SITE TESTING STANDARDS FOR METHANE

Similar documents
METHOD 2E - DETERMINATION OF LANDFILL GAS PRODUCTION FLOW RATE. NOTE: This method does not include all of the

It s Just Calibration How Hard Can It Be?

METHOD 21 - DETERMINATION OF VOLATILE ORGANIC COMPOUND LEAKS. 1.2 Scope. This method is applicable for the

2005 CERTIFICATE OF ACCEPTANCE (Part 1 of 3) MECH-1-A

Construction Dewatering

Explosive gas migration monitoring for a sanitary landfill facility.

UTAS EH&S INSTRUCTION No. 036 June 2012 Revision No. 3. Purging of Flammable Gas Equipment and/or Piping (Explosion Hazard)

Appendix D: SOP of INNOVA 1412 Photoacoustic Multi-Gas Monitor. Description and Principle of Operation

Written Closure Plan. Cherokee Station - Active CCR Impoundments Public Service Company of Colorado Denver, Colorado.

Proposed Uniform Standards for Equipment Leaks

D.B. Wilson Station CCR Landfill

September 2018 Pressure Test

Notable Clarifications to Directive 077 Requirements

Mott Manufacturing Limited

NCDOT S EXPERIENCE USING HYDRAULIC SETTLEMENT GAUGES. David L. Teague,P.E. NCDOT GEOTECHNICAL ENGINEERING UNIT

DURRIDGE STAINLESS STEEL SOIL GAS PROBE

Item 404 Driving Piling

Written Closure Plan. Comanche Station - Active CCR Surface Impoundment Public Service Company of Colorado Denver, Colorado

Flare Gas Composition Analysis and QA/QC Lessons Learned and Lessons Lost SPECTRUM ENVIRONMENTAL SOLUTIONS, LLC 1

Subparts AA and BB - The Other RCRA Air Rules. Beginners aabb

KWA. Evaluation of the MassTech 001 Tank Integrity Test System. EPA Forms Obtained From

STANDARD OPERATING PROCEDURES

Flammability Chart. Gas Formula Ignition

INDUSTRIAL HYGIENE GROUP Standard Operating Procedure. TVA-1000 PID/FID Portable Toxic Vapor analyzer. 1 of 9. Contents

the annulus between the second casing string and the surface casing [must be] open to the atmosphere in the manner described in subsection (2).

IDEM Indiana Department of Environmental Management Office of Land Quality P.O. Box 6015 Indianapolis, IN OLQ PH: (317)

RK-IR Sample Draw Aspirator Adapter Operator s Manual

TOWN/VILLAGE OF LIMA POOL PERMIT APPLICATION

CPT and MiHpt Programs Bayou Corne 8 AUG 2013

Type Testing of Rising Stem Valves Equipped with Graphite Packing for Fugitive Emissions

CLEANING, INSPECTION, AND TESTING OF SEWERS

Written Closure Plan. Pawnee Station - Active CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016

Discussion on Fugitive Emissions Standards Rich Davis

FLOW COMPONENT TESTING FACILITIES API SAFETY VALVE VALIDATION TESTING

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL

DeFelsko PosiTector Dew Point Meter DPM & DPMD Probes

Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1

Initial Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1

LINEAR TRANSFORMATION APPLIED TO THE CALIBRATION OF ANALYTES IN VARIOUS MATRICES USING A TOTAL HYDROCARBON (THC) ANALYZER

MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS

G type DUCTED EXHAUST SAFETY VALVE 2871 AND 288X SERIES. Model/Ref:

Supersedes: The copy of this document located on Measurement Canada s website is considered to be the controlled copy.

RESIDENTIAL SWIMMING POOLS INFORMATION CHECKLIST

WaterSense Specification for Spray Sprinkler Bodies. Version 1.0

Annual CCR Landfill Inspection. Lansing Landfill. Interstate Power and Light Company. Prepared for:

Two-Wire In Situ Oxygen Analyzer (550 to 1400 C)

Grading Plan - Drawing No. C-2 - Project Revision 1 dated January 30, 2018.

ASTM WK Standard Test Method for Dissolved Gases. Anne Jurek Applications Chemist

2016 Annual Inspection Report

Piped Air SCBA Refilling System Standard

Quick Reference Technical Data

Optical Dissolved Oxygen Meter

Merced County Agricultural Commissioner s. Commodity Fumigation Permit Conditions

METHOD 25A - DETERMINATION OF TOTAL GASEOUS ORGANIC CONCENTRATION USING A FLAME IONIZATION ANALYZER

*A Certificate of Survey for the property may be on file at City Hall if the house was built after 1984.

