Contract HY/2011/09 Hong Kong-Zhuhai-Macao Bridge Hong Kong Link Road-Section between HKSAR Boundary and Scenic Hill. Dolphin Watching Plan

Similar documents
Contract No. HY/2013/02 HZMB HKBCF Infrastructure Works Stage I (Western Portion) Dolphin Watching Plan

Contract No. HY/2011/03 Hong Kong-Zhuhai-Macao Bridge Hong Kong Link Road Section between Scenic Hill and Hong Kong Boundary Crossing Facilities

Contract No. NL/2017/03 Tung Chung New Town Extension Reclamation and Advance Works Dolphin Watching Plan

Contract No. HY/2013/01 HZMB HKBCF Passenger Clearance Building Dolphin Watching Plan (Revision 5)

REVISED SILT CURTAIN DEPLOYMENT PLAN

Proposed Marine Park in the Brothers Islands

SILT SCREEN DEPLOYMENT PLAN

HK Electric SLG Meeting Minutes 17 August 2012

Geotechnics, Face and Stockpile Operations

RESULTS. 21 September 2003 (Sunday) Kowloon Park Swimming Pool Diving Pool HONG KONG AGE GROUP DIVING CHAMPIONSHIPS 2003

The District Cooling System in Hong Kong

Constructing Artificial Islands. Ken Yeo

BEFORE THE ENVIRONMENTAL PROTECTION AUTHORITY JOINT STATEMENT OF EXPERTS IN THE FIELD OF MARINE MAMMALS

Also present were SLG Facilitator Timothy J. Peirson-Smith, selected CLP staff and technical consultants from ERM. Issues / Discussion

Expansion of Hong Kong International Airport into a Three-Runway System

SUP 15 Health & Safety Management Pressure Systems. Unified procedures for use within NHS Scotland

Tung Chung Sustainable Development. Alternative HK Link Road Route: Critical for Tung Chung

CHAN SUI KI (LA SALLE) COLLEGE. Inter-class Athletics Meet Day 2: Friday, 14 th October, 2011 (8:00 a.m. to 1:00 p.m.)

Developing a. Guidance for operators who need to develop a. specified limits plan

Removal of Lead-Based Paint

PRESSURE SYSTEMS POLICY

Admiralty Inlet Pilot Tidal Project FERC No Appendix C. Derelict Gear Monitoring Plan

Lockout/Tagout Program

Load Falls From Crane

HAZARDOUS INCIDENT SITE SAFETY PLAN

Name Assessor or Approver Date

Surface Supplied Mixed Gas Diving Operations

2012 Aquathon Series - Race 4 Club Points

INADVERTENT RETURN PLAN FOR HORIZONTAL DIRECTIONAL DRILLING (HDD)

Health & Safety Policy & Plan. Rightway Roofing.

Request for Proposal Ground Set Up Tender. Hong Kong Sixes th October 29 th October, 2017

Preliminary Audition

Underground Mine Signs Guideline Underground Fires Major Hazard Standard

Health and Safety Inspection Procedure

Programme Leader Ms Ella Yu HHB Assistant Programme Leader Dr Gabriel Chan HHB

Procedure: Pressure equipment safety

BMC Dragline Move Vegetation Clearing Procedure. 1 December 2016

EMA, Inc. SITE SAFETY PLAN

New Castle County Guidelines for the Certified Construction Reviewer, Owner/Developer, Site Contractor and Professional Engineer

Health and Safety Policy

3 CONSTRUCTION. 3.1 Construction Methods and Sequence. 3.2 Construction Sequence

KCRC Ma On Shan Line. Railway Development in Hong Kong. Tai Wai Station and Maintenance Centre

* 水試開始時間為下午 2 時正 熱身時間為下午 1 時 15 分 -1 時 45 分 *Swimming Test will start at 2 p.m. Warmup time will be 1:15p.m.- 1:45p.m.

