Bicycle and Pedestrian Connectivity Study Phase 2

Similar documents
Bicycle and Pedestrian Connectivity Study. Old Colony Planning Council

Perryville TOD and Greenway Plan

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

Bicycle Master Plan Goals, Strategies, and Policies

MASTER BICYCLE AND PEDESTRIAN PLAN

CHAPTER 3: Vision Statement and Goals

AMATS Complete Streets Policy

We believe the following comments and suggestions can help the department meet those goals.

City of Jacksonville Mobility Fee Update

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

BIKE PLAN CONTENTS GATEWAY

Public Works AGENDA ITEM D-2 STAFF REPORT

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

Performance Criteria for 2035 Long Range Transportation Plan

MONTCLAIR SAFE COMPLETE STREETS IMPLEMENTATION PLAN. Monday November 13, 2017 Michael Dannemiller, Principal Engineer NV5, Inc.

City of Charlottesville Bicycle and Pedestrian Master Plan Update

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Living Streets Policy

Public Transportation and Bicycle & Pedestrian Stakeholder Webinar. April 11, :30 PM

Multimodal Connectivity: Walking & Wheeling to Transit

ACTIVE TRANSPORTATION

Solana Beach Comprehensive Active Transportation Strategy (CATS)

5. RUNNINGWAY GUIDELINES

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

City of Novi Non-Motorized Master Plan 2011 Executive Summary

Arlington s Master Transportation Plan

USDOT Bicycle and Pedestrian Safety Initiative: Safer People and Safer Streets. Barbara McCann, USDOT Office of Policy

EXECUTIVE SUMMARY. Vision

Moving Together Conference Complete Streets from the MassDOT District 5 Perspective

Appendix C 3. Bicycle / Pedestrian Planning

San Jose Transportation Policy

Town of Babylon Sustainable Complete Streets Policy

12 RECOMMENDATIONS Road Improvements. Short Term (generally the next five years)

Chapter 5. Complete Streets and Walkable Communities.

5. Pedestrian System. Accomplishments Over the Past Five Years

Environment and Public Works Committee Presentation

Goals, Objectives, and Policies

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

Evolving Roadway Design Policies for Walking and Bicycling

Section 9. Implementation

Bicycle Lanes Planning, Design, Funding South Mountain Partnership Trails Workshop Roy Gothie PennDOT Statewide Bicycle Pedestrian Coordinator

Goal 3: Foster an environment of partnerships and collaboration to connect our communities and regions to one another.

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

Tulsa Metropolitan Area LONG RANGE TRANSPORTATION PLAN

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

CONNECTING PEOPLE TO PLACES

Bicycle and Pedestrian Planning in a Historically Car-Centric Culture: A Focus on Connectivity, Safety, & Accessibility

Double the amount of bicycle ridership while at the same time reducing the number of bicycle crashes by one-third.

COMPLETE STREETS POLICY Exhibit A to Ordinance

Bicycle and Pedestrian

Omaha s Complete Streets Policy

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

Hennepin County Bicycle and Pedestrian Planning

City Council Agenda Item #6-A CITY OF ALAMEDA Memorandum. To: Honorable Mayor and Members of the City Council. John A. Russo City Manager

CITY MANUALS AND STANDARDS REVIEW

T1-A - Service Reduction (Re-sizing)

PEDESTRIAN ACTION PLAN

MassDOT s Transportation Choice and Healthy Transportation Policy Initiatives

INDOT Complete Streets Guideline & Policy

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

C C C

Sustainable Transportation Initiatives and Plans in Caledon

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Chapter 14 PARLIER RELATIONSHIP TO CITY PLANS AND POLICIES. Recommendations to Improve Pedestrian Safety in the City of Parlier (2014)

Rio Mills Rd/Berkmar Dr Extended Connection

FHWA Resources for Pedestrian and Bicycle Professionals

CITY OF CAMBRIDGE 2015 BICYCLE PLAN TOWARDS A BIKABLE FUTURE

Non-Motorized Transportation 7-1

Planning Regionally With Transit

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Pedestrian Safety: A Federal Perspective. Emmett McDevitt Transportation Safety Engineer September 28, 2010

Executive Summary Route 30 Corridor Master Plan

PEDALING FORWARD. A Glance at the SFMTA s Bike Program for SFMTA.COM

Kalamazoo Area Transportation Study (KATS) Complete Streets Policy Approved: Effective: FY 2018 Projects

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

Governor s Transportation Vision Panel

COASTAL RAIL TRAIL ROSE CREEK BIKEWAY PROJECT COMMUNITY WORKSHOP #2 AUGUST 15, 2013

2. Vision & Goals. Vision. Santa Rosa is a community where walking and bicycling are comfortable and convenient for people of all ages and abilities.

