BDV60 Blowdown Vessel Installation and Maintenance Instructions

Similar documents
FV Flash Vessel Installation and Maintenance Instructions

DF1 and DF2 Diffusers

Dri-Line Mk3 Monnier Compressed Air Drain Trap

CP10 Sensor Installation and Maintenance Instructions

MST21 Stainless Steel Balanced Pressure Thermostatic Steam Trap

Fig 12, Fig 14HP, Fig 16, Fig 16HP and Fig 16L Strainers

TSS21 Sealed Thermostatic Steam Tracer Trap

TP1 and TP2 Temporary Cone Shaped Strainers

Fig 1, Fig 12, Fig 13, Fig 14HP, Fig 16, Fig 16HP and Fig 16L Strainers

Spiratec ST14, ST16 and ST17 Sensor Chambers and sensors

S1, S2, S3, S5, S6, S7, S8, S12 and S13 Separators Installation and Maintenance Instructions

Dri-Line Mk2 Spirax-Monnier Compressed Air Drain Trap

S1, S2, S3, S5, S6, S7, S8, S12 and S13 Separators

KBV21i and KBV40i Key Operated Boiler Blowdown Valves Installation and Maintenance Instructions

SA121, SA122, SA123, SA128 and SA1219 Self-acting Temperature Control Systems (Dial Adjustment)

TA10A and TA10P Steam Tracing Temperature Control Valves Installation and Maintenance Instructions

DCV10 Stainless Steel Disc Check Valve for use with Condensate Pumps

BT6HC Hygienic Sanitary Balanced Pressure Steam Trap for High Capacity and CIP/SIP Applications

SA121, SA122, SA123, SA128 and SA1219 Self-acting Temperature Control Systems (Knob Adjustment)

DCV1, DCV3 and DCV3LT Disc Check Valves Installation and Maintenance Instructions

PV4 and PV6 Piston Valves

Spirax Compact FREME Flash Recovery Energy Management Equipment

KBV21i and KBV40i Air Actuated Boiler Blowdown Valves

IFTGS14 Ball Float Steam Trap ½" and ¾" with Integral Spiratec Sensor

MSC-P and MSC-N Manifolds for Steam Distribution and Condensate Collection

MF2M Monnier Miniature Compressed Air Filter

Manual Actuated Boiler Blowdown Valves

IX1 Spirax-Monnier International Compressed Air Filter Installation and Maintenance Instructions

DCV6 Disc Check Valve

CVS10 Sanitary Check Valves

HM and HM34 Inverted Bucket Steam Traps Installation and Maintenance Instructions

UIB30 and UIB30H Sealed Inverted Bucket Steam Traps for use with Pipeline Connectors

FTGS14 Ball Float Steam Trap DN15 (½") to DN25 (1")

AVM7 Stainless Steel Thermostatic Air Vent

AVC32 Carbon Steel Air Vent for Steam Systems

BCV31 DN40 - Blowdown Control Valve

SRV66 Sanitary Pressure Reducing Valve

ML3M Monnier Miniature Compressed Air Lubricator

Fig 3, 7, 33, 34, 34HP, 36, 36HP, 37, 3616 and Fig 3716 Flanged Strainers

AE14 Automatic Air Vents for Liquid Systems Installation and Maintenance Instructions

MFP14-PPU (Vented) Automatic Packaged Pump Units

APT14, APT14HC and APT14SHC Spares 2

AE30 Automatic Air Eliminators / Air and Gas Vents for Liquid Systems

CA44, CA44S, CA46 and CA46S Air and Gas Traps

SA Control Valve types: BM, BMF, BX, SB, NS, KA, KB, KC (Normally open) BMRA, BMFRA, BXRA, SBRA, NSRA, KX, KY (Normally closed)

BTM7, BTS7 and BTS7.1 Stainless Steel Thermostatic Clean Steam Traps

PC10HP Pipeline Connector (ASME 600)

Airodyn, BRair and BRoil Compressed Air Drain Traps

S and SF Inverted Bucket Steam Traps

TDC46M, TDS46M and UTDS46M Thermodynamic Steam Traps with Maintainable Seat Installation and Maintenance Instructions

Fig 7, 33, 33.1, 34, 34HP, 36, 36HP, 37, 3616 and Fig 3716 Flanged Strainers Installation and Maintenance Instructions

