Water Street Promenade Engineering and Design Services

Similar documents
Water Street Promenade. Engineering and Design Services. Public Information Meeting No. 2. Education / Infrastructure / Innovation. Maplewood Avenue &

CITY OF PORTSMOUTH PLANNING DEPARTMENT

Omaha s Complete Streets Policy

Complete Streets Funding Program Project Prioritization Plan

GARLAND ROAD/GASTON AVENUE/ GRAND AVENUE INTERSECTION IMPROVEMENT STUDY

Borough of Danville, PA Traffic Calming Program Guidelines

Broad Street Bicycle Boulevard Design Guidelines

Fleur Drive Reconstruction

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Memo. Introduction. Memphis STP Pedestrian Sidewalk Project

Preliminary Engineering Study

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX

City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines

CONTEXT SENSITIVE STREETS STANDARDS COMMITTEE

ROUNDABOUTS/TRAFFIC CIRCLES

Military Road Safety Improvements

Neighborhood Pedestrian Safety and Traffic Calming Study

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

Victoria Park Master Plan

Bicycle Facilities Planning

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

Complete Streets Successes, Opportunities, and Challenges

TOWN OF MORAGA MORAGA WAY AND CAMINO PABLO/CANYON ROAD IMPROVEMENTS Town Council Meeting March 13, 2019

Improve the livability of our streets by

Financial Project ID No(s).: and ETDM No(s).: and 14181

$ 12" $#&%$ 86.) *1! *1 /3 )00, , (1* Neighborhood Traffic Calming Part 3 Solutions Bradley William Yarger, P.E.

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

2018 Pedestrian and Bicycle and Safe Routes to School Application for Funding Page 1 of 31

DEPARTMENT OF PUBLIC WORKS Carroll County, Maryland

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

6.4 RECOMMENDED IMPROVEMENTS

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY

Community Transportation Plan

CONTENTS EXECUTIVE SUMMARY 1

Deer Street Parking Garage & Deer Street Associates Development

Application of a Complete Street

Off-road Trails. Guidance

Residential Traffic Calming Program Guide. Town of Ashland, Virginia

5. RUNNINGWAY GUIDELINES

TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES

BLUETT TRAFFIC CALMING ON-SITE MEETING #2 DISCUSSION SUMMARY

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Neighborhood Traffic Calming Guidelines

San Rafael School District. Task Force Meeting Notes. November 5, 2012

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

West Broad Street Traffic Study

Southbend to Prima Vista. October 30, Floresta Corridor Master Plan

Transportation Corridor Studies: Summary of Recommendations

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

DOT Policy and Procedure Integrity Excellence Respect

Intersection Improvement: Sturgeon Road, Silver Avenue and Murray Park Road Roundabout. Welcome. Public Information Session

Traffic Calming Review. Max Becker Drive. Thursday, November 30, 2017 Presentation at 7:00 p.m. WT Townshend Public School

II. EXISTING NEIGHBORHOODS

PERFORMANCE ACTIVITY 405 LIMB MANAGEMENT

Meadow Woods Elementary School

Improvements Infrastructure Gap Assessment and Improvements Street Striping

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

C C C

Crosswalk Policy Revisions & Pedestrian & Bicycle Connection Plans. Presentation to Sanibel City Council July 16, 2013

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

Town of Mooresville, North Carolina Neighborhood Traffic Calming and Control Device Policy

Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St.

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

City of Seattle Edward B. Murray, Mayor

Neighborhood Traffic Calming Policy & Guidelines

Active Transportation Facility Glossary

Public Information Centre

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Everyone is a Pedestrian

TRAFFIC CALMING TOOLBOX

Make Lincoln Highway an economically vibrant corridor that is safe, efficient, and beautiful for local residents and visitors.

AGENDA ITEM G-2 Public Works

42nd Ave N Reconstruction

Table of Contents Introduction...1. A. Background B. Introduction to Traffic Calming Devices Purpose Statement...

Station 1: Street & Sidewalk Upgrades

PROJECT OVERVIEW. 20th Avenue Project Limits (Lincoln Way to Wawona St)

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Fulton Market Streetscape

PERFORMANCE ACTIVITY 613 IMPACT ATTENUATOR WORK DESCRIPTION 3

MEMORANDUM. Charlotte Fleetwood, Transportation Planner

Golden Gate Park. Project Goal and Description. Lower Great Highway Facts

Cycle Track Design Best Practices Cycle Track Sections

Malvern Borough Local Traffic Calming

Tonight is for you. Learn everything you can. Share all your ideas.

Downey Road. Transportation Improvement Study

BOARD OF COUNTY COMMISSIONERS CLAY COUNTY

City of Margate, Florida. Neighborhood Traffic Management Manual

TOWN OF HALTON HILLS TRAFFIC CALMING PROTOCOL. Page 1 of 25

CURRENT ORIGINAL REFERENCE SECTIONS. (Typical Section) (Typical Section) The Parade Island Bay : Concept Option Summary Sheets.

