DESIGN DATA OBSOLETE. C. Inspections - It is imperative that the system be inspected and tested on a regular basis. See Inspection

Similar documents
DESIGN DATA A WET PIPE BLADDER TANK FOAM/WATER SYSTEM WITH HYDRAULICALLY ACTUATED DELUGE CONCENTRATE CONTROL VALVE

OBSOLETE DESIGN DATA. Foam 301a. February 9, 1998

TECHNICAL DATA. Low-Flow Foam Preaction System with Hydraulically Actuated Concentrate Control Valve.

TECHNICAL DATA. than the water inlet pressure to the concentrate

FM Approved - Automatic Water Control Valve as standard deluge valve. No formal approval available for coating. Foam Concentrate

TECHNICAL DATA OBSOLETE

FM Approved - Automatic Water Control Valve as standard deluge valve. No formal approval available for coating. Foam Concentrate

Wet pipe low flow foam/water system

OBSOLETE. Wet pipe low flow manifold system

TECHNICAL DATA Q= C. Table 1 - Specifications

TECHNICAL DATA. Page 1 of 12

TECHNICAL DATA. Table 1 - Specifications

TECHNICAL DATA. Pressure Regulation 531a. April 24, 2009

TECHNICAL DATA CAUTION

TECHNICAL DATA. the Viking Pilot Pressure Regulating Valve 1 Model A-1 Speed Control Assembly: OBSOLETE. the Viking Speed Control Assembly 1

TECHNICAL DATA. TRIMPAC Model B-5 & B-5B

TECHNICAL DATA PILOT PRESSURE REGULATED DELUGE SYSTEM CONTROLLED BY PNEUMATIC RELEASE. 1. DESCRIPTION (Refer to Figures 1, 2 or 3.

TECHNICAL DATA SINGLE INTERLOCKED PREACTION SYSTEM WITH PNEUMATIC RELEASE

TECHNICAL DATA. Trimpac 244a. September 16, 2013

TECHNICAL DATA. Page 1 of 8. model f /2 (dn40) & 2 (dn50)

TECHNICAL DATA. System water supply pressure enters the priming chamber of the deluge valve (A.1) through the 1/4 (8 mm) priming line, which

TECHNICAL DATA. Trimpac 251a. Spetember 16, 2013

TECHNICAL DATA PILOT PRESSURE REGULATED DELUGE SYSTEM CONTROLLED BY ELECTRIC RELEASE 1. DESCRIPTION 2. LISTINGS AND APPROVALS 3.

TECHNICAL DATA. Trimpac 257a. September 16, 2013

TECHNICAL DATA. Trimpac 256a. October 31, 2013

TECHNICAL DATA. Dry 132a. October 1, 2008

Anti-flood device Model B-1

TECHNICAL DATA CAUTION

TECHNICAL DATA DELUGE VALVE, MODEL F-1 STRAIGHT THROUGH STYLE

TECHNICAL DATA. Inlet Type Outlet Type OBSOLETE. 4. TECHNICAL DATA Approvals:

TECHNICAL DATA ANTI-FLOOD DEVICE MODEL B-1 1. DESCRIPTION

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA ACCELERATOR MODEL E-1

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Deluge Valves 211a. November 30, 2007 DELUGE VALVE MODEL E-1 ANGLE STYLE 3 (DN80), 4 (DN100) & 6 (DN150)

TECHNICAL DATA 3 MODEL G-3000 DRY VALVE RISER ASSEMBLY

TECHNICAL DATA Q = C. v P S. 2 Model G-2000 Dry valve. Page 1 of 13

TECHNICAL DATA OBSOLETE

INSTALLATION OPERATION MAINTENANCE

TECHNICAL DATA. Q= Cv S

TECHNICAL DATA. Deluge Valves 218a. November 30, 2007 DELUGE VALVE MODEL F-1 STRAIGHT THROUGH STYLE 2-1/2 (DN65) - 8 (DN200)

