E Grand Complete Street Pilot Project

Similar documents
Advancing Transportation Choices in Des Moines. MPO Environmental Roundtable January 9, 2018

6.4 RECOMMENDED IMPROVEMENTS

Balancing Operation & Safety for Motorized and Non-Motorized Traffic

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan

Road Diets FDOT Process

Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue

Improving intersections for people that walk in Minneapolis

Hennepin County Transportation Department

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

Complete Streets. Designing Streets for Everyone. Sarnia

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Telegraph Avenue Complete Streets DRAFT Recommendations. Oakland Public Works Department September 11 and 13, 2014 Open Houses

Community Task Force November 15, 2017

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

GIS Based Data Collection / Network Planning On a City Scale. Healthy Communities Active Transportation Workshop, Cleveland, Ohio May 10, 2011

STONY PLAIN ROAD STREETSCAPE

Major Bike Routes 102 Avenue Workshop April 21, 2015

MARKET/JFK VISION ZERO PILOT PROJECT FEBRUARY 2019 EVALUATION REPORT

Data Analysis February to March 2018 Identified safety needs from reported collisions and existing travel patterns. SFMTA Board of

Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX

Physical Implications of Complete Streets Policies

Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St.

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

San Jose Transportation Policy

Active Transportation Facility Glossary

Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns.

Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns.

5. RUNNINGWAY GUIDELINES

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Mineral Avenue Corridor Assessment. ITE 2017 Western District Annual Meeting San Diego, CA June 21 st

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

Broadway Complete Streets Project

Community Task Force March 14, 2018

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

Pedestrian Safety Guide for Transit Agencies

EXECUTIVE SUMMARY. Vision

CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Transportation Planning and Parking Division

MASTER BICYCLE AND PEDESTRIAN PLAN

Pre-Construction Meeting

THIRD&GRAND. Public Workshop #1. Transportation Hub Area Plan. June 12, 2013

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Tonight is for you. Learn everything you can. Share all your ideas.

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

East Burke Transportation, Safety and Capacity Improvements

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street)

95 th Street Corridor Transportation Plan. Steering Committee Meeting #2

Community Meeting February 27, 2007 Dorchester Avenue Transportation & Streetscape Improvements Action Plan February 27, 2007

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

NJDOT Complete Streets Checklist

Chair and Members of Transportation Standing Committee. Bruce Zvaniga, P.Eng., Director, Transportation and Public Works

CURBSIDE ACTIVITY DESIGN

Pennsylvania Avenue (CR 484) Design Alternatives Study

Lincoln Highway Streetscape Plan Concept Plan

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

Multi-Modal Traffic Analysis. Parisi and Associates

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

Controlled. Semi-Controlled PAGE 01 CHAPTER 12 INTERSECTIONS

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Welcome to the Quebec Alternatives Analysis Public Meeting

Option W: N. Washington Street Project

83 AVENUE PRE-CONSTRUCTION MEETING

VISIONZEROPHL.COM #VISIONZEROPHL

LTAP Fact Sheet. Abuzz word among transportation professionals. Kansas. Smarter, Safer Roadways: Road Diets for Rural Communities.

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Clay Street Bridge Replacement Project

Water Street Promenade. Engineering and Design Services. Public Information Meeting No. 2. Education / Infrastructure / Innovation. Maplewood Avenue &

Strategies for Maintaining & Renewing Innovative Street Projects. Elyse Parker, Director of Policy & Innovation, City of Toronto NACTO, LA, 2018

Complete Streets: Policy Framework Complete Streets: Implementation Plans A more Complete Street: Laurier Bike Lane Pilot Project

From Mile Zero to Target Zero the Dawson Creek Case Study

122 Avenue: 107 Street to Fort Road

COMPLETE STREETS PLANNER S PORTFOLIO

Long Island Rail Road Expansion Project Floral Park to Hicksville

Memo. Ocean Avenue Corridor Design Project Public Workshop #2 Summary

New Jersey Department of Transportation. Safety Impact Teams. May 22, 2007 Patricia Ott, P. E. Director, Traffic Engineering & Safety

Off-road Trails. Guidance

Transportation Planning Division

C Line Rapid Bus Preliminary Station Design

Governance and Priorities Committee Report For the July 2, 2015 Meeting

WHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building.