Maritime Rules Part 25: Nautical Charts and Publications

To comply with the OHS Act, the responsible manager must carry out and document the following:

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO LOW LEVEL LIGHT UNITS

SAFETY AND HEALTH INDUSTRIAL HYGIENE Hazard Communication Program Effective Date: 08/07/14 Standard: 10.1 Document Number: KUSHIH0008 Rev: 01

FATAL AND SEVERE RISK PROGRAM

We take safety very personally at Aurecon. Safety is everybody s business, every day. Health and safety incidents are not inevitable, they are

Lifting Operations and Lifting Equipment Regulations (LOLER) Policy. Version No. 2. Review: May 2019

Code for the Provision of Chargeable Mobile Content Services

Safety Standards Acknowledgement and Consent (SSAC) CAP 1395

2012 Aquathon Series - Race 3 Club Points

Code for the Provision of Chargeable Mobile Content Services

[Type here] MANAGEMENT OF X-RAY GENERATING EQUIPMENT

Safe High Pressure Water Washing (HPWW) Requirement

Harbor Hurricane Preparedness Plan*

The Outward Bound (Alumni) Association of Hong Kong Organizer

Galloper Wind Farm Project Response to Development Consent Order Part 3 Requirement 23 Temporary Fencing and other means of enclosure (Enabling

CONFINED SPACE ENTRY PROGRAM

GUIDLINE OF ENVIRONMENT HEALTH AN SAFETY PLAN DURING CONSTRUCTION WORK

Viaduct and bridge construction methods adopted at MTR SIL(E) Contract 903. MTR SIL(E) 903 Viaduct Construction Team

Search and Rescue ESF 9

The content of this resource has been generously provided by the AGC Houston, the Associated General Contractors of America.

OFFSHORE PATROL VESSEL OPERATIONS

Internal Scholarships (First Term)

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG PH M ABN

List all key terms and acronyms used in the procedure, and their definitions.

Traffic Control Inspection Checklist Segment:

CA16/2018 Immediate Release

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS

UC Irvine Environmental Health & Safety

ENVIRONMENTAL COMPLIANCE PLAN

1.1 The Facilitator began the 7th meeting by reviewing the SLG Team s actions from the 6th SLG meeting on 1 st February 2013.

TAK SUN SECONDARY SCHOOL. Prize Presentation

What s Up in Navigation Displays?

ASPEC Engineering HSE Management System. Work Instruction. 1 Objective. 2 Working in confined spaces. 2.1 What is a confined space?

Accident, Incident and Ill-health Reporting Procedure. This is a sub-policy of UEL s main Health and Safety Policy Statement

EWC EARLY WARNING CONTROL OPERATIONAL PRESENTATION. Charles Dickens (757)

Vermin, Insects and Scavenging Birds Management Plan

Section J. How to develop safety elements for project safety management system. How to develop safety elements for project SMS

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant

TRAFFIC IMPACT STUDY CRITERIA

Stoke Mandeville Parish Council 17 April 2018

Hang Seng Table Tennis Academy Recognises Top Young Players at 2017 Annual Ceremony

CSU Channel Islands Lead Operations and Maintenance Program

GOM Diving Safety Work Group. Recommended Minimum Dive Team Manning 3/18/2016

COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS. Prepared for:

A best practice guide produced in collaboration between

UNIVERSITY OF EDINBURGH GENERIC RISK ASSESSMENT - RADIATION RP/RA8 - WORK WITH X-RAY FLUORESCENCE ANALYSERS

Press Release. Media can also download raw footage and event photos of the 50km Ride from this link:

B S Glass Ltd Safety procedures- outsourced Workplaces

Control of Hazardous Energy. Environmental Health and Safety

CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH PROCEDURE

USE OF THE EXCEEDANCE CURVE APPROACH IN OCCUPIED BUILDING RISK ASSESSMENT

GUIDE TO USE OF THE AFP TM MARKS

MODEL AERONAUTICAL ASSOCIATION OF AUSTRALIA

CS ENERGY PROCEDURE FOR ELECTRIC SHOCK TREATMENT AND REPORTING CS-OHS-05

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO HIGH LEVEL LIGHT UNITS

Table of Summary on Operating Regulations governing Vessels Entering and Exiting and Mooring/Berthing at the Port of Taichung

Transcription:

Dragages -China Harbour-VSL JV Contract HY/2011/09 Hong Kong-Zhuhai-Macao Bridge Hong Kong Link Road-Section between HKSAR Boundary and Scenic Hill Dolphin Watching Plan April 2013 (Version 4.0) Certified By REMARKS: Dr. H.F. Chan Environmental Team Leader The information supplied and contained within this report is, to the best of our knowledge, correct at the time of printing. CINOTECH accepts no responsibility for changes made to this report by third parties CINOTECH CONSULTANTS LTD Room 1710, Technology Park, 18 On Lai Street, Shatin, NT, Hong Kong Tel: (852) 2151 2083 Fax: (852) 3107 1388 Email: info@cinotech.com.hk

