Health & Safety Policy & Plan. Rightway Roofing.

Similar documents
McKay Moore Drainage Ltd. Health and Safety Policy

CONTRACTOR SAFETY INDUCTION HANDBOOK

Health, Safety and Environment Management System. HSE-PRO-008 HSE Responsibilities Procedure

Work Health and Safety Risk Management Procedures

CONTRACTOR WHS HAZARD STANDARD CONFINED SPACE EXTERNAL USE ONLY

Hazard & Risk Management

SUPPLIER HEALTH AND SAFETY. Supporting a healthy and safe working environment for our people and customers

Chief Operating Officer Approved by. Responsible Officer. Vice-Chancellor Approved and commenced 25 September, 2017 Review by September, 2020

Safe work method statements

To comply with the OHS Act, the responsible manager must carry out and document the following:

Plant Isolation Lock out/tag out Procedure

CONTRACTOR WHS HAZARD STANDARD HAZARDOUS CHEMICALS EXTERNAL USE ONLY

Safety Guidelines for Live Entertainment and Events I Part 2. Hazard Identification and Risk Management 1

Newtown Neighbourhood Centre

Health and Safety Inspection Procedure

LADDERS FIXED AND PORTABLE

EVENT SAFETY RISK ASSESSMENT - (SMALL TO MEDIUM SIZED COMMUNITY EVENTS) 1

Accident/Incident Reporting and Investigation Procedures

ESSENTIAL SAFETY RESOURCES

Contractor Control Procedures. Contractor Control Procedures. Working Together. November Borders College 24/11/2014.

1. Objective of the initiative To ensure that all employees and subcontractors are aware of the risks associated with working at height.

Section J. How to develop safety elements for project safety management system. How to develop safety elements for project SMS

HAZARD MANAGEMENT PROCEDURE

Project & Task Work Health and Safety Risk Management Procedure

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading

List all key terms and acronyms used in the procedure, and their definitions.

HEIGHT SAFETY IT S EVERYONE S BUSINESS

Edinburgh Napier University Safe Working Procedure Gas Safety, Gas Systems and Equipment

Boating Activity Minimum Standard. January 2015

UETTDRRF06B PERFORM RESCUE FROM A LIVE LV PANEL LEARNER GUIDE

IMMANUEL CHURCH, CHICHESTER HEALTH AND SAFETY POLICY

B S Glass Ltd Safety procedures- outsourced Workplaces

We take safety very personally at Aurecon. Safety is everybody s business, every day. Health and safety incidents are not inevitable, they are

SAFE WORK METHOD STATEMENT CARPENTER

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG PH M ABN

Health and Safety Policy and Plan.

WHS PROCEDURE P Plant Isolation. Approved by: Ruth Hampton Review Date: 6 th December 2015

GENERAL WORK HEALTH & SAFETY CHECKLIST INTENDED USE. St Euphemia College - General Work Health and Safety Checklist

WHS PROCEDURE P Confined Spaces. Approved by: Ruth Hampton Review Date: 6 th December 2015

Hazard Management Making your workplace safer

Communicate and document the health and safety arrangements and ensure that these are available to staff and clients alike.

Health & Safety Plan `

Safe Work Method Statement

CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH PROCEDURE

Guidance: HSW Risk Assessment Methodology HSW-PR09-WI01. Objective. Implementation

WORKING ALONE PROGRAM

Health and Safety Policy Statement

Lone Working Guidance for University Departments and Functions December 2009 Safety Services Office

HS26 Working at Height Policy and Procedure

Contractor/Visitor Safety Orientation UNBC

Bogo Operations Pollution Incident Response Management Plan

Health, Safety and Welfare Policy

Compliance with Health & Safety legislation

HEAT, COLD, SOLAR ULTRAVIOLET & INCLEMENT WEATHER

How volunteer organisations can comply with the model Work Health and Safety Act LEGISLATIVE FACT SHEET SERIES

Lifting Operation & Lifting Equipment Procedure

Health and Safety: engaging with. suppliers requirements for contractors and suppliers

Removal of Lead-Based Paint

Confined Spaces. This procedure applies to all workers of the Diocese of Maitland Newcastle (DoMN).

Company Health and Safety Policy

SOP. Working in Confined Spaces

Competency type. positions. All workers (including contractors), higher degree students and volunteers

Safe Work Method Statement Tasks

S31 Opening Statement Working at Height

in Australian Workplaces

Prevention of Falls and Working at Heights

SOAS LONE WORKING GUIDANCE

Health and Safety Policy

Harmony Roof Tiles Site Safety Manual. Release Sheet

LONE WORKING HEALTH AND SAFETY GUIDANCE

Contractor / Exhibitor Handbook

Lifting Operations and Lifting Equipment Regulations (LOLER) Policy. Version No. 2. Review: May 2019

MINE SAFETY TARGETED ASSESSMENT PROGRAM. Ground or strata failure NSW metalliferous mines. April

SAFE WORK METHOD STATEMENT

WHS record keeping - general (Local areas responsible for keeping these records)

Gas Safety Management Policy

General Isolation Procedures

DRIVER FATIGUE MANAGEMENT PLAN

(2) but does not include a shaft, trench or tunnel that is a mine or is part of the workings of a mine.

