Water Street Promenade. Engineering and Design Services. Public Information Meeting No. 2. Education / Infrastructure / Innovation. Maplewood Avenue &

Similar documents
Water Street Promenade Engineering and Design Services

Intersection Improvement: Sturgeon Road, Silver Avenue and Murray Park Road Roundabout. Welcome. Public Information Session

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY

GARLAND ROAD/GASTON AVENUE/ GRAND AVENUE INTERSECTION IMPROVEMENT STUDY

Board of Supervisors February 27, 2017

Complete Streets Successes, Opportunities, and Challenges

STANLEY STREET December 19, 2017

122 Avenue: 107 Street to Fort Road

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Public Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017

CITY OF PORTSMOUTH PLANNING DEPARTMENT

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

Financial Project ID No(s).: and ETDM No(s).: and 14181

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

PEABODY SQUARE RECONSTRUCTION PROJECT

About the study. North Milwaukee Ave. Key goals of this study are to: Achieve Vision Zero* by. Harmonize the space and improve walkability

Tonight is for you. Learn everything you can. Share all your ideas.

Raymond Avenue: Rightsizing Improved Safety and Pedestrian Experience

Deer Street Parking Garage & Deer Street Associates Development

Building Great Neighbourhoods BONNIE DOON

Mineral Avenue Corridor Assessment. ITE 2017 Western District Annual Meeting San Diego, CA June 21 st

Building Great Neighbourhoods LANSDOWNE

Agenda. Introduction to Roundabouts. Introduction to Roundabouts. Introduction to Roundabouts 6/6/2018

Acknowledgements. Mr. David Nicol 3/23/2012. Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Telegraph Avenue Complete Streets DRAFT Recommendations. Oakland Public Works Department September 11 and 13, 2014 Open Houses

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

Balancing Operation & Safety for Motorized and Non-Motorized Traffic

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project

Fulton Market Streetscape

Pre-Construction Meeting

Application of a Complete Street

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

INNOVATIVE INTERSECTION DESIGN

MEMORANDUM. Earl Haugen and UND Transportation and Traffic Coordination Committee

» Draft Recommendations» Discussion» Next Steps. Plan for Walking and Biking

Broad Street Bicycle Boulevard Design Guidelines

Public Information Centre

Traffic Calming Program Update

ROUNDABOUTS/TRAFFIC CIRCLES

Building Great Neighbourhoods QUEEN ALEXANDRA

City of Margate, Florida. Neighborhood Traffic Management Manual

ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS

Project Update May 2018

Colchester/Riverside/Barrett/ Mill Intersection Study. PAC Meeting #3 September 22, 2016

$ 12" $#&%$ 86.) *1! *1 /3 )00, , (1* Neighborhood Traffic Calming Part 3 Solutions Bradley William Yarger, P.E.

Item No. 14 Town of Atherton

Advancing Transportation Choices in Des Moines. MPO Environmental Roundtable January 9, 2018

Southbend to Prima Vista. October 30, Floresta Corridor Master Plan

Merrick and Memorial Neighborhood Study 5/14/2014 Public Meeting

TRAFFIC STUDY. Birch Bluff Road / Pleasant Avenue 01/15/2018. City of Tonka Bay 4901 Manitou Road Tonka Bay, MN WSB PROJECT NO.

Community Meeting February 27, 2007 Dorchester Avenue Transportation & Streetscape Improvements Action Plan February 27, 2007

CITY OF CAMBRIDGE 2015 BICYCLE PLAN TOWARDS A BIKABLE FUTURE

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Road Diets and Roundabouts

Modern Roundabouts: a guide for application

133 rd Street and 132 nd /Hemlock Street 132 nd Street and Foster Street MINI ROUNDABOUTS. Overland Park, Kansas

Omaha s Complete Streets Policy

PROJECT OBJECTIVES. Improve vehicle capacity for the intersection. Improve pedestrian and bicycle access

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

Fleur Drive Reconstruction

This page intentionally left blank.

