Mandan Commission Meeting August 2, 2016 Mandan City Hall

Similar documents
Joshua Jester, E.I., Florida Department of Transportation, District One

FDOT Treasure Coast Traffic Report

122 Avenue: 107 Street to Fort Road

ICBC invests $1.175 million to help make Surrey, Delta and White Rock s roads safer in 2013

FDOT Treasure Coast Traffic Report

5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

A Sample Report of TRAFFIC CONTROL DEVICES REVIEW

Supervisor Cook Announces Final Plans for Braddock Road Improvement Project

PEDESTRIAN SAFETY IMPROVEMENT EVALUATION GUIDELINE FOR UNCONTROLLED CROSSINGS

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

Chapter 4: Funding and Implementation

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT

Route 117 Review of Ownership Transfer October 2014

1. Provide a dedicated westbound approach bus lane at the intersection;

Addendum to SDDCTEA Pamphlet 55 17: Better Military Traffic Engineering Revision 1 Effective: 24 Aug Crosswalk Guidelines

Duwamish Way-finding and CTR Report

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street)

CSAH 101 Preliminary Design

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015

Active Transportation Facility Glossary

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

PLACEMENT OF SIGNS RECOMMENDED PRACTICES SUB-SECTION

Date: February 18, 2015 Page: 1 of 9. ICBC invests $1.195 million to improve Surrey, Delta & White Rock roads

Complete Streets Funding Program Project Prioritization Plan

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

APPENDIX D COST SUMMARY TABLES

Broadway Street Pedestrian Safety Study Cass Street to 700 Feet North of Randall Avenue

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Donahue Drive Corridor Traffic Operational Evaluation

TECH MEMOS #3 & #4 EXISTING AND FUTURE TRAFFIC CONDITIONS TRAVEL FORECASTING APPROACH CITY OF NOVI THOROUGHFARE MASTER PLAN

Hennepin County Transportation Department

Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10

Ottawa Beach Road Study

ICBC invests $738,000 to make Surrey, White Rock and Delta roads safer

INTERSTATE 540 IMPROVEMENT STUDY

Omaha s Complete Streets Policy

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Updated There is no park access points beyond the limit of the phase I work. roadway to be constructed Viewport has been along full limits of the park

FDOT Broward County Traffic Impact Report November 24 through December 1, 2017

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

INDEX. Geometric Design Guide for Canadian Roads INDEX

APPENDIX E GRADE CROSSING LOCATIONS

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

Offset Single Point Interchange I-25 at Rio Bravo Boulevard Albuquerque, New Mexico

Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St.

CITY OF LANCASTER PROPOSED NEW PROJECTS

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013

Acknowledgements. Mr. David Nicol 3/23/2012. Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division

Pedestrian Road Safety Audit

Downtown Signals Traffic Analysis

FDOT Broward County Traffic Report April 20 through April 27, 2018

CAPITOL DRIVE & FOND DU LAC AVENUE INTERSECTION ANALYSIS. Urban Planning 772 SARAH BREGANT, RYAN PETERSON, & MATT WERDERITCH

SR/CR A1A PEDESTRIAN SAFETY & MOBILITY STUDY

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Washington St. Corridor Study

Fleur Drive Reconstruction

Broad Street Bicycle Boulevard Design Guidelines

Design Criteria. Design Criteria

Huntington Station Metro Zone / North Kings Highway Concept Plan

City of Scotts Valley CITY COUNCIL STAFF REPORT

Meadow Woods Elementary School

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

Orange Center Elementary School

Howell Mill Road Safety Audit Report, DRAFT

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project

Traffic Signal Phasing Study Summary & Staff Recommendations

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

Draft North Industrial Area-Wide Traffic Plan

Roundabout Evaluations in Virginia: US 15/US 50 Gilberts Corner, VA SR 106/SR 634 Prince George County, VA

DUNBOW ROAD FUNCTIONAL PLANNING

WEDNESDAY, SEPTEMBER 6, :00 PM City Council Chambers, 1 Civic Center Drive, San Marcos, CA 92069

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Palm Beach County Traffic Report November 16 through November 23, 2018

Designing for Pedestrian Safety. Alabama Department of Transportation Pre-Construction Conference May 2016

Military Road Safety Improvements

Observations and Ideas: Toomer s Corner Streetscape Improvements

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

ADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT

Small Area Study U.S. Route 220 and VA Route 615 Intersection. Bath County, Virginia