TECHNICAL DATA. Trimpac 247a_Euro. September 16, 2013

TECHNICAL DATA OBSOLETE

VERTICAL BLADDER TANK

HORIZONTAL BLADDER TANK

Bladder Tank Installation & System Design Information

Bermad Model:

Speed control assembly model A-1

VIKING OBSOLETE CONCENTRATE CONTROL SYSTEM OPERATING, MAINTENANCE, AND FILLING MANUAL. Vertical And Horizontal Bladder Tanks

FOAM TANK (1/2) DATA SHEET

FOAM TANK (1/2) DATA SHEET

End Connection. Thread x Thread N/A N/A N/A N/A Flange x Flange N/A

FireLock NXT Preaction Valve with Series 798 Pneumatic/Pneumatic Actuator

Preaction System with Model DV-5 Deluge Valve Single Interlock, Supervised Wet Pilot Actuation 1-1/2 thru 8 Inch (DN40 thru DN200)

Instructions for Installation, Operation, Care and Maintenance

TECHNICAL DATA MAINTENANCE AIR COMPRESSOR MODEL G-1

Bermad Pressure Reducing. Model: 42T

Type 1367 High-Pressure Instrument Supply System with Overpressure Protection

CONCENTRATE CONTROL SYSTEM

1 Exam Prep. Tabs and Highlights

Data Sheet Issue A

GENERAL DESCRIPTION MODEL RCW DRY SYSTEM CONFIGURATION. Technical Support Airpark Dr. Standish, MI 48658

SABERINDO PACIF SABERINDO PACIFIC CIFIC SABERINDO PA. A Tyco International Company

MWEA MAINTENANCE SEMINAR SPECIALTY VALVES POWER GLOBES

a pilot sprinkler were to be closed after its initial operation, for example a remote manual control station).

Model DDX-LP Dry Pipe Valve System 8 (200mm) Features. Differential latching clapper-type, lighweight, dependable construction.

Features. Model DDX-LP Dry Pipe Valve System 4 (100mm), 6 (150mm) & 165mm Sizes

Model: 720-UL INSTALLATION OPERATION MAINTENANCE. Bermad Pressure Reducing Valve IOM. Model: FP -720-UL Sizes: 2"-12" BERMAD. Application Engineering

Preaction System with Model DV-5 Deluge Valve Single Interlock, Supervised Dry Pilot Actuation 1-1/2 thru 8 Inch (DN40 thru DN200)

Model B-1 Pipe Line Strainer 3, 4, 6 & 8 Inch (DN80, DN100, DN150 & DN200) 175 psi (12,1 bar) General Description. Technical Data

TYPICAL TOXIC GAS SYSTEM INSPECTION VIOLATIONS

FIRE PROTECTION PRODUCTS

I T T Pressure Reducing Valve WARNING INSTALLATION, OPERATION, AND MAINTENANCE MANUAL

FIRE SPRINKLER PRODUCTS PRODUCT CATALOG

Water Mist Systems Inspection, Testing, and Maintenance of Water Mist Systems

TECHNICAL DATA NOTICE

Cash Valve TYPE KP PILOT OPERATED BACK PRESSURE VALVE. ISSUED - DECEMBER 2000 CAVMC-0518-US-0208 ISO 9001 Certified

Pipe Thread Connection 1/2 inch NPT. Friction Loss Refer to Figure 3

Data Sheet Issue A

TECHNICAL DATA. Notes: For use with Trim Charts on Pages 2-4

Model: 43T. Bermad Pressure Relief Valve

Type S301 & S302 Gas Regulators INTRODUCTION INSTALLATION. Scope of Manual. Description. Specifications. Type S301 and S302. Instruction Manual

Types S100K and S102K Pressure Regulators

BERMAD Fire Protection Hydraulic Control Valves

Horizontal Bladder Tanks

MEGR-1912 Instruction Manual

CORROSION AT THE AIR-WATER INTERFACE REMOVE THE GAS

Vertical Bladder Tanks

ECS Protector Nitrogen Inerting Vent (PAV-WN)

Installation Operation Maintenance. Bermad Level Control Valve with Modulating Horizontal Float Pilot valve One Way Flow IOM.