City of Tacoma Bicycle and Pedestrian Technical Advisory Group (BPTAG) Minutes

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

ROUNDABOUTS/TRAFFIC CIRCLES

Intersection Design. Leah Ness, Craig Hardy and Eric Sorensen

Austell Road Access Management Plan Public Meeting February 17, 2009

City of Wilsonville 5 th Street to Kinsman Road Extension Project

F L E T C H E R A V E N U E

Item No Halifax Regional Council January 16, 2018 January 30, 2018

West Capitol Avenue Road Rehabilitation and Safety Enhancement Project

Omaha s Complete Streets Policy

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation

10.0 CURB EXTENSIONS GUIDELINE

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

Massey Place Neighbourhood Traffic Review

Transcription:

E Grand Complete Street Pilot Project Des Moines City Council Workshop March 6, 2017 Presented by Brian Willham, PE, PTOE Senior Traffic Engineer

Background Connect Downtown Pilot Project Balances safety / operation between Pedestrians, Bicyclists, Transit, and Vehicles Supports Goals of PlanDSM / GuideDSM Project Development Connect Downtown Consultant Roadway Sections / Concepts City Engineering Department - Design City / Connect Downtown Team Engagement PUBLIC EDUCATION Construction Public Engagement during Pilot ( 2 years)

Design Concepts Transportation plays a key role in an exciting and healthy living and working environment when it considers more than moving vehicular traffic. The concept of a multi-modal transportation system is one that offers a range of transportation choices and supports mixed land uses along corridors - Plan DSM Transportation Section Street Design Elements being considered for Downtown Fewer / Narrower Traffic Lanes 1-way to 2-way Conversions Crosswalk Improvements Protected Bike Lanes / Intersections Transit Lanes Parking Changes Traffic Signal Removal

E Grand Crash History 2012-2016

E Grand Complete Street Pilot Project Connect Downtown Deliverable from Nelson/Nygaard

E Grand Complete Street Pilot Project Connect Downtown Deliverable from Nelson/Nygaard

E Grand Complete Street Pilot Project Design Elements Two travel lanes Parking protected bike lanes / Green Conflict Zones Islands (Sight Distance / Shorter Pedestrian Crossings) Paint / Vertical Delineators (Pilot) Bus Stops Chicago Example

E Grand Complete Street Pilot Project Design Elements Two travel lanes Parking protected bike lanes / Green Conflict Zones Islands (Sight Distance / Shorter Pedestrian Crossings) Hotel Loading Zone Paint / Vertical Delineators (Pilot) Bus Stops

E Grand Complete Street Pilot Project Design Elements Two travel lanes Parking protected bike lanes / Green Conflict Zones Islands (Sight Distance / Shorter Pedestrian Crossings) Paint / Vertical Delineators (Pilot) Bus Stops Loading Zones

E Grand Complete Street Pilot Project Design Elements Two travel lanes Parking protected bike lanes / Green Conflict Zones Islands (Sight Distance / Shorter Pedestrian Crossings) Paint / Vertical Delineators (Pilot) Eastbound left turn lane at Penn Bus Stops Loading Zones

E Grand Complete Street Pilot Project Design Elements Convert E 7 th / Penn to two-way travel south of E Grand Add 6 metered parking spots

E Grand Complete Street Pilot Project

E Grand Complete Street Parking Changes

E Grand Complete Street Pilot Project Costs Pilot Cost Estimate = $175,000 $225,000 Funding Streetscape Improvements (ST-40) Thin overlay / seal to cover existing markings Regular Traffic Paint (Not Durable) No concrete changes (Curb Ramps / Islands) Parking Meter Additions / Relocation (by City) No Landscaping (to be completed w/ future Streetscape Project) Pilot Project Maintenance Costs Annual Paint / Delineators (contractor provided) = ~ $50,000 Permanent Improvements Cost Estimate = $475,000 - $525,000 Concrete Islands, traffic signal mast arm extensions, curb ramp relocations, durable markings, etc On-going maintenance (Painting)

E Grand Complete Street Pilot Project Engagement Previous / On-going Input Historic East Village Association DM Traffic Safety Committee DM Bicycle Collective DM Public Works (Infrastructure / Snow Removal) DM Fire Department DART Des Moines MPO Nelson/Nygaard (Connect Downtown consultant) Sam Schwartz (DM Transportation Master Plan consultant) City of Cedar Rapids State of Iowa Capitol Planning Commission Public Engagement throughout Pilot Engagement / Evaluation / Data Collection During Pilot Number of Injury crashes Corner radii / Truck Aprons for Islands Traffic Signal Timing Updates Delivery truck blockage of travel lanes Parking meter usage Emergency Response Time (Fire/EMS) Volume of all modes of travel Speed of vehicular traffic Pedestrian comfort (as measured per Connect Downtown methods) Public Works Operations (sweeping / snow removal)

E Grand Complete Street Pilot Project Engagement Individual Property Owner Meetings (Connect Downtown Team) AC Marriott RAYGUN 8/7 CENTRAL Fontenelle Supply Co Artisan s Christensen Development Hatch Development Upcoming Meetings American Marking Della Viti Wine Bar Zombie Burger Quinton s Olympic Flame Streetcar Iowa Workforce Development R&R Realty Blazing Saddle Greater Des Moines Botanical Garden Domestica Dornink Porch Light Look at You New Oriental Food Store Nelson Development

E Grand Complete Street Pilot Project Schedule Date (2017) March 6 March 15 April 18 April 24-26 May 8 May July / August Task City Council Workshop Final Construction Documents Turn-In Bid Date Connect Downtown Meetings (Stakeholder / Public) Award Project to Contractor Before Data Collection* Construction * Vehicular Speeds & Emergency Response Times