Lynchburg District Update

Pedestrian and Bicycle Safety Program Leg Agency Title of Project Project Description Dist

Glenn Avenue Corridor Traffic Operational Evaluation

INNOVATIVE INTERSECTION DESIGN

A plan for improved motor vehicle access on Railroad Avenue in Provincetown

Project Team. Refined Pedestrian Crossing Toolbox. Problem Statement. Aerial of Study Corridor. Crossing Accommodations and Pedestrian Fatalities

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

GEOMETRIC DESIGN STANDARDS FOR NEW RESIDENTIAL SUBDIVISION STREETS TABLE 1A CG-6 CURB AND GUTTER SECTION

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

Engineering Countermeasures for Transportation Safety. Adam Larsen Safety Engineer Federal Highway Administration

Transcription:

Mandan-Bismarck Corridor Improvement Study Mandan Commission Meeting August 2, 2016 Mandan City Hall 2014 HDR, Inc., all rights reserved.

Mandan Corridors

Study Schedule 2015 2016 Study Kick Off August 2015 Existing Conditions Evaluation Sept-Dec 2015 Public Meeting 1 January 2016 Alternatives Development March 2016 Public Meeting 2 March 2016 Alternatives Evaluation April/May 2016 Public Meeting 3 June 2016 Prepare Report Document July/Aug 2016

Roadway Functional Classification

Projected 2040 Level of Service (LOS)

Analysis- Traffic Crashes

Analysis- Traffic Crashes

Main Street Corridor ND Hwy 25 to Twin City Drive Recommended Alternative No-build between Hwy 25 and 10th Avenue NW (Hwy 6) Install 3-lane section between 10th Avenue NW and 3rd Avenue NE Maintain on-street parking on north side Add on-street parking on the south side Lengthen right-turn lane at major intersections Coordinate all traffic signals and add protected left turn phasing at all signalized intersections. Re-stripe all crosswalks and improve all crosswalks Install Pedestrian Hybrid Beacon, (HAWK beacon) at un-signalized intersections, If warranted Add advanced pedestrian crossing signage at the intersections of 2nd Avenue NW and 4th Avenue NW The anticipated construction cost is $910,000. This cost includes $780,000 for HAWK beacons

Sunset Drive/6 th Avenue Corridor Main Street to Old Red Trail Recommended Alternative No-build between Main Street and North ramp terminal of the I-94/Sunset Drive Interchange Intersection of Sunset Drive and Old Red Trail Install a dedicated right turn lane Remove the channelized right-turn lane Narrow the through lane for the southbound traffic Add clear advanced signage for drivers South ramp terminal of the I-94/Sunset Drive Interchange Install signal control on channelized right turn on eastbound-tosouthbound approach Coordinate timing of signals at the I-94 westbound and eastbound ramp terminals with the signal at Old Red Trail The anticipated construction cost is $180,000

ND Highway 6 Corridor 19 th Street to Main Street Recommended Alternative No-build between 19 th Street and Main Street Intersection of ND Hwy 6 and 19 th Street Install a southbound left turn lane and a northbound right turn lane (Currently under development) Install advance intersection signing Install intersection lighting The anticipated construction cost is $235,000

Old Red Trail Corridor Mandan Avenue to Sunset Drive Recommended Alternative No-build between Mandan Avenue and Sunset Drive Intersection of Old Red Trail and Mandan Avenue Flatten horizontal curve Add advance intersection signing Consolidate Tesoro access to one approach as a radial T intersection Provide left and right turn lanes The anticipated construction cost is $700,000.

Mandan Avenue Corridor Main Street to Old Red Trail Recommended Alternative No-build between Main Street and Old Red Trail Intersection of Mandan Avenue and Main Street Update and restripe the pavement markings on intersection approaches Add lane extension skips through the intersection to help drivers navigate Add overhead lane designation signs on mast arms of traffic signal The anticipated construction cost is $13,000

3 rd Street Corridor ND Hwy 6 to Memorial Highway Recommended Alternative No-build between ND Hwy 6 and Memorial Highway Intersection of 3 rd Street and 9 th Avenue Replace 4-way stop with 2-way stop Add Pedestrian Signing Install Pedestrian Hybrid Beacon, (HAWK beacon) Intersection of 3 rd Street and 8 th Avenue Replace 4-way stop with 2-way stop Add Pedestrian Signing Install Pedestrian Hybrid Beacon, (HAWK beacon) Intersection of 3 rd Street and Memorial Highway Add curb and gutter or guardrail along radius The anticipated construction cost is $264,000

