NON-CONDESABLE GASES AT THE MIRAVALLES GEOTHERMAL FIELD

Similar documents
Chapter 8: Reservoir Mechanics

Gas Gathering System Modeling The Pipeline Pressure Loss Match

OLGA Modeling Results for Single Well Reinjection of Non-Condensable Gases (NCGs) and Water

Recovery from a Process Saturation Condition. Benefits of Using DeltaV PIDPlus

Measurement of Velocity Profiles in Production Wells Using Spinner Surveys and Rhodamine WT Fluorescent Tracer; Geothermal Field (California)

Well Testing and Modelling of Discharging Big Bore and Super Big Bore Wells

Interpretation of Parameters for Monitoring Wells during the Discharge Test of NWS-9D

DISTILLATION COLUMN PROCESS CONTROL STRATEGIES

Characterizers for control loops

Applied Technology and Best Practices in CEE. Conference

Transient Analyses In Relief Systems

Numerical Simulation of Instability of Geothermal Production Well

LP Separator Level Control by Variable Speed and Multi Stage Brine Reinjection Pumps at Kawerau and Nga Awa Purua Geothermal Projects, New Zealand

GAS LIFT IN NEW FIELDS

Caltec. The world leader in Surface Jet Pump (SJP) and compact separation systems for upstream oil and gas production enhancement

PURE SUBSTANCE. Nitrogen and gaseous air are pure substances.

A NEW PROCESS FOR IMPROVED LIQUEFACTION EFFICIENCY

Basic concepts of phase behavior

Flow meter. bellow vaporizer. APL valve. Scavenging system

IMPROVING PLANT AERATION USING GAS INFUSION TECHNOLOGY

S-CO 2 Brayton Recompression Loop Design and Control

Steam penetration in steam sterilization processes

Distributed Acoustic Sensor for Oil and Gas

Gas Vapor Injection on Refrigerant Cycle Using Piston Technology

EXAM # 2. First Name Last Name CIRCLE YOUR LECTURE BELOW: INSTRUCTIONS

FT28_mks.qxp 21/11/ :06 Page 1

2007 Gas-Lift Workshop

1 PIPESYS Application

Preventing unstable operation of a synthesis compressor using Dynamic System Simulation

CERTIFICATES OF COMPETENCY IN THE MERCHANT NAVY MARINE ENGINEER OFFICER

CTB3365x Introduction to Water Treatment

DISCHARGE OF GEOTHERYAI, WELLS

Advanced Intermittent Gas Lift Utilizing a Pilot Valve

SPIROVENT VACUUM DEGASSERS

Reduce Turnaround Duration by Eliminating H 2 S from Flare Gas Utilizing VaporLock Scrubber Technology

16. Studio ScaleChem Calculations

GEOTHERMAL WELL COMPLETION TESTS

Chapter 4, Problem 30.

COMPRESSORS WITH SIDE STREAM

Effect of noise in the performance of the transducers in an ultrasonic flow meter of natural gas

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS

Two types of physical and biological standards are used to judge the performance of the Wheeler North Reef 1) Absolute standards are measured against

Removing nitrogen. Nitrogen rejection applications can be divided into two categories

H o w t o U s e a R e g u l a t o r t o R e d u c e T i m e D e l a y i n a n A n a l y t i c a l S y s t e m

Digester Processes. 1. Raw Sludge Pumping System

Analysis and Modeling of Vapor Recompressive Distillation Using ASPEN-HYSYS

RESERVOIR DRIVE MECHANISMS

CHE 306 Stagewise Operations

Ball Beating Lubrication in Refrigetation Compressors

Optimizing Compressed Air Storage for Energy Efficiency

LEAP CO 2 Laboratory CO 2 mixtures test facility

STUDY OF SLUG CONTROL TECHNIQUES IN PIPELINE SYSTEMS

1. INTRODUCTION. International Journal of Students Research in Technology & Management Vol 1 (05), September 2013, ISSN , pg

Potter Nitrogen Generators

- Introduction: a) Metallized Paper & Film :The market Outlook The following diagram shows the estimated usage of the main metallized materials

Pigging as a Flow Assurance Solution Avoiding Slug Catcher Overflow

Applications of a Magnetic Sector Process Mass Spectrometer to the Analysis of Variable Vacuum Samples

