Over Deck Control Lines V1

Similar documents
Far East Boat Optimist Rigging Instructions

2. Note that the ropes from the rigging board are secured in the cam cleats of the jib fairleads.

Dolly wheels in slot #8 for Boat #10.

Wysiwig - Wayfarer Rigging Guide

HOW TO RIG A CORMORANT

Pico rigging manual 2007.doc Page 1 of 28

Weta Basic Rigging Guide

Follow these easy steps to properly assemble your new Zim 420

Bladerider X8 Assembly Help Notes

CII Rigging suggestions

Measurement Notes. By Ian Cox, ISAF International Measurer, ITCA

International J/24 Class Rules Changes As approved by ISAF Effective 1 st April 2013

Laser Rigging Basics St. Jamestown Sailing Club

The importance of splicing especially for braids made with UHMWPE fibre

Raider 16/Sport - Spinnaker Rigging. Rigging Spinnaker

Double Braid Class II Eye Splice for TS-II Turbo

Vanguard Sailboats 300 Highpoint Avenue Portsmouth, RI For the dealer nearest you call SAIL

Tuning Guide January 2012

Rigging Manual. 1 Parts of the Hull. 2 Parts of the Sail. 3 Sunfish Mast Kit. 4 Bailer Installation. 5 Ratchet Block Installation

TOPAZ R2 Race+ TOPAZ R2 Race X Rigging Instructions

Index 1. Trampoline 2. Main Foils 3. Spinnaker Pole 4. Mast Setup 5. Mast Rigging 6. Rig Tension 7. Trapeze Lines 8. Rudders 9. Boom 10. Main Sheet an

Kayaking Bob s Tandem Island SpraySkirt Kit Installation Instructions

420 Rigging Guide.

XD Hiking Strap, Main Sheet and Rudder Downhaul System

TUNE YOUR SAILS SPEED. Optimist Tuning Guide. Photo Wavelength

Shrouds, dead-eyes and ratlines

Contents 1. Components Introduction Preparation Hull Foredeck Mast Boom...

Rigging the Banshee Sailboat

INSTRUCTION NO

OPERATIONAL CHECK LIST

Tying Farm Knots. Working with Heifers

Club 420 Class Rigging Manual

Rigging Guide. 1. Unpacking and Preparation: Laser, Radial & Laser Parts of the Laser. 3. Hardware Location. 4. Hardware Installation

Dinghy Racers Parts List

UPWIND Light wind: <8 knots Sail Setting

M32 CATAMARAN ASSEMBLY MANUAL

ASSEMBLY MANUAL HOBIE CATSY

Splicing Instructions. Standard Double Braid Eye Splice Type 1 Double Braid Ropes

OPPI Rigging Guide 3/2008

Topaz OMEGA Rigging Instructions

Rigging guide for the Swift Solo Volume 1 (mostly boat rigging)

2018 Osprey Yacht Club

Rigging Manual V1 PLEASE FOLLOW RIGGING MANUAL IN THE CORRECT ORDER

Rigging Manual V Unpacking and Preparation. Useful knots to know V15. Fogh Marine

Table of content Introduction 5 1. Part 1. Assembly Tools needed for Assembly Glossary Hulls Mounting the beams 7

TUNE YOUR SAILS SPEED

INTERNATIONAL SUNFISH CLASS ORGANIZATION CLASS RULES

A Basic Guide to Europe Dinghy Rigging

Rigging Guide. June, 2017

COMMON MEASUREMENT PROBLEMS & SOLUTIONS JUNE 2011

Marlinespike Seamanship

COASTAL IN-BOOM FURLING SYSTEM. Installation Manual

BEFORE YOU BEGIN TO READ THE WI BEFORE YOU BEGIN TO READ THE WA BEGIN BY READING THIS RIGGING GU

T 10 Tacking Ver

J/70 Building Specification

Rigging Guide. August, 2016

Knots, Hitches and Bends

Knots /2017. Camp and Outdoor Curriculum Manual

End. Standing Part. An underhand loop is made by crossing the end under the standing part.