CS10-1 Stainless Steel Clean Steam Separator

BCV31 DN20 - Blowdown Control Valve

TD62LM and TD62M Thermodynamic Steam Traps with Replaceable Seats

QuickHeat TM Packaged Heat Exchanger Solutions

TW Temperature Control Valve

MPC1M, MPC2M and MPC2AM Monnier High Efficiency Compressed Air Filter / Regulators

Blowdown vessels Meeting the requirements of HSE PM60

M33F ISO, M33S ISO and M33V ISO Ball Valves Installation and Maintenance Instructions

TD62LM and TD62M Thermodynamic Steam Traps with Replaceable Seats Installation and Maintenance Instructions

FT53, IFT53, FT54, IFT54, FT57 and IFT57 Ball Float Steam Traps - DIN

CA10S, CA14 and CA14S Air and Gas Traps

BT6-B Sanitary Balanced Pressure Thermostatic Steam Trap

AE50S Automatic Air and Gas Vent for Liquid Systems Installation and Maintenance Instructions

BPT13 Balanced Pressure Thermostatic Steam Traps

M10HTi ISO Tobacco Ball Valve Screwed, SW, BW and Flanged versions

M111 Spiraflo Transducer

Vane Flow Switches Colima FLU Series

M70i ISO and M80i ISO Stainless Steel Ball Valves for Sanitary Systems Installation and Maintenance Instructions

Type 130 and HL10 'Safeguard High Limit Control' Installation and Maintenance Instructions

BDV1 and BDV2 Blowdown / Depressurisation Valves

SRV2S Pressure Reducing Valve

Thermocirc Installation and Maintenance Instructions

BRV71 and BRV73 Pressure Reducing Valves

SCA Series Inverted Bucket Steam Traps

Fig 1, Fig 12, Fig 13, Fig 14, Fig 16 and Fig 16L Strainers Installation and Maintenance Instructions

IP2M, IP2AM and IP2DM Monnier International Compressed Air Filter/ Regulators

FT16 Ball Float Steam Trap Installation and Maintenance Instructions

TD45 Thermodynamic Steam Trap Installation and Maintenance Instructions

USM21 Sealed Bimetallic Steam Trap for use with Pipeline Connectors Installation and Maintenance Instructions

A3S Bellows Sealed Stop Valve Installation and Maintenance Instructions

Spirax SafeBloc TM DBB3 Double Block and Bleed Bellows Sealed Stop Valve. 1. Safety information. 2. General product information. 3.

AVS32 Stainless Steel Air Vent for Steam Systems Installation and Maintenance Instructions

LP31 Level Probe. 1. Safety information. 2. General product information. 3. Installation. 4. Wiring. 5. Maintenance

CA16 and CA16S-14 Air and Gas trap Installation and Maintenance Instructions

FT43, FT44, FT46 and FT47 Ball Float Steam Traps Installation and Maintenance Instructions

LP10-4 Level Probe. 1. Safety information. 2. General product information. 3. Installation. 4. Wiring. 5. Maintenance IM-P402-92

M45 ISO Ball Valve DN25 to 150 Installation and Maintenance Instructions

SRV461S and SRV463S Stainless Steel Direct Acting Pressure Reducing Valves

BTD52L Thermodynamic Steam Trap Installation and Maintenance Instructions

BCVi43 Blowdown Control Valve

1. General safety information. 2. General product information. 3. Installation. 4. Commissioning. 5. Operation. 6. Maintenance. 7.

TD10, TD52M and TD259 Thermodynamic Steam Traps Installation and Maintenance Instructions

PC3000, PC3001 and PC4000, PC4001 Pipeline Connectors

STD Spray Type Desuperheater

FTC62 and FTS62 Ball Float Steam Traps Installation and Maintenance Instructions

STERI-TROL Clean Service 'S' Series Two-port Control Valves DN15 (½") to DN100 (4")

Colima TOR Magnetic Level Switches

Installation, Operating and Maintenance Instructions. V914 Cast Iron Flanged Swing Check Valve V914

UBP32 Sealed Balanced Pressure Thermostatic Steam Trap for use with PC_ Pipeline Connectors Installation and Maintenance Instructions

Transcription:

4050150/8 IM-P405-31 EMM Issue 8 BDV60 Blowdown Vessel Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning 5. Operation 6. Maintenance 7. Spare parts Copyright 2017 IM-P405-31 EMM Issue 8 1 Printed in GB

