Safety Risk Assessment Worksheet Title of Risk Assessment Risk Assessment Performed By: Date: Department:

Similar documents
ESSENTIAL SAFETY RESOURCES

1.0 PURPOSE 2.0 REFERENCES

Safety assessments for Aerodromes (Chapter 3 of the PANS-Aerodromes, 1 st ed)

HAZARD MANAGEMENT PROCEDURE

Aeronautical studies and Safety Assessment

Standards of Practice Personal Protective Equipment

Workshop to Generate Guidelines For the Implementation of: 1 - Step 1 of State Safety Program (SSP) and 2 - Phases 1 & 2 of ICAO SMS

New Airfield Risk Assessment / Categorisation

Purpose. Scope. Process flow OPERATING PROCEDURE 07: HAZARD LOG MANAGEMENT

Hazard & Risk Management

Risk Management Qualitatively on Railway Signal System

-JHA- Job. For Science and Engineering. Hazard Assessment

Safety-Critical Systems

Work Health and Safety Risk Management Procedures

Managing for Liability Avoidance. (c) Lewis Bass

Using what we have. Sherman Eagles SoftwareCPR.

Risk Management. Definitions. Principles of Risk Management. Types of Risk

BRITISH GLIDING ASSOCIATION SAFETY MANAGEMENT SYSTEM MANUAL

Safety Standards Acknowledgement and Consent (SSAC) CAP 1395

Helicopter Safety Recommendation Summary for Small Operators

Risks and Hazards Identified Now What?

HAZARD IDENTIFICATION & RISK ASSESSMENT

The Best Use of Lockout/Tagout and Control Reliable Circuits

Activity Hazard Analysis (AHA) EM A.13 FIGURE 1-2 CONTRACTOR REQUIRED AHA TRAINING

Hazard Training Guide

Hazard Management Making your workplace safer

CIRCUIT BREAKER TESTING - JOB SAFETY ANALYSIS

SYSTEM SAFETY ENGINEERING AND MANAGEMENT

SAFE WORK METHOD STATEMENT WORKING IN CONFINED SPACE HSE NET NAT SWMS APAND00030

Working Alone. Latest revised date: October 26, 2011 Page 1 of 7 Prepared by: Department of Health & Safety S-014

Safety and Risk Engineering. HSE Case Implementation Clive Rawson

Hazard Assessment & Control. Faculty of Veterinary Medicine

DATA ITEM DESCRIPTION Title: Failure Modes, Effects, and Criticality Analysis Report

Employ The Risk Management Process During Mission Planning

ALIGNING MOD POSMS SAFETY AND POEMS ENVIRONMENTAL RISK APPROACHES EXPERIENCE AND GUIDANCE

AUSTRALIA ARGENTINA CANADA EGYPT NORTH SEA U.S. CENTRAL U.S. GULF. SEMS HAZARD ANALYSIS TRAINING September 29, 2011

RISK CONTROL SOLUTIONS

Guidance: HSW Risk Assessment Methodology HSW-PR09-WI01. Objective. Implementation

Safety Risk Management: Unplugged

Gamma-ray Large Area Space Telescope

LECTURE 3 MAINTENANCE DECISION MAKING STRATEGIES (RELIABILITY CENTERED MAINTENANCE)

A study on the relation between safety analysis process and system engineering process of train control system

Federal Aviation Administration Safety & Human Factors Analysis of a Wake Vortex Mitigation Display System

NAVIGATIONAL SAFETY MANAGEMENT SYSTEM MANUAL

To comply with the OHS Act, the responsible manager must carry out and document the following:

Reducing Exposures From Confined Space Entry

Transformational Safety Leadership. By Stanley Jules

Safe Work Method Statement

Presented by John Whale Control Banding as a Potential Alternative to Risk Assessment

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG PH M ABN

A Presentation to the International System Safety Society August 11, 2016 by Gary D. Braman Senior System Safety Engineer Sikorsky Aircraft

