Cycle parking - examples of good practice

Similar documents
Improved cycle parking at South West Trains' stations in Hampshire

Cycling to work. Traffic Advisory Leaflet 11/97 November Introduction. Government perspective. Workforce

Cycle Routes. Traffic Advisory Leaflet 3/95 March Introduction. Implementation. Project aims. Design

Road humps: discomfort, noise, and groundborne

Cyclists at road narrowings

Bikerail - combined journeys by cycle and rail

Chicane Schemes. Traffic Advisory Leaflet 12/97 December Introduction

Bus priority in SCOOT

Entry Treatments. Traffic Advisory Leaflet 2/94 August Introduction. Design. Vertical Deflections. Locations

Traffic Management and Emissions

Raised Rib Markings. Traffic Advisory Leaflet 2/95 March Introduction

Monitoring Local Cycle Use

Traffic Calming Regulations

Cycle Parking Standards TfL Proposed Guidelines

TRAFFIC ADVISORY LEAFLET

Part 3: Active travel and public transport planning in new housing developments

interchange audit ABERDEEN Introduction Purpose of the Interchange Audit Interchange Audit Linking cycling with public transport

Traffic calming regulations (Scotland)

Cyclepoint: a NedRailways concept. Leeds Cyclepoint. A New Way of Continuing the Journey

The most innovative bike hire scheme in the UK

9. Parking Supporting Statement

Our Cycle Promise. northernrailway.co.uk. Produced in partnership with Sustrans. July 2017

BIKEPLUS Public Bike Share Users Survey Results 2017

TRAFFIC ADVISORY LEAFLET

Bike Friendly Business Application Form

Walking and Cycling Action Plan Summary. A Catalyst for Change The Regional Transport Strategy for the west of Scotland

Contents Location Map Welcome and Introduction Travel Plan Management Science Park Accessibility Walking Cycling Bus Rail Car Sharing Contact Details

National Transport Awards Cambridge Park & Ride

Bike share success factors

London Cycle Network Annual Report 2000

Bluebell Gardens Resident Travel Guide

Bristol City Council has produced a draft Bristol Transport Strategy document.

Chapter BICYCLE PARKING REQUIREMENTS

AGENDA. Stakeholder Workshop

GETTING WHERE WE WANT TO BE

The role of the Authority in promoting sustainable transport. Gerry Murphy South East Regional Assembly 27 th May 2011

Park & Ride Implications for TRICS Users. TRICS UGM, June 2009

Regional Spread of Inbound Tourism

UNIVERSITY OF STRATHCLYDE TRAVEL PLAN 2016 TO 2020

UNIVERSITY OF STRATHCLYDE TRAVEL PLAN 2016 TO 2020

New Directions in Street Auditing: Lessons from the PERS Audits. David Allen, Transport Research Laboratory. Spencer Clark, Transport for London

Background. Caversham a vision for the future. Joint public meeting arranged by:

Leeds CyclePoint YOUR GUIDE TO. Welcome to CyclePoint. CyclePoint offers five services in one unique environment

EXECUTIVE SUMMARY: TRANSIT-ORIENTED DEVELOPMENT IN SMITHS FALLS, ONTARIO; A COMPARISON BETWEEN TWO SITES

CONTENTS PREFACE 1.0 INTRODUCTION AND SCOPE 2.0 POLICY AND GOVERNANCE 3.0 SUMMARY OF PROGRESS 4.0 NATURE OF DEMAND 5.0 TRAVEL AND PARKING INITIATIVES

Using parking policy and parking levies to tackle transport and environmental issues

CAMBRIDGE ACCESS STUDY: TACKLING CONGESTION WORKSHOP

Abellio s sustainable door-to-door Approach

Transport Poverty in Scotland. August 2016

CYCLING CHARTER ACTION PLAN EXECUTIVE SUMMARY

Introduction. Summary conclusions. Recommendation

TRAVEL PLAN ANNUAL MONITORING REPORT

TRAVEL PLAN ANNUAL MONITORING REPORT

BIKE PARKING INFRASTRUCTURE GUIDANCE. Dublin Cycling Campaign

ATTACHMENT 4 - TDM Checklist. TDM Checklist Overview

A Guide to Your Travel Options. Chester Campuses and Buildings

The potential impact of high density docking stations on Bike Share distribution activities Biella Research June 2016