2 IM-P405-31 EMM Issue 8

1. Safety information Spirax Sarco products are designed, manufactured and tested to exacting standards to meet modern system requirements. Safe operation of the unit can only be guaranteed if it is properly installed, commissioned and maintained by a qualified person (see Section 1.10 on page 5) in compliance with the operating instructions. General installation and safety instructions for pipeline and plant construction, as well as the proper use of tools and safety equipment must also be complied with. The product is designed and constructed to withstand the forces encountered during normal use. Use of the product for any other purpose, or failure to install the product in accordance with these Installation and Maintenance Instructions, could cause damage to the product, will invalidate the fatality to personnel. marking, and may cause injury or 1.1 Intended use Referring to these Installation and Maintenance Instructions, name-plate and Technical Information Sheet, check that the product is suitable for the intended use/application. The products listed below comply with the requirements of the European Pressure Equipment Directive 2014/68/EU and carry the the following Pressure Equipment Directive categories: mark. The products fall within Product Group 2 gases BDV60/3 3 BDV60/4 3 BDV60/5 4 BDV60/6 4 BDV60/8 4 BDV60/10 4 IM-P405-31 EMM Issue 8 3

i) The products have been specifically designed for use with steam which is in Group 2 of the above mentioned Pressure Equipment Directive. The product's use on other fluids may be possible but, if this is contemplated, Spirax Sarco should be contacted to confirm the suitability of the product for the application being considered. ii) Check material suitability, pressure and temperature and their maximum and minimum values. If the maximum operating limits of the product are lower than those of the system in which it is being fitted, or if malfunction of the product could result in a dangerous overpressure or overtemperature occurrence, ensure a safety device is included in the system to prevent such over-limit situations. iii) Determine the correct installation situation and direction of fluid flow. iv) Spirax Sarco products are not intended to withstand external stresses that may be induced by any system to which they are fitted. It is the responsibility of the installer to consider these stresses and take adequate precautions to minimise them. v) Remove protective covers from all connections and protective film from all nameplates, where appropriate, before installation on steam or other high temperature applications. 1.2 Access Ensure safe access and if necessary a safe working platform (suitably guarded) before attempting to work on the product. Arrange suitable lifting gear if required. 1.3 Lighting Ensure adequate lighting, particularly where detailed or intricate work is required. 1.4 Hazardous liquids or gases in the pipeline Consider what is in the pipeline or what may have been in the pipeline at some previous time. Consider; flammable materials, substances hazardous to health, extremes of temperature. 1.5 Hazardous environment around the product Consider; explosion risk areas, lack of oxygen (e.g. tanks, pits), dangerous gases, extremes of temperature, hot surfaces, fire hazard (e.g. during welding), excessive noise, moving machinery. 1.6 The system Consider the effect on the complete system of the work proposed. Will any proposed action (e.g. closing isolation valves, electrical isolation) put any other part of the system or any personnel at risk? Dangers might include isolation of vents or protective devices or the rendering ineffective of controls or alarms. Ensure isolation valves are turned on and off in a gradual way to avoid system shocks. Ensure that any pressure is isolated and safely vented to atmospheric pressure. Consider double isolation (double block and bleed) and the locking or labelling of closed valves. Do not assume that the system has depressurised even when the pressure gauge indicates zero. 4 IM-P405-31 EMM Issue 8

1.7 Temperature Allow time for temperature to normalise after isolation to avoid danger of burns. 1.8 Tools and consumables Before starting work ensure that you have suitable tools and/or consumables available. Use only genuine Spirax Sarco replacement parts. 1.9 Protective clothing Consider whether any protective clothing is required by yourself and/or others in the vicinity to protect against the hazards of, for example, chemicals, high/low temperature, noise, falling objects, and dangers to eyes and face. 1.10 Permits to work All work must be carried out or be supervised by a suitably competent person. Installation and operating personnel should be trained in the correct use of the product according to these instructions. Where a formal 'permit to work' system is in force it must be complied with. Where there is no such system, it is recommended that a responsible person should know what work is going on and, where necessary, arrange to have an assistant whose primary responsibility is safety. Post 'warning notices' if necessary. 1.11 Handling Manual handling of Spirax-Sarco products may present a risk of injury. Lifting, pushing, pulling, carrying or supporting a load by bodily force can cause injury particularly to the back. You are advised to assess the risks taking into account the task, the individual, the load and the working environment and use the appropriate handling method depending on the circumstances of the work being done. 1.12 Residual hazards In normal use the external surface of the product may be very hot. If used at the maximum permitted operating conditions the surface temperature of blowdown vessels may reach a temperature approaching 171 C (340 F). Many products are not self-draining. Take due care when dismantling or removing the product from an installation (refer to 'Maintenance Instructions'). 1.13 Freezing Provision must be made to protect products which are not self-draining against frost damage if they are inoperative in environments where they may be exposed to temperatures below freezing point during shutdown. The vessel should be thoroughly defrosted prior to use. Trace heating should be considered under servere environmental conditions, in order to prevent the operating temperature of the vessel dropping below -10 C (14 F) during service. IM-P405-31 EMM Issue 8 5