Accident /Incident/Injury Report & Investigation Form

Safety Guidelines for Live Entertainment and Events I Part 2. Hazard Identification and Risk Management 1

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading

Electrical Safety For Managers Updated For E. ElectricalTrainingPro.com

Marine Education Society of Australasia HAZARD MANAGEMENT POLICY

Aviation Unit Safety Management System

Safety Management System and Aerodrome Resource management for AFIS Operators'

MOD Risk Assessment Form

a. identify hazardous conditions and potential accidents; b. provide information with which effective control measures can be established;

innova-ve entrepreneurial global 1

A GUIDE TO WRITING A RISK ASSESSMENT FOR A BMAA EVENT

Safe Work Method Statement

Implementation of HACCP based procedures. Tom Kennedy

Process Safety Management Of Highly Hazardous Chemicals OSHA 29 CFR

Safe Work Method Statement

UC Irvine Environmental Health & Safety

Procedure: Work health and safety hazard management

COMMISSIONING TESTS FOR NEW HV CABLES (UP TO 33 KV) JOB SAFETY ANALYSIS

Marine Risk Assessment

SYSTEM SAFETY REQUIREMENTS

Managing Injury Risk at Grain Handling Facilities. Matt Shurtliff Director of Safety and Environmental Issues J.D. Heiskell & Co January 17, 2018

SAFE WORK METHOD STATEMENT (SWMS)

NS5 Cheat Sheet #9 How Enter Incidents, Accidents, Near Misses, Illness and Injury and Equipment Damage/Loss.

University Safety Policy Supplement

DOCKYARD PORT OF PLYMOUTH HARBOUR SAFETY PLAN. Issue 2 Jun 13

SAFE WORK METHOD STATEMENT SWMS No Version

Job Hazard Analysis (JHA) What is Job Hazard Analysis (JHA)?

Drinking Water Safety Plans, Disinfection of Drinking Water & Revised EPA Disinfection Manual

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO LOW LEVEL LIGHT UNITS

Hazardous Waste Training Plan. Supersedes: 02/15/16 (Rev.02) Preparer: Owner: Approver: EHS Team Member EHS Team Member EHS Manager

The modern, fast and easy to use risk analysis tool. Advanced Features. Using HAZID in BowTie Pro

Lockout/Tagout Safety Policy

University of Cincinnati. Radiation Safety Committee Operations Guidelines Statement of Policy (RSC Guidelines) RSC Guidelines (revision 5)

Fatal Accidents Involving Roadway Workers-In-Charge and Lone Workers

EHS Solutions Based in Reality

THE CONTROLLED COPY OF THIS DOCUMENT IS ON THE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR THE DATE AT THE BOTTOM OF THE PAGE.

WH&S Act 2011 & Regulations 2011, Environmental Protection Act and Regulations

Project & Task Work Health and Safety Risk Management Procedure

Secondary Aluminum NESHAP 40 CFR Part 63 Subpart RRR. Example Malfunction Plan for Plant ABC

University of Wisconsin Colleges Administrative Policy #56 NON-COMPLIANCE IN HUMAN SUBJECTS RESEARCH

Pre-control risk estimate. Likelihood Risk

1 Great Western Painting Inert Space Entry

RISK ASSESSMENT POLICY

How to Define Your Systems and Assets to Support Reliability. How to Define Your Failure Reporting Codes to Support Reliability

Risk Management Guide

IIUM EVENT SAFETY RISK ASSESSMENT

Accident/Incident Reporting and Investigation Procedures

CEPA Initiative: Response Time Guideline 2015 EMERGENCY SECURITY MANAGEMENT WORK GROUP

Lecture 04 ( ) Hazard Analysis. Systeme hoher Qualität und Sicherheit Universität Bremen WS 2015/2016

Transcription:

Title of Risk Assessment Risk Assessment Performed By: Date: Department: Choose the appropriate type of change from the list below: Revision To Existing New Choose the appropriate system/task from the list below: System An integrated set of elements (people, hardware, procedures etc.) combined to accomplish a defined objective. Operational Process A set of interrelated or interacting activities that transform inputs to outputs Operational Procedure A sequence of steps that are used to perform a work task. Organization Any group providing aviation specific services. Operational Environment The aggregate of all external and internal conditions Identification of a Hazard Ineffective Risk Control(s) Other describe Step 1 System and Task Description a. Please describe the function and purpose of the current system, organization, operational process or procedure. Be sure to include the operating environment, the personnel, equipment, and facilities necessary for operation of the system. Consider and describe inter/intra-departmental interfaces with the system, organization, process or procedure being described (see step 5 for more info). b. Describe the new or proposed change to the system, organization, operational process or procedure, or operational environment.

Step 2 Hazard Identification Hazard any existing (or potential) condition that affects human performance or system performance that can lead to injury, illness or death: damage to or loss of a system, equipment or property. A hazard is a condition that might cause (is a prerequisite to) an accident or incident. a. Describe all hazards you have identified that may exist in the current state of the system, organization, operational process or procedure, or operational environment. Hazard 1: Current Controls/Mitigation: Hazard 2: Current Controls/Mitigation: Hazard 3: Current Controls/Mitigation: Potential Consequences: Hazard 4: Current Controls/Mitigation: Step 3 Risk Assessment a. Reference the Risk Assessment Matrix on the following page. Identify the most likely level of risk associated with each hazard identified above; include any current controls/mitigation in your assessment. Hazard 1: Severity: Likelihood: Risk: Hazard 2: Severity: Likelihood: Risk: Hazard 3: Severity: Likelihood: Risk: Hazard 4: Severity: Likelihood: Risk:

Risk Assessment: Likelihood Scale Safety Risk Assessment Worksheet Frequent 5 Likely to occur often. Probable 4 Likely to occur sometimes. Occasional 3 Unlikely to occur, but possible. Remote 2 Very unlikely to occur. Improbable 1 Almost inconceivable that the event will occur. Risk Assessment: Severity Scale Catastrophic: 5 Hazardous: 4 Results in fatalities and/or loss of the system. Results in serious injury and/or major system damage. Major: 3 Results in minor injury and/or minor system damage. Minor: 2 Nuisance, Minor incident. Negligible: 1 Little consequence. Severity Negligible 1 Risk Assessment Matrix Minor 2 Major 3 Hazardous 4 Catastrophic 5 Likelihood Frequent 5 5 10 15 20 25 Probable 4 4 8 12 16 20 Occasional 3 3 6 9 12 15 Remote 2 2 4 6 8 10 Improbable 1 1 2 3 4 5 Red = Bad Not acceptable for day to day operations, operation must not begin or continue without mitigation to a lower risk level. White = Acceptable with Mitigation, risk controls, and or risk control monitoring Green = Acceptable Risk without mitigation.

Step 4 Risk Control/Mitigation Controls are elements of the system (including hardware, software, special procedures or steps, and supervisory practices) designed to keep processes on track to achieve their intended results. Mitigation plans should either eliminate the hazard or lessen the risk associated with the hazard. Mitigation plans should be applied in order to achieve As Low As Reasonable Practicable (ALARP) risk. Once you have assessed the risk for the identified hazard(s), it may be necessary to implement or alter mitigation activities or controls in order to bring the risk within acceptable levels. a. Are mitigation activities warranted for any of the Hazards Identified to bring the risk within acceptable levels? If the risk falls within the green area of the matrix then this is considered acceptable risk. If all of the Hazards Identified fall into the acceptable level, then you will check NO and complete step 5 and step 8. If yes to any, then proceed to step b. below. Yes No Unsure b. If yes, what are the proposed mitigation activities for the risks identified? H1: H2: H3: H4: c. Are there alternative mitigation strategies that were considered? Please identify. d. What is the timeline associated with the risk mitigation activities?

