APPENDIX L: COST ESTIMATING TOOLS

Similar documents
FDOT Treasure Coast Traffic Report

APPENDIX D COST SUMMARY TABLES

State Road (S.R.) 61 (U.S. 319) FPID s and

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

FDOT Treasure Coast Traffic Report

Southcote Road Improvements Class Environmental Assessment Study

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

CTH M Reconstruction

FDOT Treasure Coast Traffic Impact Report

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

INDEX. Geometric Design Guide for Canadian Roads INDEX

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project

DRAFT. Corridor study. Honeysuckle Road. October Prepared for the City of Dothan, AL. Prepared by Gresham, Smith and Partners

Appendix 3 Roadway and Bike/Ped Design Standards

GEOMETRIC DESIGN STANDARDS FOR NEW RESIDENTIAL SUBDIVISION STREETS TABLE 1A CG-6 CURB AND GUTTER SECTION

RZC Appendix 8A Marymoor Subarea Street Requirements

Chapter 4: Funding and Implementation

FDOT Treasure Coast Traffic Impact Report

General References Definitions. (1) Design Guidance. (2) Supporting Information

UPC Design / CN Locally Administered PE Phase VDOT Administered CN Phase

Preliminary Engineering Study

Design Criteria. Design Criteria

PLACEMENT OF SIGNS RECOMMENDED PRACTICES SUB-SECTION

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES

Malabar Road (SR 514) PD&E. Town of Malabar Briefing (July 17, 2017)

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Trans-Canada Highway 1 RW Bruhn Bridge Replacement

South Carolina Department of Transportation. Engineering Directive

Chapter 3 DESIGN SPECIFICATIONS

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

DESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Financial Project ID No(s).: and ETDM No(s).: and 14181

HILLSBOROUGH COUNTY PUBLIC WORKS TECHNICAL MANUALS AND SPECIFICATIONS 2 YEAR MANDATORY UPDATES (2017) COMMENTS & RESPONSES COMMENT / JUSTIFICATION

2014 Wisconsin Tribal Transportation Conference. Matt Halada Transportation Planner NE Region

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Roadway Design Manual

Plant City Walk-Bike Plan

APPENDIX G: DETAILED COST ESTIMATES

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM

Road Diets FDOT Process

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

Application of a Complete Street

October 2004 REVISIONS (2) SUPERELEVATION DEVELOPMENT 11.3(2)

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013

APPENDIX L. Design Criteria

Bank Street Widening Class EA Study Leitrim Road to Rideau Road. Gloucester South Seniors Centre, 4550 Bank Street

BICYCLE LEVEL OF SERVICE for URBAN STREETS. Prepared by Ben Matters and Mike Cechvala. 4/16/14 Page 1

Mid Rivers Mall Drive Multi-Use Path (Rte. N to MO 364)

SECTION 2 ALTERNATIVES INCLUDING PROPOSED ACTION 2.0 ALTERNATIVES INCLUDING PROPOSED ACTION 2.1 INTRODUCTION 2.2 ALTERNATIVES CONSIDERED BUT REJECTED

Cyclists and Bikeways: What s your match? A guide to bikeway options for a variety of cyclists

Reams Road RCA Study. Board of County Commissioners Public Hearing

Information on display. Inside this handout. Triangle Area revisions. Project need displays. Preferred alternative on aerial maps

JANUARY 2017 STUDY UPDATE. Logan City, Cache Co., CMPO

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

SR 44 from US 441 / SR 500 to SR 44 / Orange Ave.

Souder, Miller & Associates 401 W. Broadway Farmington, NM

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Parks, Open Space, Trails and Recreation Master Plan

Multimodal Through Corridors and Placemaking Corridors

Does It Work? THE BENCHMARKING PROJECT. State Department of Transportation Project Assessment. Bill Wilkinson and Bob Chauncey

Name Roads Station Distance Miles

THE FUTURE OF THE TxDOT ROADWAY DESIGN MANUAL

FOR HISTORICAL REFERENCE ONLY

Active Transportation Facility Glossary

SECTION VII ROADWAY AND SITE IMPROVEMENTS

Prince George s County plans, policies, and projects

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

The procedures to be followed in undertaking Non-Emergency work depend on the degree of traffic disruption caused by the work.