Complete Rudder installation guide

INTERNATIONAL TASAR CLASS RULES

WELCOME TO THE HOBIE FAMILY

1 Parts of the Hull. 2 Parts of the Sail. 3 Sunfish Mast Kit. 4 Bailer Installation. 5 Ratchet Block Installation

Most sail with 5 or 6 in the boat. Here are the names I will use for the various positons (from the back forward):

Sail Trimming Guide for the Beneteau 40

Sea Scout Knots Knots Hitches Splices and Whippings

Rigging Guide. July, Revision: 1.6

RIGGING: RS- Vision. 1. A properly derigged boat appears as below. Please note that the tiller extension is NOT bent.

The Forest School Training Co. OCN accredited training

FDR CHRYSLER 16' CATAMARAN (MUSKETEER) The initial rigging of a sailboat is not difficult, but if the boat is strange

12.9 Gennaker. February Setting up and sailing with the 12.9 Gennaker

CSC Learn to Sail Class

Serenity Houseboat. Standard Operating Procedures for:

Rigging Manual V1 PLEASE FOLLOW RIGGING MANUAL IN THE CORRECT ORDER

Set-up and Tuning Notes: 17 September 2012

TUNE YOUR SAILS FOR OUTRIGHT SPEED. Starling Tuning Guide Solutions for today s sailors

SPARE PARTS WORKBOOK

SAIL WELL, STAY WELL. Sydney Flying Squadron ACN Sydney Flying Squadron. SAILING A SKIFF a guide

Safety Afloat. Before you go sailing:

RUDDER KIT INSTRUCTIONS

Congratulations! 1 (877) You have purchased one of the best known trailerable cruising vessels available.

Owner s Manual. Revision Date: Copyright 2012 Falcon Marine LLC 9008 Marlin St. Cape Canaveral, FL USA

TUNE YOUR SAILS SPEED. J/70 Tuning Guide Rev. Q10a. Photo Chris Howell

Place a rope coil here

OWNER S MANUAL. for Inters and Nacra F-18

INTERNATIONAL RS TERA CLASS RULES

1 Tuning Platform Reseating Beam Pads Rudder alignment Noisy Foils Rig Tension...

Fitting Instructions for Single Line Mainsail Reefing System For Yachts Up To 9m (30ft) - Part No

Wind Light Moderate Heavy Speed 0-8 mph 9-17 mph 18 + mph

NEW ENGLAND ROPES SPLICING GUIDE

2012-June-12 SECOND DRAFT Hobie Getaway Spinnaker Installation Instructions

Ref Part Part # Qty Letter A Rudder Catcher B X 1/2 PH Bolts C Rudder Bracket

Chapter Twelve. Starting the rigging process

Rhodes 19 Tuning Guide

DRAGONFLITE 95 RESTRICTED CLASS RULES 2016

J/22 Dave Perry. Based on sailing the POW in the Ft Worth Boat Club (TX) boats in 2006 We sailed with three in the boat

Sanibel Owners Manual

Sail Trimming Guide for the Beneteau 373

LDC Rigging Guide

RIGGING SERVICES AND PRICE LIST

Transcription:

Over Deck Control Lines V1

1 - Pack Contents Downhaul control line Outhaul control line Downhaul takeup elastic 3 x 30mm block Traveller line (with pre-spliced loop) 2 x Side deck strops 2 x Ronstan Shocks - (grey) 2 x Ronstan Shocks - (blue) 1a - Tools Required Dyneema scissors Push Fid Pull fid (wire type or needle type) Whipping twine Sailmakers needle Cigarette lighter

2 - dding the Ronstan Shocks a) Cut the outhaul and downhaul control lines and remove the control lines and elastic takeups. Cut and remove Cut and remove b) Locate the two side deck strops and the four Ronstan Shocks in the pack. c) Cow hitch one of the grey Ronstan Shocks onto the loop at one end of the strop. d) Pass the loop at the other end down through the front hole in the starboard gunwhale and back up through the aft hole.

2 - dding the Ronstan Shocks e) Cow hitch a blue Ronstan Shock onto the aft loop. f) Repeat on the other side of the boat. 3 - Changing the Traveller Line a) Remove the old mainsheet traveller line. b) Locate the replacement traveller line and 2 x 30mm blocks in the pack. c) Cow hitch both blocks to the loop on the end of the new traveller line.