SECTION PRESSURE TESTING OF PIPING

/ /

Operating Guidelines for PermSelect Modules Liquid Contacting

Modelling of the Separated Geothermal Water Flow between Te Mihi flash plants

32 nd Gas-Lift Workshop. Optimizing Subsea Well Kick-off Operations Case Study Using FlowLift2

THERMODYNAMIC ASPECTS OF DEVELOPMENT OF GAS RESERVES CONFINED TO COMPACT DEEP-SEATED RESERVOIR BEDS

SPE Copyright 2012, Society of Petroleum Engineers

CHE 4115 Chemical Processes Laboratory 2 Experiment 1. Batch Distillation

Two-Stage Linear Compressor with Economizer Cycle Where Piston(s) Stroke(s) are Varied to Optimize Energy Efficiency

Intermittent Gas Lift Utilizing a Pilot Valve

Training Title IDENTIFY OPERATIONAL UPSETS, REVIEW & VALIDATE IN OIL & CHEMICAL PLANTS

Cycle Isolation Monitoring

Pipeline Flooding, Dewatering and Venting Dr Aidan O'Donoghue, Pipeline Research Limited, Glasgow, Scotland

Gas Transportation Planning System in the Department of Economy of Gazprom

PETROLEUM & GAS PROCESSING TECHNOLOGY (PTT 365) SEPARATION OF PRODUCED FLUID

Focus on VOC Emissions Reduction Using an Oxygen Based Inerting Control System For Inert Gas Blanketing of Chemical Process Vessels

TESTING AND ANALYZING ON P-V DIAGRAM OF CO 2 ROLLING PISTON EXPANDER

Th CO2 P05 Influencing The CO2-Oil Interaction For Improved Miscibility And Enhanced Recovery In CCUS Projects

CASE STUDY. Compressed Air Control System. Industry. Application. Background. Challenge. Results. Automotive Assembly

Pressure and Flow Control Valves DBGM, German and European Patents

Visual Observation of Nucleate Boiling and Sliding Phenomena of Boiling Bubbles on a Horizontal Tube Heater

POP Safety Valve. POP Safety Valve INTRODUCTION DEFINITIONS

IMPACT OF THE HELIUM SHORTAGE ON PROCESS GAS CHROMATOGRAPHS

Achievable Efficiency and Stability of Supercritical CO 2 Compression Systems

Atmospheric Waves James Cayer, Wesley Rondinelli, Kayla Schuster. Abstract

A GAS CORRECTION FOR THE SEPARATOR METHOD USED IN GEOTHERMAL WELL TESTING

+)) Lower Churchill Project RIPRAP DESIGN FOR WIND-GENERATED WAVES SNC LAVALIN. SLI Document No HER

Developments on Flow Rate And High Pressure Stability of Peroxide Dosing Pumps For The Chemical Industry

Under pressure pushing down

On-Stream Tightness Testing of Vacuum Process Installations

IBP2739_10 FIELD TEST OF A FLEXIBLE PIPE INTEGRITY MONITORING SYSTEM Jean-Philippe Roques 1, Benoit Balagué 1, Dominique Dion 2, Gregoire Audouin 2

MONITORING AND CONTROLS. BENEFITS OF VARIABLE FREQUENCY CONVERTERS (VFDs)

Thermodynamics ERT 206 Properties of Pure Substance HANNA ILYANI ZULHAIMI

OIL AND GAS PROCESSES AND EMISSIONS

A Conceptual Understanding of Leakage During Soil-Gas Sampling

2600T Series Pressure Transmitters Plugged Impulse Line Detection Diagnostic. Pressure Measurement Engineered solutions for all applications

Hydraulic and Economic Analysis of Real Time Control

FAQs about Directive 017

Petroleum Development

Procedure 1: Volume vs. Pressure 1.) Using the lap tops, go to the Physics Education Technology from the University of Colorado at:

Another convenient term is gauge pressure, which is a pressure measured above barometric pressure.

SENSITIVITY ANALYSIS OF THE FIRST CIRCUIT OF COLD CHANNEL PIPELINE RUPTURE SIZE FOR WWER 440/270 REACTOR

Well Test Design. Dr. John P. Spivey Phoenix Reservoir Engineering. Copyright , Phoenix Reservoir Engineering. All rights reserved.

