Lockout Tagout Program

Similar documents
H. Control of Hazardous Energy: Lockout/Tag Out

Lockout/Tagout - Energy Control Program

University of Arkansas Office of Environmental Health and Safety

LOCKOUT/TAGOUT: Operating Procedure TABLE OF CONTENTS

Lock Out/Tag Out Control of Hazardous Energy

LOCKOUT/TAGOUT PLAN August 2015

THE UNIVERSITY OF NORTH CAROLINA

LO/TO LOCKOUT/TAGOUT PROGRAM

The Control of Hazardous Energy (Lockout/Tagout) California State University Chico

LOCKOUT/TAGOUT PROGRAM

Lockout/Tagout Program Occupation Safety & Health Standards for General Industry 29 CFR

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAG OUT PROGRAM) Washington State University Tri-Cities (all departments)

PAGE 1 OF 7 HEALTH, SAFETY & ENVIROMENTAL MANUAL PROCEDURE: S230 Lock-Out Tag-Out (LOTO) Program REV 4.0 8/13/2012

OKLAHOMA CITY COMMUNITY COLLEGE CONTROL OF HAZARDOUS ENERGY PROGRAM. Environmental Health and Safety. Established:

LOCKOUT / TAGOUT PROGRAM

Product Information Report Lockout/Tagout Hazardous Energy Control

Health, Safety, Security and Environment

WESTERN CONNECTICUT STATE UNIVERSITY LOCKOUT/TAGOUT PROCEDURE S-107

University of Vermont Department of Physical Plant Burlington, Vermont

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT) PROGRAM

Facilities Management

DUQUESNE UNIVERSITY LOCKOUT/TAGOUT PROGRAM

Lockout/Tagout - Control of Hazardous Energy Program

Page: 7/15/2009. Energy control procedures Use of lockout/tagout equipment to ensure safe work practices.

Hazardous Energy Control (Lockout-Tagout)

DuPage County Environmental, Safety, Health & Property Loss Control Program Hazardous Energy Control (Lockout/Tagout)

Lockout - Tagout. Control of Hazardous Energy OSHA Standard

SAFETY DIRECTIVE 2.0 DEPARTMENTS AFFECTED. This Administrative Directive shall apply to all Town of Marana departments and employees.

UCHC Lockout/Tagout Policy (4/09)

Control of Hazardous Energy. Environmental Health and Safety

RiskTopics. Lockout/Tagout October 2017

Control of Hazardous Energy Lockout / Tagout Program

LOCK-OUT/TAG-OUT (LO/TO) SAFETY PROGRAM

Lockout/Tagout Manual

Lockout/Tagout Safety Policy

Gettysburg College. Energy Control Program

Lockout/Tagout Program

Lockout Tagout Policy

SAMPLE WRITTEN PROGRAM for Control of Hazardous Energy LOCKOUT TAGOUT

ARKANSAS TECH UNIVERSITY FACILITIES MANAGEMENT HEALTH AND SAFETY MANUAL (LOCKOUT/TAGOUT) 30.0

LOCKOUT/TAGOUT PROGRAM

Management Plan for Lockout Tagout (LOTO) ISD #535

Lockout/Tagout Training Overview. Safety Fest 2013

PRESCOTT SCHOOL DISTRICT NO South A Street Prescott, WA The Control of Hazardous Energy (Lockout/Tagout)

PART Q CONTROL OF HAZARDOUS ENERGY (LOCKOUT-TAGOUT)

MARIPOSA COUNTY LOCKOUT/TAGOUT PROGRAM

LOCKOUT-TAGOUT PROGRAM

DRAFT LOCKOUT/TAG OUT PROGRAM (CONTROL OF HAZARDOUS ENERGY)

E2.14 Control of Hazardous Energy. Effective Date: 03/01/2018

Lockout/Tagout Program

2523-LDG-E. Leader s Guide

CONTROL OF HAZARDOUS ENERGY IN THE WORKPLACE

Lockout / Tagout Program OSHA 29 CFR

Lockout / Tag out Program

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT)

Energy Control Procedures Lockout/Tagout 29 CFR

Control of Hazardous Energy Program (Lockout/Tagout)

MCW s Control of Hazardous Energy Program

Lockout / Tagout Safety Program

This session covers the safety procedure known as lockout/tagout, which is required by Occupational Safety and Health Administration (OSHA) in its