MnDOT Implementation of Complete Streets Policy. January 2014

7 Complete Streets & Roadway Aesthetics

Roadway Bicycle Compatibility, Livability, and Environmental Justice Performance Measures

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

Chapter VISION, MISSION, AND GOALS AND OBJECTIVES. Vision. Mission. Goals and Objectives CONNECTING COMMUNITIES ACROSS THE ST.

NON-MOTORIZED TRANSPORTATION

Eastern PA Trail Summit October 1, 2018

LANCASTER CITY BICYCLE NETWORK

Public Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017

Developing an Effective Safe Routes to School Funding Program for Hawai i

Prince George s County plans, policies, and projects

Active Transportation Facility Glossary

Public Information Centre

Bridgewater Complete Streets Prioritization Plan and Pedestrian Safety Assessment

How To Encourage More Efficient Transportation in Brazilian Cities

Cecil County, Maryland. Bicycle Master Plan

2015 Florida Main Street Annual Conference. Complete Streets Equal Stronger Main Streets

Beach Cities Living Streets Design Manual and Aviation Boulevard Multimodal Corridor Plan

Transcription:

Connectivity Study Phase 2

Process PROCESS OUTCOMES Phase Prepared By STEP I Public Participation and Outreach 1. RTP Outreach activities, and development of the Bike and Ped Task Force Phase 1 2011 OCPC STEP II Planning and Goal Development 2. RTP Goals and Objectives, and Bicycle & Pedestrian Level of Service Findings Phase 1 2011 OCPC Municipalities and Task Force STEP III Problem/Need/ Opportunity Identification 3. Project Need Form (PNF) Phase 2 2012 Municipality (Assisted by OCPC) STEP IV Project Initiation 4. Project Initiation Form (PIF) Identification of appropriate funding. Definition of appropriate next steps. Project review committee action. Phase 2 2012 Municipality (Assisted by OCPC) STEP V Public Consultation and Education 5. Workshops and Public Meetings Present priority projects identified by communities to the public. Distribute educational safety info. Phase 2 2012 OCPC STEP VI Environmental/ Design/ROW Process 6. Plans, Specs and Estimates (PS&E) Environmental Studies and Permits. Right-of- Way Plans, Permits. Phase 3 2013 OCPC MassDOT Municipality STEP VII Programming of Funds 7. Identification of Funding Opportunities Regional TIP, TE, CMAQ, SRTS and other funding sources. Phase 3 2013 OCPC STEP VIII Procurement 8. Construction Bids and Contract Selection Phase 4 2014 OCPC MassDOT Municipality STEP IX Construction 9. Built Project Phase 4 2014 Selected Contractor

Connectivity Study: Phase 1 Outcomes Public Participation and Outreach Activities Distribute Educational Safety Information

Connectivity Study: Phase 1 Outcomes Development of a Regional Advocacy Group Regional Bicycle and Pedestrian Task Force Meeting

Connectivity Study: Phase 1 Outcomes Development of Regional Goals and Objectives Goal 1: Enhance and Protect Regional Mobility OUTCOMES METRICS PROPOSED PERFORMANCE MEASURES - Pedestrian Compatibility Index (pedestrian level of service) -Bicycle Compatibility Index (bicycle level of service) 1 a. Increased bicycle and pedestrian infrastructure networks and amenities in the region - By 2015, determine bicycle and pedestrian short and long term infrastructure projects. - By 2020, complete 40% of short-term infrastructure projects identified in the 2011 Bicycle Connectivity Study - By 2035, implement 50% of the identified long-term bicycle and pedestrian projects 1 b. Increased multimodal transportation centers (Transit Oriented Development) that serve business, residential, and mixed-use developments - Support the development of TODs in Kingston, Plymouth, Bridgewater, Hanson, and Easton Commuter Rail stations - By 2035, Kingston, Plymouth, Halifax, Hanson, Whitman, and Easton Commuter Rail stations will be TOD designated

