Old Colony Bikeway. Erin Pacileo Joe Conroy Pat Ruby Ryan Hipp. Civil & Environmental Engineering. South Bay Center. Moakley Park.

Similar documents
Sharrows and Elephants and Bike Boxes!, s, Oh My!

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

MARK MESSIER TRAIL LONG-RANGE PLANNING STUDY WELCOME. Mark Messier Trail Planning Study 137 Avenue to Anthony Henday Drive.

TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN

43 rd Avenue, Skillman Avenue Protected Bike Lanes

Developing Bikeways in South Denver

Date: April 4, Project #: Re: A Street/Binford Street Traffic/Intersection Assessment

Duwamish Way-finding and CTR Report

Bay to Bay Boulevard Complete Streets Project

The Northern Avenue Bridge is being replaced, and the city is debating just who will be allowed to use it

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Charlesgate. World Series Path

Bicycle Facilities Planning

Proposed White Flint Separated Bike Lane Network September 2015

Community Meeting February 27, 2007 Dorchester Avenue Transportation & Streetscape Improvements Action Plan February 27, 2007

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Forest Hills Improvement Initiative

NEWMARKET UPHAM S CORNER

Draft North Industrial Area-Wide Traffic Plan

Plant City Walk-Bike Plan

Connecting cyclists to work. Syracuse Metropolitan Transportation Council

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

CAPITOL DRIVE & FOND DU LAC AVENUE INTERSECTION ANALYSIS. Urban Planning 772 SARAH BREGANT, RYAN PETERSON, & MATT WERDERITCH

Town of Bethlehem. Planning Assessment. Bethlehem Town Board

PROJECT OVERVIEW. 20th Avenue Project Limits (Lincoln Way to Wawona St)

Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

ACTION TRANSMITTAL No

Transportation Corridor Studies: Summary of Recommendations

Recommended Improvements - Ruby/Banning Neighbourhood Greenway

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

New Seward and 36 th Avenue Intersection Conceptual Design

Clackamas County Comprehensive Plan

US 278 Corridor Concept Presentation. Avondale Estates Intersection Improvement/Roundabout and Road Diet Feasibility Study March 19, 2015

It would be an active transportation link to the Metroparks and downtown for Lakewood and the West side of Cleveland.

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Article 3.0 circulation plan

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015

4404 St. Peter Street New Orleans, LA (504) April 13 th, To Whom It May Concern:

Public Works and Infrastructure Committee. General Manager, Transportation Services

General Design Factors

Station Plan: Penn & 43rd Avenue

Hennepin Avenue Reconstruction Washington Avenue to 12 th Street

The Wiggle Route in Context

Richmond-Adelaide Cycle Tracks

COMMUNITY MEETING AGENDA

Supervisor Cook Announces Final Plans for Braddock Road Improvement Project

Board of Supervisors February 27, 2017

Corydon-Osborne Neighbourhood Plan Recommendations

Project Goals and Objectives

Public Open House #2. THE CITY OF NORTH VANCOUVER CHESTERFIELD AVENUE CYCLING IMPROVEMENTS (4th - 13th STREET) JULY 2013

Chapter 5 Future Transportation

CITY OF LOMITA CITY COUNCIL REPORT

Rochester Downtown Bicycle Study 2009

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Small Town & Rural Multimodal Networks

Marina Bay Trail Community Meeting #1

Intersection Design. Leah Ness, Craig Hardy and Eric Sorensen

Foothill Expressway Improvements Between El Monte and San Antonio

Physical Implications of Complete Streets Policies

Bridging the Gaps in the Emerald Necklace:

Harbor Ride Wharf District Boston, MA

Phone: Fax: Project Reference No. (to be filled out by MassHighway):

4 MOBILITY PLAN. Mobility Plan Objectives. Mobility Context. 1. Integrate with Local and Regional Transit Improvements

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

Blair/Williamson Intersection Expressed Needs

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

BIKE ON ROAD NETWORKS: URBAN & RURAL. Non-motorized Transportation Networks. Madison County Council of Governments

Boston Post Road Design Feasibility Study

a 20 year period. separate phases of development with staggered years)

MAKE YOUR PLACE IN CHANNELSIDE

Bluffdale South (SR140) Bicycle/Shoulder Lanes Project Type Bicycle

NEAR NORTHSIDE. Mobility Workshop. June 20th, 2018

City of Davis East Covell Corridor Plan

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

10A. DATE: October 5, Pedestrian and Bicycle Advisory Committee. Kevin Colin, Deputy Planning Manager Curt Bates, City Engineer

Terwillegar Drive Expressway Draft Concept Plan

South Bay Bicycle Master Plan American Planning Association National Conference Los Angeles, CA

Route 28 Critical Locations Bicycling Network Connectivity November 2017

US 69 RELIEF ROUTE STUDY

TRAFFIC IMPACT ANALYSIS

Giles Run Connector Road

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

Waterford Lakes Small Area Study

YELLOWHEAD TRAIL / 149 STREET INTERCHANGE

Downtown Mansfield Circulation/Parking Study

Route 79/Davol Street Corridor Study

Moving Together Conference Complete Streets from the MassDOT District 5 Perspective

