DOCKYARD PORT OF PLYMOUTH HARBOUR SAFETY PLAN. Issue 2 Jun 13

Similar documents
NAVIGATIONAL SAFETY MANAGEMENT SYSTEM MANUAL

MARINE SAFETY PLAN

DIRECTOR NAVAL BASE OPERATING CENTRE DOCKYARD PORT MARINE SAFETY POLICY

VERSION. Poole Harbour Commissioners. February PHC - Navigational Safety Management Plan. Navigational Safety Management Plan February 2016

DOCKYARD PORT OF PLYMOUTH PORT MARINE SAFETY POLICY ANNUAL REPORT Commander C Necker Royal Navy, Queen s Harbour Master Plymouth

DOCKYARD PORT MARINE SAFETY POLICY

MA RICO GREATER WELLINGTON REGIONAL COUNCIL WELLINGTON HARBOUR SAFETY MANAGEMENT SYSTEM MARICO MARINE NZ LIMITED

MARINE SAFETY MANAGEMENT SYSTEMS MANUAL

Dockyard Port of Portsmouth

Planning for tennis in your Local Government Area. A resource from Tennis Australia

Stena Line Ports Ltd. Port Marine Safety Code Annual Performance Review: 2016

Chapter 2.7 Bylaw sport governance and management

Operating Committee Strategic Plan

Laurentian Pilotage Authority Special Examination Report 2013

Port Marine Safety Code

SAFETY MANAGEMENT SYSTEM

CATTEWATER HARBOUR COMMISSIONERS PORT MARINE SAFETY CODE

MINE SAFETY TARGETED ASSESSMENT PROGRAM. Ground or strata failure NSW metalliferous mines. April

July 2016 JD No 6 Post No 6 JOB DESCRIPTION

DRAFT FOR DISCUSSION Water Forum Terms of reference: September 2016

THE MARITIME SAFETY MANAGEMENT SYSTEM MANUAL. For Marlborough District Council as Harbour Authority

Big Bike Revival Scotland - Cycling Development Officer. Job Description and Responsibilities.

GROWING THE GAME FOR THE FUTURE

HAZARD MANAGEMENT PROCEDURE

ABP Group Port Marine Operational Procedures Manual (2012 Version 3.1)

Health, Safety and Environment Management System. HSE-PRO-008 HSE Responsibilities Procedure

Australian Volleyball Federation

Principles guiding Sport NI investment in Sporting Clubs and Sporting Winners objectives.

Project & Task Work Health and Safety Risk Management Procedure

Strategic Plan for Sevens Rugby. September 2006

Vermin, Insects and Scavenging Birds Management Plan

LEGIONELLA CONTROL POLICY

Swimming Tasmania Strategic Plan ST Strategic Plan Final

Lifting Operations and Lifting Equipment Regulations (LOLER) Policy. Version No. 2. Review: May 2019

World Rowing s Strategic Framework

The Berwick-upon-Tweed Conservation Areas Advisory Group (CAAG)

London Organising Committee of the Olympic Games and Paralympic Games. 14 June 2010

ICC RELATIONSHIPS, ROLES AND RESPONSIBILITIES

Role Profile. Chief Executive of Blackburn Youth Zone. Chair and Board of Blackburn Youth Zone

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design

APPROVED CODE OF PRACTICE FOR THE SAFE CONDUCT OF TRACK AND FIELD TRAINING

A GUIDE TO GOOD PRACTICE ON PORT MARINE OPERATIONS PREPARED IN CONJUNCTION WITH THE PORT MARINE SAFETY CODE

Aiming for Zero Road Worker Safety. Mark Pooley Highways Agency Road Worker Safety Programme Manager Monday 11 June 2012

BYE-LAWS TO ARTICLE 56 DUTIES OF THE COMMISSIONS AND WORKING GROUPS

Assessor Report. IMCA Specific Review VoiceAbility

Harwich Haven Authority

POSITION DESCRIPTION

CONTRACTOR SAFETY INDUCTION HANDBOOK

Irish Hockey Four Year Strategic Plan

The development of Emergency Aquatic Animal Disease Response Arrangements

Strategic Plan Saving Lives and Building Great Communities

HOE TONGA REGIONAL WAKA AMA DEVELOPMENT OFFICER. Regional Waka Ama Development Officer. Board of Hoe Tonga Pacifica Waka Ama Association