Connectivity Study: Phase 1 Outcomes Development of Regional Goals and Objectives Goal 2: Foster Sustainable, Healthy, and Livable Communities OUTCOMES METRICS PROPOSED PERFORMANCE MEASURES 2a. Improved networks that accommodate pedestrians and bicycles - Pedestrian Compatibility Index (pedestrian level of service) -Bicycle Compatibility Index (bicycle level of service) - By 2035, create a contiguous, regionwide network of sidewalks, walkways, bicycle paths, and bicycle lanes - By 2035, bring Pedestrian Level of Service B or better at intersections with 2b. Revitalized downtowns and town centers - Additional mixed-used developments with bicycle and pedestrian amenities in downtowns and town centers high pedestrian activity - Support local initiatives, which enact, implement and enforce laws and regulations regarding pedestrian and bicycle traffic in downtowns. - Support policies that encourage cluster development. - By 2035, Kingston, Plymouth, Hanson, Whitman, and Easton Commuter Rail stations will be in designated TODs

Connectivity Study: Phase 1 Outcomes Development of Regional Goals and Objectives Goal 3: Ensure Equity and Public Participation OUTCOMES METRICS PROPOSED PERFORMANCE MEASURES - Number of active multidisciplinary task forces -Number of surveys and feedback forms during the year 3 a. Improved public participation and awareness of new initiatives and programs 3 b. Partnered with other agencies with similar goals and objectives -List of existing and potential partners -Meet quarterly with stakeholders and the public to discuss key Environmental Justice issues on Sustainability and Livability, bicycle and pedestrian, regional mobility, and climate change -Develop surveys during the year to collect public opinion on different transportation issues -Extended partnerships with agencies that have similar goals and objectives

Connectivity Study: Phase 1 Outcomes Development of Regional Goals and Objectives Goal 4: Improve Transportation Safety and Security OUTCOMES METRICS PROPOSED PERFORMANCE MEASURES -Annual crash data report -Road safety audits 4 a. Reduced transportationrelated fatalities 4 b. Reduced transportationrelated injuries -Annual crash data report -Road safety audits - Reduce the number of transportationrelated fatalities in the Old Colony region by 40 percent in 2035 compared to 2008. - Reduce the number of transportationrelated accidents in the Old Colony region by 20 percent in 2035 compared to 2008.

Connectivity Study: Phase 1 Outcomes Development of Regional Goals and Objectives Goal 5: Promote Environmental Protection and Climate Change Adaptation OUTCOMES METRICS PROPOSED PERFORMANCE MEASURES -1993 to 2008 Department of Motor Vehicle (Average Vehicular Daily Miles Traveled in the Old Colony region) 5 a. Reduced carbon emissions, improved energy efficiency, and reduced dependence on oil 5 b. Increased the use of environmentally sustainable practices in transportation to prevent climate change effects 5 c. Increased development of waste water treatment capacity and drainage systems - Data comparison of 2000 and 2010 US Census Journey to Work data - 2011 Climate Change Roadway Drainage and Runoff Program - Decrease fuel consumption per vehiclemiles traveled, per passenger miles traveled, and per (net) freight ton-mile - Increase percent of transit vehicles using alternative fuels - By 2035, stop increasing greenhouse emissions -By 2035, reduce average daily miles traveled to 10% below 2008 - By 2035, increase the use of transit by 20% compared to 2000 - Increase carpool/vanpool and nonmotorized transportation modes such as bicycle and walking compared to 2000 census -By 2035, upgrade 20%of the drainage systems in areas identified as high risk in the Climate Change Study

Connectivity Study: Phase 1 Outcomes Development of Regional Goals and Objectives Goal 6: Promote Policies that Ensure Economic Vitality and Sustainability OUTCOMES METRICS PROPOSED PERFORMANCE MEASURES - Number of Transit Oriented - By 2035, Plymouth, Halifax, Hanson, Development Studies Whitman, and Easton Commuter Rail - Number of Economic stations will be TOD designated Development Studies -By 2035, all OCPC communities will have - Number of projects under overlay districts that encourage Chapter 40B of the state s economic development affordable housing law and the 40R smart growth act -Number of Brownfield projects 6 a. Increased mixed use centers, re-use of existing infrastructures, and transit oriented development districts in the Old Colony region 6 b. Pursued policies of sustainable development -Number of communities that opt to modify their subdivision rules and regulations to require bicycle/pedestrian easements to tie into a binding adopted regionwide bicycle/pedestrian system -Revision of local Subdivision Rules and Regulations to require bicycle/pedestrian easements and paths to adjacent property, located so as to tie into binding adopted region-wide bicycle/pedestrian system