19 th Street Corridor ND Hwy 6 to ND Hwy 1806 Recommended Alternative Extend the existing urban section from Ridge Drive to HWY 6 with a 3-lane section No on-street parking Extend the existing urban section from 14 th Avenue SE to ND Hwy 1806 with a 3-lane section No on-street parking Provide turn lanes to all major intersections between Ridge Drive and ND Hwy 6 3-lane section between Ridge Drive and 14th Avenue SE No on-street parking The anticipated construction cost is 3,411,000

Collins Avenue Corridor Main Street to Old Red Trail Recommended Alternative No-build between Main Street and Old Red Trial Intersections of Collins Avenue at 5 th Street NE, 7 th Street NE and Division Street offset retaining walls at the 5 th Street NE Intersection of Collins Avenue and 14th Street Replace 4-way stop with a 2-way stop Signalize if warranted Intersection of Collins Avenue and Old Red Trail o Because of the proposed Starion Sports Complex intersection improvements may be needed Install traffic signal and left turn lanes in all quadrants or Install a roundabout The anticipated construction cost is $390,000

ND Hwy 1806N Corridor 38 th Street to Old Red Trail Recommended Alternative No-build between 38th Street and Old Red Trail Intersection of ND Hwy 1806 N and 27 th Street NW Install left turn lane on northbound ND Hwy 1806 Install right turn lane on southbound ND Hwy 1806 Install right/left turn lanes on the eastbound on 27 th Street Install a Pedestrian Hybrid Beacon (HAWK beacon) at the pedestrian crossing, if warranted. The anticipated construction cost is $322,000

ND Hwy 1806S Corridor Main Street to 19 th Street SE Recommended Alternative 3-lane section between 3 rd Street SE to Main Street No on-street parking Intersection of ND Hwy 1806 S and 3 rd Street SE Extend curb and gutter around radius in NW quadrant Line up left turn lane offsets on the east and west approaches Utilize the boulevard on the east approach Dedicated right turn lane on the north approach Dedicated left turn lane on south approach No-build between 3 rd Street SE and 19 th Street SE Note: Aerial photo is out of date. Does not show development in NE quadrant

ND Hwy 1806S Corridor (Continued) Main Street to 19 th Street SE Recommended Alternative Intersection of ND Hwy 1806 S and Burlington St. Add a pedestrian crossing and sidewalk along the east side of ND 1806 S (6th Avenue SE) Install traffic signal if warranted If signal not warranted install a Pedestrian Hybrid Beacon (HAWK beacon) at the pedestrian crossing Install left turn lane on ND 1806 S on the south approach and right turn lane on north approach The anticipated construction cost is $405,000

Division Street Corridor Sunset Drive to 8 th Avenue NE Recommended Alternative No-build between Sunset Drive and 8 th Avenue NE Intersection of Division St and Sunset Drive Restripe stop bar Trim vegetation and prune trees Intersection of Division St and 6 th Avenue NW Eliminate yield and stop control for Division Street approaches The anticipated construction cost is $13,700

Corridor Improvement Prioritization The corridors are listed in order of highest priority (1) to lowest priority (11) below: 1. Main Street /Business I-94 (ND Highway 25 to Twin City Drive) 2. Collins Avenue (Main Street to Oil Red Trail) 3. 3rd Street (ND Highway 6 to Memorial Highway) 4. Sunset Drive/6th Avenue NW (Main Street to Oil Red Trail) 5. ND Highway 1806 South (Main Street to 19th Street) 6. ND Highway 6 (Main Street to 19th Street NW) 7. Old Red Trail (Mandan Avenue to Sunset Drive) 8. Mandan Avenue/ND Highway 1806 (Main Street to Old Red Trail) 9. ND Highway 1806 North (Old Red Trail to 38th Street) 10. 19th Street (ND Highway 6 to ND Highway 1806) 11. Division Street (Sunset Avenue to 8th Avenue NE)

Truck Route Evaluation Current Truck Average Daily Traffic (ADT)

Truck Route Alternatives

Truck Route Recommendation Relocation of aggregate pit and the asphalt plant Anticipated cost for reconstructing 45 th Street The no build alternative is being recommended