Section 1: Overview... 6 Features... 6 Supported Software Part 1: Getting Started 7

Similar documents
Pegas 4000 MF Gas Mixer InstructionManual Columbus Instruments

RM-80 respiration monitor

HPICAL Operation & Data Logging Procedures. Click spacebar to advance through slides 1

Air Bubbler Depth Gauge DG2200 Installation and Reference Manual

MASK INTEGRITY TEST ACCESSORY (MITA) MODEL 8120

Technology. In the My Files [My Files] submenu you can store all the programs that you have made on the NXT or downloaded from your computer.

D-Opto Dissolved Oxygen Sensor Operation Manual for the D-Opto 4-20mA

The HumiSys. RH Generator. Operation. Applications. Designed, built, and supported by InstruQuest Inc.

TR Electronic Pressure Regulator. User s Manual

BGA244 Binary Gas Analyzer

SECTION FIVE: OP-1B (XLDS) HIGH PRESSURE AIR STORAGE SYSTEM (HPASS) 02/17/2012

Misaligned Folds Paper Feed Problems Double Feeds Won t Feed FLYER Won t Run iii

The HumiPyc ( Model 2) - Gas Pycnometer; Density, Moisture, Permeation Analyzer; Filter Integrity Tester; RH sensor Calibrator

SHIMADZU LC-10/20 PUMP

Race Screen: Figure 2: Race Screen. Figure 3: Race Screen with Top Bulb Lock

Quick Start Guide. A. Hardware installation B. Software installation C. Start the software for the first time D. Do your first measurement

WELCOME TO THE REVOLUTION

Model 106 DPI "Micro-switch" Installation and Operating Instructions

FireHawk M7 Interface Module Software Instructions OPERATION AND INSTRUCTIONS

UNIVERSAL MASK TEST SYSTEM

XpressFill XF2500 Counter Pressure Filler. Operating Instructions

UNITY 2 TM. Air Server Series 2 Operators Manual. Version 1.0. February 2008

Armfield Distillation Column Operation Guidelines

Oxygen Meter User Manual

SomnoSuite FAQ. Setup. Calibration 4. What are the calibration requirements for the SomnoSuite? Settings

CONSUMER MODEL INSTALLATION GUIDE

Troubleshooting Guide: 640 Pediatric Exam Table with Midmark Scale

KEM Scientific, Inc. Instruments for Science from Scientists

Natural Gas High-Altitude Conversion Kit For Installations in the United States (2,001 10,000 Feet)

HumiSys HF High Flow RH Generator

In Response to a Planned Power Outage: PPMS EverCool II Shut Down and Re-start Procedure

Operating Instructions Part No

PROPORTIONING VALVE. Model 150 INSTRUCTION MANUAL. March 2017 IMS Company Stafford Road

Pneumatic high-pressure controller Model CPC7000

300 Held Drive Northampton Pa

User Instruction Manual

User s Guide. CO2 & O2 Controller for miniature incubators

D-OptoLogger Dissolved Oxygen Logger Operation Manual

Marschalk Model # 94000

STAND alone & p.c. VERSION

RAM Operation Manual. Worldwide Manufacturer of Gas Detection Solutions

Instruction Manual. BZ7002 Calibration Software BE

Operating Instructions Part No

D-Opto Dissolved Oxygen Sensor Operation Manual

159 mm 154 mm. Subject to changes 10/2012

Automatic Isokinetic Sampler. ST5 Evo

ACV-10 Automatic Control Valve

RAM 4021-PR. Operation Manual. Worldwide Manufacturer of Gas Detection Solutions

SDM-2012 Docking Station Standalone Configuration Operator s Manual

Table of Contents. Sensor Calibration and Troubleshooting CDS4000 CO 2. Introduction 1. Handling Information. Calibration 2.