RCM CHIEF EXECUTIVE OFFICER & GENERAL SECRETARY Job Description and Person Specification

Salmon Five Point Approach restoring salmon in England

(on behalf of Cricket Scotland and The Lord s Taverners)

Newtown Neighbourhood Centre

SOUTH AFRICAN NATIONAL BOXING ORGANISATION

Club Roles and Responsibilities Version 2.1 July 2017

COUNTY SPORTS PARTNERSHIP (CSP) CORE SPECIFICATION INTERPRETATION GUIDE

SAFETY MANAGEMENT SYSTEM

Hazard & Risk Management

CONTENTS PREFACE 1.0 INTRODUCTION AND SCOPE 2.0 POLICY AND GOVERNANCE 3.0 SUMMARY OF PROGRESS 4.0 NATURE OF DEMAND 5.0 TRAVEL AND PARKING INITIATIVES

MARINE SAFETY MANAGEMENT SYSTEM

Racecourse Operations Manager. Position Description

Canadian Ski Patrol System Strategic Plan Canadian Ski Patrol System Mission, Vision and Focus

Working with your Harbour Authority. Roger Wilson and Mike Pearson. Protecting your Rights, Promoting your Interests

Cricket Ireland Active Clubs Coordinator

Hazardous Waste Training Plan. Supersedes: 02/15/16 (Rev.02) Preparer: Owner: Approver: EHS Team Member EHS Team Member EHS Manager

WHS PROCEDURE P Confined Spaces. Approved by: Ruth Hampton Review Date: 6 th December 2015

Diving Operations Procedure

WAFC Position Description

Marion Marlins Masters Swimming Club Strategic Plan

Quest 2016 Splus 28 Swim England Learn to Swim Accreditation

IMPLEMENTATION. Argyll Marine Special Areas of Conservation

Cooroy Golf Club Inc. (ABN ) of 28 Myall Street, Cooroy Q4563

New Zealand Thoroughbred Racing (NZTR) Job Description

Roads and public rights of way

SMJFL POSITION DESCRIPTION. South Metro Junior Football League. Full-time employment

STRATEGIC PLAN

Australian Volleyball Federation

APPOINTMENT OF AUDIT SERVICES PROVIDER INVITATION TO TENDER

Gas Safety Management Policy

SPORT AND RECREATION. Outcome Strategy. Outcome 10. Outcome I 10

COUNCIL POLICY NAME: COUNCIL REFERENCE: 06/119 06/377 09/1C 10llC 12/1C INDEX REFERENCE: POLICY BACKGROUND

CRICKET HONG KONG 2019 AGM CHAIRMAN S REPORT

Development Plan

Netball Australia Bench Officials Accreditation Framework. Updated 2018

Objective 1: Serious and very serious marine incidents

Chief Operating Officer Approved by. Responsible Officer. Vice-Chancellor Approved and commenced 25 September, 2017 Review by September, 2020

1.0 PURPOSE 2.0 REFERENCES

Fishery Improvement Projects

TENNIS VICTORIA STRATEGIC PLAN TO 2020

KAYAKING REGISTRATION LEVELS AND ASSESSMENT REQUIREMENTS

PASSENGER SHIP SAFETY. Review of Operational Safety Measures to Enhance the Safety of Passenger Ships. Submitted by ICS SUMMARY

MONASH CROQUET CLUB STRATEGIC PLAN

A Guide to Good Practice on Port Marine Operations

County Donegal Public Participation Network Work Plan

Netball Australia Bench Officials Accreditation Framework. Updated 2015

Agenda Item 6-ATM Coordination (Airspace restructuring, AIS and SAR agreements)

Section J. How to develop safety elements for project safety management system. How to develop safety elements for project SMS

Transcription:

DOCKYARD PORT OF PLYMOUTH HARBOUR SAFETY PLAN 1

CONTENTS Para Page 1. Introduction 3 2. Safety Management System 3 3 Reduce Risks 4 4. Identification of the Hazards and Risks... 4 5. Conformance with the Navigational Safety and Marine Policies.. 6 6. Periodic Review of Data.... 7 7. Employee Competence Training, Navigational & SMS Awareness. 8 8. Port User Involvement... 8 9. Communication of Navigational Safety to all Stakeholders... 9 10. Effectiveness of and Continual Improvement of the Navigational SMS 10 2

DOCKYARD PORT OF PLYMOUTH HARBOUR SAFETY PLAN 1. INTRODUCTION The Dockyard Port of Plymouth (DPoP) exists to serve the defence interests of the UK. Safe operation of the Dockyard Port is essential to support the operational programme of the Royal Navy but also for the safety of the many commercial and recreational users of the Dockyard Port waters. For ports other than Dockyard Ports, the Department for Transport (DfT) Port Marine Safety Code (PMSC) recommends harbour authorities maintain a dedicated Navigational Safety Management System (SMS) for marine operations within the port. Although the PMSC is not binding on the Ministry of Defence (MOD), the MOD recognises it as the authoritative articulation of best practice in port safety, and is committed to meet these or equivalent standards as far as is reasonable and practical. However, the legislative background under which Dockyard ports operate is different from that on which the PMSC is based and the powers of the QHM are not directly analogous to those vested in a Statutory Harbour Authority (SHA). For this reason, as observed by the DfT, the PMSC is not wholly appropriate to a Dockyard Port such as Plymouth 1. With this in mind, the Dockyard Ports Board has developed the Dockyard Port Marine Safety Policy (DPMSP) using the PMSC as a basis. The DPMSP details the policies to be adopted by the MOD Dockyard Ports to achieve standards at least equivalent to those provided for in the PMSC so far as is reasonably and practicable. At all times, Dockyard Port safety policies and plans are to be based upon identification of the hazards, assessment of the risks and implementation of effective control measures to minimise or remove those risks, thus ensuring the safety of the Dockyard Port and its users. This allows for safe operation of the Dockyard Port and supports PMSC compliance by the Statutory Harbour Authorities within DPoP. 2. SAFETY MANAGEMENT SYSTEM The development of the SMS was the result of a significant amount of work, which involved a consultation process with port stakeholders. The SMS was developed by building upon the extensive existing risk management documentation, knowledge and processes that were embedded in the operations of the port. The process for developing the manual was, consequently, valuable in that it fostered discussions between the stakeholders. The discussions principally focused on defining the existing controls and achieved greater clarity in the roles, responsibilities and arrangements for managing safety and environment risks which was the way forward for further improvements in safety and environment management across the whole of the port. 1 www.dft.gov.uk 3

As part of the SMS QHM Plymouth has compiled this Harbour Safety Plan of which the strategic objectives are: Reduce risks to as low as is reasonably practicable (ALARP); Ensure all reasonably practicable steps are taken to identify the hazards and risks arising from operational activities in DPoP; Ensure conformance with the navigational safety and marine policies, associated operating controls, applicable port and marine legislation and non-statutory obligations; Periodically review data gathered from audits, inspections, incidents and any concerns raised to evaluate and determine where improvements and changes need to be made; Implement employee competence training and Navigational SMS awareness programmes; Facilitate port user involvement in the maintenance of the Navigational SMS and the overall improvement in the provision of navigational safety; Communicate the Harbour Authority s ongoing efforts and achievements in facilitating navigational safety to all stakeholders; Review the effectiveness of and continually improve the Navigational SMS. In consultation with the Plymouth Harbour Authorities Liaison Committee (HALC), the Harbour Safety Plan will be reviewed periodically. At minimum, it will be reviewed every three years 3. REDUCE RISKS A risk management approach for the identification, assessment and control of risks within the port is laid down in the SMS. This approach is consistent with the DPMSP and the PMSC. The underlying principle is to utilise the manual as a mechanism to reduce navigational risk within the port to a level that is ALARP. The risk assessment process has enabled additional risk treatment management strategies to be identified. The identification of these additional management strategies has been focussed towards the significant risks in the port over which the QHM and other regulatory stakeholders have direct control. The treatment strategies are prioritised based on the findings of the risk assessment process. It is the intent of the QHM to continue working in consultation with port stakeholders to ensure that over time, appropriate risk management strategies are identified and increasingly mature systems are implemented to deliver continued safety and environmental improvements throughout DPoP. 4. IDENTIFICATION OF THE HAZARDS AND RISKS The Hazman database held on a stand alone computer within QHM Port Operations (an exact copy of the current database is kept by the Cattewater Harbour Authority) contains details of identified hazards, together with the associated risk control measures employed to mitigate those hazards. Both hazards and risk control measures have a designated owner. All hazards are 4