Street Paving and Sidewalk Policy

Dr. Naveed Anwar Executive Director, AIT Consulting Affiliated Faculty, Structural Engineering Director, ACECOMS

Columbia Pike Implementation Team (CPIT) Meeting

Project Description Form 8EE

CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES

Gandy Connector: Travel Demand. Policy Committee August 2013

Geometric Design Tables

5 CIRCULATION AND STREET DESIGN

FM 1092/Murphy Road Access Management Study Pulic Meeting #1. Wednesday, August 31, :00 p.m. 8:00 p.m.

Southbend to Prima Vista. October 30, Floresta Corridor Master Plan

Road Diets: Reconfiguring Streets for Multi-Modal Travel

Appendix B - Street Sections

Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities

Henderson Ave. Complete Streets Project

Guidelines for Integrating Safety and Cost-Effectiveness into Resurfacing, Restoration, and Rehabilitation Projects

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

Transcription:

APPENDIX L: COST ESTIMATING TOOLS

Rural Arterial From LRE MOT * Mobilization * Subtotal Scope Contingency (25%) Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders $3,351,896 $335,190 $368,709 $4,055,794 $1,013,949 $5,069,743 $760,461 $760,461 $6,590,666 New (4-Lane Roadway) with 5' Paved Shoulders $5,449,902 $544,990 $599,489 $6,594,381 $1,648,595 $8,242,976 $1,236,446 $1,236,446 $10,715,869 New (6-Lane Roadway) with 5' Paved Shoulders $6,945,143 $694,514 $763,966 $8,403,624 $2,100,906 $10,504,529 $1,575,679 $1,575,679 $13,655,888 Milling and Resurfacing (4-Lane Roadway) with 5' Paved Shoulders $1,145,229 $114,523 $125,975 $1,385,727 $346,432 $1,732,158 $259,824 $259,824 $2,251,806 Milling and Resurfacing (6-Lane Roadway) with 5' Paved Shoulders $1,668,122 $166,812 $183,493 $2,018,428 $504,607 $2,523,035 $378,455 $378,455 $3,279,945 Add Lanes (2 to 4 Lanes) with 5' Paved Shoulders (Includes milling and resurfacing of existing Add Lanes (4 to 6 Lanes) with 5' Paved Shoulders (Includes milling and resurfacing of existing Add Lanes (4 to 8 Lanes) with 5' Paved Shoulders (Includes milling and resurfacing of existing Add Lanes (6 to 8 Lanes) with 5' Paved Shoulders (Includes milling and resurfacing of existing $3,895,621 $389,562 $428,518 $4,713,701 $1,178,425 $5,892,127 $883,819 $883,819 $7,659,764 $4,364,817 $436,482 $480,130 $5,281,428 $1,320,357 $6,601,785 $990,268 $990,268 $8,582,321 $5,855,972 $585,597 $644,157 $7,085,726 $1,771,432 $8,857,157 $1,328,574 $1,328,574 $11,514,305 $5,489,564 $548,956 $603,852 $6,642,373 $1,660,593 $8,302,966 $1,245,445 $1,245,445 $10,793,856 Add 1 Through Lane on Inside (To Existing) with 5' Paved Shoulders $852,034 $85,203 $93,724 $1,030,962 $257,740 $1,288,702 $193,305 $193,305 $1,675,313 Add 1 Through Lane on Outside (To Existing) with 5' Paved Shoulders $1,334,043 $133,404 $146,745 $1,614,192 $403,548 $2,017,740 $302,661 $302,661 $2,623,062 Add 300' Exclusive Left Turn Lane $43,253 $6,488 $7,461 $57,203 $14,301 $71,503 $10,725 $10,725 $92,954 Add 300' Exclusive Right Turn Lane $102,384 $15,358 $17,661 $135,403 $33,851 $169,254 $25,388 $25,388 $220,030 Urban Arterial New (2-Lane Roadway) with 5' Sidewalk, and Curb & Gutter $4,840,624 $484,062 $532,469 $5,857,155 $1,464,289 $7,321,444 $1,098,217 $1,098,217 $9,517,877 New (4-Lane Roadway) with 5' Sidewalk, and Curb & Gutter $6,832,753 $683,275 $751,603 $8,267,631 $2,066,908 $10,334,539 $1,550,181 $1,550,181 $13,434,900 New (6-Lane Roadway) with 5' Sidewalk, and Curb & Gutter $8,353,372 $835,337 $918,871 $10,107,580 $2,526,895 $12,634,475 $1,895,171 $1,895,171 $16,424,818 Milling and Resurfacing (4-Lane Roadway) with 5' Sidewalk, and Curb & Gutter $1,227,295 $122,729 $135,002 $1,485,027 $371,257 $1,856,283 $278,442 $278,442 $2,413,168 Milling and Resurfacing (6-Lane Roadway) with 5' Sidewalk, and Curb & Gutter $1,740,670 $174,067 $191,474 $2,106,211 $526,553 $2,632,764 $394,915 $394,915 $3,422,593 Add Lanes (2 to 4 Lanes) with 5' Sidewalk, and Curb & Gutter (Includes milling and Add Lanes (4 to 6 Lanes) with 5' Sidewalk, and Curb & Gutter (Includes milling and Add Lanes (4 to 8 Lanes) with 5' Sidewalk, and Curb & Gutter (Includes milling and Add Lanes (6 to 8 Lanes) with 5' Sidewalk, and Curb & Gutter (Includes milling and Roadway Per Centerline Mile $4,477,530 $447,753 $492,528 $5,417,812 $1,354,453 $6,772,265 $1,015,840 $1,015,840 $8,803,944 $5,002,273 $500,227 $550,250 $6,052,750 $1,513,188 $7,565,938 $1,134,891 $1,134,891 $9,835,719 $6,581,386 $658,139 $723,952 $7,963,477 $1,990,869 $9,954,346 $1,493,152 $1,493,152 $12,940,650 $5,969,158 $596,916 $656,607 $7,222,681 $1,805,670 $9,028,351 $1,354,253 $1,354,253 $11,736,856 Add 1 Through Lane on Inside (To Existing) with 5' Sidewalk, and Curb & Gutter $894,894 $89,489 $98,438 $1,082,822 $270,705 $1,353,527 $203,029 $203,029 $1,759,585 Add 1 Through Lane on Outside (To Existing) with 5' Sidewalk, and Curb & Gutter $2,420,914 $242,091 $266,300 $2,929,305 $732,326 $3,661,632 $549,245 $549,245 $4,760,121 Add 300' Exclusive Left Turn Lane $63,013 $9,452 $10,870 $83,334 $20,834 $104,168 $15,625 $15,625 $135,418 Add 300' Exclusive Right Turn Lane $132,149 $19,822 $22,796 $174,767 $43,692 $218,459 $32,769 $32,769 $283,996 * A 15% MOT and Mobilization factor was used for exclusive left and right turn lanes. A 10% factor was used for all other figures. ** Total cost shown is derived from a standard typical section. s will need to be adjusted to account for signals, bridges, or any additional item not deemed typical. 1. Estimates were derived from FDOT LRE system 2. These figures exclude costs for intersections/interchanges, improvements to cross streets, bridges over 20', right-of-way, landscaping, ITS, and traffic signals. 3. The figures are based on market costs for Hillsborough County. 4. s shown are present day costs. 5. The costs developed for this report are not project-specific and should be used for preliminary estimating purposes only.

Roadway Per Centerline Mile Rural Arterial Add Lanes (4 to 6 Lanes) with 5' Paved Shoulders, 2 Traffic Signals, Highway Lighting, Fiber Based Communication Backbone, Widening 150' Low Level Bridge, and Milling & Resurfacing Existing 4 Lanes Urban Arterial Add Lanes (4 to 6 Lanes) with 5' Sidewalk, Bike Lanes, 2 Traffic Signals, Highway Lighting, Fiber Based Communication Backbone, Widening 150' Low Level Bridge, and Milling & Resurfacing Existing 4 Lanes From LRE MOT (10%) Mobilization (10%) Subtotal Scope Total Contingency (25%) PE Design (15%) CEI (15%) Total Project $5,974,792 $597,479 $657,227 $7,229,498 $1,807,375 $9,036,873 $1,355,531 $1,355,531 $11,747,935 $6,282,391 $628,239 $691,063 $7,601,693 $1,900,423 $9,502,116 $1,425,317 $1,425,317 $12,352,751 1. Estimates were derived from FDOT LRE system 2. These figures exclude costs for intersections/interchanges, cross street improvements, right-of-way, ITS, and landscaping. 3. The figures are based on market costs for Hillsborough County. 4. s shown are present day costs. 5. The costs developed for this report are not site-specific and should be used for preliminary estimating purposes only.