Pipe-Away Pressure Vacuum Vent /Conservation Vent

BALANCED PRESSURE PROPORTIONERS

Model 420-HY Pressure Regulating Hydrant Valve

Preaction System with DV-5 Deluge Valve Single Interlock, Supervised Wet Pilot Actuation 1-1/2 thru 8 Inch (DN40 thru DN200) General Description

BLADDER TANK PROPORTIONING SYSTEM PRE-PIPED

Irrigation System Winterization and Pressurization Procedures

Transcription:

February 9, 1998 Foam 201a 1. DESCRIPTION A Deluge Bladder Tank Foam/Water System is a standard deluge system capable of discharging a foam/water solution automatically through open sprinklers, spray nozzles, monitor nozzles, and other discharge devices. A Deluge Bladder Tank Foam/Water System with a hydraulically actuated Halar coated Viking Deluge Concentrate Control Valve (CCV) consists of a standard deluge system using a Viking Deluge Valve complete with full standard trim and detection and releasing devices on the water supply line, a concentrate controller-proportioning device with appropriately sized orifice, a hydraulically actuated Halar coated Viking Deluge CCV on foam concentrate line, a foam concentrate bladder tank and trim and foam agent. 2. OPERATION Actuation of the release line (pneumatic, hydraulic or electric) relieves the pressure in the priming chamber of both the Viking deluge valve (C) and the Halar coated Viking deluge CCV (D). This allows the clapper to open on both valves (C) and (D). The system piping is filled with water, activating connected alarms and pressurizing the bladder tank (A) by the water supply piping (12). System water pressure in the space between the flexible bladder and the inside surface of the steel tank, causes the bladder to collapse, forcing the foam concentrate out through the foam concentrate discharge piping (15), Halar coated CCV (D), and the metering orifice of the concentrate controller (B), into the venturi, (low pressure) area of the concentrate controller (B). The foam concentrate is proportioned (usually 3% or 6%), with the main water supply, sending foam solution to the sprinklers and foam/water discharge devices downstream. 3. DISCHARGE DEVICES Open standard spray sprinklers Foam/water sprinklers Non-aspirating spray nozzles Manual and oscillating monitors Foam chambers Sub-surface injection (forcing foam maker) Hose reels and hand lines... and other dispensing devices 4. GENERAL INSTRUCTIONS AND WARNINGS A. Refer to the General Notes and Warnings at the end of the Design section of the foam water data book. B. Refer to specific technical data sheets, acceptable installation standards, codes and Authority Having Jurisdiction for additional installation, operation and maintenance instructions. C. Inspections - It is imperative that the system be inspected and tested on a regular basis. See Inspection and Maintenance. D. WARNING - Any system maintenance or testing which involves placing a control valve or detection system out of service may eliminate the Fire Protection of that system. Prior to proceeding, notify all Authorities Having Jurisdiction. Consideration should be given to employment of a Fire Patrol in the affected area. E. The valve, trim and assembly must be installed in an area not subject to freezing temperatures or physical damage. 