1.0 FOREWORD EXECUTIVE SUMMARY INTRODUCTION CURRENT TRENDS IN TRAVEL FUTURE TRENDS IN TRAVEL...

WALK- AND bike-friendly TURLOCK

Active Travel Survey for Bridgend and Pencoed towns. Page description:

ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025

BRC/Springboard Footfall and Vacancies Monitor January 2015 Covering the four weeks 04 January January 2015

DOE Climate Change Proposals

Government transport policy

Sandwell General Hospital Travel Plan 2014

End of the motor car age: the evidence and what could follow

TOUR DE FRANCE GRAND DÉPART YORKSHIRE

Smart Network Smarter Choices

How to set up a pool bike scheme for staff members at your Institution

Child Road Safety in Great Britain,

Welcome! Public Open House on UBC s Transportation Plan

Bedfordshire County Council Cycle Parking Guidance Annex 1 Development standards Annex 2 Parking dimensions and layouts

Putting Inverness Streets Ahead

1.5 On this basis it is fundamental that the Transport Strategy for the site focuses on the following key criteria,

Quality Bus Corridor delivery report 1999/ /07

CPC Parking Lot Riverside Drive. Transportation Rationale

Staff Travel Survey 2015 Key Findings

Public Bicycle Sharing Scheme

Transport Poverty in Scotland. August 2016

MARKHOUSE ROAD IMPROVEMENTS

Neighbourhood Development Plan: Ashtead INTRODUCTION 2 SUMMARY CONCLUSION CAR USE AND CONGESTION IN ASHTEAD 4

20mph. We want to make Edinburgh a better and safer place to live, work and play.

Introduction. Using the Checklist. TDM-Supportive Development Design and Infrastructure Checklist Version 1.0 (30 June 2017) City of Ottawa

Space for Cycling. A guide for decision makers

Public Bike Share Schemes. 14 December 2017

School information. Wormholt Park School Travel Plan. London Borough of Hammersmith and Fulham Wormholt Park Primary School.

Travel Planning WC & NWCD Cycling Group. Thursday 2 nd July Amanda Holden

Promoting Cycle Tourism

Active travel and economic performance: A What Works review of evidence from cycling and walking schemes

Roads and public rights of way

GD 0043/18 ACTIVE TRAVEL STRATEGY

Callander Mountain Bike Trails Feasibility Study Executive Summary January 2015

A bicycle map depicts the local bicycle lane network. It also gives recommendations for routes,

21/02/2018. How Far is it Acceptable to Walk? Introduction. How Far is it Acceptable to Walk?

PERSONALISED TRAVEL PLANNING IN MIDLETON, COUNTY CORK

Sustainable Travel Information

Lancaster University Travel Plan

Lea Bridge Road A street for everyone Tell us

Test Valley Borough Council

UNIVERSITY CENTRE. TRAVEL AND TRANSPORT Guidelines

Transcription:

Traffic Advisory Leaflet 6/99 April 1999 Cycle parking - examples of good practice Introduction Fear of cycle theft is known to be a significant deterrent to cycling. The National Cycling Strategy identified cycle security as a key issue. It sets out objectives of improving parking at major destinations, including town centres, shopping developments, educational establishments, hospitals and leisure facilities. This leaflet highlights a number of cycle parking initiatives taken by local authorities and others which appear to be good practice that others might follow. Many of the schemes covered in the leaflet resulted from the cycle challenge competition begun in 1995. The Department of the Environment, Transport and the Regions (DETR) is always interested to know of innovative cycling schemes, including those involving cycle parking. Cycle Challenge The Department of Transport (now the DETR) initiated a cycle challenge competition in 1995. This was followed by a similar initiative by the Scottish Office in 1997. Both offered funds to support projects designed to encourage cycling at a local level. The resulting schemes had a wide geographic spread, and included a number of cycle parking initiatives. There were variations both in the size and the range of cycle parking, but all were designed to encourage an increase of cycling in the area by providing secure on and off-street cycle parking. A number of the schemes are featured in this leaflet. Types of cycle parking Short/Mid Stay Cycle Parking - For short and mid-term parking cyclists will use Sheffield type parking stands, and any convenient items of street furniture. Long Stay Cycle Parking - For longer-term parking cyclists will tend to seek a higher level of security. This is available from cycle lockers, cycle centres or manned cycle parking. Cyclists may be more willing to pay for such facilities. Cycle Centres - Cycle centres offer under cover long term high security cycle parking for a fee. In addition they offer showers, lockers and changing facilities. There may also be the attraction of cycle repairs, and sales of bikes and accessories. Basingstoke and Dean Borough Council worked with the Basingstoke Cycle Works Shop, a local cycling retailer, to provide a mobile parking facility for the central area of the town. A van was fitted out to hold about 12 cycles inside, with racks outside for a further 8 secured with an electronic cable. The van was used on Saturday mornings and located at an entrance to the shopping malls. The facility was signed and well advertised. Free cycle parking was offered, together with checks on

the mechanical condition of bikes. The van was also used to provide parking at special events. Initial reaction was good, although the number of bikes parked each week subsequently declined. The scheme no longer operates in the shopping centre because the Council has provided covered cycle parking. Sheffield stands were provided in the villages of Frampton Cottrell and Winterbourne by the Parish Councils. The stands were installed in a number of locations around the villages to encourage local cyclists. No formal monitoring was undertaken, but it is believed that the use of the stands has increased, most noticeably in Frampton Cottrell in the areas where parking was requested by local cyclists. The Greater Manchester Passenger Transport Executive has provided Sheffield stands at Metrolink Stations between Altrincham and Stretford. Thirty stands were installed at stations such as Navigation Road, Timperley, Sale, Dane Road, Brooklands and Stretford, with more to follow at Altrincham. Further improvements will follow, including the installation of lockers at Navigation Road, Bury and Radcliffe, and Sheffield stands at Prestwich and Whitefield Stations. As part of a wider package of cycling measures, the train operating company West Anglia Great Northern has installed additional cycle parking at Cambridge railway station. 160 extra Sheffield stands have been put in on the approach to the station, along with a number of high security cycle parking stands close to the station entrance which are reserved for individual cyclists for a small fee. There has been a very full take-up of all the additional cycle parking. Raigmore Hospital NHS Trust, Inverness, has provided a combination of Sheffield stands and cycle lockers for use by staff, visitors and patients. 40 Sheffield stands and 6 cycle lockers, all covered by CCTV, were installed near to the hospital entrance. The Trust has also provided designated on-site shower facilities. The cycle lockers are leased on a rotating yearly basis upon application, and keys are provided for a deposit of 15. The locker scheme was over-subscribed and indications are that the Sheffield stands are also being well used. The scheme will be monitored to assess the effects of encouraging cycling to and from the hospital. First Aberdeen Limited have installed 5 secure lockers at Aberdeen's first Park and Ride site. The lockers are situated at a site which is within easy cycling distance from large residential areas. The scheme aims to make cycling more attractive to commuters by offering added security through robust cycle storage facilities. Aberdeen City Council has undertaken responsibility for the ongoing maintenance of the lockers. Early interest has been encouraging, and usage is increasing. Hampshire County Council and SW Trains worked together to provide improved cycle parking at a number of commuter stations in the County. This resulted in a considerable increase in cycle parking activity. Monitoring results from the council in 1998 showed continued good levels of cycle parking at stations, with Eastleigh at capacity. All the stations in the project showed increased use except Swanick. The improved cycle facilities have been justified by their additional usage and the Council is keen to extend the scheme to other SW Train stations. Improved cycle