PROGRAM: Control of Hazardous Energy (LOCKOUT) Chapter 5

Lock Out - Tag Out Safety Program

LOCKOUT/TAGOUT PROGRAM

Control of Hazardous Energy Program (LOTO)

Lockout/Energy Control

CONTROL OF HAZARDOUS ENERGY LOCKOUT/TAGOUT PROGRAM

Sample Written Program for The Control of Hazardous Energy (Lockout/Tagout)

Lockout/Tagout Plan Environmental Health & Safety Office July 2017

University of Tennessee Safety Program

230-LOCKOUT/TAGOUT PROGRAM

Issue: Issued By: Environment, Health & Safety Part: Hazard Identification and Assessment Revision #: 2 Revision

SUNY OSWEGO ENVIRONMENTAL HEALTH AND SAFETY

CITY OF NEW LONDON LOCKOUT/TAGOUT PROGRAM

LOCKOUT/TAGOUT POLICY

Elements of a Lockout/Tagout Program OSHA

Lockout/Tagout. Page. Introduction. Purpose. 2 Background. 2 Who s Covered?... 3 Responsibilities. 3 Explanation of Key Terms. 4.

Lockout Tagout Program

Texas Department of Insurance Division of Workers Compensation. Lockout Tagout HS96-100D (8-06)

Health and Fire Safety Review 2/15

PALM BEACH STATE COLLEGE PERSONAL PROTECTIVE EQUIPMENT (PPE) JOB HAZARD ASSESSMENT

Hazardous Energy Control

PALM BEACH STATE COLLEGE PERSONAL PROTECTIVE EQUIPMENT (PPE) JOB HAZARD ASSESSMENT

Lockout/Tagout Program

SUNY OSWEGO ENVIRONMENTAL HEALTH AND SAFETY

Health & Safety Policy and Procedures Manual SECTION 6 ELECTRICAL SAFETY / CONTROL OF HAZARDOUS ENERGY

Lockout / Tagout Program. The Control of Hazardous Energy. Environmental Health and Safety Office

Environmental Health and Safety (EH&S) Revision Date: Initial. Prepared by: EH&S and Facility Management and Campus Services (FMS)

Lockout Tagout Program

Hazardous Energy Control Lockout/Tagout

ILLINOIS INSTITUTE OF TECHNOLOGY SAFETY COMMITTEE

TAMPA ELECTRIC COMPANY ENERGY SUPPLY HAZARDOUS ENERGY CONTROL LOCKOUT PROGRAM

EM Section 12. Control of Hazardous Energy (Lockout/Tagout)

University of Louisville. Physical Plant

Hazardous Energies Control and Lockout/Tagout Program

CONTROL OF HAZARDOUS ENERGY

Lock-out Tag-out Program (Zero Energy State)

Sample Lockout/Tagout Policy

Hazardous Energy Control/Lockout

Control of Hazardous Energy (Lockout/Tag-out) 29 CFR

SAINT MARY S COLLEGE OF CALIFORNIA STANDARD HAZARDOUS ENERGY CONTROL PROGRAM INCLUDING LOCKOUT/TAGOUT. Prepared by

Transcription:

Lockout Tagout Program RIM of the World Unified School District 27315 North Bay Road Blue Jay, CA 92352 (909) 336-4100 July 2016 Safety and Risk Management Department RIM of the World Unified School District 27315 North Bay Road Blue Jay, CA 92352 (909) 336-4121

2 Contents Purpose... 3 Definitions... 3 Training... 4 Authorized Employees Training... 4 Affected Employee Training... 4 Other Employee Training... 4 Preparation for Lockout Tagout Procedures... 5 Routine Maintenance and Machine Adjustments... 5 Locks, Hasps and Tags... 5 SOP: General Lockout Tagout... 5 Preparation for Shutdown... 5 Machine or Equipment Shutdown... 6 Machine or Equipment Isolation... 6 Lockout or Tagout Device Application... 6 Stored Energy... 6 Verification of Isolation... 7 Extended Lockout Tagout... 7 SOP: Release from LOCKOUT TAGOUT... 8 SOP: Lockout Tagout Procedure for Electrical Plug-Type Equipment... 8 SOP: Lockout Tagout Procedures Involving More Than One Employee... 9 SOP: Management's Removal of Lock and Tag Out... 9 SOP: Contractors... 9

