MCTC 2018 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV13.xlsx

Similar documents
Performance Criteria for 2035 Long Range Transportation Plan

North Coast Corridor:

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015

Appendix T-2: Transportation Facilities Inventory

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Regional Transportation Needs Within Southeastern Wisconsin

Fresno Council of Governments Community Workshop. Tuesday, April 25, 2017 Hoover High School Fresno, California

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

Transportation Master Plan Advisory Task Force

WELCOME TO OPEN HOUSE # 1 June 14, 2017

I-105 Corridor Sustainability Study (CSS)

5. RUNNINGWAY GUIDELINES

ROADSOADS CONGESTION HAMPTON SYSTEMYSTEM MANAGEMENT. Part II Roadway Congestion Analysis Mitigation Strategies and Evaluation

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

Goal 3: Foster an environment of partnerships and collaboration to connect our communities and regions to one another.

ACTIVE TRANSPORTATION

Typical Rush Hour Commute. PennyforTransportation.com

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Governor s Transportation Vision Panel

Classification Criteria

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Roadways. Roadways III.

How To Encourage More Efficient Transportation in Brazilian Cities

Balancing Operation & Safety for Motorized and Non-Motorized Traffic

Eliminate on-street parking where it will allow for a dedicated bus only lane %

CONNECTING PEOPLE TO PLACES

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

State Highway 44/State Street High Capacity Corridor

TRANSPORTATION NEEDS ASSESSMENT

Purpose and Need. Chapter Introduction. 2.2 Project Purpose and Need Project Purpose Project Need

Chapter 5 Future Transportation

Clackamas County Comprehensive Plan

1.0 INTRODUCTION 1.1 PURPOSE OF THIS REPORT

Vision Public Workshop: Findings

MOBILITY RESULTS AREA. Budgeting For Outcomes Council Presentation January 12, 2007

2. Context. Existing framework. The context. The challenge. Transport Strategy

Bicycle Master Plan Goals, Strategies, and Policies

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015

SANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008

Develop a Multi-Modal Transportation Strategy (Theme 6)

STATION #3 INITIAL ALTERNATIVES

Draft MOBILITY ELEMENET. Community Meeting May 22, 2013

Basalt Creek Transportation Refinement Plan Recommendations

2040 RTP. Chapter 6: Investments in our Transportation Future

Perryville TOD and Greenway Plan

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

Chapter 6 Transportation Plan

Providing an Efficient and Multi-modal Transportation System

Route 7 Corridor Study

Highway 217 Corridor Study. Phase I Overview Report

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Defining Purpose and Need

General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

2015 Florida Main Street Annual Conference. Complete Streets Equal Stronger Main Streets

Appendix F: Detailed Modeling Results

2018 Transportation Survey October 17, Prepared by:

Attachment A: Columbus Area Metropolitan Transportation Plan Objectives, Performance Measures, and Targets

FROM: CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: OCTOBER 4, 2004 CMR:432:04

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

2045 Long Range Transportation Plan. Summary of Draft

T1-A - Service Reduction (Re-sizing)

Most Important Part of any Plan

Public Consultation Centre

STUDY ADVISORY COMMITTEE. October 8, 2015

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Congestion Evaluation Best Practices

Corridor Advisory Group and Task Force Meeting #10. July 27, 2011

Appendix T 1: Additional Supporting Data

Town of Superior. Superior Trails Plan

LANE ELIMINATION PROJECTS

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

In Collaboration with: City of Belton Cass County FHWA Johnson County KDOT MoDOT City of Olathe City of Overland Park

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

SECTION 1 - TRAFFIC PLANNING

Town of Bethlehem. Planning Assessment. Bethlehem Town Board

Chapter 9: Pedestrians and Bicyclists

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

NJDOT Complete Streets Checklist

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

MOBILITY WORKSHOP. Joint City Council and Transportation Commission May 5, 2014

The State General Plan Guidelines recommend that the circulation policies and plans should:

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives

Road Diets FDOT Process

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

Incorporating Health in Regional Transportation Planning

City of Bartow Comprehensive Plan. Transportation Element

Bicycle Lanes Planning, Design, Funding South Mountain Partnership Trails Workshop Roy Gothie PennDOT Statewide Bicycle Pedestrian Coordinator

El Paso County 2040 Major Transportation Corridors Plan

Sustainable Transportation Planning in the Portland Region

Transportation Corridor Studies: Summary of Recommendations

Rochester Downtown Bicycle Study 2009

Roads and Vehicular Traffic Design Principles. Roads and Vehicular Traffic Recommendations

