UltraLo 1800 Alpha Particle Counter

Similar documents
6890 GC Site Preparation

Site Preparation Specification for GCMS system. Dimensions and Weight. Agilent 7820MSD Series G3175A (G7020A), G3176A (G7021A)

Discovery HP-TGA 75/750. Site Preparation Guide

Varian 325-MS LC/MS Quadrupole Mass Spectrometer Pre-installation Instructions

Varian 240-MS GC/MS Ion Trap Mass Spectrometer Pre-installation Instructions

Customer Responsibilities. Important Customer Information Series Q-TOF LC/MS Systems Site Preparation Checklist

Customer Responsibilities

Site Preparation Specification for GCMS system. Dimensions and Weight. Agilent 5975C MSD Series G3170A, G3171A, G3172A, G3174A

Markes Thermal Desorption Systems Site Preparation Page 1 of 8

Discovery SDT 650. Site Preparation Guide. Revision G Issued December Page 1

Customer Responsibilities

The HumiSys. RH Generator. Operation. Applications. Designed, built, and supported by InstruQuest Inc.

DD2 Site Preparation Checklist Hardware Site Preparation Specification

490 Micro GC Site Preparation Checklist

INTRODUCTION. The Quantum Technology system has the following advantages:, as it does not need plastic gas-bags which are volume-consuming,

Customer Responsibilities. Important Customer Information. Cary 4000/5000/6000i UV-Vis spectrophotometer Site Preparation Checklist

ID-Cube. Installation and Operations Manual For ID-Cube Source and Power Supply. Revision 2 Document #:

Customer Responsibilities. Important Customer Information. Agilent Infinity II Preparative HPLC System Site Preparation Checklist

Customer Responsibilities. Important Customer Information. Agilent 6400 Series Triple Quad LC/MS Site Preparation Checklist

Customer Responsibilities

Customer Responsibilities

HumiSys HF High Flow RH Generator

Customer Responsibilities

V48 Series 3-Way Pressure-Actuated Water-Regulating Valves With Union Fittings

For additional information about our solutions, please visit our web site at US/Pages/HomePage.

Varian 400-MR Magnetic Resonance Spectrometer Pre-installation Instructions

Customer Responsibilities. Important Customer Information GCMS QQQ Site Preparation Checklist

Discovery TGA 55, TGA 550, TGA Site Preparation Guide

AB SCIEX QTRAP 4500 System

TA Instruments Installation Requirements for the Thermal Discovery Series

Your local gas generation partner. Precision series Modular gas generation solution for GC.

RPS900W Redundant Power Supply. Installation Guide.

V46 Series 2-Way Pressure-Actuated Water-Regulating Valves With Union Fittings

Misaligned Folds Paper Feed Problems Double Feeds Won t Feed FLYER Won t Run iii

Detector Carrier Gas Comments Detector anode purge or reference gas. Electron Capture Nitrogen Maximum sensitivity Nitrogen Argon/Methane

Precision Liquid Settlement Array Manual

FPG8601 Force Balanced Piston Gauge

Preinstallation Checklist and Instructions for the TriStar These Preinstallation Checklist and Instructions were reviewed and approved by:

Agilent 1220 Infinity II LC Mobile Upgrade Kit

CSA Sample Draw Aspirator Adapter Operator s Manual

Vertical Parylene Coating System

SPECIFICATIONS ATTENTION

490 Micro GC Site Preparation Checklist

Oxford Instruments Plasma Technology. PlasmaPro NGP80. Installation Data Sheet. Original Instructions.

Additel 761 Automated Pressure Calibrators Selection Guide

Additel 761 Automated Pressure Calibrators

The X-11 Molding Chamber

Micro GC Fusion Pre-Installation Checlist

DOMESTIC HOT WATER TEMPERATURE CONTROL with SAFEGUARD

SDX Submersible Depth Transmitter User Manual

Additel 761 Automated Pressure Calibrators Selection Guide

BUBBLER CONTROL SYSTEM

OEM Manual MODEL 2305 ECONOMICAL DIGITAL SINGLE CYLINDER SCALE

TECHNICAL DATA MAINTENANCE AIR COMPRESSOR MODEL G-1

Agilent 7820A GC. Site Preparation Guide. Agilent Technologies

Agilent 7890 / 220 Ion Trap GCMS Site Preparation Checklist

Information Sheet. About this information sheet. Floor and wall loadings. Attachment of process module to floor. PlasmaPro Estrelas100

General Specifications: Forensic. Petrochemical Environmental. Lab Quality Analyses in the Field, It Goes with you Anywhere!