1.14 Disposal This product is recyclable and no ecological hazard is anticipated with its disposal providing due care is taken. 1.15 Returning products Customers and stockists are reminded that under UK and EC Health, Safety and Environment Law, when returning products to Spirax Sarco they must provide information on any hazards and the precautions to be taken due to contamination residues or mechanical damage which may present a health, safety or environmental risk. This information must be provided in writing including Health and Safety Data Sheets relating to any substances identified as hazardous. 6 IM-P405-31 EMM Issue 8

2. Product safety information The following information is specific to this product and should be read in conjunction with the General Safety Information - Section 1. Warning If this product is not used in the manner specified by this IMI, then the protection provided may be impaired. 2.1 Overpressure protection The outlet flash steam connection should not be restricted in any way that would cause a rise in the vessel pressure above ambient conditions. Therefore no pressure safety device need be fitted to this vessel. 2.2 Guard rail The vessel may need a guard rail and/or mesh screen to prevent injury caused by accidental contact with the hot vessel or pipework. 2.3 Associated equipment Please ensure that you make reference to the technical/installation information for equipment coupled to this vessel to avoid any possible operational difficulties with associated equipment. IM-P405-31 EMM Issue 8 7

3. Product information 3.1 General information Spirax Sarco products are designed, manufactured and tested to exacting standards to meet modern system requirements. Where applicable, they satisfy current safety and design codes and users can expect long service life when products are selected, installed and maintained in accordance with Spirax Sarco recommendations. BDV60 blowdown vessels are designed and constructed to comply with the European Pressure Equipment Directive 2014/68/EU. These vessels are particularly suited to accept manual/automatically controlled bottom blowdown, manually controlled bleed valves for continuous blowdown, automatically controlled valves and control systems for TDS, vessels and ancillaries and heat recovery equipment. This Installation and Maintenance Instruction document provides comprehensive information on operation, installation and maintenance and should be read prior to commencing work on the product. 3.2 Technical data Materials of construction Paint finish Carbon steel Temperature resistant silver paint 3.2 Pressure/temperature limits Please note: For the application of boiler blowdown and to comply with the HSE Guidance Note PM60 the vessel internal pressure should not exceed 0.35 bar g (5 psi g). Body design conditions PN16 Maximum design pressure 7 bar g @ 171 C (101 psi g @ 340 F) Maximum design temperature 171 C @ 7 bar g (340 F @ 101 psi g) Minimum design temperature -10 C (14 F) Maximum operating pressure re. PM60 0.35 bar g (5 psi g) Maximum operating temperature re. PM60 109 C (228 F) Minimum operating temperature 0 C (32 F) Designed for a maximum cold hydraulic test pressure of 11 bar g (160 psi g) Note: This test is in accordance with the European Pressure Equipment Directive 2014/68/EU 8 IM-P405-31 EMM Issue 8

Conforms to Ped 2014/68/EU Category Fig. 1 Typical name-plate details IM-P405-31 EMM Issue 8 9

