Updates on CA Pipeline Safety Program

Similar documents
New Hampshire Public Utilities Commission CFR 49 Part 192 Regulations. MINIMUM Pipeline Safety Regulations

Investigation of failures

O&M MANUAL HIGHLIGHTS

2017 LGA 191/192 & 195 Pipeline Safety Conference

PIPELINE SAFETY. Darin Burk, Manager Pipeline Safety. January 28, 2014

SPE Forum: Source Control for Wells in Shallow Water. Lars Herbst, Gulf of Mexico Regional Director

LP Gas Odorization and Testing

Leticia Santos Hernández Pipeline Safety Specialist U.S. Department of Transportation PHMSA Inspector Training and Qualifications

BSR GPTC Z TR GM References and Reporting Page 1 of 8

Striking an underground pipeline or underground electric line can lead to serious injury or death. If you hit either, call (800) , even if

Gas System Restoration and Remediation: Post Katrina. Perry Dufrene Manager, Engineering

National Transportation Safety Board Washington, DC 20594

The purpose of this policy is to provide operational guidelines for San Diego County Fire Departments (FD) responses to natural gas incidents.

Practice Exam IADC WellSharp Driller and Supervisor

Part 192 Subparts J & K. Testing & Uprating

NATURAL GAS MAINTENANCE. Part 192 Subpart "M"

PSM TRAINING COURSES. Courses can be conducted in multi-languages

PE 2708 CTS & IPS GAS PIPE

Statewide Rule 36: H2S

Pressure Relief Device Investigation Testing Lessons Learned

Charlottetown Marine Terminal Pipeline Decommissioning Project Description

Responding to Natural Gas Pipeline Emergencies

We re good at what we do! Anywhere, TX SITE

APPENDIX B PHMSA 57 Special Conditions for Keystone XL and Keystone Compared to 49 CFR 195

Process Safety Management is the application of management principles and systems to the identification, understanding, and control of process

PRESSURE TESTING AND RECORDKEEPING: RECONCILING HISTORIC PIPELINE PRACTICES WITH NEW REQUIREMENTS

Metering and Measuring of Multi-Family Pool Pumps, Final Report - Phase 1 & 2

A quantitative risk analysis method for the natural gas pipeline network

2017 LGA SMALL OPERATOR SEMINAR MAOP VERIFICATION. Steven Giambrone Director of Pipeline Safety

Materials Performance November Nitrogen generator inhibits corrosion within fire protection systems

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD

Be our partner in safe, reliable natural gas delivery

Yakima County Fire District 12 Standard Operating Guidelines SOG 5-1 Hazardous Materials Operations

East Building, PHH-30 U.S. Department New Jersey Avenue S.E. of Transportation Washington, D.C DOT-SP (TWENTY-THIRD REVISION)

Elgin G4 Leak. 25 March 16 May 2012

Aliso Canyon Gas-Electric Coordination Phase 3 Draft Final Proposal

the annulus between the second casing string and the surface casing [must be] open to the atmosphere in the manner described in subsection (2).

NATURAL GAS RESPONSE SOG

49 CFR 195 Regulatory Overview

HYDROSTATIC LEAK TEST PROCEDURE

Deepwater Horizon Incident Internal Investigation

Anomaly Evaluation, Response, and Repair Summit. Presentation by INGAA June 3, 2008

Operation & Maintenance Manual

A PROACTIVE APPROACH TO ADDRESSING ANNULAR PRESSURE ISSUES AND STRAY GAS MIGRATION IN THE UNCONVENTIONAL SHALE PLAYS

Pressures MAOP MOP OP

NEW PROGRAM! OIL AND GAS TECHNOLOGY PROGRAM

Policy Contact Melissa Chaney, Director, Human Resources Department, (916)

Failure Investigation Report. January 10, 2010 Third Party Damage to Terasen Gas Line at Bay Street and Pleasant Street, Victoria, B.C.