Base Information. 1. Project Title County Line Road Shoulder Improvements. Start: County Line Road/17 th Avenue End: County Line Road/State Highway 66

Project Description Form 6V

ROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE

Base Information. 1. Project Title Erie Parkway and WCR 7 Traffic Signal Project

Transcription:

MCTC 8 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV.xlsx Madera County Transportation Commission Regional Transportation Plan / Sustainable Communities Strategy Multi-Modal Project Evaluation Criteria Madera County Resource Management Agency Madera County Road Impact Fee Program Update Local Street and Road and State Highway Corridor Project Evaluation Criteria Bicycle and Pedestrian Projects Is consistent with current local plans and policies Implements existing local plans and policies Yes 8 No Will be part of an existing trail, bicycle or pedestrian network Addresses continued system continuity Project will address system continuity in one or more of the following ways: * The project will enhance or extend an existing trail, bicycle, or sidewalk facility * The project is the first phase of a project that will provide future system connectivity * The project is a connectivity gap closure project The project is a stand alone project not connecting or enhancing an existing facility Provides improved access to activity centers or schools Improves the access to activity centers or schools through an improved and expanded bicycle and/or pedestrian system Health Priority Index Directly serves an activity center or a school Indirectly serves an activity center or a school Does not directly or indirectly serve an activity center or schools The project bridges an obstacle or provides a more direct route (reducing significant out-of-direction travel) The project reduces travel time and distance Yes No Improves pedestrian and bicycle user safety Improved pedestrian and/or trail/bicycle user safety The project includes enhancements for pedestrian and/or trail/bike safety The project does not include ancillary improvements that will enhance safety Project is scheduled to be open to bicycles and pedestrians within the next years Project is scheduled to be open to bicycles and pedestrians within to years Project is scheduled to be open to bicycles and pedestrians within to years Project is scheduled to be open to bicycles and pedestrians within to years Project is scheduled to be open to bicycles and pedestrians within to years Project is scheduled to be open to bicycles and pedestrians in more than years Project benefits areas that are most health burdened Projects that benefit areas with - health burden measures Projects that benefit areas with - health burden measures or that falls within an economically disadvantaged community Projects that do not benefit areas with significant health burden measures Supports SCS growth principles ( points possible) Project furthers implementation of the SCS Reduces reliance on single-occupancy vehicles Supports compact development Supports transit connectivity Provides Greenhouse Gas reduction and/or Criteria Pollutant emission reductions Directly serves is defined as: a bike or pedestrian project that leads straight to or alongside an activity center or school. Indirectly serves is defined as: a bike or pedestrian project that does not lead straight to or go alongside an activity center or school but is within. miles of an activity center or a school. Activity Center defined as: A medical center or civic center, school, office, park, employment or commercial area. School defined as: Public or private elementary, middle or high school, community college, trade college, or university. Examples of enhancements for pedestrian and/or trail/bike safety include: lighting, drainage, improved visibility, hazard elimination, rightof-way separation, etc. Project may receive point per criterion that applies. A maximum of points may be awarded. Visit Fresno County Department of Public Health's website at http://www.co.fresno.ca.us/divisionpage.aspx?id=8 (Health Priority Index) for a map to determine project areas level of health burden. Health Burden measures include: Pre-term Birth rate, Pollution Burden, Year of potential life lost, Composite Mortality Index. A maximum of points may be awarded. [Accounts for 9.% of total points available.]