3 Purpose of the Plan Control of hazardous energy is the purpose of the Lockout Tagout program. This program establishes the requirements for isolation of both kinetic and potential electrical, chemical, thermal, hydraulic and pneumatic and gravitational energy prior to equipment repair, adjustment or removal. Reference: OSHA Standard 29 CFR 1910. 147 - The control of hazardous energy. Authority and Scope Authority: California Code of Regulations, Title 8, Section 3203 Scope: This plan applies to the cleaning, repairing, servicing, setting-up and adjusting of machines and equipment in which the unexpected energization or start-up of the machines or equipment, or release of stored energy could cause injury to employees. Definitions Authorized (Qualified) Employees are the only ones certified to lock and tagout equipment or machinery. Whether an employee is considered to be qualified will depend upon various circumstances in the workplace. It is likely for an individual to be considered "qualified" with regard to certain equipment in the workplace, but "unqualified" as to other equipment. An employee, who is undergoing on-the-job training and who, in the course of such training, has demonstrated an ability to perform duties safely at his or her level of training and who is under the direct supervision of a qualified person is considered to be "qualified" for the performance of those duties. Affected Employees are those employees who operate machinery or equipment upon which lockout or tagging out is required under this program. Training of these individuals will be less stringent in that it will include the purpose and use of the lockout procedures. Other Employees are identified as those that do not fall into the authorized, affected or qualified employee category. Essentially, it will include all other employees. These employees will be provided instruction in what the program is and not to touch any machine or equipment when they see that it has been locked or tagged out. SOP is an acronym that stands for Standard Operating Procedures or the way things are done during normal circumstances and in normal conditions.

4 Training Authorized Employees Training All maintenance and operations employees, department supervisors and custodial employees will be trained to use the Lockout Tagout Procedures. Maintenance and Operations supervisors or the appropriate risk management staff will conduct the training at the time of initial hire. Retraining shall be held at least annually. The training will consist of the following: Review of General Procedures Review of Specific Procedures for machinery, equipment and processes Location and use of Specific Procedures Procedures when questions arise Affected Employee Training Only trained and authorized employees will repair, replace or adjust machinery, equipment or processes Affected employees may not remove locks, locking devices or tags from machinery, equipment or circuits. Purpose and use of the lockout procedures. Other Employee Training Only trained and authorized employees will repair, replace or adjust machinery or equipment. Other employees may not remove locks, locking devices or tags from machinery, equipment or circuits

5 Preparation for Lockout Tagout Procedures A Lockout Tagout survey has been conducted to locate and identify all energy sources to verify which switches or valves supply energy to machinery and equipment. Dual or redundant controls have been removed. A Tagout Schedule has been developed for each piece of equipment and machinery. This schedule describes the energy sources, location of disconnects, type of disconnects, special hazards and special safety procedures. The schedule will be reviewed each time to ensure employees properly lock and tag out equipment and machinery. If a Tagout Schedule does not exist for a particular piece of equipment, machinery and process, one must be developed prior to conducting a Lockout Tagout. As repairs and/or renovations of existing electrical systems are made, standardized controls will be used. Routine Maintenance and Machine Adjustments Lockout Tagout procedures are not required if equipment must be operating for proper adjustment. Only trained and authorized employees may use this rare exception. Theses employees may perform this task, when specific procedures have been developed with proper training to safely avoid hazards. All consideration shall be made to prevent the need for an employee to break the plane of a normally guarded area of the equipment by use of tools and other devices. Locks, Hasps and Tags All qualified maintenance personnel will be able to check out a lock with one key, hasp and tag. All locks will be keyed differently, except when a specific individual checks out a series of locks for complex lockouttagout tasks. In some cases, more than one lock, hasp and tag are needed to completely de-energize equipment and machinery. Additional locks may be checked out from the department or supervisor on a shift-by-shift basis. All locks and hasps shall be uniquely identifiable to a specific employee. SOP: General Lockout Tagout Before working on, repairing, adjusting or replacing machinery and equipment, the following procedures will be utilized to place the machinery and equipment in a neutral or zero mechanical state. Preparation for Shutdown Before an authorized or affected employee turns off a machine or piece of equipment, the authorized employee will have knowledge of the type and magnitude of the energy, the hazards of the energy to be controlled, and the means to control the energy. Notify all affected Employees that the machinery, equipment or process will be out of service

