As temporary grade control facilities along waterways until final stabilization is established.

Similar documents
Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam.

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 4 OVER THE BEAVER RIVER ST. LOUIS COUNTY

ROAD OCCUPANCY PERMIT APPLICATION # Damascus Township, 60 Conklin Hill Road, Damascus, PA Tel Fax

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 133 OVER A DITCH ST. LOUIS COUNTY

Huntington District. For More Information Contact (304)

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO OVER THE STRAIGHT RIVER DISTRICT 6 - RICE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY

Sediment Basin 7E-12. Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures BENEFITS.

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS

General Information for Culvert Design

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 1 PINE COUNTY

INFILTRATION PRACTICE MAINTENANCE INSPECTION FORM

JAP Additional Information Sheet

Earthen Embankments. turning into larger, more costly repairs. The following. The State Dam Safety Program has inspection

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 101 OVER THE MINNESOTA RIVER DISTRICT 8 - REDWOOD COUNTY

TRAFFIC FIELD OPERATIONS (1 of 7) - ADMINISTRATION

UNDERWATER BRIDGE INSPECTION REPORT METRO DISTRICT - ANOKA COUNTY

Design & Maintenance of Culverts

Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO MSAS 123 (2 ND AVE. SW) OVER THE CANNON RIVER CITY OF FARIBAULT, RICE COUNTY

APPENDIX J HYDROLOGY AND WATER QUALITY

Introduction to Check Dams

Notice of Intent to Close Inactive CCR Surface Impoundments

Shoreline Erosion Control Failures and How To Avoid Them

Chutes Part 2: Synthetic linings

REVETMENTS. Purposes and Operational Constraints. Purposes Erosion control o o. Revetment Design 4/5/2016. CE A676 Coastal Engineering

Building Coastal Resiliency at Plymouth Long Beach

Components of a Barrage

VWP CONSTRUCTION INSPECTION REPORT. Project Name: Berkmar Drive Extension Locality: Albemarle County Inspector: ERM

June 13, 2016 Tom Garigen Re: Myrtle Beach Golf and Yacht Club Drainage assessment

Illinois State Water Survey

Coal Combustion Residuals Closure Plan

January, same manner that stirring a fire hastens its burning.

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 7 OVER THE SNAKE RIVER DISTRICT 1 - PINE COUNTY

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO B WABASHA STREET SOUTH BOUND (MASA 235 SB)

CITY OF SALEM DEPARTMENT OF PUBLIC WORKS STANDARD DRAWINGS TABLE OF CONTENTS

RIIWMG203D Drain and Dewater Civil Construction Site Learner Guide

CT EXPANSION PROJECT SILT FENCE DESIGN CRITERIA AND METHODOLOGY CONNECTICUT LOOP. Submitted by:..

Outlet Structures T-12

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 4 - OTTER TAIL COUNTY

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)

INDIANA REGIONAL GENERAL CONDITIONS FOR THE STATE OF INDIANA

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 4 - OTTER TAIL COUNTY

Great Lakes Stream Crossing Inventory Instructions

MANERI DAM D/S VIEW. Er. SANDEEP SINGHAL Director (Projects) UJVN Limited, Dehradun, (UK)

CCR Landfill 2017 Annual Inspection Report NC1 Ash Disposal Area

THE DON DISTRICT SALMON FISHERY BOARD RIVER DON DRAFT GRAVEL MANAGEMENT PLAN NEWE DAM

7.Site Note Poders in Labutta Township Labutta North Polder Shansu Sluice Gate - Shansu sluice locates in Labutta (North) polder, it is about 1.5 km n

Cross-Vane Plan View FIN-UP Habitat Consultants, Inc. 220 Illinois Avenue Manitou Springs, CO (719) P.

HYDROLOGIC AND HYDRAULIC REPORT PROPOSED CULVERT STRUCTURES SR 194, SECTION 10

Public Notice. Corps File No. LRE Date: March 19, 2017 Expires: March 18, 2022

Resident Forum February 5, 2013

Green CCR Surface Impoundment

2012 Susitna River Water Temperature and Meteorological Field Study

PROJECT TO INSTALL LARGE WOOD HABITAT STRUCTURES IN THE CARMEL RIVER USING CALIFORNIA DEPARTMENT OF FISH AND GAME GRANT FUNDS

Project 184 Preferred Canal Drainage Structure and Release Point Plan

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

VIMS CCRM Coastal Management Decision Tools. Decision Tree for Undefended Shorelines and Those with Failed Structures

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 9 OVER THE BLUE EARTH RIVER DISTRICT 7 - BLUE EARTH COUNTY

COASTAL HAZARDS. What are Coastal Hazards?

Culvert Design for Low and High Gradient Streams in the Midwest. Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest

STRUCTURAL STABILITY ASSESSMENT

La Crescent Township Zoning Ordinance

REPORT TO THE MINISTER OF NATURAL RESOURCES. Pursuant to an appointment made by the Honourable Frank S. Miller, Minister of Natural

Chadbourne Dam Repair and Fish Barrier

Shoreline Studies Program, Department of Physical Sciences, VIMS

Joe Rathbun Michigan DEQ Water Resources Division Nonpoint Source Unit * Thanks to The Nature Conservancy

CLOSURE PLAN. CFR (b) Bottom Ash Pond Complex Cardinal Plant Brilliant, Ohio. September, 2016

Road Design Guidelines for Low Impact to Hydrology *

Initial Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1

then extrapolated to larger area just based on the length of bank [that actually falls in this category].