MCTC 8 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV.xlsx Capacity Increasing Street, Road and Highway Projects Is consistent with current local plans and policies Implements existing local plans and policies Yes No Congestion Relief Urban LOS F to LOS A 9 LOS F to LOS B 8 LOS E to LOS A LOS F to LOS C LOS E to LOS B LOS F to LOS D LOS E to LOS C LOS F to LOS E LOS E to LOS D N/A LOS D to LOS C or Better Improves Air Quality (up to 8 points) Reduces Emissions Project includes synchronization of traffic signals Project includes or promotes Active Transportation options Rural LOS F to LOS A or B LOS F to LOS C LOS E to LOS A or B LOS F to LOS D LOS E to LOS C LOS F to LOS E LOS E to LOS D LOS D to LOS C or Better N/A N/A N/A Project is already served by transit Project corrects an existing deficiency that regularly causes significant delays and congestion. Project includes air pollution mitigation strategies Project includes a new connection to state freeway roadway system or has freeway auxiliary lanes to serve weave or queues Project has parallel facilities within a mile that operate at LOS F (Urban), LOS E (Rural) Provides improved access to activity centers, Environmental Justice areas, Low Income areas and/or Native American Sites Improves the access to major services, EJ areas, Low Income areas, or Native American sites through an improved and expanded street road system Directly serves is defined as: a streets and roads project that leads Directly serves an activity center, EJ area, Low Income area, or Native American site straight to or alongside an activity center. Indirectly serves is defined Indirectly serves an activity center, EJ area, Low Income area, or Native American site as: a streets or roads project that does not lead straight to or go alongside an activity center but is within mile of an activity center. Does not directly or indirectly serve an activity center, EJ area, Low Income area, or Activity Center defined as: A medical center or civic center, school, Native American site office, park, employment or commercial area. Project Improves Safety ( points possible) Safety is improved with countermeasures Addresses multi-modal policies in the Region's RTP/SCS Examples of an existing deficiency can include: round-a-bout, widening a bottleneck, or providing a connection over/under/through an existing circulation barrier (i.e. freeway, railroad, waterway), etc. May receive points for each criterion that applies. A maximum of 8 points may be awarded. Project includes countermeasures to improve safety Countermeasures to improve safety includes, but not limited to: Railroad grade separations, round-a-bouts, improvements to Provides safety improvements to a roadway or intersection that is accident- prone - e.g.: bike/pedestrian vehicle interactions, speed reductions on high-speed in the top % of collision rate by traffic volume (+ collisions per, ADT, past roads, dedicated left- turn lanes, etc. years) Supports Other Modes of Transportation Yes - Project includes the construction of planned trail/bike lanes, sidewalks, transit systems. Amenities, or other modal improvements within the ROW. Yes - Project provides for future planned trail/bike lanes, sidewalks, transit systems. Amenities, or other modal improvements within the ROW. No Project is scheduled to be open to traffic within the next years Project is scheduled to be open to traffic within to years Project is scheduled to be open to traffic within to years Project is scheduled to be open to traffic within to years Project is scheduled to be open to traffic within to years Project is scheduled to be open to traffic in more than years A maximum of points may be awarded. 8 Located in a High Crash Rate Area Does facility have high vehicular crash rate? Crash rate exceeds the statewide average Crash rate is below the statewide average

MCTC 8 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV.xlsx 9 Serves Smart Growth Development Does the project serve Smart Growth areas? Highway corridors shall receive points for each place type they serve. Serves existing/planned Urban Center, or Special Use Center Serves potential Urban Center or Special Use Center Minimizes Habitat and Residential Impacts Does the project minimize negative habitat and residential impacts? Avoids preserve areas as defined by habitat conservation plans or other state or federal lands designated for habitat conservation Avoids native habitats Avoids existing residential development (defined as existing housing stock within - feet of the highway right-of-way and is more than two dwelling-units per acre. This does not imply a taking and is used only as a measure of proximity). Avoids Negative Environmental Impacts on EJ, Minority or Low Income areas, or Native American Historic, Cultural and Sacred Sites Does the facility avoid negative environmental impacts on Environmental Justice, Low Income, or Minority areas or Native American historic, cultural and sacred sites? Yes Note: Preserve areas are defined as habitat preserve planning areas for approved Natural Community Conservation Planning (NCCP) Subregional Plans. Approved NCCP Subregional Plans include: the Multiple Species Conservation Program (MSCP) and the Multiple Species Habitat Conservation Program (MSHCP). Native habitats include all non habitat conservation plan areas within the region. No Provides Access to Evacuation Routes Does the project provide evacuation access for regional hazard areas including Environmental Justice, low income or federally recognized Indian reservations? Yes No Serves Goods Movement Does the project accommodate goods movement? Critical Linkage Is the highway a major freight corridor as measured by truck AADT% Truck AADT >% Truck AADT % - % Truck AADT Less Than % Is the project located in a high volume freeway corridor and/or lacking a continuous parallel arterial to provide congestion relief? High volume freeway corridor and lacking a continuous parallel arterial (High volume is defined as greater than, ADT using the Future Year Regional Growth forecast) Congested freeway corridor and lacking a continuous parallel arterial Congested freeway corridor or lacking a continuous parallel arterial A truck is defined as a vehicle with greater than axles Note: Congested corridors are measured by majority of corridor with Future Year peak-period LOS E or F.

