MIAMI & ERIE CANAL SHARED USE TRAIL

Similar documents
City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

CITY OF OREGON BIKEWAYS

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project

MIAMI-ERIE CANAL DEVELOPMENT/TOURISM PLAN

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010)

Non-Motorized Transportation 7-1

Chapter 5 Future Transportation

Route 29 Solutions Projects

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

SD Highway 50 in Yankton (4 TH Street) Reconstruction Project NH 0050(99)381 PCN By Josh Larson McLaury Engineering Inc.

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Building Great Neighbourhoods QUEEN ALEXANDRA

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

Route 47 (North Main Street) Reconstruction

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Exhibit B: Proposed amendments to the Transportation Element of the Oakland Comprehensive Plan

MPO Staff Report Technical Advisory Committee: May 10, 2017 MPO Executive Board: May 17, 2017

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

2.0 Existing Conditions

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

Building Great Neighbourhoods LANSDOWNE

DISTRICT BICYCLE PROGRAM

Derby Street. Project Updates. Salem, Massachusetts

Plant City Walk-Bike Plan

NJDOT Complete Streets Checklist

Street Paving and Sidewalk Policy

Henderson Ave. Complete Streets Project

2012 Capital Budget Capital Improvement Program

Transportation and General Civil Engineering Projects

TRANSPORTATION & MOBILITY

Funding Sources Appendix I. Appendix I. Funding Sources. Virginia Beach Bikeways and Trails Plan 2011 Page I-1

Building Great Neighbourhoods BONNIE DOON

Highway Construction

Appendix B - Street Sections

State Route 28 Shared Use Path & Safety/Stormwater Enhancements Public Information Meeting

Mark Malone, P.E. SD DOT

4APNOIPF Vh, YII PTC CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. 8K TH 63 River Crossing Bridge Replacement Project

Chapter 4: Funding and Implementation

Clackamas County Comprehensive Plan

Chapter 3 DESIGN SPECIFICATIONS

Bluffdale/ UDOT South High-T Intersection Project Type Operations

El Paso County 2040 Major Transportation Corridors Plan

Legislative Update Williamsburg Residency

St. Francis Drive through the City of Santa Fe Corridor Study

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

DESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Environmental Assessment Findings & Recommendations. Public Hearing November 13, 2014

ACTIVE TRANSPORTATION

Bicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1)

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Clinton Street Bridge over the Maumee River. ODOT Project DEF April 1, 2015 Stakeholder s Meeting

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Board of Supervisors February 27, 2017

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Duwamish Way-finding and CTR Report

APPENDIX L: COST ESTIMATING TOOLS

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Item No. 14 Town of Atherton

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

Project Application. Project Location: Salem Drive (Federal Route 1101)

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension

Enhancing Downtown

Roadway Project Recommendations:

New Jersey Department of Transportation. Complete Streets Summit Shukri Abuhuzeima NJDOT-Local Aid

Giles Run Connector Road

Readington Road (C.R. 637) Construction

Active Transportation Facility Glossary

Basalt Creek Transportation Refinement Plan Recommendations

Off-road Trails. Guidance

Warsaw, Missouri Van Buren Street Preliminary Engineering Report

Lynchburg District Update

Moving Together Conference Complete Streets from the MassDOT District 5 Perspective

OKI Awards More Than $41 Million to Transportation Projects Across the Region

Southcote Road Improvements Class Environmental Assessment Study

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

Engineering - Bicycle and Pedestrian

Bicycle and Pedestrian Connectivity Study. Old Colony Planning Council

Connecting cyclists to work. Syracuse Metropolitan Transportation Council

FM 1092/Murphy Road Access Management Study Pulic Meeting #1. Wednesday, August 31, :00 p.m. 8:00 p.m.