Henderson Ave. Complete Streets Project

North Avenue Corridor Study

Hennepin Avenue Reconstruction Washington Avenue to 12 th Street

COMMUNITY MEETING AGENDA

North Avenue Corridor Study

42nd Ave N Reconstruction

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

Ottawa Beach Road Study

5. RUNNINGWAY GUIDELINES

83 AVENUE PRE-CONSTRUCTION MEETING

Lawrence Avenue Streetscape Concepts August 30, 2011

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study

Welcome. If you have any questions or comments on the project, please contact:

TRANSPORTATION & MOBILITY

BLUETT TRAFFIC CALMING ON-SITE MEETING #2 DISCUSSION SUMMARY

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

Design Public Hearing MassDOT Project # February 19, 2015 Chatham Town Hall Annex 7:00 P.M.

WELCOME Public Information Centre

Lincoln Highway Streetscape Plan Concept Plan

Major Bike Routes 102 Avenue Workshop April 21, 2015

MPO Staff Report Technical Advisory Committee: May 10, 2017 MPO Executive Board: May 17, 2017

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

Front and Myrtle Improvement Project

TRANSPORTATION FACILITY PLANNING Waugh Chapel Road Maytime Drive to New Market Lane

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

Mark Malone, P.E. SD DOT

Capital Metro Downtown Multimodal Station

Chapter 4: Funding and Implementation

Dear Mr. Tweed: Sincerely, Min Zhou, P.E. Vice President

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

Transcription:

Public Information Meeting No. 2 Water Street Promenade Maplewood Avenue & Engineering and Design Services Adjacent Areas July 16,2014Portsmouth, NH May 10, 2016 Education / Infrastructure / Innovation 1

Introductions City Staff Planning Department Department of Public Works Highway Division Water Division Sewer Division Public Safety Police Department Fire Department Engineering Consultants Greenman-Pedersen, Inc. Weston & Sampson, Inc. Sub-Consultants Stakeholders Residents Business Owners 2

Project Need: Primary Need: Water Main Replacement on Maplewood Avenue - Recommended in 2013 Water Master Plan Identified Adjacent Areas in Need of Work - Added to Overall Project Full Roadway and Utility Reconstruction Where Appropriate Complete Street Type Design - City Council Policy Implementation of 2014 Bicycle & Pedestrian Plan 3

Agenda/Meeting Purpose: Project Limits for Design Data Collection Public Input Summary Utility Improvements Adjacent Area Improvements Maplewood Avenue Concept Intersection Concepts Next Steps Anticipated Project Schedule Feedback 4

Project Limits for Design Market Street Woodbury Avenue Utilities & Complete Street Water, Sewer & Drainage Sewer & Drainage Sewer Replacement Fairview Drive Cutts Street Central Avenue Leslie Drive North Mill Pond 5

Data Collection Existing Conditions: Speed Data Traffic Volume Data Parking Observations Accident Reports 6

Data Collection Speed and Traffic Volumes: Posted Speed Limit 25 mph Location 1: Average Daily Traffic 8,800 Peak Hour 700 (AM), 820 (PM) Toward Downtown 33 mph Outbound 35 mph Location 2: Average Daily Traffic 2,300 Peak Hour 170 (AM), 230 (PM) Toward Downtown 36 mph Outbound 37 mph 2 1 7

Data Collection AM Peak Hour: 502 8

Data Collection PM Peak Hour: 490 502 9

Data Collection Observations 10

Data Collection Parking Observations: January 27, 2016 Wednesday 6am-8am Wednesday 11am-1pm Wednesday 6pm-8pm January 30, 2016 Saturday 6am-8am Saturday 11am-1pm Saturday 6pm-8pm 11

Data Collection: Parking Observations Fairview Drive Cutts Street Central Avenue Leslie Drive Weekday 6-8am 12

Data Collection: Parking Observations Fairview Drive Cutts Street Central Avenue Leslie Drive Weekday 11am-1pm 13

Data Collection: Parking Observations Cutts Street Central Avenue Leslie Drive Fairview Drive Weekday 6-8pm 14

Data Collection: Parking Observations Fairview Drive Cutts Street Central Avenue Leslie Drive 4 Total Vehicles on Cutts St Saturday 6-8am 15

Data Collection: Parking Observations Fairview Drive Cutts Street Central Avenue Leslie Drive 3 Total Vehicles on Cutts St SB Saturday 11am-1pm 16

Data Collection: Parking Observations Cutts Street Central Avenue Leslie Drive 2 Total Vehicles on Cutts St SB Fairview Drive Saturday 6-8pm 17