Your local gas generation partner. Precision series Modular gas generation solution for GC.

MUELLER. A A Adjustable. Vertical Indicator Posts. Reliable Connections. General Information 2. Technical Data 3.

9600 Compressor Installation, Operation, and Maintenance Instructions Rev. G (1/99)

Your local gas generation partner. Precision series Modular gas generation solution for GC.

GILMONT ACCUCAL FLOWMETERS

RK-IR Sample Draw Aspirator Adapter Operator s Manual

Pipe Thread Connection 1/2 inch NPT. Friction Loss Refer to Figure 3

Judson Technologies PB 219. JTC JOULE-THOMSON CRYOSTAT COOLING SYSTEM Operating Instructions. October, 2003

Features. Model DDX-LP Dry Pipe Valve System 4 (100mm), 6 (150mm) & 165mm Sizes

KMW3000C. User Manual. Water Chiller for Xcalibur and Gemini systems. Version 1.6, September 2010

AUTO PUMP STATUS CENTER

Liquid Helium Plant. INSTALLATION, OPERATION and ROUTINE MAINTENANCE MANUAL

TA Instruments Installation Requirements for Q Series Thermal Analysis Systems

RDK-408D2 Cold Head. Technical Manual. SHI-APD Cryogenics Inc Vultee Street Allentown, PA U.S.A. Revision A: September 2005

UBEC 1AT. AUTO TANK Fill System Installation, Operation, & Setup Instructions

BUBBLER CONTROL SYSTEM

Cryogenic Refrigerator. INSTALLATION, OPERATION and ROUTINE MAINTENANCE MANUAL

Installing a Probe. Typical Installation

TANDEM MODULATOR FOR OUTLET GAS FLOW: STEPPED (836 TANDEM) - CONTINUOUS (837 TANDEM) SERVO-CONTROLLED PRESSURE REGULATOR

GA24 Technical Datasheet

Additel 761 Automated Pressure Calibrators

INSTRUCTION MANUAL FOR MODEL 7360V VERTICAL CURING CHAMBER Revision E May

MUELLER A A Non-Adjustable. Vertical Indicator Posts. Reliable Connections. General Information 2. Technical Data 3.

OPERATION. Estimated kerf width compensation. HPR260 Manual Gas Instruction Manual 4-9

MUELLER. A Wall Type. Indicator Post. Reliable Connections. General Information 2. Technical Data/ Dimensions 3. Installation 4-5.

AUTOMATIC HOSE TEST UNIT, TYPE SPU

Techcon Systems TS1254 Pressure Pot

TM8 On-Line Gas Chromatography DGA Monitor Site Preparation Guide Model TMx Series

TANK MANAGER FOR TWO TANKS OPERATING MANUAL. 10/31/11 C-More T6C L color touch panel

INFINITE 02. Storage System with Compressor. Installation and operation Manual

ATEX ATEX

PURA. Pure Gas Dewpoint Transmitter. Users Guide

Infrared Linescanners

Arbor Terminator Press Operation Manual For IDT Connectors Order No Engineering No: AM

Model DDX-LP Dry Pipe Valve System 8 (200mm) Features. Differential latching clapper-type, lighweight, dependable construction.

LUDLUM MODEL 239-1F FLOOR MONITOR. Revised December 2010

AC : MEASUREMENT OF HYDROGEN IN HELIUM FLOW

Instruction Manual. Digital Thermocouple Gauge Control Units Models DTC & DTC Models DTC-06M-115 & DTC-06M-230

Installation, Operation and Maintenance Instructions for Electronically Controlled Pressurisation Units

Easy Nest Kits. Installation Suggestions

Site Planning Guide. API 2000 LC/MS/MS System

3M Steri-Vac Sterilizer/Aerator GSX Series. For Life Science Applications. Product. Profile

Transcription:

XIA LLC UltraLo 1800 Alpha Particle Counter Site Requirements & Planning Version: 0.4 Friday, February 15, 2013