MCTC 8 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV.xlsx Streets and Roads - Non-Capacity Increasing MAINTENANCE Projects Pavement Management The project participates in the jurisdiction's Pavement Management System Project participates in a Pavement Management System Project does not participates in a Pavement Management System Pavement Condition / Safety Condition The project's road pavement is in the most failing condition in the jurisdiction? The project's road condition is in the bottom % of the roads in the jurisdiction The project's road condition is in the bottom % of the roads in the jurisdiction, but above % The project's road condition is not in the bottom % of the roads in the jurisdiction Road Usage Road exhibits the highest use for the jurisdiction based on ADT The project's road usage is in the top % of ADT for the jurisdiction Only / of a jurisdiction's maintenance projects will get points. Another / will get point. The project's road usage is in the top % of ADT for the jurisdiction, but below % Only / of a jurisdiction's maintenance projects will get points. The project's road usage is not in the top % of ADT for the jurisdiction Another / will get point. Project is scheduled to be open to traffic within the next years Project is scheduled to be open to traffic within to years Project is scheduled to be open to traffic within to years Project is scheduled to be open to traffic within to years Project is scheduled to be open to traffic within to years Project is scheduled to be open to traffic in more than years A maximum of points may be awarded.

MCTC 8 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV.xlsx Streets and Roads - Non-Capacity Increasing OPERATIONS Projects Is consistent with current local plans and policies Implements existing local plans and policies Yes No Improves Air Quality (up to 8 points) Reduces Emissions Project includes synchronization of traffic signals Project includes or promotes Active Transportation options Project is already served by transit Project corrects an existing deficiency that regularly causes significant delays and congestion. Project includes air pollution mitigation strategies Project includes a new connection to state freeway roadway system or has freeway auxiliary lanes to serve weave or queues Project has parallel facilities within a mile that operate at LOS F (Urban), LOS E (Rural) Provides improved access to activity centers, Environmental Justice, Low Income, or Minority Areas and/or Native American Sites Improves the access to major services, EJ areas, Low Income areas, or Native American sites through an improved and expanded street road system Directly serves is defined as: a streets and roads project that leads Directly serves an activity center, EJ area, Low Income area, or Native American site straight to or alongside an activity center. Indirectly serves is defined Indirectly serves an activity center, EJ area, Low Income area, or Native American site as: a streets or roads project that does not lead straight to or go alongside an activity center but is within mile of an activity center. Does not directly or indirectly serve an activity center, EJ area, Low Income area, or Activity Center defined as: A medical center or civic center, school, Native American site office, park, employment or commercial area. Serves Smart Growth Development Does the project serve Smart Growth areas? Examples of an existing deficiency can include: round-a-bout, widening a bottleneck, or providing a connection over/under/through an existing circulation barrier (i.e. freeway, railroad, waterway), etc. May receive points for each criterion that applies. A maximum of 8 points may be awarded. Highway corridors shall receive points for each place type they serve. Serves existing/planned Urban Center, or Special Use Center Serves potential Urban Center or Special Use Center Road Usage Road exhibits the highest use for the jurisdiction based on ADT The project's road usage is in the top % of ADT for the jurisdiction The project's road usage is in the top % of ADT for the jurisdiction, but below % The project's road usage is not in the top % of ADT for the jurisdiction Project is scheduled to be open to traffic within the next years Project is scheduled to be open to traffic within to years Project is scheduled to be open to traffic within to years Project is scheduled to be open to traffic within to years Project is scheduled to be open to traffic within to years Project is scheduled to be open to traffic in more than years Only / of a jurisdiction's maintenance projects will get points. Another / will get point. A maximum of points may be awarded.