Transcription:

PROCEEDINGS, Thirtieth Workshop on Geothermal Reservoir Engineering Stanford University, Stanford, California, January 31-February 2, 2005 SGP-TR-176 NON-CONDESABLE GASES AT THE MIRAVALLES GEOTHERMAL FIELD Paul Moya and Eddy Sánchez Instituto Costarricense de Electricidad, UEN Proyectos y Servicios Asociados C. S. Recursos Geotérmicos, Apartado Postal 10032-1000 San José, Costa Rica, Centro América e-mail: pmoya@ice.go.cr, esanchezr@ice.go.cr ABSTRACT The Miravalles Geothermal Field has been producing electric energy since March 1994. It has provided steam for Unit 1 (55 MWe) since 1994, a Wellhead Unit (5 MWe) installed in 1995, Unit 2 (55 MWe) in 1998, Unit 3 (29 MWe) in 2000 and Unit 5 (19 MWe, a binary plant) in year 2004. The total installed capacity (163 MWe) has been increasing since 1994, and so have the non-condensable gases in the steam. With these increases, the compressors at the generating units have reached their maximum gas capacity without ejectors, and therefore options to decrease the non-condensable gases have been analyzed. Field management strategies have been implemented in order to minimize the total amount of non-condensable gases that are sent to the generating units. INTRODUCTION The Miravalles geothermal field is located on the southwestern slope of the Miravalles volcano. The extent of the geothermal field already identified is greater than 21 km 2, of which about 16 km 2 are dedicated to production and 5 km 2 to injection. There are 53 geothermal wells (Figure 1), including observation, production and injection wells, whose depths range from 900 to 3,000 meters. The production wells produce between 3 and 12 MW each, and the injection wells each accept between 70 and 450 kg/s. The reservoir has a temperature of about 240 o C and is water-dominated (Moya, 2003). The Miravalles geothermal field has been producing since 1994. Normally, two or three production wells supply two-phase fluid to each separation station. Seven separation stations now supply the steam needed for Unit 1, Unit 2, Unit 3 and one active Wellhead Unit. At present there is a need to supply enough steam to produce 55 MWe (Unit 1), 5 MWe (Wellhead Unit), 55 MWe (Unit 2) and 29 MWe (Unit 3), for a total of 144 MWe. This capacity was increased to 163 MWe when a bottoming-cycle Figure. 1. Miravalles Geothermal Field. binary plant came online in January of 2004. As indicated in Table 1, two wellhead units from the Comisión Federal de Electricidad (Mexico) were in operation while Unit 2 was being built, but these have been decommissioned. Plant Name Power (MW) Belongs to Startup Final Unit 1 55 ICE 3/1994 WHU-1 5 ICE 1/1995 WHU-2 5 CFE 9/1996 4/1999 WHU-3 5 CFE 2/1997 4/1998 Unit 2 55 ICE 8/1998 Unit 3 29 ICE 3/2000 (BOT) Unit 5 19 ICE 1/2004 Table 1: Units at the Miravalles geothermal field. In Table 1, the abbreviations stand for: ICE - Instituto Costarricense de Electricidad; CFE - Comisión Federal de Electricidad (México); WHU - Wellhead Unit; and BOT build-operate-transfer.