Step 5 Intra/Inter Departmental Interfaces When considering changes to system, organization, operational process or procedure, or operational environment, it is likely that other operating departments may be affected in some way. a. Place a check mark by the departments listed below if the proposed change(s) you make could potentially affect activities in that department (including regulatory impact). Flight Accounting Sales Maintenance IT Human Resources Security Airport Services Accounting Legal Environmental Other - Safety FBO s Other - b. Ensure that the proposed change has been appropriately coordinated with the affected departments. c. Place a check mark next to the Manuals listed below if there is a potential impact to a process or procedure already documented. GOM (General Operations Manual) SMS (Safety Management System) FAM (Flight Attendant Manual) GMM (General Mx Manual) PTP (Pilot Training Program) Op Specs (Maintenance) Op Specs (Fight Ops) Repair Station Manuals (145) LTP (Line Service Training Prog) Employee Manual Other (Specify) Other (Specify) d. Please list the specific program(s) that may be affected. e. Based on your knowledge, does this change relate to any CFR, Ops Spec, or standard(s) set by ISBAO, ARGUS, DOT, DOD, Insurance etc.? If so specify.

Step 6 Re-Evaluating Risk With New Controls (Substitute Risk Assessment) Substitute Risk is a risk unintentionally created as a consequence of safety risk control(s)/mitigation activities. Once you have identified proposed mitigation strategies and verified impact in other departments, it is necessary to reassess the system or task with the new control(s) in place. This will ensure that the proposed changes do not inadvertently introduce unacceptable risk elsewhere. a. Describe any new hazards that you have identified that may exist as a result of the mitigation strategies implemented in Step 4(b). Hazard 1: Hazard 2: Hazard 3: Hazard 4: b. Identify the level of risk associated with each potential hazard listed above using the Risk Matrix provided in Step 3. Hazard 1: Severity: Likelihood: Risk: Hazard 2: Severity: Likelihood: Risk: Hazard 3: Severity: Likelihood: Risk: Hazard 4: Severity: Likelihood: Risk: c. Note: If the risk value for the above identified hazards does not fall into the green area (acceptable risk) then more effective controls will need to be implemented in Step 4(b) in order to reduce the risk to the acceptable level.

Step 7 Follow-up/Monitoring Plan Monitoring: to track and measure the effectiveness of risk controls/mitigation actions. a. What type of monitoring plan should be involved in tracking any proposed changes and mitigation activities? Step 8 Submitting The Risk Assessment Worksheet Once completed, send this completed Risk Assessment Worksheet packet to your immediate supervisor for review and acceptance. You should receive feedback/approval within 7 business days. If you have any questions or additional information to add, you can contact the Director of Safety via telephone or email ron.barnum@flycfm.com for assistance. Step 9 Department Manager/Supervisor Review and Acceptance Note: This part of the form to be filled out and completed by the associated Department Manager/Supervisor. All applicable fields in the SRA Worksheet are completed and associated files are attached. Hazard Identification, Risk Rating and Substitute Risk are completed and validated as applicable. Risk-mitigation strategies are completed and validated as applicable. Inter/Intra-Departmental Interfaces have been considered and validated. Appropriate source references are identified. SRA to validate impact and continued compliance with source references. CFR s ARGUS Operation Specifications (FO/MX) DOT ISBAO DOD Insurance Other Specify

Step 9 (Continued) - Review and Acceptance Is monitoring recommended? Yes No If Yes, what is the monitoring plan and who is responsible, for example (CASS, IEP, QA, Self Audit, etc.). Department Manager/Supervisor Sign-Off. Approved Not Approved Comments: Name Title Date NOTE: When this form has been completed, return this Worksheet to the Process Owner and the Director of Safety via email with approval for implementation or reasons for disapproval. Director of Safety: Save a copy of the completed Worksheet under the appropriate folder on the company Safety Drive server and file in the Event Log and Documentation Manual for documentation purposes.