TABLE OF CONTENTS Page 1 INTRODUCTION... 1 Background... 1 2 DOLPHIN WATCHING PLAN... 2 LIST OF FIGURES Figure 1 Figure 2 Layout of Silt Curtain Silt Protection Principles for Marine Piling in Western Water LIST OF APPENDIX Appendix A Flow Chart for Communication under Dolphin Watching Plan i

Dragages -China Harbour-VSL JV Contract No. HY/2011/09 Hong Kong-Zhuhai-Macao Bridge Hong Kong Link Road Section between HKSAR Boundary and Scenic Hill Proposal for Construction Phase Dolphin Watching Plan 1 INTRODUCTION Background 1.1 The Hong Kong Link Road (HKLR) comprises a 9.4km long viaduct section from the HKSAR boundary to Scenic Hill on the Airport Island; a 1 km tunnel section to the reclamation formed along the east coast of the Airport Island and a 1.6km long at-grade road section on the reclamation connecting to the Hong Kong Boundary Crossing Facilities (HKBCF). The tunnel section of HKLR will pass under Scenic Hill, Airport Road and Airport Railway to minimize the environmental and visual impacts to Tung Chung residents. 1.2 Dragages - China Harbour-VSL JV (hereinafter called the Contractor ) was awarded as the main contractor of Contract No. HY/2011/09 Hong Kong-Zhuhai-Macao Bridge Hong Kong Link Road Section between HKSAR Boundary and Scenic Hill (hereinafter called the Contract). 1.3 According to the EM&A Manual, a number of environmental mitigation measures related to dolphin shall be implemented during construction phase, including dolphin watching plan. 1.4 This construction phase dolphin watching plan proposal will detail the methodology and monitoring frequency to meet the requirement in the Environmental Permit (EP) and EM&A Manual. It was prepared and submitted for approval before commencement of monitoring works. MA12014/DolphinWatchingPlan_v.4.0 1 Cinotech

Dragages -China Harbour-VSL JV Contract No. HY/2011/09 Hong Kong-Zhuhai-Macao Bridge Hong Kong Link Road Section between HKSAR Boundary and Scenic Hill Proposal for Construction Phase Dolphin Watching Plan 2 DOLPHIN WATCHING PLAN 2.1 This dolphin watching plan is prepared in accordance with the requirement under the EP- 352/2009/A Condition 2.5 that: The Permit Holder shall deposit with the Director prior to the commencement of marine works of the Project, three hard copies and one electronic copy of a Dolphin Watching Plan. The plan shall include regular inspection of the silt curtains, visual inspection of the waters surrounded by the curtains, and an action plan shall be devised to cope with any unpredicted incidents such as the case that Chinese white dolphin is found within the water surrounded by the silt curtains. 2.2 The requirement under the EP-352/2009/A Condition 3.5 is that: Once the perimeter silt curtains as mentioned in Condition 3.4 above are installed or redeployed, the Dolphin Watching Plan as deposited under Condition 2.5 of this Permit shall be implemented as part of the EM&A programme. 2.3 The requirement is also specified in the EM&A Manual 10.2.17 Dolphin Watching Plan that: A dolphin watching plan for works areas will also be included in the EM&A programme. The plan would include regular inspection of the silt curtains, scanning of the waters surrounded by the curtains, and an action plan should be devised to cope with any unpredicted incidents such as in case dolphins are found within the waters surrounded by the silt curtains. Similarly, at marine pier sites the dredging and concreting works could be conducted inside the bored pile casing after its installation. A dolphin watching plan will replace the dolphin exclusion zone after the casing is installed. 2.4 The method for each parameter to be included in the dolphin watching plan is detailed in the following sections: Implementation Location and Time 2.5 Dolphin Watching Plan should be implemented in the silt curtain enclosed area once silt curtain is installed to enclose the working platform in accordance with EP Condition 3.5. During installation of bored pile casing, dolphin exclusion zone of 250m radius will be implemented, which covers the scope of dolphin watching plan. After installation of the bored pile casing, dolphin watching plan will be in place as per EM&A Manual Section 10.2.17. The layout and location of the silt curtain can be found in Figure 1. Cross-sectional view of the silt curtain can be found in Figure 2. Regular inspection of the silt curtains 2.6 Before each day of work, the silt curtain should be inspected by trained staff to ensure that it is intact and the ends of the silt curtain are overlapped properly to form an enclosed area. Damaged silt curtain should be repaired or replaced before conducting any construction activity within the silt curtain. The construction work will only commence after confirming the integrity of the silt curtain. 2.7 The floating and underwater section of the silt curtain should be physically examined weekly to ensure that there is no damage to the curtain. The silt curtain will be pulled out of the water for checking where necessary. Additional checks will be required after typhoon that may have MA12014/DolphinWatchingPlan_v.4.0 2 Cinotech