facilities are planned at both Fleet and Farnborough stations in 1999. Hampshire County Council also installed cycle lockers at the Hythe Ferry Terminal, and secure cycle parking at the Southampton Ferry Terminal (Town Quay). All the cycle parking is free. There is a mixture of covered and uncovered parking. There are around 25 ferry crossings daily and cycles are carried free of charge. The ferries are known to be reasonably well used by cyclists, particularly at peak times. Most of the cycle parking at the Southampton Ferry Terminal is long term and often involves overnight parking. Some of the Sheffield stands at the Town Quay are in a covered location. The cycle racks there are well used, with around 12 cycles parked in the open air and 9 in the covered rack. Four cycle lockers of a type not previously used in the UK were provided at Hythe in addition to 5 Sheffield stands installed in the nearby High Street. Keys are provided on deposit of a cheque that is cashed only if the key is not returned. Although one of the lockers at Hythe was taken on a long-term basis, they are generally little used. This is thought to be because the facility is not well known, and improved publicity has been planned. movements of cyclists. Less successful lockers can always be transferred on to other locations. Cycle lockers have also been provided in the following projects, many of which were designed to encourage staff to cycle to work. The schemes include Blackpool Victoria Hospital, Nottingham City Hospital, Bristol - Frenchay NHS Trust, Royal Surrey Hospital, Edinburgh University, Highland Regional Council for commuters in Inverness, at the offices of Surrey County Council and Lancashire County Council, Taunton Cycle Centre, Devon County Council (Park and Ride sites), Lancaster station, Morecambe Bus station, and Strathclyde PTE (24 stations around Glasgow). Kirklees MBC provided 60 cycle lockers at railway stations, sports centres and town centre sites in the borough. The lockers were provided free of charge. Use of the lockers was monitored by the Transport Research Laboratory (TRL). Usage varies from near capacity at Huddersfield Station to around 50% in the town centre. Little use was made of the facilities at the rural stations. The lessons learnt were that lockers were best sited where there were already large congregations or Wiltshire County Council installed a cycle station at Salisbury District Hospital. The Station offers secure sheltered parking using high quality stands that can accommodate cyclists' own locks. It is in an overlooked location, which allows it to be unmanned. The design of the station being modular is transferable to other locations, and can be enlarged or reduced by a bay at a time depending on the location and the number of cycles expected to be parked. Small luggage lockers are available for use by cyclists, and there is covered seating and information/advertising space. Southampton City Council has worked with the Southampton General and the Princess Anne Hospitals to reduce the number of cars coming onto the hospital sites. Extra cycle parking has been provided, together with inducements to staff to give up car parking spaces. Reductions of over 750 vehicles per day using the hospital sites have been noted since the scheme began. Additional traffic

management has been undertaken by the Council in the neighbourhood. Cycle Centres exist in a number of places around the country. Typically they provide a range of services to cyclists, including secure cycle parking. Such centres have been established in Central London, Liverpool, Leicester and Taunton. Cycle parking is also provided by the Bike 'N' Rack company at Victoria Station, London, with another site planned for Waterloo Station. Some car park operators also offer cycle parking, as do a number of retail cycle shops. Traffic Advisory Leaflet 5/98 gives detailed information on Cycle Centres. combination lock system might be around 1,500 for 12 bikes. Semi -vertical or vertical stands can be introduced for around 80-100 for four bikes. Conventional cycle parking and cycle lockers are both capable of being adapted to take payment by coins and by credit or smart cards. Lessons Learnt Demand assessment Cycle parking - Charges Most on-street cycle parking will be offered free of charge, but there is evidence that some cyclists are prepared to pay a small fee for secure off-street parking. Cycle centres and off-street parking places, such as those in car parks and at some rail stations, usually charge for parking. Charges of around 50p - 1.50 are common depending on the length of stay. The Liverpool Cycle centre no longer charges for parking but offers free parking as an inducement to visitors to visit the centre and use other facilities. Such a system might appeal to other cycle shops and traders. Costs of providing cycle parking A Sheffield stand can cost around 35 for two bicycles, and wall loops cost a similar amount. Installation costs are around 100 per stand. The cost of a covered secure cycle park for around 12 bicycles could be around 500 or less: that for a cycle cage with key or Cycle parking involving colleges or work as destinations was often well used straight away, with a demand for more. This is not surprising, since these are traditionally areas of relatively high use. Cycle parking at rail stations tends to vary by station and careful monitoring of cycle use prior to installation is needed. Not all the cycle challenge projects managed to match the supply of cycle parking to demand, and there was some surplus provision. Advance monitoring can help avoid over-provision. The experience with cycle challenge projects confirmed earlier findings by TRL that cycle parking must be close to cyclists' destinations to be well used, and prominently placed for maximum casual observation to help prevent theft. Security Cycle lockers provide additional security, either alone or as an option to standard cycle parking by way of Sheffield stands. Within the cycle challenge projects a number of different designs of lockers were used, some of which were new to the UK. Like cycle stands, some lockers were free whilst others were charged. Providers need to know their market but