Bikeways Network and Facilities

Perryville TOD and Greenway Plan

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS

Morristown, NJ Complete Streets Policy

900 BICYCLE FACILITIES Traffic Engineering Manual

NORTH DOWNTOWN N EAST WEST

WALKSacrame nto. Welcomes you to the 2009 Sacramento County Safe Routes to School Conference

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Montclair s Complete Streets Experience

BPP / SUB

Montco 2040 Implementation Grant Program Award Summary

Transcription:

New Bremen, Ohio Survey Transportation Engineering Grant Writing Project Cost Engineers Estimate: $509,358 Bid Amount $480,892 Size 1.12 miles $597,696 ODOT TEP $249,815 ODNR Completion Projected 11/15/14 Actual November, 2014 PDG Project Team Gregory Bieszczad, P.E. Project Manager MIAMI & ERIE CANAL SHARED USE TRAIL PDG assisted the Village of New Bremen with applying for funding from ODOT Transportation Enhancement Program (TEP) and ODNR Recreational Trails & Clean Ohio Trail Program. The goal was to fund a project to enhance pedestrian, handicapped and bicycle travel along the historic Miami and Erie Canal within the Village. The Trails & Clean Ohio Trail Program funding will be used to design and construct approximately 1 mile by 10 foot-wide paved portion of the path connecting the downtown with the Kuenning-Dicke Nature Area and Bremenfest Park. The project is currently in design and will extend an existing shared use path from Minster to the north side of New Bremen. The project is a step in a long-term goal of a shared use path along the canal to the City of St. Marys. The project will adaptively reuse the abandoned canal to connect the downtown and its historic, cultural and commercial attractions to the developing north side of the Village, and serve visitors using trails along the canal. more... Project Relevance Multi-Use Trail Grant Writing Assistance Mr. Jeff Pape, Mayor Village of New Bremen 419.733.9838 jeff.pape@crown.com

Miami & Erie Canal Shared Use Trail In addition to its local transportation function, the path will serve as a way to experience one of Ohio s original surface transportation routes, the historic Miami and Erie Canal, a designated State and National Heritage Corridor. The canal corridor also provides for regional and national pedestrian and bike travel as part of the Buckeye Trail and North Country National Scenic Trail. The proposed southern terminus is the existing trailhead to Minster at restored Lock 1 and the Lockkeeper s House (Miami and Erie Canal Visitors Center) in downtown New Bremen. The northern terminus is Lock 2 Road, once the site of a wooden canal lock and an unincorporated village where the remaining buildings still give a feel of the canal era. The proposed path is between the canal and the Kuenning-Dicke Natural Area, now under development. The project will attempt to preserve the trees along the existing path in the natural area. In a few areas, particularly the last few hundred feet near Lock 2 Road, some earthwork will be necessary to restore the tow path cross section and avoid new right-of-way. In addition with the Canal Bikeway project, the Village of New Bremen is evaluating possible trail segments along the canal and the Kuenning-Dicke Natural Area and Bremenfest Park, a recreational area with a pool, ball fields and a planned new handicapped accessible playground. The proposed recreation path will link together the largest handicapped accessible park facilities in the region, and directly serves the Auglaize County Board of Developmental Disabilities school on 1st Street.

Fostoria, Ohio Transportation Engineering, Grantwriting Cost $1.8 million Engineer s Estimate Project estimated from funding application, which did not include R/W acquisition. $1.57 million Bid Amount $1.6 million TMACOG Transportation Improvement Program (TIP) Size 1/2 mile Schedule Professional Services 2014 Construction: 2015 Project Team Greg Bieszczad, P.E., Project Manager STEARNS ROAD IMPROVEMENTS SR-199 TO US-23 PDG was the prime consultant for the design of improvements to approximately one-half mile of Stearns Road, from State Route 199 (Perrysburg McCutchenville Road) to US-23 (North Fostoria Road) in Wood County. The portion of Stearns Road to be improved is primarily within the City of Fostoria, although portions remain in Perry Township, where it is designated Township Road 31. The improvements include widening to three lanes to add a center two-way left turn lane, new curbs, gutters, enclosed storm drainage and traffic control upgrades. Sidewalks will be included in developed areas, with space available for adding future walks in currently undeveloped areas. The existing two lane pavement was structurally inadequate, rough riding and had poor cross slope and drainage. Long term city planning anticipates developing a Community Loop Road around the city to promote commercial and industrial development and minimize congestion on the state routes within town. The first major segment of the loop is the Jones Road overpass of the CSX railroad. Stearns Road will connect SR-199 to US-23 and the new overpass. PDG provided Transportation Engineering, Right-of-Way Plans, Grant Writing for $1.6 Million In Funding Assistance obtained from TMACOG Transportation Improvement Program (TIP). Mr. Daniel Thornton, P.E. City of Fostoria Engineer cityengineer@ci.fostoria.oh.us 419.435.9775