Dragages -China Harbour-VSL JV Contract No. HY/2011/09 Hong Kong-Zhuhai-Macao Bridge Hong Kong Link Road Section between HKSAR Boundary and Scenic Hill Proposal for Construction Phase Dolphin Watching Plan damaged or dislodged the curtain, or cases of trapped dolphins that may indicate presence of holes. All necessary repairs should be performed before any construction work can commence. Scanning of the waters surrounded by the curtains 2.8 A scanning staff will scan the waters surrounded by the silt curtains prior to the start of construction work. He will look for any presence of dolphin inside the silt curtain with naked eyes. 2.9 Prior to the commencement of work for each day, the area enclosed by the silt curtain should be scanned for 30 minutes by the scanning staff. The scanning staff will station and observe under the work platform. The construction work will only commence after confirming 30 minutes of absence of dolphins. As both ends of the silt curtain will be overlapped to form an enclosed area, it is unlikely that the dolphin can enter the silt curtain. 2.10 Training session will be provided by a qualified dolphin specialist so that the scanning staff will have adequate knowledge to identify presence of dolphins. 2.11 The approximate location, time of appearance/disappearance and direction of movement of the dolphin etc should be recorded. Action Plan to be Devised to Cope with any Unpredicted Incidents 2.12 As mentioned in previous sections, the chance for dolphin entering the enclosed silt curtain is highly limited. Nevertheless, an action plan is also prepared in case of any dolphin is found accidentally trapped inside the silt curtain. 2.13 The frontline staff should stay alert for dolphins in the silt curtain during construction work. Training session should be provided so that they have adequate knowledge to identify presence of dolphins. 2.14 If a dolphin is found within the silt curtain, the staff should notify the site supervisor immediately through handheld transceiver or mobile phone. All construction work within the silt curtain should cease until further notice. At the same time, the staff will open the silt curtain to allow dolphin to escape. Also, staff should be allocated to check the silt curtain for any openings that may be missed during the daily integrity check. A flow chart showing how the communication will be carried out can be found in Appendix A. 2.15 The scanning staff should closely observe the movement of the dolphin and search for appearance of other dolphins within the silt curtain. 2.16 The approximate location, time of appearance/disappearance and direction of movement of the dolphin etc should be recorded. The construction work can only re-commence if no dolphin is found within the observation area for 30 minutes. During re-installation of the silt curtain, dolphin exclusion zone will be implemented. 2.17 If scanning staff finds that the dolphin has difficulty in escaping from the silt curtain, this will be reported to the SOR to decide whether the use of vessel for guiding the dolphin to leave should be adopted. The curtain should be closed to its original state afterwards. 2.18 In case injured or live-stranded cetaceans are found, the AFCD will be contacted immediately through "1823" marine mammal stranding hotline. MA12014/DolphinWatchingPlan_v.4.0 3 Cinotech

FIGURES

P84 P81 P74 P92 P78 P99 0 P7 P10 4 P108 4 P11 7 P6 9 P5 P5 9 P4 P0 5 1 P5 3 P4 P8 5 P3 P16 P21 Designed By:- P27 Main Contractor : Client : Contractor's Designer : Project : Drawn By:- Drawing no. Scale: Sheet No.: Drawing Title : Rev. Description Date Checked Approved By:- CAD REF: Date:- Job No.: Drawing Status: Rev.

0

APPENDIX A Flow Chart for Communication under Dolphin Watching Plan

A flow chart indicating communication line for effective cease of works Dolphin is found within the silt curtain Notification from 1. Hotline 6898 6161, or 2. DCVJV Area Supervisory Staff Notify the site supervisor Environmental Team CS Chu Ashley Au Chris Chong Environmental Officer Ass. Env. Officer Ass. Env. Officer Notify the ET s Representative Site Management Chan Man Project Director WK Poon D. Project Director Notify Dolphin Specialist Notify the SO s Representative Notify ESS/ENPO/IEC

Emergency Team Members Post Name Contact No. Emergency Co-ordinator W K POON 9461 8397 Emergency Safety Representative C S MA 9627 6217 Emergency Env. Representative C S CHU 6871 1634 Work Team Members Site Agent C Y WONG 9303 1266 Work Team Members Foreman KEUNG Hoi 9345 4251 Work Team Members Drivers FU Yu Kwong CHENG Yiu Chung 9098 2637 6971 8313 Dolphin Specialist Dr Samuel Hung 9800 8652