maintained within the system in ranked order, based on the outcome of the risk assessment process. This ranking structure will change with time as the hazards and risk controls continue to be reviewed, reassessed and re-scored. The archive also includes a comprehensive audit record. This documents the outcome of the scheduled proactive hazard review process, any incident review, and the addition of any new risk and its associated assessment. In each case the outcome of the review is recorded and includes: The action taken and recommendations made by or to the QHM; Whether the HALC reviewed any aspect; The names of those involved and their recommendations; and Subsequent recommendations from the HALC. The review of hazards and control measures are prompted by any of the following: Planned, periodic, formal review of established hazards and risk controls, initiated by the Hazman software; Review of hazards and associated risk controls following an incident; The identification and assessment of any potential hazards arising from changes to circumstances including the introduction of a new trade and/or marine operation. Review of hazards and associated risk controls following an incident outside DPoP e.g. from MAIB report. The process used to implement, modify or develop the Navigational SMS is shown in Figure 1 below. The day-to-day administration of Hazman is the responsibility of the Port Safety Officer (PSO). In particular, the role: Maintains, administers and interprets the Hazman database to ensure effective support to the Harbour Authority; Maintains, administers and interprets the Hazman database to ensure the effective recording, availability and archiving of marine incident information; and, Constructs and presents Hazman information and reports as required in an effective and appropriate format, such that the overall navigational safety performance of the port may be reviewed and assessed. 5

Periodic Review New Risk Assessment Incident Investigation External Incident Report Staff Input DECISION QHM HALC External consultation Recommendations Input to HAZMAN Navigational SMS Update Fig 1 Navigational SMS Development Process 5. CONFORMANCE WITH THE NAVIGATIONAL SAFETY AND MARINE POLICIES The Harbour Authority ensures conformance with the navigational safety and marine policies, associated operating controls, applicable port and marine legislation and non-statutory obligations; The Harbour Authority is committed to conformance with the principles established through the DPMSP. The Harbour Authority will seek to achieve this through: Regulating navigation in a way that safeguards the harbour, its users and stakeholders, the public and the environment; Ensuring that relevant assets of the harbour are managed safely and efficiently; Ensuring the provision of adequate resources (including staff training) to discharge the navigational safety obligations of the Harbour Authority; Making available relevant navigational information to all harbour users; Working closely with key Stakeholders to aid the development of a Navigational SMS; Working closely with key stakeholders to ensure the ongoing relevance of the Navigational SMS; and, Publishing relevant parts of the Navigational SMS on the public website of the Harbour Authority, employing a continuous process of briefing and updating information with regard to navigational safety. 6

The DPMSP requires that QHM liaises with and involves local practitioners, port users and other interested parties in the management of marine operations and navigational safety in the port, i.e. the development and maintenance of the Navigational SMS; the PMSC makes similar recommendations for SHAs. The Organisational structure for the development and oversight of safety policy and regulation for DPoP is shown in Figure 2.. Environmental Policy Advice (TECF) Port User Cosultation (PPMLC) MoD SoS HALC (Advisory Body) Nuclear Regulator NBC CoMFleet (Dockyard Ports Board) DP PCC Licensing Policy Sutton Harbour SMS Millbay Docks SMS Cattewater Harbour SMS Navigation and Pilotage Sub Group DPoP Navigational SMS Navigation Policy Pilotage Policy Other Policies Key Harbour Authority (QHM) Direction Reporting Document Development Advisory DPPO (Directions) Port Guidance Figure 2 Dockyard Port of Plymouth Policy Development and Regulatory Structure 6. PERIODIC REVIEW OF DATA The Harbour Authority periodically review data gathered from audits, inspections, incidents and any concerns raised to evaluate and determine where improvements and changes need to be made. The Harbour Authority will audit itself against the DPMSP in parts monthly encompassing the whole organisation at least twice a year. The results of these audits, inspections, incidents and any concerns are reviewed and evaluated by QHM and passed to the HALC where it is determined whether improvements or changes within the port are required. Each HALC has minutes taken and are retained within the Harbour Authority records. 7