ASSE International Product (Seal) Listing Program. ASSE Performance Requirements for Air Valve and Vent Inflow Preventer

ELEVATION CORRECTION FACTORS FOR RADON MONITORS*

RGC-IR Remote Gas Calibrator for IR400

DeFelsko PosiTector CMM IS Probe

CCR Closure Plan Ash Impoundment

Advanced Test Equipment Rentals ATEC (2832)

The Complete Forward and Backstroke Start Protocols and Checklist contains information and an explanation of these changes:

Revised Corrective Action Plan Part B

DEVELOPMENT OF A ROBUST PUSH-IN PRESSUREMETER

Pocket Bellows Pumps. 180 Hines Ave. Bellville, OH PH: FAX:

VALVE MANUFACTURERS ASSOCIATION API 622 API 624

Workhorse 8 Oxygen System Model No 5665, 5673, 5679

BROWNFIELD ASSESSMENT, REDEVELOPMENT & REMEDIATION

Amended Written Closure Plan

Optical Dissolved Oxygen Meter

San Antonio Water System Standard Specifications for Construction ITEM NO. 841 HYDROSTATIC TESTING OPERATIONS

Minot State University Institutional Review Board ANNUAL UPDATE/REVISION/PROJECT COMPLETION REPORT

Division of Environmental Quality Wellhead Protection Section

Limerock Bearing Ratio Technician Training Course

TABLE OF CONTENTS 1.0 INTRODUCTION PLAN CERTIFICATION (B)(4) 1

Township of North Huntingdon Application for Permit

PRODUCT SHEET. Order probe only as RXPROBE02

APPENDIX A1 - Drilling and completion work programme

Simplified Start-Up Checklist For Fully-Pressurized Seasonal Systems

Written Closure Plan. Pawnee Station - North CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016

CORESTA RECOMMENDED METHOD N 6

ACCREDITATION OF ON-LINE LEAK SEAL ORGANIZATIONS

APPLICATION FOR A PERMIT TO CONSTRUCT OR ALTER A PUBLIC SWIMMING POOL, SPA POOL, WADING POOL OR FOUNTAIN

RK LEL Sample Draw Aspirator Adapter Operator s Manual

Chalmers & Kubeck - Certified Individual Review Test

DEVICES FOR FIELD DETERMINATION OF WATER VAPOR IN NATURAL GAS Betsy Murphy MNM Enterprises 801 N. Riverside Drive Fort Worth, Texas 76111

We measure it. For gas and water installers. testo hpa. bar

Vertical Bladder Tanks

VACUUM TESTING PRECAST CONCRETE MANHOLES

1811G/H PITOT-STATIC TEST SET

CMT Multilevel System Assembly Manual

CSA Sample Draw Aspirator Adapter Operator s Manual

Automated Determination of Dissolved Gases in Water Anne Jurek. Abstract: Discussion:

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM

Air Operated Hydraulic Pumping Systems to 50,000 psi

The purpose of this brochure is to explain to owners and contractors the City of Burnaby s requirements for private swimming pools.

Volt 8000 Series Heated Regulator

PROCEDURES FOR REPAIRS TO ASME NV STAMPED PRESSURE RELIEF DEVICES OF NUCLEAR SAFETY RELATED PRESSURE RELIEF VALVES

INADVERTENT RETURN PLAN FOR HORIZONTAL DIRECTIONAL DRILLING (HDD)

OPTIMA 7 - BIOGAS Calibrating the gas sensors SENSOR ADJUSTMENT. Diamond Scientific 625 Peachtree St., Cocoa, Florida /Tel:

Transcription:

INFORMATION BULLETIN / PUBLIC - BUILDING CODE REFERENCE NO.: 91.7104.1 Effective: 11-30-04 DOCUMENT NO. P/BC 2002-101 Revised: Previously Issued As: None SITE TESTING STANDARDS FOR METHANE This Infmation Bulletin establishes the standard protocol f Site Testing that provides design input data f methane mitigation systems required by Division 71 of the Los Angeles Building Code. The wk plan f site testing is summarized in three primary steps: Step 1 - Schedule Site Testing Step 2 - Conduct Shallow Soil Gas Test Step 3 - Conduct Gas Probe Test The site testing results from these steps are to be ganized in a rept and included with the building permit application. I. SITE TESTING FOR METHANE Site testing shall be conducted using the following three-step testing protocol described in this Bulletin to determine the concentration and pressure of the subsurface methane gas f the design of methane hazard mitigation systems. STEP 1 - SCHEDULE SITE TESTING Site Testing should be scheduled befe any site grading. If Site Testing after site grading is unavoidable, then Site Testing shall be conducted at least 30 days after any site grading. STEP 2 - CONDUCT SHALLOW SOIL GAS TEST 1. Methane gas concentration measurements f the Shallow Soil Gas Test (See page 8 f the Shallow Soil Gas Test Equipment Set-Up) shall be taken as follows: a. A minimum of two per project site, and at a rate of one sample per 10,000 square feet of site area, ption thereof, and b. At a depth of not less than 4 feet below ground surface, c. If ground water is found less than 4 feet below ground surface, then the depth of the Page 1 of 8

Shallow Soil Gas Sample shall be taken above the ground water level. 2. Review the methane gas concentration data from the Shallow Soil Gas Test and site observations to identify locations where high gas concentrations of methane gas may be found. 3. Shallow Soil Gas measurements shall be made at least once and may be taken at anytime befe the installation of Gas Probe Sets. STEP 3 - CONDUCT GAS PROBE TEST 1. The location of Gas Probe Sets shall be based on the infmation from the Shallow Soil Gas Test where the highest concentration of soil gas may be found. 2. Methane gas concentration and pressure measurements f the Gas Probe Tests (See page 9 f the Gas Probe Set Equipment Set-Up) shall be taken as follows: a. There shall be at least one gas probe set f every 20,000 square feet ption thereof of site area. Regardless of area, all sites shall install a minimum of two gas probe sets. b. Each Gas Probe Set shall consist of three probes, installed at approximate sampling depths of 5 feet, 10 feet and 20 feet below the elevation of the lowest building slab footing. c. Gas Probe Sets shall be installed a minimum of 12 inches above ground water table. d. Gas Probe Sets are not required to be installed below the ground water level. e. Shallow Soil Gas data, collected as described in Step 2, may be used in lieu of Gas Probe Set data when ground water is found less than 5 feet below the ground surface. 3. Recd data from the Gas Probe Sets as follows: a. Two sequential measurements shall be taken, with a minimum 24-hour interval following placement of the Gas Probe Sets. Samples shall not be collected during increasing barometric pressure from a pre-frontal weather condition. b. Site testing data shall be recded on Fm 1 Certificate of Compliance f Methane Test Data and certified by the engineer (see pages 4 and 5). II. REPORTING SITE TESTING RESULTS The methane site testing data shall be ganized as described below: 1. The Certificate of Compliance f Methane Test Data, Fm 1, shall be completed, stamped and signed by an engineer, geologist architect. This fm shall be attached to the methane mitigation construction plans. 2. Site Testing Plan showing: Page 2 of 8

a. Locations of Shallow Soil Gas Samples and Gas Probe Sets. b. Locations and dimensions of the proposed and existing building footprints. III. CERTIFICATE OF COMPLIANCE AND GAS COLLECTION EQUIPMENT Fm 1- Certificate of Compliance f Methane Test Data Table I - Gas Collection Equipment Shallow Sample Equipment Set-Up Gas Probe Set Equipment Set-Up Page 3 of 8