Table of Contents I. Site Preparation Tasks... 3 A. Instrument Overview... 3 B. Installation Overview... 3 1. Site preparation process... 3 C. Select the site... 3 1. Space requirements... 3 2. Gas requirements... 5 3. Layout requirements... 6 4. Required clearances... 7 5. Mounting hole locations... 8 6. Dimensions and weights... 9 7. Electrical requirements... 10 D. Prepare for installation... 11 1. Safety and materials... 11 E. Receiving and inspecting the system... 12 1. Shipped Contents... 12 2. Inspect shipping containers for damage... 12 3. Shipping container dimensions... 12 II. Checklists... 13 A. Space and Layout checklist... 13 B. Gas checklist... 13 C. Electrical checklist... 13 D. System receipt and inspection... 14 UltraLo 1800 Alpha Particle Counter XIA LLC Page 2

I. Site Preparation Tasks A. Instrument Overview The UltraLo 1800 is a state of the art alpha particle counting system that uses a gas filled ionization chamber and pulse shape analysis to achieve the lowest possible backgrounds and shortest possible counting times. The instrument is to be used only by technologists trained both in laboratory techniques and procedures, and in the use of the instrument. The customer is responsible for validation of any results, and compliance with any requirements that pertain to their procedures and uses of the instrument. B. Installation Overview Before the system arrives at your location, please prepare your site for the installation process according to the instructions that follow. If an XIA LLC representative will be present to help install the instrument and associated devices, your site must be prepared prior to their arrival. 1. Site preparation process 1. Review this guide 2. Select the installation site 3. Meet requirements (gas, electrical, network) 4. Stock the site 5. Receive and inspect the system (shipment) 6. Move system to installation site C. Select the site 1. Space requirements a) System components The shipment includes the following components: A. Counter module B. Support module C. ThinkPad control laptop D. Cables and Tubing (not shown) A B C UltraLo 1800 Alpha Particle Counter XIA LLC Page 3

b) Setup requirements A typical setup is shown below in Figure 1. 26.0 (66 cm) Req d Clearance Gas Inlet 24.0 (61 cm) 60.0 (152 cm) Laptop can be placed elsewhere, but must be within 6 feet (1.8m) of counter. 65.0 (165 cm) 95.0 (241 cm) 50.0 (127 cm) Req d Clearance 46.0 (117 cm) 27.0 (69 cm) Gas Inlet 1.8 (4.6 cm) Figure 1: Space Requirements For details on space requirements, see Dimensions and weights on page 8. For additional information on necessary clearances, see Required clearances on page 7. For details on the location of the gas inlet (and associated tolerance), see Gas Inlet Location on page 5. UltraLo 1800 Alpha Particle Counter XIA LLC Page 4

2. Gas requirements The UltraLo 1800 requires a source of pure, dry Argon gas ideally, the gas provided is boiloff from a tank of liquid Argon. All metal tubing (i.e. copper or stainless) should be used when running the gas from the source tank to the UltraLo 1800, and the plumbing system should be free from leaks. The gas pressure at the input to the UltraLo 1800 is required to be 21psi (150kPa) ± 5%. The gas input fitting on the UltraLo 1800 is a Swagelok type connector: P/N SS 400 61, and requires ¼ OD metal tubing. All necessary fitting hardware is supplied with the UltraLo 1800 system. The installation process for the gas tube and fitting is straightforward. If an XIA LLC representative is present during system installation, they will perform this installation step. Figure 2: Gas Input Interface (Image from swagelok.com) a) Gas Inlet Location The location of the gas input fitting is called out in Figure 1. Prior to the scheduled date of installation, the gas tubing must be run from the gas source to the site of installation, and terminate at the specified gas inlet location. The termination of the ¼ metal tube (at the gas inlet location) shall be run in such a manner as to provide approximately 10 of play (in all directions) for final alignment during system installation. b) Summary: Requirement (at input to UltraLo) Gas Specification Argon Pressure 21psi (150kPa) ± 5% Tubing Location 1/4" OD metal tube As called out in Figure 1, ± 10 all directions c) Gas supply and consumption: Our recommendation is to use a dewar of liquid Argon, and plumb the boiloff gas to the counter. In regards to gas consumption, the UltraLo 1800 has two defined flow rates; normal (3.5 LPM) and purge (15LPM). When you insert a new sample, the system runs at the purge rate for about 45 minutes, after which the flow is automatically throttled down to the normal rate for the measurement. Your gas consumption will depend on how many times you insert new samples. For reference, the counters at XIA run off of 230 liter liquid dewars. One counter running daily measurements (averaging at least 1 purge/day) will consume the dewar in a bit over two weeks. UltraLo 1800 Alpha Particle Counter XIA LLC Page 5