4. Installation Before actioning any installation observe the 'Safety information' in Sections 1 and 2. Ensure that any permanent plugs supplied with the vessel are fitted securely, both at ambient and operating temperatures. The vessel must be mounted with the flash steam outlet uppermost, as shown in Figure 2. Each vessel incorporates a " BSP screwed boss for a pressure gauge, U-syphon and cock. Please refer to Table 1 for the numbers of legs and bolt holes. The outlet flash steam connection should not be restricted in any way that would cause a rise in the vessel pressure above ambient conditions. Therefore no pressure safety device need be fitted to this vessel. Table 1 Fixing bolts Vessel feet have a pre-drilled hole for fixing bolts (diameters are as stated):- Blowdown vessel No. of Legs PCD of bolt holes BDV60/3 3 Ø19 mm (¾") on a 436 mm PCD BDV60/4 3 Ø19 mm (¾") on a 537 mm PCD BDV60/5 3 Ø19 mm (¾") on a 681 mm PCD BDV60/6 3 Ø19 mm (¾") on a 833 mm PCD BDV60/8 4 Ø19 mm (¾") on a 1127 mm PCD BDV60/10 4 Ø19 mm (¾") on a 1425 mm PCD 4.1 Positioning: - Use the lifting lugs to position the vessel. - Ensure there is access to the inspection opening. - Remove all plastic plugs and blanks from the vessel connections. - Plug or blank off connections which are not to be used. WARNING: Do not blank off the vent or the outlet connections. - Use a spirit level to check that the blowdown vessel is perfectly vertical. This is essential for optimum performance. Use a non-compressible packing under the legs if necessary. 4.2 Mating of vessel pipework on site We offer as much guidance and technical detail as possible for the vessel to help with connection to system pipework/valves. When making the final connections between the blowdown vessel and the system pipework please use any technical documents that refer to individual porting dimensions as a guide only and use the final position of the vessel to match up the individual ports to the system pipework for level and mating accuracy. 4.3 Inlet layout Install the inlet pipework at a lower level than the vessel. This ensures that the blowdown line remains flooded, minimising the effect of waterhammer. Ensure the proper use of stop valves and check valves, or the combination of both to avoid adverse interaction between different supply lines to and from the vessel. (Refer to the HSE, PM60 for full details). 10 IM-P405-31 EMM Issue 8

Note: Inlet 1 should only be used for the main blowdown from the bottom of the boiler. Inlets 2 and 3 are interchangable, between level control chamber/gauge glass blowdown and TDS blowdown. Inlet number 3 for level control chamber or TDS blowdown. Inlet number 2 for discharges from automatic TDS control system or level control chamber/gauge glass blowdown. Lifting lugs for safe positioning of vessel on site. Vent head with internal separator removes moisture from the steam. This is only a representation of a possible set-up, the product may have 3 or 4 legs and the inspection port may be different on the product. Pressure gauge and 'U' syphon for monitoring operation. DCV2 Check valve control M21S2 Ball valve Oval inspection opening Outlet to drain maintains internal standing water level to cool incoming blowdown. Line drain valves for emptying a shutdown boiler. Cooling water system for applications where blowdown is very frequent. Vessel drain valve for clearing sludge from the blowdown vessel. Inlet number 1 for main blowdown from the bottom of the boiler only. Fig. 2 Typical features of a blowdown vessel Note: The BDV60/6, BDV60/8 and BDV60/10 have two inspection openings, one towards the top and a lower one at 180. IM-P405-31 EMM Issue 8 11

4.4 Vent layout Install the vent pipe vertically if possible. If it has to run horizontally then it should have a slight slope to drain back to the vessel. It should not join other vent lines. WARNING: Do not fit a check valve or stop valve in the vent line. It is useful to fit a spool piece between the vessel and vent pipework, which can be removed to facilitate blanking-off for hydraulic testing. We strongly recommend the use of a Spirax Sarco vent head to maximise the separation of any entrained water thereby offering protection to nearby personnel and buildings. Connect the vent head drain to waste, ideally with an air break, which could take the form of a tundish. Do not connect it into the blowdown vessel. 4.5 Outlet Connect the outlet to drain, which must be at a lower level than the vessel. WARNING: Do not fit a stop valve or a check valve in the outlet pipework. It is useful to fit a spool piece between the vessel and the outlet pipework, which can be removed to facilitate blanking-off for hydraulic testing. 4.6 Cooling water system All vessels are fitted with two connections for a cooling water system, one for a temperature controller and one for cooling water. Install the temperature controller as described in the relevant Installation and Maintenance Instructions supplied with the product. Set the controller to operate at a temperature below 43 C (109.4 F) in the UK, as this is the maximum temperature at which water may be discharged to drain. 4.7 Paint finish The vessel is protected with one coat of silver paint which would be deemed suitable for protection during transit or for vessels located within the boiler house. For vessels stored or used in external locations more appropriate protection such as additional paint finish or insulation will need to be considered - See Section 4.8. 4.8 Frost protection If the vessel is located outdoors there should be some consideration for vessel temperature protection, guarding against the water reservoir freezing. Provide trace heating in extreme cases. 12 IM-P405-31 EMM Issue 8