3 - Changing the Traveller Line d) Pass the free end of the new traveller line through the starboard traveller deck fitting, from starboard to port, then through the bottom block of the sisterblocks on the mainsheet purchase. e) Pass the tail through the port deck fitting. Set the traveller height (100mm in the centre is recommended ) and tie a stopper knot in the tail. Starboard 100mm Port 4 - Outhaul Control Line a) Take the new outhaul control line from the kit. b) Pass one end of the outhaul control line through the forward block on the starboard gunwhale. Note: fter doing this modification the control line positions on the gunwhale will be reversed (ie the outhaul will now go through the forward cleat and the downhaul through the aft cleat.

4 - Outhaul Control Line c) Pass the end through the forward cleat on the starboard gunwhale. d) Pass the end through the front block on the port organiser by the mast step. e) Pass the end through the outhaul block at the gooseneck. f) Pass the end back down to the mast step and through the aft block on the port organiser.

4 - Outhaul Control Line g) Pass the tail through the front cleat on the port gunwhale. h) Pass the end through the grey (front) Ronstan Shock on the port gunwhale. i) The two ends of the outhaul control line must now be spliced together. See section 7 for how to do this. Make sure that the outhaul is set to the maximum off position before you cut the rope to length. This rope will now sit across the boat in front of the daggerboard and beneath the daggerboard elastic.

5 - Downhaul Takeup Elastic a) Locate the downhaul takeup elastic and 30mm block in the pack and tie the block onto one end of the elastic with knot #2. b) Pass the other end through the bullseye at the bow (from starboard to port). c) Take the end aft and pass it underneath the organiser on the starboard side of the mast step. d) Tie it off with a stopper knot. You may want to adjust this once the downhaul control line is added.

6 - Downhaul Control line a) Locate the new downhaul control line in the pack. Pass one end backwards through the cleat and the aft (blue) Ronstan Shock on the starboard gunwhale. b) Pass the end through one of the 30mm blocks on the end of the traveller line. c) Pass the tail forward through the block on the takeup elastic (added in section 5). d) Pass the tail aft and through the other 30mm block on the end of the traveller line.

6 - Downhaul Control line e) Pass the end across the boat and through the aft (blue) Ronstan Shock on the port gunwhale. f) Pass the end through the aft cleat on the port gunwhale. g) Pass the end forward to the front (double) block on the starboard organiser by the mast step and rig the downhaul purchase as shown. C D C D Front block To starboard side From port side

6 - Downhaul Control line h) Pass the end back towards the cleat on the starboard gunwhale then splice the two ends of the downhaul control line together (as described in section 7). i) djust the amount of tension in the system if necessary by tightening or loosening the takeup elastic.

7 - How To Splice Control Lines Together a) Pull back the outer part of the control line to reveal the inner core. b) Cut away 180mm of the inner core on each end of the control line. 180mm c) Pull the outer part of the rope back. This will leave a thin section at each end of the rope and will mean that once they are joined the splice will still be able to pass freely through the blocks. d) Find and mark the mid point of the thin section of rope at each end. e) Load one end of the control line (now labelled ) into the push fid and push it through the other end () at the mid point which you marked in step d).

7 - How To Splice Control Lines Together f) Pull end through until both sides are even. g) Take your pull fid and push it into rope at the point where the inner core ends. Push it through the rope towards the intersection with rope, then exit tight to the point where the ropes cross. h) Open the end of the pull fid and use it to catch the end of rope.

7 - How To Splice Control Lines Together i) Pull the end of rope inside rope with the pull fid. j) Take the pull fid and insert it into rope at the point where the inner core ends. Push it through the rope and exit the rope as close as possible to the join with rope.

k) 7 - How To Splice Control Lines Together Open the end of the pull fid and use it to catch the end of rope. l) Pull the end of rope inside rope using the pull fid. m) Cut away any excess and seal the ends with a lighter. You must now add a whip mid way along each side of the splice to prevent slipping. See Section 7a for how to add the whip.

7a - Whipping the Control Lines a) b) c) x8 d) e) f) Once you have added the whip: Cut the tails. Melt the wax and seal the tails with a lighter. Repeat on the other side of the splice.