5. DESIGN & INSTALLATION WARNING: Locate all portions of the foam/water system subject to freezing, in a heated area. A. Refer to the Special Notes on page 201c and the General Notes and Warnings at the end of the Design Section of the foam water data book. B. Install the deluge valve (C) and trim in accordance with the Viking Engineering and Design Data Book. C. Install the proportioning device (B), concentrate controller with integral orifice, in riser piping level with top of bladder tank (A). This will help prevent the foam concentrate from draining or siphoning from the tank into the water supply piping due to expansion of foam in bladder tank. (See Note A and B, Page 201c) D. Install foam solution test valve (17**) and system isolation valve (18**), if required. These optional valves are used to conduct foam/water solution tests and are not usually required. However, they eliminate the need for running a foam/water solution test through the system piping. E. Install hydraulically actuated Halar coated Viking Deluge foam CCV (D) and associated trim as indicated on Figure 201, Page A BLADDER TANK WITH HYDRAULICALLY 201b, and trim charts or technical data pages. F. Install bladder tank (A) in accordance with the manufacturer s instructions with connections as shown on Figure 201, Page 201b and herein described. 1. Locate the tank as close as practical to the system riser. (See Special Note B on Page 201c) 2. Allow enough room around the tank to service the bladder. 3. Allow access to the tank for filling from barrels of foam concentrate 4. Install the pipe from the riser to the tank as indicated on Figure 201. The connection at the riser which supplies the bladder tank (A) should be installed higher than or level with the top of the bladder tank (A). this will prevent the accidental draining of the bladder tank water supply piping and tank, when performing maintenance on the sprinkler riser. Install the piping from the tank (A) to the concentrate controller (B) as straight as possible. 5. All valves and devices should be located for easy access for operation and maintenance. G. Pressurize System 1. Verify that water supply valve (10) is closed, then place bladder tank (A) in service by following manufacturer s instructions 2. Close tank water supply control valve (11), then place the deluge valve (C) in service as follows (See installation instructions on Viking Technical Data Sheet) 3. Set release and detection system according to installation instructions for type of release used (Pneumatic, Hydraulic or Electric) 4. Prime both Viking Deluge valves (C & D) by opening the priming valve on the deluge valve (C) trim. Bleed off any air pressure trapped in the priming line (13) to the Halar coated CCV (D) by opening the 3 way pressure gauge valve (14). Once air pressure has been relieved, close the 3 way valve and plug outlet. Re-open 3 way valve to maintain pressure on gauge (14) Form No. 011092 Replaces Foam 201a-f with dates prior to February 9, 1998