Estuarine Shoreline Stabilization

Figure 1. Schematic illustration of the major environments on Mustang Island.

Culvert Design An Overview of the NYS Highway Design Manual Chapter 8

USE OF SEGMENTED OFFSHORE BREAKWATERS FOR BEACH EROSION CONTROL

Dredging Keeping Our Underwater Highways Open

CHAPTER 4 SPALDING COUNTY, GEORGIA 4.0 CULVERT DESIGN

P r o j e c t T e a m

2O-2 Open Channel Flow

The Basics of Culvert and Inlet Design

Pre-Application Document Kaweah Project (FERC Project No. 298)

DECISION MEMO. Pursuant to 36 C.F.R (e), the following persons are exempted from this order:

22. Specialty Valves.

Hydrant Flow Testing for Hydraulic Model Calibration. Doug Lane, PE City of Bellevue, WA

TDLP INC. The Dam & Levee Professionals. Kevin Chancey Sarah Edens. Monica Murie Jason Unruh

Deep-water orbital waves

HISTORY OF CONSTRUCTION

Mid-Columbia Fisheries Enhancement Group Annual Report Fiscal Year 06: July 1, 2005 June 30, 2006

Interim Guidance Fish Presence Absence

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS

Site Diary Campus Drive Relocation Project. Noboru Togawa. Presented to: Dr. Pitt Construction Site Erosion Control

Fish Habitat Design, Operation and Reclamation Worksheets for

Large-scale Field Test

COUPLED MANAGEMENT STRATEGY LAKE CATHIE ESTUARY & COAST

CHAPTER 4: BEST MANAGEMENT PRACTICES FOR EROSION AND SEDIMENTATION CONTROL

Transcription:

Check Dams (CD) EC-12 Description Check dams are temporary grade control structures placed in drainage channels to limit the erosivity of stormwater by reducing flow velocity. Check dams are typically constructed from rock, gravel bags, sand bags, or sometimes, proprietary devices. Reinforced check dams are typically constructed from rock and wire gabion. Although the primary function of check dams is to reduce the velocity of concentrated flows, a secondary benefit is sediment trapping upstream of the structure. Photograph CD-1. Rock check dams in a roadside ditch. Photo courtesy of WWE. Appropriate Uses Use as a grade control for temporary drainage ditches or swales until final soil stabilization measures are established upstream and downstream. Check dams can be used on mild or moderately steep slopes. Check dams may be used under the following conditions: As temporary grade control facilities along waterways until final stabilization is established. Along permanent swales that need protection prior to installation of a non-erodible lining. Along temporary channels, ditches or swales that need protection where construction of a nonerodible lining is not practicable. Reinforced check dams should be used in areas subject to high flow velocities. Design and Installation Place check dams at regularly spaced intervals along the drainage swale or ditch. Check dams heights should allow for pools to develop upstream of each check dam, extending to the downstream toe of the check dam immediately upstream. When rock is used for the check dam, place rock mechanically or by hand. Do not dump rocks into the drainage channel. Where multiple check dams are used, the top of the lower dam should be at the same elevation as the toe of the upper dam. When reinforced check dams are used, install erosion control fabric under and around the check dam to prevent erosion on the upstream and downstream sides. Each section of the dam should be keyed in to reduce the potential Check Dams for washout or undermining. A rock apron upstream and Functions downstream of the dam may be necessary to further control Erosion Control Yes erosion. Sediment Control Moderate Site/Material Management No November 2010 Urban Drainage and Flood Control District CD-1

EC-12 Check Dams (CD) Design details with notes are provided for the following types of check dams: Rock Check Dams (CD-1) Reinforced Check Dams (CD-2) Sediment control logs may also be used as check dams; however, silt fence is not appropriate for use as a check dam. Many jurisdictions also prohibit or discourage use of straw bales for this purpose. Maintenance and Removal Replace missing rocks causing voids in the check dam. If gravel bags or sandbags are used, replace or repair torn or displaced bags. Remove accumulated sediment, as needed to maintain BMP effectiveness, typically before the sediment depth upstream of the check dam is within ½ of the crest height. Remove accumulated sediment prior to mulching, seeding, or chemical soil stabilization. Removed sediment can be incorporated into the earthwork with approval from the Project Engineer, or disposed of at an alternate location in accordance with the standard specifications. Check dams constructed in permanent swales should be removed when perennial grasses have become established, or immediately prior to installation of a non-erodible lining. All of the rock and accumulated sediment should be removed, and the area seeded and mulched, or otherwise stabilized. CD-2 Urban Drainage and Flood Control District November 2010

Check Dams (CD) EC-12 November 2010 Urban Drainage and Flood Control District CD-3

EC-12 Check Dams (CD) CD-4 Urban Drainage and Flood Control District November 2010

Check Dams (CD) EC-12 November 2010 Urban Drainage and Flood Control District CD-5

EC-12 Check Dams (CD) CD-6 Urban Drainage and Flood Control District November 2010