NON-CONDENSABLE GAS EVOLUTION Data from the first wells drilled at the Miravalles geothermal field showed that there was a wide range of concentrations of non-condensable gases in the steam. As new wells were drilled, it was determined that, under natural conditions, the field s noncondensable gas content ranged from to % w/w. Figure 2b shows the natural distribution of non-condensable gas contents. In Figure 2a the values are disturbed by air-drilling, which had begun in 1992. 301000 a) 1994 b) 1995 300000 299000 298000 297000 296000 295000 PGM-05 PGM-10 PGM-46 PGM-20 PGM-12 PGM-17 PGM-03 PGM-21 PGM-11 PGM-01 PGM-31 PGM-46 PGM-20 PGM-05 PGM-10 PGM-17 PGM-12 PGM-01 PGM-31 PGM-03 PGM-21 PGM-11 1.5 1.4 1.3 1 294000 405000 406000 407000 408000 409000 405000 406000 407000 408000 409000 0 1000 2000 m Figure. 2. Distribution of non-condensable gases in 1994 and 1995 (% w/w in steam separated at 7 bar a) All values of non-condensable gas concentration presented here are in weight percent (weight/weight). In Figure 2b, it can be seen that in 1995 the noncondensable gases in the northern part of the field (at wells PGM-11and PGM-10) were 1 % and 8% respectively, in the central part (at PGM-46) they were 2 %, and in the southern zone (at well PGM-21) they were 6 %. Almost every well fell within the range mentioned above (Sánchez, 2004a). Non-condensable gas contents have been affected during commercial operation by the following factors: 1. The bubble effect, which takes place when drilling with aerated fluids (to protect open fractures) causes the upper layers of the reservoir to become richer in non-condensable gases, due to the carbon dioxide (CO 2 ) present in the reservoir as well as the nitrogen (N 2 ) provided by air injection when drilling. Figure 3 shows the non-condensable gas content behavior in well PGM-21 from 1994 to 2004. The gas content was close to 1.3 % initially and decreased a year later to around % (Figure 3, yellow box). A similar behavior of the non-condensable gases is shown in Figures 4 and 5, in which the wells PGM-10 (northern zone) and PGM-20 (southern zone), respectively, experienced an increase followed by a decrease within a year. 2. Changes in the hydrogeology of the system due to continuous exploitation cause fluids which may have high or low gas contents to move from one sector of the field to another.

3.2 Unit 1 Unit 1 & 2 Unit 1, 2 & 3 6,000 2.8 5,500 2.4 2.0 Westhern injection 5,000 4,500 4,000 3,500 3,000 2,500 Chloride (ppm) Gas % (w/w) in steam Chloride (ppm) Average Curve (gas % w/w in steam) 2,000 Figure. 3. History of non-condensable gases in well PGM-21 (% w/w in steam separated at 7 bar a) N2, CO2/10 (mmol/kg) 20 18 16 14 12 10 8 6 4 2 0 07-06-85 07-06-86 07-06-87 07-06-88 07-06-89 07-06-90 07-06-91 07-06-92 07-06-93 07-06-94 07-06-95 07-06-96 CO2/10 mmol/kg N2 mmol/kg Gas % (w/w) in steam Figure. 4. History of non-condensable gases in well PGM-10 (% w/w in steam separated at 7 bar a)

40 0 N2, CO2/10 (mmol/kg) 35 30 25 20 15 10 5 5 0 5 0 5 0 5 0 0 15-09-93 15-12-93 15-03-94 15-06-94 15-09-94 15-12-94 15-03-95 15-06-95 15-09-95 15-12-95 15-03-96 15-06-96 15-09-96 CO2/10 mmol/kg N2 mmol/kg Gas % (w/w) in steam Figure. 5. History of non-condensable gases in well PGM-20 (% w/w in steam separated at 7 bar a) 3. Injected fluids, which are degassed, travel back to some production sectors, causing a decrease in the non-condensable gases in those particular zones. In Figure 3 (green box) it can be seen that the noncondensable gases decreased from the end of the year 1999 to the end of 2004. The decrease coincided with an increase in the chloride content, also shown in Figure 3 (green box), which indicates that injected water was reaching that sector of the production zone 4. Sustained production due to continuous exploitation generates a pressure drawdown in the reservoir and an increase in the steam fraction. This increases the steam fraction, but at the same time increases the non-condensable gases in the steam. Figure 6 shows the behavior of the non-condensable gases in well PGM-10. The well was drilled during 1984, but air-drilling in the surrounding wells (PGM- 09 and PGM-31) increased the non-condensable gases to a value close to % in early 1994. The gases then began to decrease (until the end of 1997) and finally increased from the end of 1997 to the end of 2004. The increment in the non-condensable gases coincided with an increase in enthalpy values for the same period (1997 to 2004). In well PGM-10, the pressure drop (close to 2 bar/year from 1998 to 2003) caused the wellhead pressure to decrease, impeding PGM-10 from supplying its two-phase flow to the gathering system, which finally caused the well to stop producing. The bubble effect was transitory; that is, it increased the non-condensable gases up to 100% in some cases, but it disappeared within the following year, leaving non-condensable gas content of the particular zone at its natural level. The other three effects (hydrogeology, injected fluids and pressure drop) have been present since production started and have influenced the increase in non-condensable gases one way or another. Figures 7 and 8 show that, in several production wells and reservoir sectors (respectively), the non-condensable gases have been increasing from 1994 to 2004. It can be seen from these two figures that the non-condensable gas increase in the reservoir has taken place since the three major units (Units 1, 2 and 3) began been producing continuously. The bubble effect due to air-drilling, as well as the hydrogeologic effects and pressure decline caused by the continuous exploitation of the reservoir, have produced a strong increase in the non-condensable gases at the Miravalles geothermal field. Only the effect of injected fluids has tended to decrease the non-condensable gas content.