Other Roadway Related s From LRE Intersection Traffic Signalization (Mast Arm Assembly)** MOT * Mobilization (15%) Subtotal Scope Contingency (25%) Total PE Design (15%) CEI (15%) Total Project 2-Lane Roadway Intersecting 2-Lane Roadway $152,791 $22,919 $26,357 $202,067 $50,517 $252,583 $37,887 $37,887 $328,358 4-Lane Roadway Intersecting 4-Lane Roadway $192,772 $28,916 $33,253 $254,941 $63,735 $318,676 $47,801 $47,801 $414,279 6-Lane Roadway Intersecting 6-Lane Roadway $214,028 $32,104 $36,920 $283,052 $70,763 $353,815 $53,072 $53,072 $459,959 Bicycle and Pedestrian Facilities Sidewalks Per Mile (5' Width - 1 Side) $88,939 $4,447 $14,008 $107,393 $26,848 $134,242 $20,136 $20,136 $174,514 Sidewalks Per Mile (6' Width - 1 Side) $106,726 $5,336 $16,809 $128,872 $32,218 $161,090 $24,164 $24,164 $209,417 Multi-Use Trail Per Mile (12' Width - 1 Side) $170,032 $8,502 $26,780 $205,314 $51,329 $256,643 $38,496 $38,496 $333,635 Stormwater Retention Facilities 1 Acre Pond Site (6' Depth) $217,722 $10,886 $34,291 $262,899 $65,725 $328,624 $49,294 $49,294 $427,211 Median Retrofit Convert 14' Center Turn Lane to 14' Raised Median (Per Mile) Cross Street Improvements Widen 1-Leg of Existing Rural 2-Lane Cross Street to Accommodate 2 Receiving Lanes, Dual Left Turn lanes, and Exclusive Right Turn Lane (Approximate Length of 0.25 Miles) $189,476 $28,421 $32,685 $250,582 $62,646 $313,228 $46,984 $46,984 $407,197 $1,156,434 $173,465 $199,485 $1,529,384 $382,346 $1,911,730 $286,760 $286,760 $2,485,249 * A 15% MOT factor was used for Traffic Signals, Median Retrofit, and Cross Street Improvements. A 5% factor was used for all other figures. **The cost of traffic signalization assumes the installation of mast arms on all four legs of an intersection. To obtain the cost of signalizing a four-lane roadway intersecting a two-lane roadway, divide the signal cost of a four-lane roadway by two and add this figure to the signal cost of the two-lane roadway divided by two. Notes: 1. Estimates were derived from FDOT LRE system 2. The figures are based on market costs for Hillsborough County. 3. s shown are present day costs. 4. The costs developed for this report are not site-specific and should be used for preliminary estimating purposes only. From LRE Interchange MOT (10%) Mobilization (10%) Subtotal Scope Contingency (25%) Total PE Design (15%) CEI (15%) Subtotal Project Single Point Urban Interchange (SPUI) $ 19,832,201.63 $1,983,220 $2,181,542 $23,996,964 $5,999,241 $29,996,205 $4,499,431 $4,499,431 $38,995,066 1. was derived from an LRE estimate to modify the existing diamond interchange at I-75/SR 54 to a single point urban interchange. 2. shown is for construction only. Does not include Design, CEI, and right-of-way.