Complete Streets Needs. Complete Streets Project Origin (planning documentation or supporting analysis)

MARC Rail Communities Plan Working Draft December 21, 2017

Chapter 3 DESIGN SPECIFICATIONS

Appendix 3.2 D. Ridership Errata Sheet

EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives

P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No Halifax Regional Council September 18, 2018

RIVERSIDE, Newton MA BH NORMANDY RIVERSIDE LLC. Riverside Station. A green, transit-oriented community

Transcription:

Old Colony Bikeway South Bay Center Dorcheste er Ave. Old Colo ony Ave. Moakley Park UMass Boston Erin Pacileo Joe Conroy Pat Ruby Ryan Hipp

Outline Project Overview Objectives & Goals Proposed Corridor Existing Conditions Selected Design Questions

Old Colony Bikeway Downtown Boston Emerald Necklace Seaport District South Boston Jamaica Pond South Bay Harbor Trail Dorchester Dorchester Bay Harborwalk Existing Bicycle Network Old Colony Bikeway Neponset River Greenway

Corridor Overview Boston Medical Center Preble Street South Bay Center Dorch hester Ave. Old Col ony Ave. Moakley Moakley Park Park Bay Side Expo UMASS Boston

Corridor Overview Boston Medical Center Preble Street South Bay Center Dorch hester Ave. Old Col ony Ave. Moakley Park Park Bay Side Expo UMASS Boston

Corridor Overview Boston Medical Center Preble Street South Bay Center Center Dorch hester Ave. Old Col ony Ave. Moakley Park Bay Side Expo UMASS Boston

Corridor Overview Boston Medical Center Preble Street South Bay Center Center Dorch hester Ave. Old Col ony Ave. Moakley Moakley Park Park Bay Side Expo UMASS Boston

Project Objectives Connection between Existing Paths Safety, Separation & Comfort Appealing Bikeway for All Users Recreational Cyclists Commuters

Southampton Street (Western Section) Existing Constraints Industrial Area Heavy Vehicles Loading Truck Block Lanes New Market District South Bay Center

Southampton Street ` (Western Section) Critical Volume Analysis (Westbound) 3600 1800 948 Existing Capacity Proposed Capacity 525 Actual Volume (AM) Actual Volume (PM) 0 500 1000 1500 2000 2500 3000 3500 4000 Vehicles per Hour

Southampton Street (Western Section) Proposed Design One-Way Two-Way

Southampton Street (Eastern Section) Existing Constraints High Traffic Volumes Extended Queues MBTA Andrew Square Dorchester Ave. South Bay Center

Southampton Street (Eastern Section) Proposed Design

Preble Street Existing Opportunities Expansive Right-of-Way Residential Low Traffic Volumes Dorchester Av ve. Preble St.

Preble Street Proposed Design Existing

Preble Street Rotary Existing Constraints Expansive Pavement Straight Shots Difficult Crossings Preble St. Old Colony Moakley Park Ave.

Preble Street Roundabout Proposed Design Existing

Old Colony Avenue Existing Opportunities Expansive Pavement Underutilized Lanes Residential Recreational Old Colony Ave. Moakley Park

Old Colony Avenue Critical Volume Analysis (Southbound) 5400 3600 1110 1290 Existing Capacity Proposed Capacity Actual Volume (PM) Actual Volume (AM) 0 1000 2000 3000 4000 5000 6000 Vehicles per Hour

Old Colony Avenue Existing Proposed Design N

Morrissey Blvd. (Northern Section) MBTA JFK/UMASS Existing Constraints Inadequate Bike Lane Underutilized Southbound Shaw s S Lanes Supermarket

Morrissey Blvd. (Northern Section) Critical Volume Analyis (Southbound near Shaw's) 3600 1800 Existing Capacity Proposed Capacity 575 Actual Volume (AM) 854 Actual Volume (PM) 0 500 1000 1500 2000 2500 3000 3500 4000 Vehicles per Hour

Morrissey Blvd. (Northern Section) Proposed Design Existing N

Morrissey Blvd. (Southern Section) B.C. High Existing Constraints No Bicycle Facilities Deteriorating Pedestrian Facilities Traffic Centered Roadway Boston Globe

Morrissey Blvd. (Southern Section) Critical Volume Analyis (Southbound) 9000 7200 Existing Capacity Proposed Capacity 1324 Actual lvolume (AM) 2266 Actual Volume (PM) 0 2000 4000 6000 8000 10000 Vehicles per Hour

Morrissey Blvd. (Southern Section) Existing Proposed Design

University of Massachusetts Boston Intersection Existing Constraints Underutilized Lanes Expansive Pavement Confusing Southbound Configuration

University of Massachusetts Boston Intersection Proposed Design Existing Existing Existing Proposed Proposed N

Conclusions Feasible Feasible Safe Safe f Separated Separated p Appealing Appealing to All Users