Foam 201b February 9, 1998 A BLADDER TANK WITH HYDRAULICALLY TO SYSTEM TO HYDRAULIC RELEASE SYSTEM (IF REQUIRED) FOAM/WATER SOLUTION B 13 18** WATER C 17** 16 FOAM CONCENTRATE Install a removable spool piece in the foam concentrate piping to facilitate servicing orifice plate. D 14 15 19** 9*** A 8 7 6 12 5 10 11 FROM WATER SUPPLY FIGURE 201 1 2 4 3

February 9, 1998 Foam 201c SYSTEM COMPONENTS FOR FIGURE 201 - BLADDER TANK FOAM SYSTEM WITH HYDRAULICALLY ACTUATED DELUGE CONCENTRATE CONTROL VALVE A. Foam Concentrate Bladder Tank complete with Items 1-8 1. Water Drain/Fill Valve - NORMALLY CLOSED 2. Fill Line Master Shut-off Valve NORMALLY CLOSED. 3. Concentrate Drain/Fill Valve NORMALLY CLOSED 4. Fill Cup Sight Gauge Shut-off Valve - NORMALLY CLOSED 5. Sight Gauge Assembly - The trim for this assembly varies with the type of foam concentrate to be used. Refer to Tank Manufacturer s O & M Manual for specific details. 6. Tank Water Vent Valve - NORMALLY CLOSED 7. Hydrostatic Relief Valve A B C D 8. Diaphragm Concentrate Vent Valve - NORMALLY CLOSED B. Proportioning Device - Concentrate Controller with Integral Orifice C. Type of System - Deluge Valve with Standard Trim and Gauges connected to an appropriate release and detection system 10. Water Supply Control Valve - NORMALLY OPEN D. Foam Concentrate Control Valve (CCV) - Hydraulically actuated Halar coated Viking Deluge Valve 14. Water Pressure Gauge and 3 way valve, and remainder of CCV special trim 19. 1/2" Foam Concentrate Auxillary Drain Valve E. Accessory Trim - (Order each item separately) 9. Concentrate Control Shut-off Valve - NORMALLY OPEN *** SPECIAL NOTES 11. Tank Water Supply Control Valve - NORMALLY OPEN 12. Water Supply Piping to Bladder Tank 13. Release Line/Priming Line Piping to foam CCV (D) 15. Foam Concentrate Discharge Piping 16. Foam Concentrate Swing Check Valve 17. Foam Solution Test Valve - NORMALLY CLOSED** 18. System Isolation Valve - NORMALLY OPEN** ** Recommended Optional Valves *** Full Port Bronze Body with 316 Stainless Steel Trim and Ball (2" and under) for AFFF & ATC. Cast Iron Body OS & Y with bronze Trim and Seats (over 2") for AFFF only. Provide a minimum of 5 pipe diameters of straight pipe on the inlet and outlet of the concentrate controller (B) to minimize turbulence inside the concentrate controller. Exception, the outlet for the tank water supply control valve (11) maybe connected nearer to the inlet of the concentrate controller and should not cause excessive turbulence. However, if the outlet for the foam solution test valve (17**) is located closer than 5 pipe diameters, there may be turbulence at high flow rates. The combined total equivalent length of pipe, fittings and valves in both the water supply inlet piping (12) and the foam concentrate discharge piping (15), must not exceed 50 equivalent feet (15.2 meters). This will allow both pipes to be the same size as the foam liquid inlet to the concentrate controller. Should the total equivalent length exceed 50 feet (15.2 meters), then refer to the Proportioning Device Design Data located in the Design section of this Data book for the method of calculating these pipe sizes. The Halar coated deluge CCV (D) and swing check valve (16) must be connected adjacent to the concentrate controller using pipe nipples as short as possible. Figure 201 is a general schematic of the required piping arrangement. Refer to the appropriate technical data page for specific information regarding the valve, tank and related trim and devices. E F G The technical information, statements and recommendations contained in this manual are based on information and tests which, to the best of our knowledge, we believe to be dependable. It represents general guidelines only, and the accuracy or completeness thereof, are not guaranteed since conditions of handling and usage are outside our control. The purchaser should determine the suitability of the product for its intended use and assumes all risks and liability whatsoever in connection therewith. The Halar coated foam concentrate control deluge CCV (D) does not require any trim except for a 1/2" priming line (13) and water pressure gauge and 3 way valve (14) from the main deluge valve (C) to the priming chamber of valve (D). Plug all the remaining valve trim outlets. Connect CCV (D) priming line (13) to deluge valve (C) as shown on Figure 201. Refer to the Equipment section of this data book under Valves, to find the correct trim kit part number for the corresponding size of Halar coated foam concentrate control deluge valve (D) required. A strainer is not required in the foam concentrate discharge piping (15) of bladder tank systems per NFPA Standards.