Engineered solutions for complex pressure situations

KEY FACTORS FOR THE ESTIMATION OF CROSS-COUNTRY PIPELINES FAILURE RATES

Regulated Oil and Gas Companies under National Energy Board Jurisdiction

Guidance Manual for Operators of Small Natural Gas Systems January 2017

CONTACT INFORMATION. Wayne St. Germain Transportation Specialist U.S. Department of Transportation PHMSA Inspector Training and Qualifications

TAQA North Ltd. Well Blowout W4M June 8, 2009

UNITED STATES DEPARTMENT OF LABOR MINE SAFETY AND HEALTH ADMINISTRATION Metal and Nonmetal Mine Safety and Health REPORT OF INVESTIGATION

EQUIPMENT AND MATERIALS

NATURAL GAS DISTRIBUTION SYSTEM MAYOR: ROBERT BOB HARDY OPERATOR: MICHAEL WARREN

HAZARDOUS INCIDENT SITE SAFETY PLAN

Subpart E. Pressure Testing

CEPA Initiative: Response Time Guideline 2015 EMERGENCY SECURITY MANAGEMENT WORK GROUP

1 Scope... 2 Functions of cementing float equipment... 3 Definitions... 4 Calibration... 5 Test Categories... 6 General...

Success Paths: A Risk Informed Approach to Oil & Gas Well Control

1995 Metric CSJ SPECIAL PROVISION ITEM 7. Legal Relations And Responsibilities To The Public

Safe Work Permits A Safety Advantage

Appalachian Basin Gas Well. Marietta College, Marietta, Ohio June 7-8, Development. Robert McKee, P.E. Design Engineer Multi Products Company

In the spring of 2006, national newspaper headlines screamed

July 12, Subject: California Underground Gas Storage Projects Rulemaking. Dear Mr. Harris,

PRESSURE REDUCING STATION INSTALLATION, OPERATIONS & MAINTENANCE MANUAL

LP-GAS BLEVES RESULT IN FIRE FIGHTER FATALITIES

APPENDIX A GLOSSARY AND ACRONYMS

Albany Connecticut Vermont Westchester

Hydrostatic Testing of In-Situ Pipelines & Spike Testing. Colin Silla, PE, PMP Southeast District Manager 6/27/18

Casing Design. Casing Design. By Dr. Khaled El-shreef

NATIONAL TRANSPORTATION SAFETY BOARD Public Meeting of September 24, 2014 (Information subject to editing)

Process Safety Management Of Highly Hazardous Chemicals OSHA 29 CFR

Operating Committee Strategic Plan

22. Specialty Valves.

GUIDELINES FOR SLUG DISCHARGE MANAGEMENT PLAN (Abstract from EPA Guidance Manual)

System Pressure Manager Standard & System Pressure Manager Plus

EXAMPLES OF COMPLIANCE METHODS FOR MONITORING AND RECORDKEEPING RCRA SUBPARTS BB AND CC. Tennessee Operations Eastman Chemical Company

CONTROL OF HAZARDOUS ENERGY LOCKOUT/TAGOUT PROGRAM

Management of Change (MOC) Could Have Prevented Death

RULE 36 & H 2 S SAFETY

Australian/New Zealand Standard

Compressed Gases and Cryogens

Gas Distribution Connection Forms

OPERATING PROCEDURES

ORDER: APPENDIX: 3 BULLETIN TYPE: Flight Standards Handbook Bulletin for Airworthiness (HBAW)

CITY AND COUNTY OF DENVER POLICY DENVER FIRE DEPARTMENT

Item ID: Rev.: 00 Status: Final Effective Date: 29-Feb-2015 EXECUTIVE SUMMARY

Written Programs Listing

Texas Administrative Code

Bladder Damper PP/PVC

MANUFACTURING TECHNICAL INSTRUCTIONS - SAFETY FALL HAZARD CONTROL REQUIREMENTS SERIES & NO. SMI - 157

Student Pedestrian Safety Fiddlers Canyon Elementary Community Council 2012

Investigation of Loss of Well Control Eugene Island Block 277 OCS-G Well A-2 Off the Louisiana Coast July 6, 2001

Series Confined Space Rescue - Draft Page 1 of 6 Adopted: Revised: INCIDENT MANAGEMENT SYSTEM AND TACTICAL OPERATIONS MANUAL

Incident Investigation AEGIS Insurance Services, Inc. All rights reserved.