User Manual for the Mars Calibration Bench

BUBBLER CONTROL SYSTEM

FOOD INTAKE MONITOR. Hardware and Software User s Manual DOC-047 Rev 3.0. Copyright 2009 All Rights Reserved

In Vivo Scientific, LLC INSTRUCTION MANUAL

Superconducting Susceptometer (MPMS-5S) Quantum Design Room 296 (MPMS)

RAM 4021-DPX Operation Manual

BAROMETER PRESSURE STANDARD PRESSURE CONTROLLER

Cover Page for Lab Report Group Portion. Pump Performance

VROC (Viscometer/ Rheometer-on-a-Chip) User s Manual 1

XpressFill XF4500C Counter Pressure Can Filler. Operating Instructions

DPC-30 DPC-100. Reference Manual

The Discussion of this exercise covers the following points:

RAM Operation Manual

XC2 Client/Server Installation & Configuration

The HumiPyc - Model 1 - Gas Pycnometer; Density, Moisture, Permeation Analyzer; RH sensor Calibrator

256 Pneumatic Pressure Indicator

Installation Instructions

RAM Operation Manual. Worldwide Manufacturer of Gas Detection Solutions

Pneumatic high-pressure controller Model CPC7000

Fisher DVI Desuperheater Venturi Inline

ACCESSORY KIT INSTALLATION INSTRUCTIONS

TOMI PRO MODEL PERSONAL MODEL

RAM 4021 Operation Manual

Additel 761 Automated Pressure Calibrators Selection Guide

The M-Series Eletta Flow Meter High accuracy DP Flow Meter with multiple functions

AIR FLOW ANEMOMETER INSTRUCTION MANUAL

XpressFill XF4500 Counter Pressure Filler. Operating Instructions

Quickstart Installation Checklist (Please refer to operation manual for complete installation instructions)

OPERATION MANUAL DIVE CALIPER NOT SCALE / IF IN DOUBT ASK* *ALL UNITS IN MM/DEGREES UNLESS SPECIF. Dive Caliper General DC-051

Lab 1: Pressure and surface tension. Bubblers, gravity and the mighty paper clip.

WARNING: Installation Instructions. Natural Gas High Altitude Conversion Kit United States Installations Only

Lab 1c Isentropic Blow-down Process and Discharge Coefficient

Description. Measuring Device 3760XBI USP. Balancing

RPS900W Redundant Power Supply. Installation Guide.

IDL01. Battery Powered Precision Digital Gauge for Leak Testing. Stainless Steel Sensor. class 0.05

Overview. Front Panel: Keypad and Display

NB/NBR NITROGEN BOOSTER FOR AVIATION SERVICE

Lab #1 Pressure: Bubblers and Water Balloons CEE 331 Fall 2003

AUTOMATIC HOSE TEST UNIT, TYPE SPU

EPP4 Pressure Regulator Basic G 1/4"

Installation, operating and maintenance Instructions for Seemag bypass level indicator

User s Guide. Vacuum Controller for liquid delivery systems

uemis CONNECT: Synchronisation of the SDA with myuemis

Digital Vacuum Regulator

eflo ELECTRONIC GAS FLOW METER OPERATIONS MANUAL

D-Opto. Dissolved Oxygen Sensor. Operation Manual (Software Version 1.0)

Jet Stream 500 Instruction Manual

Additel 761 Automated Pressure Calibrators Selection Guide

NT High-temperature flowmeter model Simultaneous flow and pressure outputs for high-temperature applications

Series Ruska Digital Pressure Indicator. GE Sensing & Inspection Technologies. Features

Transcription:

Table of Contents About this Manual... 3 Intended Audience... 3 How this Manual is Organized... 4 Conventions Used in this Manual... 5 Related Information... 5 Where To Get Help... 5 Section 1: Overview... 6 Features... 6 Supported Software... 6 Part 1: Getting Started 7 Section 2: Preparing to Use the A.I.R. Flow Test Stand... 7 Unpacking 7 Checking the System Requirements... 8 Installing the Software 9 Section 3: Installing the Test Stand... 10 Attaching Test Stand to the Computer and Power Source... 10 Attaching Test Stand to the Air Supply. 10 Section 4: Verifying the Operation of the Test Stand... 11 Performing a Quick Test of the test stand and running a calibration check 11 Part 2: Using Your A.I.R. Flow Test Stand 16 Section 5: Connecting a Test Regulator to the Test Stand... 16 Recommended Preliminary Conditions... 16 Connecting the Regulator First /Second Stage and Regulator H.P. / I.P Hoses... 16 Pressurizing The Regulator... 17 Section 6: Conducting test sequences on the Test Regulator... 18 Performing Free Run Test... 18 Performing Data Log Test... 18 Managing Data and Records... 20 1