FORM 1 - CERTIFICATE OF COMPLIANCE FOR METHANE TEST DATA Part 1: Certification Sheet Site Address: Legal Description: Tract: Lot: Block: Building Use: Architect s, Engineer s Geologist s Stamp: Name of Architect, Engineer, Geologist: Mailing Address: Telephone: Name of Testing Labaty: City Test Lab License #: Telephone: I hereby certify that I have tested the above site f the purpose of methane mitigation and that all procedures were conducted by a City of Los Angeles licensed testing agency in confmity with the requirements of the LADBS Infmation Bulletin P/BC 2002-101. Where the inspection and testing of all part of the wk above is delegated, full responsibility shall be assumed by the architect, engineer geologist whose signature is affixed thereon. Signed: date Required Data: Project is in the (Methane Zone) (Methane Buffer Zone). Depth of ground water observed during testing: feet below the Impervious Membrane. Depth of Histical High Ground Water Table Elevation*: feet below the Impervious Membrane. Design Methane Concentration**: parts per million in volume (ppmv). Design Methane Pressure***: inches of water column. Site Design Level: (Level I, Level II, Level III, Level IV, Level V) with inches of water column. De-watering: De-watering ( is ) ( is not ) required per Section 91.7104.3.7. Pump discharge rate cubic feet per minute per reference geology soil rept: dated. Additional Investigation: Additional investigation ( was ) ( was not ) conducted. Latest Grading on Site: Date of last grading on site ( was ) (was not) me than 30 days befe Site Testing. See Attached explanation of the effect on soil gas survey results by grading operations. Notes: * Histical High Ground Water Table Elevation shall mean the highest recded elevation of ground water table based on histical recds and field investigations as determined by the engineer f the methane mitigation system. ** Design Methane Concentration shall mean the highest recded measured methane concentration from either Shallow Soil Gas Test any Gas Probe Set on the site. *** Design Methane Pressure shall mean the highest total pressure measured from any Gas Probe Set on the site. Page 4 of 8

FORM 1 (CONTINUED) - CERTIFICATE OF COMPLIANCE FOR METHANE TEST DATA Part 2: Test Data - Shallow Soil Gas Test and Gas Probe Test Site Address: Description of Gas Analysis Instrument(s): Instrument Name and Model: Instrument Accuracy: + ppmv. City of Los Angeles Testing License #: Date Time Probe Set # Concentration (ppmv) Pressure (inches water column) Probe Depth (feet) Description / Probe Location Page 5 of 8

TABLE 1 - DATA COLLECTION EQUIPMENT Parameter Barometric Pressure Equipment Procedure Barometer GA-90 Detection Limit 0.1" of Hg Gas Probe Pressure Pressure Gauge 0.1" of H 2 O Methane Concentration Combustible Gas Concentration Notes f Table 1: Landtec GA-90 (Field) EPA 8015 (Lab) LTX-310 (Field) EPA 8015 (Lab) 0.1% 1,000 ppm 0.1% 1,000 ppm 1. Gas Probe Sets shall be capable of collecting data f both soil gas pressure and methane concentration. 2. Instruments and test procedures used to determine gas pressure and concentrations shall be in accdance with the test equipment manufacturer s instructions and the listed Detection Limits. 3. Ptable Gas Sampling Instruments shall consist of infrared gas analyzer other combustible gas analyzers. Photo Ionization Detects (PIDs) shall not be used to measure methane concentrations. Flame Ionization Detects (FID s) may be used as the primary detect f gas probe moniting. All ptable gas sampling instruments shall be calibrated daily using a labaty certified methane calibration gas. Page 6 of 8

SHALLOW SOIL GAS TEST EQUIPMENT SET-UP Gas-Tight quick connect fitting Ground surface Ground surface Protective Vault Protective Vault Native soil Slurry backfill *~5' typical ~3 to 36 inch diameter bing (typical) *~5' typical Native soil Slurry backfill Bentonite seal 1 ft. typ. Clean sand 1.2" 1/4" O.D. Polyethylene Tubing 1.2" Pous Polypropylene Tip 0.7" Acetyl Female Adapter 1" to 4" diameter, Schedule 40 PVC Well Screen with 0.020-inch facty slotted casing 24-inch screen length Cap Clean sand *Note: Measurement from Shallow Soil Gas Test shall be taken above ground water level. Page 7 of 8

GAS PROBE TEST EQUIPMENT SET-UP Option A - Ploypropylene Tip Option B - Slotted PVC Casing Gas-Tight quick connect fitting Ground surface Ground surface @ 5 feet Protective Vault ~3 to 36 inch diameter bing (typical) 1.2" 1/4" O.D. Polyethylene Tubing 1.2" Pous Polypropylene Tip 0.7" Acetyl Female Adapter @ 5 feet Protective Vault ~3 to 36 inch diameter bing (typical) 1" to 4" diameter, Schedule 40 PVC Well Screen with 0.020-inch facty slotted casing 24-inch screen length Clean sand Native soil @ 10 feet Clean sand @ 10 feet @ 20 feet 1 ft. typical @ 20 feet 2' screen typical *Note: Gas Probe Test shall not be install below ground water level. Page 8 of 8