3. Layout requirements The UltraLo 1800 is fairly sensitive to microphonics. As such, the counter should be located in a relatively quiet space with reduced foot traffic, and away from acoustically noisy machinery such as fans, pumps, etc. Verify that the installation location: Is not adjacent to vibration sources, such as pumps, compressors, or fans. Excessive vibration will affect instrument performance. Is not adjacent to electrically noisy devices, such as ovens, stepper motors, refrigeration units, etc. Allows the laptop to be within 6 feet (2 meters) of the instrument. UltraLo 1800 Alpha Particle Counter XIA LLC Page 6

4. Required clearances During instrument setup and maintenance, it is necessary to access the back of the counter module and the support module. If the back of the instrument faces a wall, it will be necessary to have enough space to access the back of the counter and support module from the side. When changing a sample for measurement, the sample tray opens and extends 26.0 inches (66 cm) forward, from the instrument s front face. See Figure 3 below for illustration. When loading or removing a sample, the user may wish to stand to either side of the extended tray, or alternatively, in front of the extended tray. For comfortable operation, add additional space for the user (~3 feet, 1m) as appropriate. Figure 3: Counter with sample tray extended During instrument maintenance, it may be necessary to open the counter module to access and service various internal components. See Figure 4 below for illustration. A total of 46 inches (117 cm) of vertical clearance is required for this operation. Figure 4: Counter opened for maintenance UltraLo 1800 Alpha Particle Counter XIA LLC Page 7

5. Mounting hole locations Should the user wish to secure the counter module to a table or bench for earthquake safety or otherwise the mounting hole pattern is provided below. The vibration isolating feet are symmetrically located underneath the counter body. ¼ 20 size hardware would be appropriate. Mounting hardware is not supplied with the UltraLo 1800. 21.75 (55.25cm) Counter Body Outline 34.00 (86.4 cm) 3.56 (9 cm) 3.50 (8.9 cm) square Front face of counter 1.25 (3.2 cm) DIA = 0.28" Figure 5: Mounting hole locations UltraLo 1800 Alpha Particle Counter XIA LLC Page 8

6. Dimensions and weights The table below indicates dimensions and weights of the instrument and associated components. Ensure that the installation site (table and/or bench space) can accommodate the dimensions and support the weights. In the table below, Width is defined as the distance from the left side to the right side of the object, and Depth is defined as the distance from the front to the back of the object. Component Width (in) Depth (in) Height (in) Weight (lbs) Counter Module (closed) 34.3 (87.1 cm) 40.0 (101.6 cm) 27.0 (68.6 cm) 330 (150 kg) Counter Module (open) 34.3 (87.1 cm) 40.0 (101.6 cm) 45.3 (115.1 cm) 330 (150 kg) Counter Module (tray ext) 34.3 (87.1 cm) 66.0 (167.6 cm) 27.0 (68.6 cm) 330 (150 kg) Support Module 16.0 (40.6 cm) 12.0 (30.5 cm) 8.5 (21.6 cm) 30 (13.6 kg) Laptop 13.5 (34.3 cm) 9.5 (24.1 cm) 10.5 (26.7 cm) 5 (2.2 kg) Figure 6: Views of the UltraLo 1800 UltraLo 1800 Alpha Particle Counter XIA LLC Page 9

7. Electrical requirements a) System electrical requirements The UltraLo 1800 has minimal power requirements, and can accept operating voltages between 100VAC and 240VAC with a fluctuation of +/ 10% of nominal at 50/60 Hz. The instrument will be preconfigured by XIA LLC for the appropriate line voltage based on the country where the installation site is located (or by the voltage specified by customer if specifically provided). The maximum power consumption of the UltraLo 1800 is less than 0.100 kw at 110VAC. However, typical power consumption during active measurement, as well as during standby, is 0.05 kw (at 110VAC). A single outlet with a good ground connection is required. Ideally, this outlet will be well isolated or separate from any circuits powering electrically noisy systems or devices that can cause power surges, such as vacuum pumps, stepper motors, ovens, refrigeration units, etc. If you wish to install and use an uninterruptible power supply (UPS), isolation transformer, or surge protector, you must still provide a single, solid ground connection between the instrument and the building s main electrical ground. b) Summary: Rated Voltage Rated Freq Typ. Current Typ. Power Max Power Device (VAC) (Hz) (A) (kw) (kw) Instrument 100 240 (± 10%) 50/60 0.4 0.05 0.100 Laptop 100 240 (± 10%) 50/60 0.3 0.03 N/A c) Network (Computer) requirements While not required for operation, the laptop should be connected to the internet in order to receive software and firmware updates from XIA LLC. Additionally, there are several support scenarios that significantly benefit by using an active internet connection. The laptop can connect to a local network either via a standard Ethernet cable (using the RJ45 type connector on the laptop) or by using a wireless connection. UltraLo 1800 Alpha Particle Counter XIA LLC Page 10