7. EMPLOYEE COMPETENCE TRAINING, NAVIGATIONAL & SMS AWARENESS The Harbour Authority Implements employee competence training and Navigational SMS awareness programmes regularly to keep its staff properly trained. In particular, for marine staff the Harbour Authority will: Identify operational and safety training needs; Establish a skills matrix of competency levels required for key tasks; Plan how training requirements are to be met and when; and, Establish a process to appraise the effectiveness of training. It is the policy of the Harbour Authority that all marine staff (including Admiralty pilots) shall attend Navigational Safety Management awareness briefings to ensure that they are fully aware of the provisions of the Navigational SMS, and of specific roles and responsibilities assigned to them within this programme. The topics to be covered by this training will include: An overview of all relevant legislation, General Directions and QHMSOs; A review of the Navigational Safety Policy; An outline of Management and Operating procedures, and their provisions; The principles of individual accountability and responsibilities; The formal and informal procedural controls in place; An outline of response to emergencies and contingencies; and, Health and safety. To prevent any decline in the level of competence and skills of either management or staff, relevant training and instruction shall be repeated periodically, as appropriate. Each member of staff will be assessed for competence at least once a year during their annual assessment. All training and instruction provided to Harbour Authority personnel and / or external bodies will be duly recorded and securely retained. 8. PORT USER INVOLVEMENT The Harbour Authority facilitates port user involvement in the maintenance of the Navigational SMS and the overall improvement in the provision of navigational safety via the Tamar Estuaries Consultative Forum (TECF) which comprises all the organisations with statutory powers or functions relating to the Tamar Estuaries. It has developed and oversees The Tamar Estuaries Management Plan, a document written to provide guidance in delivering statutory compliance and best practice in the management of the Estuaries. Their Action Plan identifies priority actions for the delivery of the Tamar Estuaries Management Plan periodically over the forthcoming financial years, including development of the management plan for the subsequent years. It also provides a format for annual reporting against which progress towards deliverables can be monitored. 8

The development of environmental policy as it affects the Navigational SMS, e.g., oil spill response, will be facilitated through the TECF and with the Port of Plymouth Marine Liaison Committee (PPMLC), which also provides a mechanism for consultation with port users. 9. COMMUNICATION OF NAVIGATIONAL SAFETY TO ALL STAKEHOLDERS The Harbour Authority s ongoing efforts and achievements in facilitating navigational safety to all stakeholders is carried out via the Navigational Safety Policy which was developed by the Harbour Authority in consultation with the HALC, in its role as Advisory Body. The Policy has been posted on the website of the Harbour Authority and, as appropriate, Staff Intranet. Furthermore, the Harbour Authority is committed to working closely with harbour stakeholders to aid the development of the Navigational SMS, which will enhance conformance with the DPMSP and PMSC. The Policy has been communicated to: Staff engaged by: The Harbour Authority, both military and civilian; The SHAs; The Plymouth Pilotage Service; The Admiralty Pilotage Service; PCC; Harbour users; and, Interested parties. The Harbour Authority regularly releases Plymouth Navigational Warnings and Local Notice to Mariners via the Internet and local newspapers if and when required. 10. EFFECTIVENESS OF AND CONTINUAL IMPROVEMENT OF THE NAVIGATIONAL SMS In considering the safe operation and management of the harbour the Harbour Authority will monitor and review its performance against a number of predetermined indicators. The results of such reviews will be recorded and, where appropriate, information will be made available to users and other interested parties including the HALC. 9