3.2 Unit 1 Unit 1 & 2 Unit 1, 2 & 3 1,600 2.8 2.4 2.0 Westhern injection 1,500 1,400 1,300 1,200 1,100 1,000 Enthalpy (Kj/Kg) 900 Gas % (w/w) in steam Enthalpy Average Curve (% gas in steam) Figure. 6. History of non-condensable gases in well PGM-10 (% w/w in steam separated at 7 bar a) 3.0 2.7 Unit 1 Unit 1 & 2 Unit 1, 2 & 3 2.4 2.1 1.8 1.5 Westhern injection PGM-10 PGM-11 PGM-63 PGM-07 PGM-45 PGM-62 PGM-01 Figure. 7. History of non-condensable gases from 1994 to 2004 (% w/w in steam separated at 7 bar a)

a) 1999 b) 2004 301000 PGM-14 300000 299000 298000 297000 296000 PGM-05 PGM-10 PGM-42 PGM-08 PGM-43 PGM-17 PGM-60 PGM-11 PGM-01 PGM-31 PGM-45 PGM-03 PGM-46 PGM-49 PGM-47 PGM-20 PGM-21 PGM-12 PGM-62 PGM-63 PGM-05 PGM-10 PGM-65 PGM-42 PGM-01 PGM-31 PGM-08 PGM-66 PGM-44 PGM-43 PGM-17 PGM-03 PGM-45 PGM-46 PGM-19 PGM-49 PGM-47 PGM-20 PGM-21 PGM-12 PGM-60 PGM-11 PGM-07 3 2.8 2.6 2.4 2.2 2 1.8 1.4 1 295000 294000 405000 406000 407000 408000 409000 405000 406000 407000 408000 409000 0 1000 2000m Figure. 8. Distribution of non-condensable gases from 1999 to 2004 (% w/w in steam separated at 7 bar a) FIELD STRATEGIES The continuous exploitation of the reservoir has tended to increase the non-condensable gases in the reservoir, which in turn has provoked the establishment of a program of detailed monitoring of the non-condensable gases at each well in order to determine the principal causes of the increase, and also the implementation of injection and production strategies to improve the current operating conditions. The studies that have been carried out have indicated that the principal cause of the increase in noncondensable gases is the pressure decline of the reservoir. In order to minimize this tendency, three different strategies have been or will be implemented. First, by increasing the volume of fluids injected in the western sector (wells PGM-22 and PGM-24), it was possible to decrease the non-condensable gases in the vicinity of well PGM-45 and also in all of the wells located in the western sector. Figure 9 shows that well PGM-45 had a trend of increasing noncondensable gases from early 1999 to late 2003. Diverting more fluid to the western sector caused an immediate decrease in the non-condensable gases reported in this well (a positive effect). Also, the enthalpy began to decrease as a consequence of the arrival of injected fluids in the reservoir near well PGM-45. Since positive results have been obtained by injecting hot fluids in the western and southern parts of the production zone, in the near future it is planned to inject more hot fluids into PGM-63, which could contribute to stopping the current pressure drop as well as decreasing the non-condensable gases in the northern zone. Wells such as PGM-01, PGM-10 and also PGM-63 were initially production wells (in 1994), but due to the pressure drop in the northern zone they have had to be taken out of production. Second, the studies carried out have indicated that the non-condensable gases were increasing rapidly in the northern part of the production zone, that is, near wells PGM-11, PGM-60 and PGM-62. It has been necessary to produce these wells at a minimum flow rate in order to reduce the pressure drop and consequently the non-condensable gas contents. The resulting deficit in steam supply for Unit 3 (located in