6 Machine or Equipment Shutdown The machine or equipment will be turned or shut down using the specific procedures for that specific machine. An orderly shutdown will be utilized to avoid any additional or increased hazards to employees as a result of equipment de-energization. If the machinery, equipment or process is in operation, follow normal stopping procedures (depress stop button, open toggle switch, etc.). Move switch or panel arms to "Off" or "Open" positions and close all valves or other energy isolating devices so that the energy source(s) is disconnected or isolated from the machinery or equipment. Machine or Equipment Isolation All energy control devices that are needed to control the energy to the machine or equipment will be physically located and operated in such a manner as to isolate the machine or equipment from the energy source. Lockout or Tagout Device Application Authorized employees will affix lockout or tagout devices to energy isolating devices. Lockout devices will be affixed in a manner that will hold the energy isolating devices in the "safe" or "off" position. Where tagout devices are used they will be affixed in such a manner that will clearly state that the operation or the movement of energy isolating devices from the "safe" or "off" positions is prohibited. The tagout devices will be attached to the same point a lock would be attached. If the tag cannot be affixed at that point, the tag will be located as close as possible to the device in a position that will be immediately obvious to anyone attempting to operate the device. Lock and tag out all energy devices by use of hasps, chains and valve covers with assigned individual locks. Stored Energy Following the application of the lockout or tagout devices to the energy isolating devices, all potential or residual energy will be relieved, disconnected, restrained, and otherwise rendered safe. Where the re-accumulation of stored energy to a hazardous energy level is possible, verification of isolation will be continued until the maintenance or servicing is complete. Release stored energy (capacitors, springs, elevated members, rotating fly wheels, and hydraulic/air/gas/steam systems) must be relieved or restrained by grounding, repositioning, blocking and/or bleeding the system.

7 Verification of Isolation Prior to starting work on machines or equipment that have been locked or tagged out, the authorized employees will verify that isolation or de-energization of the machine or equipment have been accomplished. After assuring that no employee will be placed in danger, test all lock and tag outs by following the normal start up procedures (depress start button, etc.). Caution: After Test, place controls in neutral position. Extended Lockout Tagout Should the shift change before the machinery or equipment can be restored to service, the lock and tag out must remain. If the task is reassigned to the next shift, those employees must lock and tag out before the previous shift may remove their lock and tag.

8 SOP: Release from LOCKOUT TAGOUT Before lockout or tagout devices are removed and the energy restored to the machine or equipment, the following actions will be taken: 1. The work area will be thoroughly inspected to ensure that nonessential items have been removed and that machine or equipment components are operational. 2. The work area will be checked to ensure that all employees have been safely positioned or removed. Before the lockout or tagout devices are removed, the affected employees will be notified that the lockout or tagout devices are being removed. 3. Each lockout or tagout device will be removed from each energy-isolating device by the employee who applied the device. SOP: Lockout Tagout Procedure for Electrical Plug-Type Equipment This procedure covers all Electrical Plug-Type Equipment such as Battery Chargers, some Product Pumps, Office Equipment, Powered Hand Tools, Powered Bench Tools, Lathes, Fans, etc. When working on, repairing, or adjusting the above equipment, the following procedures must be utilized to prevent accidental or sudden startup: 1. Unplug Electrical Equipment from wall socket or in-line socket. 2. Attach "Do Not Operate" Tag and Plug Box and Lock on end of power cord. An exception is granted to not lock and tag the plug if the cord and plug remains in the exclusive control of the employee working on, adjusting or inspecting the equipment. 3. Test Equipment to ensure power source has been removed by depressing the "Start" or "On" Switch. 4. Perform required operations. 5. Replace all guards removed. 6. Remove Lock and Plug Box and Tag. 7. Inspect power cord and socket before plugging equipment into power source. Any defects must be repaired before placing the equipment back in service. NOTE: Occasionally used equipment may be unplugged from power source when not in use.

9 SOP: Lockout Tagout Procedures Involving More Than One Employee In the preceding SOPs, if more than one Employee is assigned to a task requiring a lock and tag out, each must also place his or her own lock and tag on the energy isolating device(s). SOP: Management's Removal of Lock and Tag Out Only the Employee that locks and tags out machinery, equipment or processes may remove his/her lock and tag. However, if the Employee leaves the facility before removing his/her lock and tag, the immediate supervisor may remove the lock and tag. The immediate supervisor must be assured that all tools have been removed, all guards have been replaced and all employees are free from any hazard before the lock and tag are removed and the machinery, equipment or process are returned to service. Notification of the employee who placed the lock is required prior to lock removal. SOP: Contractors Contractors working on district property and equipment must use this Lockout Tagout procedure while servicing or maintaining equipment, machinery or processes.