requirement. 95

DEVELOPMENT FRAMEWORK 2.5 Bulk contributions 20 2.5.1 Purpose and Basic Content The purpose of the bulk contribution policy is to define responsibilities with regard to the provision of municipal road infrastructure required by developments in Gauteng Province. The policy will serve as an interim policy until such time the planned Gauteng Planning and Development Act and Regulations are promulgated and a final policy adopted. For the purpose of this UDF, some important elements of the interim policy are: Responsibilities are defined with regard to the provision of municipal road infrastructure required by developments; The person or body making an application, is responsible for the provision and installation of internal roads and to contribute to the cost of external roads (the definitions of which are defined in the Interim Policy); Engineering service contributions must be equitable and fair to both new entrants and existing residents; The full cost of roads required to accommodate developments, must be recovered by means of engineering service contributions. A municipality may allow rebates to applicants as incentives for the promotion of development objectives; The municipality shall, where possible and practical, allow the applicant to make an offer to provide and install external road infrastructure in lieu of monetary contributions, either partially or fully; Contributions to external roads shall first be used for payment of land provided by the applicant for external roads and secondly for improving external road infrastructure to the extent deemed necessary by the municipality to accommodate the development; The municipality will establish a road contributions account; If a development is located near the boundary of a municipality, the engineering service contribution will be divided between the adjacent municipalities. The contributions to external roads consist of two components, namely a basic external road contributions and a boundary road component. Parameters for the calculation of the calculation of engineering service contributions will be provided in the Data Manual for Engineering Service Contributions and Traffic Impact Assessments in Gauteng. The municipality will also annually publish costing rate parameters. 20 Draft Interim Policy for Engineering Service Contributions to Municipal Road Infrastructure in Gauteng, Gauteng Transport Co-ordination Committee (TCC), May 2007 96

DEVELOPMENT FRAMEWORK 2.5.2 Relevance to Transportation UDF The proposed methodology, as prescribed by the Bulk Contributions Policy document should be adhered to and adopted by the City as a matter of priority. The policy ties in with the aforementioned new Policy on the development of Traffic Impact Investigations for Gauteng. The adoption and application of this methodology should eliminate many ambiguities and uncertainties that exist with the application and charging of bulk contributions. Where particular leverage exists within the Bulk Contribution Interim Policy, is in the allowance for rebates by the municipality to promote development objectives. The development of traffic assessments and travel plans as discussed in this transportation UDF, provides the prospective developers in the Marlboro GRRL precinct area with the ability to negotiate for such rebates, based on the content of this framework document (as provided in sections 0, 0, 0, 0 and Error! Reference source not found.). Basic external road contributions will be calculated based on vehicle kilometres per hour (capacity component) as well as vehicle E80 axle-kilometres per day (strength component). Both of these aspects will be affected directly through the application of the principles as suggested in this framework document. Over and above this direct saving, further rebates may be affected by the City in favour of a demonstrated approach towards measures to reduce vehicle trips, as suggested by the development of a Travel Plan (section Error! Reference source not found.). This rebate may also be applied to the boundary road contribution which, in terms of its calculation methodology, will not have a direct saving component as a result of reduced trips. Many innovative incentive schemes are used abroad and good examples (best practice) exist of these methodologies. Many of these initiatives have successfully managed to encourage the private sector (on a large scale) to partake actively in the management of congestion on public roadways. They strive towards the creation of public-private partnerships have been sited as one of the key ingredients required for the sustainability of the transportation system in the City. 97

PART 6 IMPLEMENTATION The management of nodes and the development that occur within them is vital for a City. The following are important issues that will need to be managed: Monitoring and management of nodes to prevent an oversupply. The design approach should focus on integrating various parts of the node in one cohesive whole, as well as integrating the node within its surrounding environment through adequate pedestrian linkages. Maintain the public environment and infrastructural services up to such a standard that the maturity of the node could be maintained. Monitoring should consequently take place to identify and rectify any problems as soon as they occur. Infrastructure and services sufficiently support the needs of the node and can be upgraded as intensification of the node occurs. Manage as a cohesive entity not separate properties. Implement a focused programme to upgrade and maintain the public environment at the highest levels. Align management interventions with the RUMP process in the regions. The design codes that will follow are but one management element that should be put into place. 98