WORK HEALTH SAFETY MANAGEMENT SYSTEM First Aid Policy & Procedure WHS2200

Gas Safety Code of Practice

Falling Supervisor Certification Assessment

Health and Safety Management System Template

HS329 Risk Management Procedure

ASPEC Engineering HSE Management System. Work Instruction. 1 Objective. 2 Working in confined spaces. 2.1 What is a confined space?

Procedure: Pressure equipment safety

Marine Education Society of Australasia HAZARD MANAGEMENT POLICY

MECHANICAL DEMOLITION SITE WHS MANAGEMENT PLAN

Diving Operations Procedure

Health &Safety Policy HS803

PROCEDURES FOR STANDBY

HAZARDOUS SUBSTANCES / DANGEROUS GOODS

PRO Lifting Operations

Hazardous substance risk management

Safe Work Method Statement

Work Health Safety Record Management Guidelines. October, 2014

Safe Work Practices / Procedures / Instruction CONFINED SPACE

Policy Redesign Project. Plant Safety Policy. Table of Contents

University Safety Policy Supplement

Health and Safety Policy & Arrangements. CONTOUR ROOFING (ESSEX) LTD 12 Harolds Road, Pinnacles Harlow, Essex CM19 5BJ

Transcription:

Health & Safety Policy & Plan. Rightway Roofing. Valid: 02/2012-02/2013

Contents ( 1 ) Policy Statement. ( 2 ) Hazard Identification. ( 3 ) Hazard Management. ( 4 ) Induction & Training. ( 5 ) Monitoring and Review. ( 6 ) Site & Team Specific Safety Plans. ( 7 ) Accidents and Incidents ( 8 ) Recording & Reporting Process. ( 9 ) Safe Plant & Equipment. (10) Site Safety Representative. (11) Communication. (12) Contractor management. (13) Obligations & Definitions. (14) Disclaimer.

(1) Policy Statement. Rightway Roofing is committed to creating and maintaining a safe and healthy environment on all our work sites. We are committed to meeting the requirements of the Health & Safety In Employment Act 1992, Health & Safety Regulations 1995 and Relevant Codes of Practice. We are also committed to meeting industry best practice standards and will strive for continuous improvement in health and safety by implementing the HazardCo System which is designed to address the provisions outlined in AS/NZS 4801 OHSM Systems. We will also address (where applicable) the requirements outlined in Section 8, of the Housing, Alterations and Small Building Contract, NZS 3902: 2004. Rightway Roofing will work to the Principals Site-Specific Safety Plan or prepare and work to our own Site-Specific Safety Plan. We will take all practicable steps to: Provide a safe place of work, safe equipment, and proper materials. Establish & insist that safe work methods are practiced at all times. Provide regular supervision, induction, and training of employees. Ensure all staff understand and accept their responsibility to promote and maintain a safe and healthy place of work. Ensure all contractors who work on Rightway Roofing sites have a suitable and approved Health & Safety Programme. Employees and contractors are expected to contribute to creating safe work sites by practicing safe work methods, ensuring PPE is used, and reporting any unsafe work conditions or equipment to Rightway Roofing Site Supervisors immediately. Director or Senior Manager Sign: Date:

(2) Hazard Identification. Hazard Identification is a major component of Rightway Roofing Health & Safety Programme. One or more of the following methods will be used by Rightway Roofing, employees to identify and manage Hazards when they are at work: Site Analysis: Regularly referring to information on specific hazards contained in HazardCo Site and Team Packs (Visual and documented hazard registers). Survey the worksite for any of these hazards and update the Site Hazard Board by ticking the board against the listed site hazards. Task Analysis: Identifying the tasks that will be required for each job and based on our knowledge and having referred to hazard information contained in the HazardCo Site and Team Packs, identify the hazards that are related to the work we are doing. Where required a Task Analysis (using the HazardCo website) can also be used to document this process. Observe the actions of those working on site and identify any hazards involved. Update the Site Hazard Board by ticking the Board or by writing on the Board any new hazard(s) identified and the appropriate method to prevent it causing any harm. Physical Inspections: Rightway Roofing will carry out regular inspections of each worksite to ensure the Site Hazard Board is up to date.