cyclists are more likely to be willing to pay for lockers because of the extra security and convenience they offer. Lockers could be abused by users and a tight system of monitoring and of issuing keys is needed. Coin operated lockers are more likely to suffer from vandalism and theft. Lockers installed at stations can carry a security risk, and need to be designed so that staff can see into them and inspect the contents. A number of designs of parking stand exist that offer a high level of security along with convenience of use. Work is in progress to assess in greater depth the security attributes of different kinds of cycle parking device. Closed circuit television (CCTV) can add considerably to the security of all cycle parking provision. In some cases cycle parking can be located so that it benefits from existing CCTV installed to cover car parking. Location/Signing Cycle parking should be easily accessible to regular commuters as well as to shoppers, visitors and passing trade. This is because cyclists will park informally, if it is easier for them to do so than to seek out designated cycle parking areas. Cyclists will only be prepared to park more than a short walk from their parking place if there is a significant gain in security. Cyclists prefer locations where their bicycles are in regular view of local shops or passers-by. Placing cycle parking at or very near cyclists' destinations is important. Shopping centres, theatres, cinemas, leisure centres and libraries are amongst the most obvious places at which cycle parking should be established. Signing to the parking is important, especially for casual users or in tourist areas. Transport interchanges such as train and bus stations are other obvious locations. Cycling can be used for part of a longer journey if secure parking can be provided for part of the trip. Complementary parking Off street cycle parking, such as at cycle centres or cycle parking in car parks, needs to complement, not compete with, nearby on street parking. Evidence from the cycle centre established in Taunton showed that there was little demand for short term parking at the centre when it first opened, because there was sufficient cycle parking available in the nearby high street. Enquiries Walking and Cycling Department for Transport Zone 3/27 Great Minster House 76 Marsham Street LONDON SW1P 4DR Tel : 020 79442983 References Traffic Advisory Leaflet 11/97 - Cycling to Work Traffic Advisory Leaflet 5/98 - Cycle Centres Acknowledgement The help and assistance of the promoters of all the schemes mentioned in this leaflet is gratefully acknowledged. Traffic Advisory Leaflets (TAL) are available to download free of charge on the Department for Transport website www.dft.gov.uk Sign up for a free e-mail alert to receive notification when a new TAL is published by sending an e-mail to tal@dft.gsi.gov.uk with the subject line "subscribe". To obtain a printed copy of this and/or other TALs, contact: DfT Publications, PO Box 236, Wetherby, West Yorkshire, LS23 7NB. Telephone 0870 122 6236. Fax 0870 122 6237. E-mail: dft@twoten.press.net The Department for Transport sponsors a wide range of research into traffic management issues. The results published in TALs are applicable to England, Wales and Scotland. Attention is drawn to variations in statutory provisions or administrative practices between the countries. Within England, enquiries should be made to: Traffic Management Division, Department for Transport, 2/07 Great Minster House, 76 Marsham Street, London, SW1P 4DR. Telephone 020 7944 2478. E-mail: tal@dft.gsi.gov.uk