6.1 Management Guidelines: Transportation Although good information is available for the Marlboro precinct, development will be guided by market forces and the exact make-up of the development environment may change from what is currently foreseen. The defining elements are therefore provided within a theoretical framework that relates to the class of road on which it should be implemented. This enables planners and officials to apply the logic and recommended design code contained in this chapter, beyond the boundaries of this report. 105

Class 2 Road CLASS 2 ROAD SELECTED ROADWAY ELEMENT DESIGN CODES FOR MARLBORO PRECINCT Development Cell Circulation Description: Primary arterial routes providing vehicular mobility with limited offstreet access. These roads serve a global / city wide mobility function connecting places of importance throughout the city. These roads are generally forming the ring roads around precincts providing external circulation but do not traverse the precinct itself. Street Classification: Road Hierarchy Oxford Drive Jan Smuts Drive Bolton Road Characteristics: 1. Speed: 70 80 km/h 2. Vehicle volumes: 1750 5000 veh/hr 3. Geometry: Dual carriageway (median separated). Exceptions to the rule exist. 4. Turning Radii: > 10m < 12m 5. Level of Access: LOA 1 LOA 3 (Limited off-street access) 6. Parking: Off-street (No on-street parking permitted) 7. Surfacing: Road surfacing materials generally should promote vehicular mobility. Therefore predominantly asphalt is recommended. Alternative surfacing could be considered at intersection with high pedestrian conflicting movements or along public transport routes with dedicated lanes. Sight Distances Kerb Radii (Turning Vehicles) 106

PEDESTRIAN USERS Conceptualisation of Mid-block Crossings Mid Block Pedestrian Crossings Signal Layout (Refer to A): Provide signalized mid-block crossings along Class 2 routes with S11 signal heads and pedestrian demand push-buttons. Audible signals to be implemented for sight impaired road users. RTM 4 pedestrian crossing lines to be implemented (minimum width 2.3m / desirable width 5m) Signal heads to be placed 3m from RTM1 stop line. W306 signs to be provided leading up to mid-block crossings. Road Lighting (Refer to B): A: Mid-block Crossing Signal Layout Street lighting to be provided as per NDoT Pedestrian Guideline Standard (Illustrated adjacent). Kerb Transitions (Refer to C): Kerb ramps must be implemented at all crossing points to accommodate for wheelchair users and sight impaired pedestrians. C: Kerb-Ramp Details B: Lighting of Mid-Block Crossings Application Areas: Bus Rapid Transit (BRT) Median station locations High volume pedestrian crossing points that occur mid-block between two land-use attractors (Where intersection spacing is longer than 300m apart. 107

PEDESTRIAN USERS (Continued /) A: Pedestrian Signal Scramble Phase Intersection Crossings: Pedestrian Signal Applications: Three types of pedestrian signal applications are recommended for precinct intersections: Standard Pedestrian Phase Scramble Pedestrian Phase (Refer to A) Early Start Pedestrian Phase Intersection and Signal Layout (Refer to B): B: Intersection and Signal Layout Provide signalized pedestrian crossings at all Class 2 route intersections with S11 signal heads and pedestrian demand pushbuttons. Audible signals to be implemented for sight impaired road users. RTM 3 pedestrian crossing lines to be implemented (minimum width 1.5m / desirable width 3m) Interlocking pavers or coloured asphalt is recommended at Class 2 junctions serving as gateways to the precinct (indicates higher pedestrian volumes and entrance to the precincts). Staged crossings should be considered. Minimum median width for staged crossings 2m. Road Lighting (Refer to C): Street lighting to be provided as per NDoT Pedestrian Guideline Standard. C: Intersection Lighting Staged Intersection Crossing Dimensions Kerb Transitions (Refer to D): D: Kerb Transitions Kerb ramps must be implemented at all crossing points to accommodate for wheelchair users and sight impaired pedestrians. 108

PEDESTRIAN USERS (Continued /) Application Areas: Road intersection between Class 2 roads and any other road class (Generally Class 3 or 4) NB: Provide pedestrian crossings on left-slip lanes where high vehicle speeds conflict with pedestrian crossings. 109