Foam 201d February 9, 1998 A BLADDER TANK WITH HYDRAULICALLY 5. When pressure in deluge valve (C) priming chamber equals system water supply pressure, turn on system water supply by opening main drain on deluge valve (C) and partially opening water supply valve (10). When water appears at main drain, slowly close main drain. Before fully opening water supply control valve (10), place alarm test shut-off valve in alarm position, and open tank water supply control valve (11) and system isolation valve (18**). With system fully set, fully open and secure water supply control valve (10). 6. Verify normal valve positions 7. Check for and repair any leaks. 6. REMOVING THE SYSTEM FROM SERVICE AND RETURN- ING THE SYSTEM TO SERVICE WARNING: See Warning on Page 201e, Item 7, Inspection and Maintenance A. For system and riser piping maintenance and service. 1. Close water supply control valve (10) 2. Close concentrate shut-off valve (9***) and tank water supply valve (11) 3. Open all drain valves on deluge system 4. Leave system isolation valve (18**) open 5. Refer to instructions for removing the deluge valve (C) from service in the Viking Engineering and Design Data Book 6. Perform maintenance and service on system and riser piping 7. Open concentrate shut-off valve (9***) 8. With tank water supply valve (11) closed, place the deluge valve (C) in service as follows (See installation instructions in Viking Engineering and Design Data Book 9. Set release and detection system according to installation instructions for type of release used (Pneumatic, Hydraulic or Electric) 10. Prime both Viking Deluge valves (C & D) by opening the priming valve on the deluge valve (C) trim. Bleed off any air pressure trapped in the priming line to the CCV by opening the 3 way pressure gauge valve (14). Once air pressure has been relieved, close the 3 way valve and plug the outlet. Re-open 3 way valve to maintain pressure on gauge (14) 11. When pressure in deluge valve (C & D) priming chambers equal system water supply pressure, turn on system water supply by opening main drain on deluge valve (C) and partially opening water supply valve (10). When water appears at main drain, slowly close main drain. Before fully opening water supply valve (10), place alarm test shut-off valve in alarm position. Verify system isolation valve (18**) is open and open tank water supply valve (11). With system fully set, fully open and secure water supply control valve (10) 12. Verify normal valve positions 13. Check for and repair any leaks. B. For tank maintenance and service - While leaving deluge system in service 1. Close concentrate shut-off valve (9***) and tank water supply (11) 2. Follow tank manufacturer s procedures for removing from service, and perform maintenance 3. To return to service, close water supply control valve (10) and verify Halar coated foam CCV (D) is closed. Follow tank manufacturer s procedure 4. Verify that concentrate shut-off valve (9***), tank water supply (11) and system isolation valve (18**) are open. Verify deluge valve (C) is primed, then open water supply control valve (10) 5. Verify normal valve positions 6. Check for an repair any leaks C. For total system maintenance and service 1. Close water supply control valve (10), concentrate control shut-off valve (9***) and tank water supply valve (11) 2. Open all drain valves on deluge system 3. Leave system isolation valve (18**) open 4. Refer to instructions for removing the deluge valve (C) from service. See appropriate Viking Technical Data Sheet 5. Perform maintenance and service as required 6. Refer to the Special Notes on page 201c and the General Notes and Warnings at the end of the design section. 7. All valves should be closed, including concentrate control shut-off valve (9***), water supply control valve (10), tank water supply valve (11), foam solution test valve (17**), system isolation valve (18**) and Halar coated foam CCV (D), and alarm test shut-off valve on deluge valve (C) trim. 8. Verify that water supply valve (10) is closed, then place bladder tank (A) in service by following manufacturer s instructions. 9. Place the deluge valve (C) in service as follows (See installation instructions on Viking Technical Data Sheet) 10. Set release and detection system according to installation instructions for type of release used (Pneumatic, Hydraulic or Electric) 11. Prime both Viking Deluge valves (C & D) by opening the priming valve on the deluge valve (C) trim. Bleed off any air pressure trapped in the priming line (13) to the Halar coated CCV by opening the 3 way pressure gauge valve (14). Once air pressure has been relieved, close the 3 way valve and plug outlet. Reopen 3 way valve to maintain pressure on gauge (14) 12. When pressure in deluge valve (C & D) priming chambers equal system water supply pressure, turn on system water supply by opening main drain on deluge valve (C) and partially opening water supply valve (10). When water appears at main drain, slowly close main drain. Before fully opening water supply control