Connectivity Study: Phase 1 Outcomes Evaluation Tools: Pedestrian Infrastructure Index model developed by FHWA to evaluate the pedestrian conditions at intersection Between Segments Bicycle and Pedestrian Level of Services (BLOS and PLOS) models developed by the 2010 Highway Capacity Manual At Intersections

Connectivity Study: Phase 1 Outcomes Stoughton Pedestrian Level of Service Findings Stoughton Bicycle Level of Service Findings Good Poor

Process PROCESS OUTCOMES Phase Prepared By STEP I Public Participation and Outreach 1. RTP Outreach activities, and development of the Bike and Ped Task Force Phase 1 2011 OCPC STEP II Planning and Goal Development 2. RTP Goals and Objectives, and Bicycle & Pedestrian Level of Service Findings Phase 1 2011 OCPC Municipalities and Task Force STEP III Problem/Need/ Opportunity Identification 3. Project Need Form (PNF) Phase 2 2012 Municipality (Assisted by OCPC) STEP IV Project Initiation 4. Project Initiation Form (PIF) Identification of appropriate funding. Definition of appropriate next steps. Project review committee action. Phase 2 2012 Municipality (Assisted by OCPC) STEP V Public Consultation and Education 5. Workshops and Public Meetings Present priority projects identified by communities to the public. Distribute educational safety info. Phase 2 2012 OCPC STEP VI Environmental/ Design/ROW Process 6. Plans, Specs and Estimates (PS&E) Environmental Studies and Permits. Right-of- Way Plans, Permits. Phase 3 2013 OCPC MassDOT Municipality STEP VII Programming of Funds 7. Identification of Funding Opportunities Regional TIP, TE, CMAQ, SRTS and other funding sources. Phase 3 2013 OCPC STEP VIII Procurement 8. Construction Bids and Contract Selection Phase 4 2014 OCPC MassDOT Municipality STEP IX Construction 9. Built Project Phase 4 2014 Selected Contractor

Connectivity Study: Phase 2 Data Collection Sidewalks Inventory Crosswalk and Sidewalk in West Bridgewater Trails Inventory Trail in East Bridgewater Seaside Trail in Plymouth

Connectivity Study: Phase 2 Next Steps Data Analysis, Evaluation, and Prioritization 1. Pick routes for community bike network 2. Identify weak links in bicycle or pedestrian network 3. Prioritize sites needing improvement 4. Evaluate alternate treatments during design

Connectivity Study: Phase 2 Next Steps Identify weak links in pedestrian network

Connectivity Study: Phase 2 Next Steps Identify weak links in pedestrian network

Connectivity Study: Phase 2 Next Steps Explore Complete Streets Design Guideline Complete streets feature curb cuts, high visibility crosswalks, and other designs for travelers with disability

Connectivity Study: Phase 2 Next Steps Explore Complete Streets Design Guideline Designs for travelers with disability

Connectivity Study: Phase 2 Next Steps Transit Benefits Connect transit to work, to shops, to schools, to homes through appropriate planning and design for transit users.

Connectivity Study: Phase 2 Next Steps Pick Routes for Community Bike Network

Connectivity Study: Phase 2 Next Steps Identify weak links in bicycle network

Connectivity Study: Phase 2 Next Steps Explore Bicycle Design Guide Options Conventional Bike Lanes Buffered Bike Lanes Contra-flow Bike Lanes Left-Side Bike Lanes

Connectivity Study: Phase 2 Conclusion Five Things to Make a Bicycle and Pedestrian Friendly Community: 1. Political Leadership 2. Advocates 3. Municipal staff, who are supported and trained and walk or bike on a regular basis 4. A Really Good Bicycle and Pedestrian Plan 5. Money (the money tends to come when you have all the other factors in place)