the northern sector) is compensated for by steam from the central part of the field. This strategy has at least allowed the non-condensable gas content in that particular area to be kept constant. Third, two existing acidic wells (PGM-02 and PGM-06) are planned to be placed online to extract fluids from the acidic zone instead of the main production zone. The production from the acidic zone will add to the steam supply in the northern zone (Unit 3), and will stabilize or slow down the pressure decline and consequently moderate the increase in noncondensable gas content in that sector of the reservoir. 3.2 1,600 Unit 1 Unit 1 & 2 Unit 1, 2 & 3 2.8 2.4 2.0 Westhern injection 1,500 1,400 1,300 1,200 1,100 1,000 Entalpy (Kj/Kg) 900 Gas % (w/w) in steam Enthalpy Average Curve (gas % w/w in steam) Figure. 9. History of non-condensable gases in well PGM-45 (% w/w in steam separated at 7 bar a) IMPROVEMENTS The strategies described in the above section have allowed optimization of the available steam supply for the generating plants. A new strategy has been established for managing the steam supply from the field. Initially (in 1994) there was no particular strategy for supplying steam to the various units, but now it is important to manage the supply based on non-condensable gas contents, in order to maximize the final power output. The compressor capacities for the main units are 6% (Unit 1), 8% (Unit 2) and 1.5 % (Unit 3). If the non-condensable gas content is higher than the compressor capacity, then the ejectors provide the extra capacity needed to process the steam. Unfortunately, the ejectors require some of the supplied steam to operate, decreasing the efficiency of the energy generation. Higher compressor capacities were specified for the new units coming online, but nevertheless those capacities are becoming too small to process the current levels of non-condensable gases being sent to the units. Initially, separation stations 1, 2 and 3 supplied their steam to Unit 1, while separation stations 4, 5 y 6 supplied their steam to Unit 2. Separation station 7 supplies steam to Unit 3, but this unit can also receive steam from a pipeline coming from separation station1. Figure 10 indicates that, by the end of 2003, the compressor capacity of Unit 1 (6%) was insufficient for the non-condensable gases coming from separation stations 1 (6%), 2 (%) and 3 (6%), with a weighted average of 4%. On the other hand, the compressor capacity of Unit 2

(8%) was much higher than the capacity required for the steam from separation stations 4 (7%), 5 (5%) and 6 (4%), with an average of 8%. After studying the case and looking for the best option, it was decided to interchange separation stations 1 and 4. Beginning in early 2004 the steam coming from separation station 1 was sent to Unit 2 and vice versa, that is, the steam from separation station 4 was sent to Unit 1. The interchange resulted in a better distribution of the non-condensable gases among the compressors (Figure 11). % gas w/w in steam at 7,0 bar a 1.8 1.7 1.5 1.4 1.3 6 0 6 4 7 5 4 8 8 8 Satellite 1 Satellite 2 Satellite 3 Unit 1 Satellite 4 Satellite 5 Satellite 6 Unit 2 Satellite 7 Gas extraction capacity: Compressor Compressor + Ejectors Unit 3 Figure. 10. Non-condensable gases per satellite in 2003 (% w/w in steam separated at 7 bar a) % gas w/w in steam at 7,0 bar a 1.8 1.7 1.5 1.4 1.3 6 6 3 1 7 8 3 1.43 1.43 Satellite 4 Satellite 2 Satellite 3 Unit 1 Satellite 1 Satellite 5 Satellite 6 Unit 2 Satellite 7 Unit 3 Gas extraction capacity: Compressor Compressor + Ejectors Figure. 11. Non-condensable gases per satellite in 2004 (%w/w in steam separated at 7 bar a) The effect of the switch can be observed in Figures 12 and 13. Figure 12 shows the measured noncondensable gas data, the average curve for the measured data and the maximum compressor capacity at Unit 1. Once the interchange was made, a decrease in the total non-condensable gas content was