INSPECTIONS OF THE LPG ESTABLISHMENTS IN PORTUGAL. Graça Bravo. 26th September 2017

Overview Assessment of the 16 Inch Diameter Olympic Pipeline Integrity

Transcription:

Updates on CA Pipeline Safety Program Kenneth Bruno Program Manager Gas Safety Branch Safety and Enforcement Division California Public Utilities Commission 1

Mission To ensure that intrastate natural gas and liquefied petroleum gas (LPG) pipeline systems are designed, constructed, operated, and maintained according to safety standards set by the CPUC and the federal government 2

Pipeline Safety Team 30 Gas Safety Engineers 1 Damage Prevention Expert 6 Supervisory 2 Administrative 3

Jurisdictional Metrics Distribution: 2016 104,317 miles (Main) 92,996 miles (Services) 1 st in the Nation (TX, IL, OH, MI) 4

Jurisdictional Metrics Transmission: 2016 10,391 Miles 5 th behind (TX, LA, KS, OK) HCA 2,838 Miles (~27%) 5

Operators 11 NG Operators 12 Storage Fields 2,479 Master Meters 655 LPG 6

Operators Bare Steel: 1.6% CP Steel: 36.4% Plastic 55% Other 7% 7

Inspection Types O&M TIMP, DIMP, OQ Emergency Management D&A, CRM, PAP, Damage Prevention Construction 8

9 CPUC Safety Assurance

10 CPUC Safety Assurance

11 CPUC Safety Assurance

12

13 Inspection Types

Large Scale Incidents 1. First Responders 2. Make Safe Stop the flow of gas and conduct a leak migration survey 3. Set up a perimeter and stay off the scene until CPUC completes its investigation 4. Chain of Custody Procedures 14

Incidents Reporting Requirements per GO-112F 151 incidents through July 31, 2017 Reporting Requirements per 49 CFR 191 23 incidents through July 31, 2017 15

16 Incident by Category

2016 Enforcement Four Citations Issued and CPUC-OII for a total of $44,376,000 Distribution Facilities Records Keeping Unqualified Personnel Atmospheric corrosion inspections & Cross bores Failure to take prompt remedial action to correct cathodic protection deficiencies 17

September 9, 2010 Pipeline Failure of 30 Transmission Line in San Bruno, CA 8 Fatalities, numerous injuries Pipeline had MAOP established under 49 CFR 192.619C NTSB Accident Report identified exemptions for pre-code pipelines from pressure testing as a contributing factor to the failure 18

Safety Assurance Actions Post San Bruno PUC Code 958 Required Intrastate NG Transmission Operators to submit a plan to either Pressure Test or Replace all segments that were not pressure tested or that lack sufficient records of pressure testing 19

Progress Update of PU Code 958 CA NG Transmission Pressure Tested: ~875 Miles, 12 Failures Replaced: ~190 Miles Remaining Transmission Lines to be either Pressure Tested or Replaced: ~3,027 Miles Estimated time to completion: SouthWest Gas: Completed PG&E: 2026 20 SoCalGas and SDG&E: 2036

NG Transmission - Safety Measures Average Cost of Hydrostatic Test Range: 1.18 1.7 $MM New Automated Valves (RCV and ASV) 268, 267$MM (PG&E) 131, 151$MM (Sempra) 21

Goals Better technology on Inspections Process Owners for Specialized Areas Continuous Improvement in Pipeline Safety Assurance and Program Performance Regionally based Inspectors 22

Aliso Canyon SS-25 Failure occurred on or around October 23, 2015 October 24 th : 1 st Kill Attempt After several additional failed attempts, well was eventually controlled on February 12, 2016 via relief well 23

Aliso Canyon CPUC is conducting an active investigation in SS-25 failure PU Code 315 and 701 Root Cause Analysis Blade Energy Partners Department of Conservation s DOGGR 24

25

26

Tree Tubing Head Ground Line Casing Head 11-3/4 -in Casing 990 ft 2-7/8 -in TOC at 7,590 ft TOC at 8175 ft Packer = 8,486 ft 7.0 -in Casing 8,585 ft 8,749 ft Page 27

Tubing Extraction - Ongoing 0 Free point tubing Cut Tubing C&C Mud, POH to 1050, Circ. clear brine PU to 850, Run video camera to 1000 RIH to 1050 C&C mud, POH Log 7 Casing 1000 OSS Fault 2000 COMPLETED 3000 4000 5000 YSS Fault COMPLETED _4652' _4910' Pause Operations Submit Supplementary Notice for Proposed Operations above 7590 Aliso _5645' 6000 7000 Porter Upper DA TOC B Annulus 7000' Mid DA Low DA 8000 Cap Rock Sesnon 9000 _xxxx' = OH DST TOC A Annulus 7590' 7 Casing 8585' 3 barite plugs pumped down tubing during kill attempt location and disposition unknown Run video camera ONGOING

29 Thank you! For Additional Information: www.cpuc.ca.gov KAB@CPUC.CA.GOV