D. Prepare for installation 1. Safety and materials a) Safety notes: The UltraLo 1800 is a heavy instrument (see Dimensions and weights on pg 9), and is to be moved and positioned with caution and care. If you decide to lift or move the instrument after it has been installed, do not attempt to lift or move the instrument without the assistance of others, the use of appropriate moving equipment, and proper lifting techniques. Improper lifting can cause injury. Moving or lifting the instrument may require three or more persons. Please exercise caution when running the gas supply lines to the installation site. Pressurized gas poses a safety hazard if appropriate precautions are not followed. The customer is responsible for compliance with any safety requirements that pertain to the installation of the gas supply lines. b) Materials for installation/maintenance The following tools are necessary for installation and maintenance: Box wrenches (for use with gas fittings): 1/2, 9/16, 5/8 Hex keys (for use with latches/panels): 5/16, 1/8, 3/32 Screwdrivers (for use with electronics): Size 0 1 or 1 2 Phillips c) Materials for routine operation No tools are required for routine operation, but from time to time you may wish to clean the sample tray to prevent contamination from building up. XIA LLC recommends the following materials for cleaning: Radiacwash available from Biodex Medical Systems Distilled/Deionized water Methanol or Isopropyl alcohol Powder free gloves The user manual will provide additional details on recommended cleaning supplies and methods. UltraLo 1800 Alpha Particle Counter XIA LLC Page 11

E. Receiving and inspecting the system 1. Shipped Contents All shipments include the following: UltraLo 1800 Counting Module UltraLo 1800 Support Module Cable assembly/gas tubing kit Laptop control computer PCB kit 2. Inspect shipping containers for damage Carefully inspect the shipping containers and report any damage to an XIA service representative. Specifically, check the condition of all ShockWatch stickers present on the outside of the shipping container. Should an indicator be red, carefully follow instructions listed on sticker. Record any damage or mishandling on the shipping documents. 3. Shipping container dimensions All items will arrive in one large shipping container (crate). The dimensions for the crate are listed in the table below. Crate Dimension Width Depth Height Weight Minimum building clearance 43in (109cm) 43in (109cm) 62.5in (159cm) 500lbs (225kg) The main instrument body (UltraLo 1800 Counting Module) is shipped on a dolly to facilitate transportation of the (relatively heavy) unit from shipping and receiving to your installation site. When the counter is on the dolly, the external dimensions of the combined unit are listed in the table below. Please verify that there are sufficient building clearances between shipping and receiving and your installation site for the passage of the dolly. Dolly & Unit Dimension Width Depth Height Weight Minimum building clearance 35in (89cm) 40in (102cm) 32in (82cm) 325lbs (150kg) UltraLo 1800 Alpha Particle Counter XIA LLC Page 12

II. Checklists Use the checklists below to ensure that you have made all preparations for installing the UltraLo 1800 counting system. If you have requested installation and training, an XIA LLC representative will contact you to verify that all checklists are complete before setting up the installation date. A. Space and Layout checklist Date verified Requirements Location is away from: Vibration from other instruments or devices Electrically noisy devices Location accommodates the dimensions and weights specified in "Dimensions and weights" on pg 9 Location meets the requirements specified in "Space requirements" on pg 3 B. Gas checklist Date verified Requirements Source of Argon gas is available on site All metal plumbing is installed between Argon gas source and installation site Gas pressure at installation site is 21psi (150kPa) Metal tubing at installation site is 1/4" OD, and terminates at the appropriate location with necessary tolerance C. Electrical checklist Date verified Requirements Appropriate grounded power receptacles are available at installation site (See "Electrical requirements", pg 10) An active, tested, LAN/internet connection is available UltraLo 1800 Alpha Particle Counter XIA LLC Page 13

D. System receipt and inspection Date verified Action The measured building clearances can accommodate the dolly and main instrument body dimensions (See Shipping container dimensions, pg 12). Received the system and inspected the shipping containers for mishandling or damage. Reported to the XIA service representative any signs of mishandling or damage to the shipping container. UltraLo 1800 Alpha Particle Counter XIA LLC Page 14