observed (Figure 12). In contrast, Figure 13 shows an inverse effect, that is, an increase occurred after switching the non-condensable gases from the separation stations 1 and 4. Since the noncondensable gas content in the reservoir keeps increasing, due to continuous exploitation, the gas content at the three units has consequently increased (Figures 12, 13 and 14). Even though interchanging the separation stations had a positive effect, at present the non-condensable gas contents are getting close to the maximum compressor capacities at Units 1, 2 and 3 (Figures 12, 13 and 14). In order to fully utilize the compressor capacities at Units 1 and 2, there is the option of installing a set of valves (upstream of the steam collectors of these Units) that would allow the steam from separation stations 1 and 4 to be variably distributed to Units 1 and 2. This would permit the non-condensable gas levels to be matched as closely as possible to the available compressor capacities. The second and most expensive option would be to increase the non-condensable extraction capacity of the main units. This can be done by: a) increasing the current capacity of the compressor (improving it), b) adding a vacuum pump to the system, c) increasing the existing ejectors (increasing the amount of steam required per ejector), or d) buying a new compressor with the required capacity. Unit 1, Steam Collector Interchange: Satellite 1 by Satellite 4 Gas % (w/w) in steam Compressor capacity Average curve (gas % in steam) Figure. 12. History of non-condensable gases at Unit 1 (% w/w in steam separated at 7 bar a)

Unit 2, Steam Collector Interchange: Satellite 1 by Satellite 4 Gas % (w/w) in steam Compressor capacity Average curve (gas % in steam) Figure. 13. History of non-condensable gases at Unit 2 (% w/w in steam separated at 7 bar a) 1.5 1.4 1.3 Gas % (w/w) in steam Compressor capacity Average curve (gas % in steam) Figure. 14. History of non-condensable gases at Unit 3 (% w/w in steam separated at 7 bar a) (Sánchez, 2004b).

FINAL REMARKS Air-drilling caused a temporary increase in noncondensable gases in the Miravalles reservoir that lasted for about a year. The arrival of the injected fluids to some production sectors has contributed to a decrease of the noncondensable gases in those sectors. So far, most of the production wells in the western and southern sectors have been benefited from hot injection. Hot fluid injection into PGM-63 should contribute to stopping the current pressure drop as well as decreasing the non-condensable gases in the northern zone. Minimum flow production from the wells located in the northern sector has at least allowed the noncondensable gas content in that particular area to be kept constant. Wells PGM-02 and PGM-06 are planned to be placed online to extract fluids from the acidic zone instead of the northern sector. This will allow a reduction of both, the pressure drop and the non-condensable gases in this part of the reservoir. The pressure drop in the reservoir, due to continuous exploitation, is the principal cause of the increase in the non-condensable gas content of the system. Interchanging the fluids from separation stations 1 and 4 contributed to obtaining a better distribution of the non-condensable gases at Units 1 and 2. At the present non-condensable gas levels, the compressors of the main units are very close to their maximum capacities. The trend of increasing noncondensable gases suggests that in the near future the current compressor capacities will be exceeded. A set of valves installed upstream of the steam collectors of Units 1 and 2 will allow diversion of part of the non-condensable gases to the compressor that is not operating at its maximum capacity, thus optimizing the current compressor capacities. Under normal exploitation of the reservoir, it is expected that the trend of increasing non-condensable gas contents is going to persist. Investments in higher extraction capacities are foreseen at the generating units. Sánchez, E. (2004a), "Evaluación y tendencias del contenido de gases en el vapor entregado a las unidades 1 y 2 de Miravalles, periodo 2000-2004, ICE Internal Report, Equipo de Geoquímica, Area de Geociencias, 18 de setiembre de 2004. Sánchez, E. (2004b), "Evaluación del contenido de gas en el vapor entregado a la Unidad 3 de Miravalles y pozos del Satélite 7, causas y consecuencias, ICE Internal Report, Equipo de Geoquímica, Area de Geociencias, 31 de octubre de 2004. ACKNOWLEDGEMENTS The authors thank Roger Henneberger (GeothermEx, Inc.) for editing and improving the manuscript. REFERENCES Moya, P., (2003), "The Costa Rican Geothermal Energy Development, The IERE Central America Forum Transnational Electrical Interconnections and Sustainability in Central America, Session 2, November 24-25, 2003. San José, Costa Rica.