5. Commissioning Before putting the unit into service, ensure that: - Permanent plugs are tight; Tighten these when the vessel has reached normal operating temperature. Caution! The maximum operating temperature is 171 C @ 7 bar g (340 F @ 101 psi g). - All connections to adjoining pipework/plant are sound and secured so that no external stresses are introduced into the unit. - No extraneous objects/material is present within the vessel. - The vessel is filled with a standing level of water. 6. Operation Operation of the blowdown vessel is inherently simple and no special operating instructions are required. The vessel allows for the safe expansion of hot water from high to lower pressures with the accompanying production of flash steam. Before use and after draining/flushing the vessel, it must be replenished to its normal working level (level with the outlet on the centreline of the vessel shell) by introducing fresh water until it discharges at the outlet. On a precautionary note, vessels are designed to operate at high temperatures and care should be taken to avoid personal injury as vessels are normally unlagged to dissipate heat. We recommend that the pressure gauge is checked during bottom blowdown. If it indicates more than 0.35 bar g (5 psi g) then it may indicate that the vent or outlet is blocked, a situation demanding immediate attention. WARNING: The stop valve at the vessel/manifold must be in the fully open position before operating/testing any bottom blowdown valve, auto TDS control system, level control system, etc. that may drain into the vessel. This is particularly important in the case of level control systems, as level controls may appear to be working correctly but in reality will be untested, and may be faulty. Operating conditions Spirax Sarco blowdown vessels are designed to operate up to: 7 bar g @ 171 C (101 psi g @ 340 F) They have a minimum operating temperature of: 0 C (32 F) IM-P405-31 EMM Issue 8 13

7. Maintenance WARNING: Isolate the vessel by closing and securing stop valves on blowdown lines at the vessel inlet, closing all boiler blowdown valves and opening any line valves (i.e. double block and bleed principle). Repairs to pressure vessels are not recommended as specialist design procedures and welding operations are required, together with reinspection by a qualified competent person. 6 month intervals The vessel must be drained every 6 months to remove concentrated blowdown water/ sludge. Any accumulation of sludge within the vessel must be cleared by passing a hose through the inspection/access hatch and flushing with the drain valve open. Before reusing, after draining/flushing the vessel, it must be replenished to its normal working level (level with the outlet on the centreline of the vessel shell) by introducing fresh water until it discharges at the outlet. 14 month intervals Blowdown vessels should be thoroughly examined by a 'competent person' every 14 months or at every major boiler inspection. An examination would normally include a visual examination of the internal surfaces of the vessel to ensure that there is no excessive corrosion, erosion, or scaling, and a check for scaling or other obstruction in the vessel vent, outlet or outlet anti-syphon hole. It is the task of the competent person to determine which checks to carry out, and the necessary action to be taken. Fit a new gasket to the inspection opening every time the cover is removed (see Section 8, Spare parts). The Table below gives detail of inspection port openings for each model: Vessel designation BDV60/3, BDV60/4, BDV60/5 BDV60/6, BDV60/8, BDV60/10 Inspection port opening Handhole size 150 x 100 mm oval 2 x hole size 150 x 100 mm oval Note: Vessels should be included in a written scheme of examination compiled by a suitably qualified competent person who is responsible for determining the frequency of examination. 14 IM-P405-31 EMM Issue 8

8. Spare parts Gaskets are the only available spares for blowdown vessels: Available spares - Inspection opening gaskets Vessel type BDV60/3 BDV60/4 BDV60/5 BDV60/6 BDV60/8 BDV60/10 Outside dimensions 180 x 130 mm Outside dimensions 180 x 130 mm 1 off Torus gasket Spirax Sarco Part no. 4050181 2 off Torus gasket Spirax Sarco Part no. 4050181 How to order spares Example: 1 off Inspection opening gasket for a BDV60/3 - Spirax Sarco Part no. 4050181. IM-P405-31 EMM Issue 8 15

16 IM-P405-31 EMM Issue 8