February 9, 1998 Foam 201e A BLADDER TANK WITH HYDRAULICALLY valve (10), place alarm test shut-off valve in alarm position, and open tank water supply control valve (11) and system isolation valve (18**). With system fully set, fully open and secure water supply control valve (10) 13. Verify normal valve positions 14. Check for and repair any leaks 7. INSPECTION AND MAINTENANCE NOTICE: The owner is responsible for maintaining the fire protection system and devices in proper operating condition. For minimum maintenance and inspection requirements, refer to recognized standards such as those produced by NFPA, LPC and VdS which describe care and maintenance of sprinkler systems. In addition, the "Authority Having Jurisdiction" may have additional maintenance, testing and inspection requirements which must be followed. WARNING - Any system maintenance or testing which involves placing a control valve or detection system out of service may eliminate the Fire Protection of that system. Prior to proceeding, notify all Authorities Having Jurisdiction. Consideration should be given to employment of a Fire Patrol in the affected area. Inspections - It is imperative that the system be inspected and tested on a regular basis. The following recommendations are minimum requirements. The frequency of the inspections may vary due to contaminated or corrosive water supplies and corrosive atmospheres. In addition, the alarm devices or other connected equipment may require more frequent inspections. Refer to the technical data, system description, applicable codes and Authority Having Jurisdiction for minimum requirements. Prior to testing the equipment, notify appropriate personnel. A. Alarm Test - At least quarterly, test all connected alarm devices by opening the remote inspectors test valve. B. Riser Flow Test - At least quarterly, perform a riser flow test. Observe and record the supply pressure gauge reading. Open the main drain valve fully. Again, observe and record the supply pressure gauge reading. Close the main drain valve. If the readings vary significantly from those previously established or from normal, check the main supply line for obstructions or closed valves and correct. C. General - Visually inspect the valve, trim, piping, alarm devices and connected equipment for physical damage, freezing, corrosion or other conditions that may inhibit the proper operation of the system. 8. TROUBLESHOOTING A. For operating and maintenance instructions pertaining to Viking manufactured equipment, refer to the appropriate Viking Technical Data Sheet. B. For operating and maintenance instructions pertaining to foam equipment manufactured for Viking, refer to the appropriate section of the Viking Foam Data Book. C. For operation and maintenance instructions for all other equipment, refer to appropriate equipment data 9. EMERGENCY INSTRUCTIONS A. During and after a fire: 1. Make sure the fire is OUT! Make a complete inspection of all areas covered by this system including areas not involved in the fire. Place a fire watch in the entire area until the system is back in service. 2. Close the system water supply control valve (10). Post a person at the valve ready to turn it back on, should the fire rekindle. Close the tank water supply valve (11). 3. Open the flow test angle vlave, system drain valve and all auxillary drain valves. Close drain valves once the system has completely drained. 4. Replace any fused sprinklers in the pilot line (if so equipped), with the same type and temperature rating as were removed. Check all releases and/or detectors in the fire area for damage. 5. Isolate the bladder tank (A) by closing the concentrate control shut-off valve (9***) and verify that the tank water supply control valve (11) is closed. 6. Check the level of foam concentrate and refill the foam concentrate bladder tank (A) by following tank manu-facturer s instructions. Always replace the foam concentrate with the same brand and type as that being used currently. Note: Never intermix different types or brands of foam concentrate, as this could cause them to gel or solidify, and render the concentrate useless. 7. Return the complete system to service by following the procedure listed in Section 6C, Steps 6 through 14. 8. Perform quarterly test. 9. Fire can damage piping and supports, so call your Viking Representative for assistance in obtaining a complete inspection and additional replacement sprinklers. For additional details, see technical data sheets for specific device. NOTE: If replacement foam concentrate is not immediately available, activate the deluge system portion of the foam/water system until the replacement concentrate arrives. B. For emergency shut down of the complete system 1. Close main water supply valve (10) 2. Close concentrate control shutoff valve (9***) to eliminate the flowing of the foam concentrate to the hydraulically actuated Halar coated Viking Deluge CCV (D) and the concentrate controller (B) 3. Close tank water supply control valve (11) to reduce the pressure on the bladder tank (A) 4. Open main drain 5. Completely drain system 6. Repair the damaged portion of the discharge system, or perform emergency maintenance as required 7. Return the riser and foam system to service by following the procedure listed in Section 6C, Steps 4 and 6 through 14 C. If the foam concentrate pipe system is damaged: 1. Close the concentrate control shut-off valve (9***) to eliminate the flowing of the foam concentrate to the hydraulically actuated Viking deluge

Foam 201f February 9, 1998 A BLADDER TANK WITH HYDRAULICALLY foam CCV (D) and the concentrate controller (B) 2. Close the tank water supply control valve (11) to reduce the pressure on the bladder tank (A). 3. Verify that the Halar coated foam deluge CCV (D) is closed by observing water pressure gauge (14). If the water pressure gauge reads the same or higher than the system water pressure gauge located on the Viking deluge valve (C), the foam deluge CCV (D) is closed. 4. Repair the damaged portion of the foam concentrate piping system. 5. Return the foam concentrate system to service, by following the procedure as described above in Section 6B, items 3 through 6. NOTE: If there are no damaged sections of the distribution system, the deluge portion of the sprinkler system may be kept in service for protection, while repairs to the foam concentrate system are performed. Replaces Foam 201a-f with dates prior to February 9, 1998. Form No. 011092