Data Collection Parking Observations: Maplewood Avenue: Some demand Sufficient supply on side streets Cutts Street: Saturday demand Regulation recently revisited 18

Data Collection: Accident Reports (2009-June 2013) 5 Accidents 18 Accidents 1 Accident Cutts Street Central Avenue Leslie Drive Fairview Drive 5 Accidents 2 Accidents 19

Public Input Summary: 20

Public Input Summary: Public Input Summary: 21

Public Input Summary: Public Input Summary: 22

Public Input Summary: Maplewood Avenue: Sidewalk Repairs/Replacement Speed humps Vehicles driving too fast Bicycle accommodation Drainage issues Accommodate school children Crosswalks Neighborhood feel Pavement conditions (neighborhoods) 23

Conceptual Improvements: Utility Improvements Adjacent Area Improvements Maplewood Avenue Concept Intersection Concepts 24

Utility Improvements Sewer/Drainage: Central/Cutts Leslie Drive Fairview Drive 25

Utility Improvements - Water: Central/Cutts Leslie Drive Fairview Drive 26

Adjacent Area Improvements: Fairview Drive Sewer relocation Trench repair and overlay Central/Cutts/Beechwood/Ashland Water Drain/Partial Curbing Road reconstruction Sidewalk Leslie Drive Primary: Sewer spot repairs/drainage Primary: Selected roadway reconstruction Secondary: Curbing 27

Maplewood Avenue Concept: Traffic Calming Sidewalk Bicycle Accommodations Grass Buffer (where possible) Curbing/Drainage Utility Coordination Street Tree Plantings (where possible) 28

Maplewood Avenue Concept: Optional Sidewalk Woodbury Avenue to McGee Drive 29

Maplewood Avenue Concept: Optional Sidewalk McGee Drive to Edmond Avenue 30

Maplewood Avenue Concept: Edmond Ave to Emery St/Central Ave 31

Maplewood Avenue Concept: Emery St/Central Ave to Cutts St 32

Maplewood Avenue Concept: Pinch Point Cutts Street to Prospect Street 33

Maplewood Avenue Concept: Prospect Street to Dennett Street 34

Maplewood Avenue Concept: Dennett Street to North Mill Pond 35

Intersection Concepts: Source: National Association of City Transportation Officials, Urban Street Design Guide 36

Intersection Improvements: Dennett Street 37

Intersection Improvements: NB Bypass Ramps Mountable Apron 38

Intersection Improvements: Central/Emery & Cutts 39

Intersection Improvements: Edmond Avenue Optional Sidewalk 40

Maplewood Avenue at Woodbury Ave: Concerns Woodbury Ave Travel Speed Maplewood Ave Travel Speeds Excessive Pavement Gateway Treatment Crosswalks Desired 41

Intersection Improvements: Woodbury Avenue T-Configuration Woodbury Ave Travel Speeds Maplewood Ave Travel Speeds Excessive Pavement Gateway Treatment Crosswalks Desired 42

Intersection Improvements: Woodbury Avenue T-Configuration w/left Turn Lane Woodbury Ave Travel Speeds Maplewood Ave Travel Speeds Excessive Pavement Gateway Treatment Crosswalks Desired 43

Intersection Improvements: Woodbury Avenue Roundabout Woodbury Ave Travel Speeds Maplewood Ave Travel Speeds Excessive Pavement Gateway Treatment Crosswalks Desired 44

Roundabouts: FHWA Proven Safety Countermeasure Provides Horizontal Deflection Speed Control 24 Hour 90% Reduction in Fatalities Fewer Conflict Points Efficient Operations Gateway Treatment 45

Next Steps Written Comments Tonight Or within 10 days Final Concept Plans To Be Provided On City Website 46

Anticipated Project Schedule: Second Public Meeting May 2016 Complete Preliminary Design.July 2016 Third Public Meeting. September 2016 Complete Final Design...Fall 2016 Advertise for Bids Winter 2017 Begin Construction. Spring 2017 47

Keeping in Touch Project Website: http://cityofportsmouth.com/projects/maplewoodave.htm City Staff Contact: Raymond C. Pezzullo, P.E. Phone: 603-766-1755 Email: rcpezzullo@cityofportsmouth.com Email Distributions 48