(3) Hazard Management. Once hazards have been identified they will be assessed and controlled using the required hierarchy of: Eliminate: - can the hazard be removed completely? Isolate: - If not can it be separated from those working around it? Minimise: - If not how can you prevent it harming anyone? If the hazard has the potential to cause injury or serious harm, or has delayed or cumulative effects, then it will be classified as a Significant Hazard and will be controlled (i.e. eliminated isolated or minimised) The appropriate action to manage each of the Significant Hazards will be determined and implemented on site. Significant Hazards and their controls are listed in the Site Specific Safety Plan (Safety Plan) and displayed in the Induction & Training cards (Visual Hazard Registers) contained in the Site & Team Packs. The identified hazards and the management steps / actions to control them will also be written on the Site Hazard Board or Team Hazard Board that is displayed at each entrance to the worksite. The Site Supervisor who is managing each site or the person in control of the worksite will be responsible for keeping the hazard board updated daily and ensure that the hazard management steps listed in the Safety Plan are carried out. The Site Supervisor or person in control of the worksite is responsible to inform other employees /contractors and visitors to the site of existing hazards and the requirement to identify and report any potential hazards to the Site Supervisor. These hazards will also be recorded on the Team / Site Hazard Board.

(4) Induction & Training. Rightway Roofing will ensure all employees are either sufficiently experienced to do their work safely or are supervised by an experienced person. Employees / Contractors will be trained to an appropriate standard (by a suitable provider) in the safe use of equipment, including the use and maintenance of PPE (Personal Protective Equipment). Examples include working at height, confined spaces etc. The Principal (where applicable) will provide a set of Induction & Training cards on each individual work site to enable new employees and contractors to be inducted to the site and existing employees and contractors to participate in regular safety training conducted by the Principal. Client Induction cards (if applicable) will be provided to the client to inform them of the hazards they will encounter when visiting the site. The Client will be expected to induct visitors they bring to the site when a contractor is not present. Contractors are required to enforce the rules outlined in the induction cards to ensure visitor safety. The Induction & Training cards will be used at regular intervals to train all employees and contractors working on the site. Employees are required to participate in the training sessions. Where a Principal does not provide Site Specific Induction & Training cards or a Contractor is solely in control of a worksite, the contractor will use their HazardCo Training & Induction cards contained in their Team Pack to induct staff and conduct regular training sessions. (5) Monitoring and Review. Rightway Roofing (where applicable) will ensure all employees are meeting the required standards of health and safety by conducting regular site audits using the HazardCo Audit Checklist. Findings will be discussed at regular toolbox meetings held on site. Audits and meetings will be recorded on the HazardCo forms and submitted to the Principal.

(6) Site & Team Specific Safety Plans. (Where applicable) Rightway Roofing will provide a Site Specific Safety Plan or a Team Specific Safety Plan on all its worksites. The Site and Team Specific Plans outline the following: Contact Details for the Site Supervisor responsible for the work site. The responsibilities of the Site Supervisor, Employees and Contractors, working on the contract. The hazard identification and management process to be used on the work site. How the Health & Safety Programme outlined in this Policy & Plan will be implemented on each individual contract undertaken by Rightway Roofing. (7) Accident / Incidents: In the event of an accident where a person appears to be injured staff are required to preserve life by calling the emergency services on 111 and provide first aid. The next step is they must preserve the scene, by leaving everything as it is until they have sought advice from HazardCo or have permission from Department of Labour to clean up or move anything. All accidents and near miss incidents will be reported to Rightway Roofing or their representative (site supervisor, person in control of the workplace) as soon as possible. The Principal will then be informed. HazardCo can be called and will assist Rightway Roofing to determine the degree of harm, to notify the Department of Labour (DoL) of any serious harm injuries and to investigate the accident /incident.

(8) Recording / Reporting. Rightway Roofing will ensure that there is a suitable recording and reporting process in place on each of its work sites. This will include a process for each of the following areas: Injury/Incident Recording and Reporting: - The forms for recording and reporting any incident or injury, including serious harm injuries, will be available on the worksite in each individual Site and Team Pack. All injuries and near misses will be reported to Rightway Roofing and or the Principal. Minor injuries and near misses that are reported will be recorded using the prescribed form by the Site Supervisor or the person in control of the workplace and discussed at the next safety meeting. HazardCo will assist Rightway Roofing with this process and ensure the forms are completed correctly and an investigation is conducted to identify the cause. All serious harm injuries will be reported to the Department of Labour verbally and in writing as soon as possible and within the required time frame. Emergency Procedures: - In the event of an emergency each HazardCo Team and Site Pack contains a basic Emergency Plan. The Supervisor is responsible for ensuring all contractors and employees have read the emergency plan and are familiar with its content. All employees and contractors will be advised of the location of the assembly area as part of the site induction. Notifiable Works: - Where notifiable work, as defined in the Health & Safety Regulations Sections 2 and 26, is to be carried out by the company, DoL will be notified in writing at least 24 hours prior to commencement of such work.