Bridge Per Square Foot Per Square Foot New 2014 Low Level $120 Mid Level $145 High Level $170 Overpass (Over Roadway) $155 Bascule $1,900 Pedestrian Overpass $335 Widening 2014 Low Level $150 Mid Level $170 High Level $205 Overpass (Over Roadway) $185 Bridge Removal 2014 Concrete Bridge $50 1. Figures are for construction costs per square foot of deck area. 2. All figures exclude costs for right-of-way, bridge approaches, and approach slabs. 3. Figures account for recent increases in concrete and steel, and the effects of labor and material shortages in the construction industry. 4. The costs developed for this report are not site-specific and should be used for preliminary estimating purposes only.

Roadway Per Centerline Mile Comparison June 2013 versus June 2014 s LRE Model 2013 2014 Percent Difference Rural Arterial New (2-Lane Roadway) with 5' Paved Shoulders $6,220,090 $6,590,666 5.96% New (4-Lane Roadway) with 5' Paved Shoulders $9,974,786 $10,715,869 7.43% New (6-Lane Roadway) with 5' Paved Shoulders $12,689,060 $13,655,888 7.62% Milling and Resurfacing (4-Lane Roadway) with 5' Paved Shoulders $2,185,199 $2,251,806 3.05% Milling and Resurfacing (6-Lane Roadway) with 5' Paved Shoulders $3,201,091 $3,279,945 2.46% Add Lanes (2 to 4 Lanes) with 5' Paved Shoulders (Includes milling and resurfacing of existing $7,534,764 $7,659,764 1.66% Add Lanes (4 to 6 Lanes) with 5' Paved Shoulders (Includes milling and resurfacing of existing $8,395,445 $8,582,321 2.23% Add Lanes (4 to 8 Lanes) with 5' Paved Shoulders (Includes milling and resurfacing of existing $11,155,949 $11,514,305 3.21% Add Lanes (6 to 8 Lanes) with 5' Paved Shoulders (Includes milling and resurfacing of existing $10,559,816 $10,793,856 2.22% Add 1 Through Lane on Inside (To Existing) with 5' Paved Shoulders $1,664,859 $1,675,313 0.63% Add 1 Through Lane on Outside (To Existing) with 5' Paved Shoulders $2,663,500 $2,623,062-1.52% Add 300' Exclusive Left Turn Lane $92,096 $92,954 0.93% Add 300' Exclusive Right Turn Lane $222,566 $220,030-1.14% Total $76,559,221 $79,655,779 4.04% Urban Arterial New (2-Lane Roadway) with 5' Sidewalk, and Curb & Gutter $8,798,189 $9,517,877 8.18% New (4-Lane Roadway) with 5' Sidewalk, and Curb & Gutter $12,387,472 $13,434,900 8.46% New (6-Lane Roadway) with 5' Sidewalk, and Curb & Gutter $15,170,760 $16,424,818 8.27% Milling and Resurfacing (4-Lane Roadway) with 5' Sidewalk, and Curb & Gutter $2,351,378 $2,413,168 2.63% Milling and Resurfacing (6-Lane Roadway) with 5' Sidewalk, and Curb & Gutter $3,337,039 $3,422,593 2.56% Add Lanes (2 to 4 Lanes) with 5' Sidewalk, and Curb & Gutter (Includes milling and resurfacing existing Add Lanes (4 to 6 Lanes) with 5' Sidewalk, and Curb & Gutter (Includes milling and resurfacing existing Add Lanes (4 to 8 Lanes) with 5' Sidewalk, and Curb & Gutter (Includes milling and resurfacing existing Add Lanes (6 to 8 Lanes) with 5' Sidewalk, and Curb & Gutter (Includes milling and resurfacing existing $8,942,637 $8,803,944-1.55% $9,968,284 $9,835,719-1.33% $13,169,187 $12,940,650-1.74% $11,879,482 $11,736,856-1.20% Add 1 Through Lane on Inside (To Existing) with 5' Sidewalk, and Curb & Gutter $1,683,088 $1,759,585 4.55% Add 1 Through Lane on Outside (To Existing) with 5' Sidewalk, and Curb & Gutter $4,500,989 $4,760,121 5.76% Add 300' Exclusive Left Turn Lane $127,134 $135,418 6.52% Add 300' Exclusive Right Turn Lane $274,245 $283,996 3.56% Total $92,589,884 $95,469,645 3.11%