MCTC 8 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV.xlsx Transit Projects Is consistent with current local plans, policies, and Short and/or Long Range Transit Plans Implements existing local plans, policies and Short or Long Range Transit Plans 8 9 The project enhances the regional transportation system Links High-Frequency Transit Services How many other high-frequency (timed transfer service or at least minute service) transit routes does the route connect to? GHG Emissions - Yes No Provides improved access to activity centers or schools Improves access to activity centers or schools through an expanded transit system Directly serves an activity center or school Indirectly serves an activity center or school Does not directly or indirectly serve an activity center or school Project will maintain established productivity standards The project can be supported and operated over time Will exceed established productivity standards Yes, all existing productivity standards can be maintained Two or more productivity standards can be maintained Productivity standards cannot be maintained by the project Project provides for or promotes intermodal connectivity Yes, the project provides intermodal connectivity No, the project does not provide intermodal connectivity Connects with heavy rail (High Speed Rail, Intercity Rail, and Commuter Rail), light rail, or bus rapid transit Connects with bus rapid transit Connects with high frequency local transit What is the change in regional CO emissions from implementing the project? Change in CO emissions with and without project Project serves a transit dependent population and/or community or Indian Reservation Project provides access to essential services for the transit dependent population The project will serve a transit dependent population that is currently not served at all The project will serve a transit dependent population that currently has some service or access within. miles The project will not serve a transit dependent population Project enhances interagency transit service coordination Enhances regional transportation system connectivity and ability to consolidate regional trips Yes, the project is being developed in collaboration with another agency or group No, the project is not being developed in collaboration with another agency or group Project reduces reliance on private automobiles Enhances air quality and reduces peak automobile travel Consistent is defined as: a project listed within a plan or a project supports a plan's goal, policies, or objectives. Directly serves is defined as: a transit project that leads straight to or alongside an activity center or school. Indirectly serves is defined as: a transit project that does not lead straight to or go alongside an activity center or school but is within. miles of an activity center or school. Activity Center defined as: A medical center or civic center, school, office, park, employment or commercial area. School defined as: Public or private elementary, middle or high school, community college, trade Intermodal connectivity is defined as: bus to train, bus to airport, bus to a Park & Ride, bus to a Vanpool or Carpool, or bus to a Bike Facility. A project that accomplishes at least one of the connections listed receives points. Note: These scores will be ranked relative to the highest performing project. The calculation is based on the California Air Resources Board (CARB) EMFAC emissions model. The project involves new or enhanced commuter service The project involves new or enhanced access to an activity center or school Activity Center defined as: A medical center or civic center, school, office, park, employment or commercial area. School defined as: Public or private elementary, middle or high school, community college, trade The project does not involve new or enhanced commuter service or access to essential college, or university. services Project will enhance part of an existing transit service Addresses continued system continuity The project will enhance or extend an existing regional or corridor transit service or facility and Includes carpool/vanpool connections/services The project is a stand alone project not connecting or enhancing an existing facility or service Productivity standards are based on the definitions in the Short or Long Range Transit Plan (i.e. TDA performance indicators, ridership and farebox). Note: These scores will be ranked relative to the highest performing project. Transit routes shall receive points for each type of service they connect with. This will be determined by stations/stops. Scores are based on the total number of connections at stations/stops. Transit Dependent is defined as: individuals, or groups of individuals that do not have a choice in their selection of transportation modes, and are primarily dependent on the availability of public transportation. Examples include: vanpool, rideshare programs as well as coordination between transit operators.

MCTC 8 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV.xlsx Project reduces vehicle congestion Reduces commuter or special event trips The project involves new or enhanced express transit service along a congested (LOS D - Rural or F - Urban) corridor The project involves shuttle service for major events in congested areas such as in a City center The project will not reduce traffic congestion along a deficient corridor or in a city center Supports SCS growth principles ( points possible) Project furthers implementation of the SCS Supports compact development Provides Greenhouse Gas reduction and/or Criteria Pollutant emission reductions by replacing gas/diesel with ZEV, hybrids or CNG Provides Greenhouse Gas reduction and/or Criteria Pollutant emission reductions by eliminating SOV with larger capacity buses More imminent projects are higher priority than those that are not ready to be implemented Project is scheduled to be implemented within the next years Project is scheduled to be implemented within to years Project is scheduled to be implemented within to years Project is scheduled to be implemented within to years Project is scheduled to be implemented within to years Project is scheduled to be implemented in more than years Cost Benefit Person Trips Captured by Project vs. Cost of Improvement Project Cost / Benefit Ratio is or greater 9 Cost / Benefit Ratio is. or greater 8 Cost / Benefit Ratio is or greater Cost / Benefit Ratio is. or greater Cost / Benefit Ratio is or greater Cost / Benefit Ratio is less than Health Priority Index Project benefits areas that are most health burdened Projects that benefit areas with - health burden measures Projects that benefit areas with - health burden measures or that falls within an economically disadvantaged community Projects that do not benefit areas with significant health burden measures Project may receive point per criterion that applies. A maximum of points may be awarded.