VILLAGE OF NILES TRAFFIC CALMING POLICY

Lawrence Avenue Streetscape Concepts August 30, 2011

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

MEMORANDUM TERESA MCCLISH, COMMUNITY DEVELOPMENT DIRECTOR SUBJECT: CONSIDERATION OF DRAFT NEIGHBORHOOD TRAFFIC CALMING GUIDELINES

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

Draft North Industrial Area-Wide Traffic Plan

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

WELCOME Public Information Centre

Transcription:

Preliminary Design Presentation Parking & Traffic Safety Committee Water Street Promenade Engineering and Design Services July 16,2014 November 3, 2016 Education / Infrastructure / Innovation 1

Project Need: Primary Need: Water Main Replacement on Maplewood Avenue - Recommended in 2013 Water Master Plan Identified Adjacent Areas in Need of Work - Added to Overall Project Full Roadway and Utility Reconstruction Where Appropriate Complete Street Type Design - City Council Policy Incorporate Elements of 2014 Bicycle & Pedestrian Plan 2

Project Limits for Design Market Street Woodbury Avenue Utilities & Complete Street Utilities* Utilities* Utilities* Fairview Drive Cutts Street Central Avenue Leslie Drive North Mill Pond *Construction limits and phasing to be based on available funding. 3

Data Collection Speed and Traffic Volumes: Posted Speed Limit 25 mph Average Daily Traffic 8,800 Toward Downtown 33 mph* Outbound 35 mph* Average Daily Traffic 2,300 Toward Downtown 36 mph* Outbound 37 mph* *85 th Percentile Speeds 4

Data Collection Parking Observations: January 27, 2016 Wednesday 6am-8am Wednesday 11am-1pm Wednesday 6pm-8pm January 30, 2016 Saturday 6am-8am Saturday 11am-1pm Saturday 6pm-8pm 5

Data Collection Parking Observations: Maplewood Avenue: Very little demand Residential driveways Ideal roadway for bicycle lanes 6

Data Collection: Accident Reports (2009-June 2013) 5 Accidents 18 Accidents 1 Accident Cutts Street Central Avenue Leslie Drive Fairview Drive 5 Accidents 2 Accidents 7

Public Input Summary: Maplewood Avenue: Vehicles driving too fast Speed humps Bicycle accommodation Accommodate school children Crosswalks Sidewalk Improvements Drainage issues Pavement conditions (neighborhoods) Neighborhood feel 8

Maplewood Avenue Road Design Goals: Safety Traffic Calming Accessible Sidewalk Grass Buffer (where possible) Bicycle Accommodation Curbing/Drainage Utility Coordination 9

Market Street Proposed Sidewalk Locations Fairview Drive Central Avenue Cutts Street Leslie Drive 10

Market Street Proposed Traffic Calming Fairview Drive Central Avenue Cutts Street Leslie Drive Narrowed Travel Lanes Radar Speed Signs Intersection Geometry 11

Maplewood Avenue Typical Section: 12

Intersection Improvements: Woodbury Avenue 13

Intersection Improvements: Woodbury Avenue Calm Travel Speeds Realign Maplewood Reduce Pavement Green Space Gateway Treatment Pedestrian Crosswalks/Refuge RRFB Bicycle Accommodation Connect to Woodlawn Cr Retain Existing Tree 14

Raised Intersections: Vertical Deflection Reinforces Slow Speeds Encourages Yielding Emergency Vehicles Source: National Association of City Transportation Officials, Urban Street Design Guide 15

Intersection Improvements: Edmond Avenue Calm Travel Speeds Raised Intersection Dynamic Striping Pedestrian Crosswalk/Refuge Bicycle Accommodation 16

Intersection Improvements: Central/Emery Calm Travel Speeds Raised Intersection Dynamic Striping Pedestrian Crosswalks/Refuge Bicycle Accommodation Sidewalk Connections 17

Intersection Improvements: Cutts Street Calm Travel Speeds Median Island Dynamic Striping Pedestrian Crosswalk Bicycle Accommodation Sidewalk Connections Radar Speed Signs Supplemental STOP signs 18

Intersection Improvements: NB Bypass Ramps Tighten Geometry Mountable Apron Bicycle Accommodation Maintain Exist. Island 19

Intersection Improvements: Dennett Street Calm Travel Speeds Dynamic Striping Pedestrian Crosswalks Bicycle Accommodation 20

Next Steps: Define Project Limits and Phasing.Fall 2016 Coordinate Temp. Const. Access w/abutters.fall/winter 2016 Complete Final Design...Winter 2016/2017 Advertise for Bids..Spring 2017 Receive Bids/Award Contract Spring 2017 Public Pre-Construction Meeting Summer 2017 Begin Construction..Summer/Fall 2017 21