Fremont, Ohio Transportation Engineering Grant Writing Cost $1.45 million Engineers Estimate $1,107,559 Project Bid $1.1 million ODOT Small Cities Size 2,700 feet Schedule Professional Services: 2009 Construction: 2013 PDG Project Team Timothy J. Bock, P.E. Project Manager FIFTH STREET WIDENING AND RECONSTRUCTION PDG prepared construction plans for the widening and reconstruction of approximately 2,700 feet of Fifth Street in the City of Fremont. The project was a locally administered transportation project (LPA) requiring coordination with the Ohio Department of Transportation (ODOT). PDG assisted the City with the preparation of a successful Small Cities Application through ODOT. The total project cost was $1.107 million, with over $1.1 million coming from Small City Program funds. The roadway was 23 feet wide with no curbs or shoulders. Areas of stone parking existed throughout the corridor. Although mainly residential, and with an ADT of nearly 5,500 vehicles a day, this stretch experienced a high number of mid-block accidents. The project widened the roadway to three lanes and established a new profile grade for improved drainage. Other more... Project Relevance Roadway Improvements Grant Administration Municipal Project Erica Williams Assistant City Engineer City of Fremont 419.334.8963 emwilliams@fremontohio.org

Fifth Street Widening and Reconstruction Before components of the project included a new storm sewer system, curb and gutter, sidewalks, and ADA compliant curb ramps. The pavement width was widened to 40 feet. The existing right-of-way was 99 feet wide; therefore, no new right-of-way acquisition was required.

Port Clinton, Ohio Survey, Preliminary Design, Design, Bidding, Engineering Assistance During Construction Cost Water & Sewer Engineer s Estimate $720,000 Bid Amount $724,000 Construction Cost $804,000 Street Reconstruction Engineer s Estimate $731,000 Bid Amount $664,660 Construction Administration by Others $587,840 ODOT Small Cities (grant) $175,000 - OPWC Schedule Professional Services: 2013-2014 Construction: 2015 PDG Project Team Richard H. Hertzfeld, P.E. Project Manager Julie Thomas, P.E. Project Engineer SECOND STREET RECONSTRUCTION Poggemeyer Design Group was hired by the City of Port Clinton to provide professional engineering, surveying and bidding assistance for the Second Street Reconstruction project. The project was the reconstruction of a two block section of Second Street in the downtown business district of the City of Port Clinton, and included the reconstruction of all pavement and walks within the right-of-way. The route is two lanes with parallel parking provided on both sides. The project included a new dedicated storm sewer, a new waterline and sanitary sewer interceptor, as well as traffic control upgrades and electrical conduit for lighting. PDG secured two sources of funding for the project in the amount of $587,840 of federal funds through ODOT Small Cities, $175,000 through OPWC in the form of a grant, and an OWDA to fund the waterline and sanitary sewer construction. PDG prepared construction plans for the project which was a locally administered transportation project (LPA) requiring coordination with the Ohio Department of Transportation (ODOT). PDG will also provide services required to hold a public meeting for the project to inform and garner support from community members. Project Relevance Bidding Assistance Prepared Construction Plans ODOT Project OPWC Funding Assistance Road Resurfacing Municipal Project Tracy Colston, Safety Service Director 1868 East Perry Street Port Clinton, Ohio 43452 419.734.5522 pcrec@portclint-oh.gov