The Principal will be provided confirmation of any notifiable works and a copy of the notification for their records. If engaged on notifiable work then our Site Supervisor will be the holder of an appropriate safety qualification. A copy of the completed notifiable works form will be held in the HazardCo Sitepack and blank forms are available in each HazardCo Teampack or can be downloaded from the HazardCo website (www.hazardco.com). The HazardCo process ensures that the notifiable works form is completed and faxed to DoL prior to the commencement of any notifiable work. For further information on this process you can contact HazardCo on 0800 555 339 (9) Safe Plant & Equipment. Rightway Roofing will ensure that all plant and equipment supplied to employees and/or contractors is of the required standard and is in good working order with all safety mechanisms working and intact. If any equipment is not in safe working order it will be repaired by a competant person before use. Employees and/or contractors will be made aware of their obligation to regularly inspect plant and equipment and immediately report any damage or fault to Rightway Roofing. Rightway Roofing will provide their employees with suitable personal protection equipment (PPE) for the tasks they are undertaking and ensure they have been trained in the correct use and maintenance of such equipment. Contractors must ensure they supply suitable PPE appropriate for the the job and ensure it is used and maintained correctly. The minimum standard of PPE for our worksites will be set by Rightway Roofing prior to the commencement of work and monitored by the Site Supervisor.

(10) Site Safety Representative Rightway Roofing will appoint a representative to actively promote Health & Safety in our workplace to ensure appropriate safe work practices are in place on site. This person will be made known to all contractors and employees on site and may be a dedicated H&S person, a supervisor, senior worker or a director who is designated to act on behalf of the Company with regard to Health & Safety. (11) Communication Appropriate communications will be established with all persons working on our site to ensure all information regarding safety is passed on. This will include the notification of hazards brought onto site or created during the course of our work. This will be done during site inductions, regular toolbox talk meetings and verbally as required throughout the job. The aim is to ensure that all workers and visitors to the site are aware of the hazards as they arise and equally be advised when they no longer exist. If English is a second language of any employees or contractor then we will ensure hazards and their controls are effectively communicated to them using the HazardCo visual tools such as the Induction and Training cards. (12) Contractor Management: Rightway Roofing as the Principal will take all practical steps to manage the safety of their Contractors and Employees whilst working under a contract. We will ensure that our Contractors meet a minimum standard of health and safety compliance by having an effective health and safety system in place.

The minimum required standard is that Contractors provide evidence of an on site active system that contains the following elements: 1) Site Induction of Visitors and Contractors 2) Hazard Identification and Management 3) Training & Supervision 4) Accident and Incident Reporting & Investigation 5) Emergency Procedures 6) Notifiable Works HazardCo will assist Rightway Roofing with ensuring (where applicable) all contractors meet this minimum requirement. (13) Obligations & Definitions. The following is a summary of the main legal obligations contained in the Health & Safety in Employment Act 1992 and subsequent amendments. Definitions of relevant terms contained in the act are also included:- Every employer and principal must comply with health and safety legislation. You are legally required to protect employees (including contractors) and any other person who enters your place of work. As an employer or principal you are required to take all practicable steps to make the workplace safe. The most important part of this process involves the creation and use of a system that identifies and manages significant hazards. Management of significant hazards involves taking all practicable steps to eliminate, isolate, or minimise those hazards. You must first look to eliminate any hazard that exists - if you cannot you must isolate the hazard - If you cannot isolate, you must decide how the risk of injury can be minimised?

Employers and principals are also required to take all practicable steps to provide staff training and supervision. Staff must be made aware of potential hazards and there must be a system for dealing with any emergencies that occur at work. All practicable steps means what is reasonable and practical given the circumstances. Whether a safety measure is reasonable will largely depend on how much harm could be done, how much is known about the hazard, and how difficult or expensive it is to put protections in place. Employers and principals must notify the Department of Labour of incidents involving serious harm. Contractors are legally required to inform their Principal or employer of any hazards that arise from their work. Contractors should ensure they have received all necessary health and safety information from the principal or employer. Principals cannot contract out of health and safety obligations (14) Disclaimer: HazardCo Limited or any persons involved in the preparation and distribution of this material expressly disclaim all and any contractual, tortious or other form of liability to any person or entity (being a purchaser of the material or not) in respect of the material and any consequences of its use by any person in reliance upon the whole or any part of the contents of this publication. The material is a guideline to assist businesses in addressing their key responsibilities on a worksite particularly in the areas of hazard identification and management. It is not a substitute for the legal obligations imposed under the Health & Safety in Employment Act 1992 or its subsequent amendments or for legal advice.