Section 7: Troubleshooting the A.I.R. Flow Test Stand 22 General Checklist... 22 Technical Support 24 If Your Test Stand Needs Factory Service... 24 Appendix A: Specifications... 25 2

About this Manual The first part of this manual describes how to install and set up your A.I.R. Flow Test Stand and software, verify that your test stand is working properly and perform a calibration check. The second part of this manual describes the Test Stand operation which includes how to connect a regulator for testing, performing test sequences and managing test data files. Troubleshooting information on the test stand is also provided. Intended Audience This document describes the operation and use of the A.I.R. Flow Test Stand and is intended for SCUBA repair technicians, or others responsible for testing or servicing SCUBA regulators and related life support equipment. It is assumed that you have familiarity with test instrumentation and principles associated with testing procedures related to SCUBA diving regulators. Note: It is not within the scope of this manual to neither recommend troubleshooting practices nor interpret data relating to SCUBA regulator operational performance. It is the responsibility of the technician to correctly interpret the data this test stand produces and ensure the performance of the SCUBA regulator meets the specifications of the regulator manufacturer. 3

How this Manual is Organized The manual is organized as follows: Section 1, Overview, describes the major features of the A.I.R. Flow Test Stand, as well as the supported software. Section 2, Preparing to Use the A.I.R. Flow Test Stand, describes how to unpack the test stand, check the system requirements and install the test stand software under Windows XP. Section 3, Installing the Test Stand, describes how to connect the test stand to the computer and power source, connect to the air supply and prepare the test stand for operation. Section 4, Verifying the Operation of the Test Stand, describes how to perform a quick test to verify the operation of the test stand and run a calibration check of the A.I.R. Flow Test Curve. Section 5, Connecting a Test Regulator to the Test Stand, describes how to connect the test regulator first and second stages along with the ancillary H.P. and I.P. hose connections to the test stand. Section 6, Conducting test sequences on the Test Regulator, describes how to perform Free Run Testing and Data Log Testing on the Test Regulator along with hints and suggestions on managing data and records. Section 7, Troubleshooting the test stand, provides information that you can use to resolve problems with the test stand should they occur. Appendix A, Specifications, lists the specifications of the Test Stand. 4

Conventions Used in this Manual The following conventions are used in this manual: Notes provide useful information or information that requires special emphasis, cautions provide information to help you avoid losing data or damaging your equipment, and warnings provide information to help you avoid catastrophic damage to yourself or your equipment. Items that you select or type are shown in bold. Related Information The A.I.R. Flow Test Stand was developed around the same basic instrumentation configuration as the A.I.R. Flow Analyzer produced by the Peter Built Co... Scuba Instruments developed this test stand to extend the data logging capabilities by providing an automated method of recording and tracking performance data. To this end, the methods for testing regulators follows closely with those developed by the Peter Built Co. and are reflected in the publication SCUBA Regulator Savvy written by Pete Wolfinger. It is recommended that users of this flow test stand refer to this publication specifically in chapters Seventeen and Eighteen to get a basic understanding of the procedures involved in regulator testing and to realize the full benefit of how this A.I.R. Flow Test Stand can save time. Where To Get Help Should you run into problems with installation or using the A.I.R. Flow Test Stand, the Scuba Instruments Technical Support Department is available to provide technical assistance. Refer to Section 7 for more information. 5

Features Overview The A.I.R. Flow Test Stand from here on will be referred to as Test Stand utilizes the latest technologies in measurement instrumentation along with latest in data acquisition hardware and software. The pressure sensors used are accurate to within ±0.5% FS at reference conditions. The Test Stand features a patented advanced DP flow sensor designed specifically for this application that provides ±1.0% FS flow measurements at standard conditions. The Test Stand utilizes a compact and efficient venturi pump and manual flow control. All components are mounted along with a data acquisition system in a compact enclosure that includes all pressure port connections and adapters. All data from the sensors in the test stand are processed and sent via USB interface to a PC. Supported Software The Test Stand software includes the run time application software, USB drivers and Excel template for data logging. The software runs under Windows XP and Microsoft Office 2003 is recommended (for Excel support). The features of the software include graphical information that is displayed along with measurement data control functions in an intuitive familiar instrument layout with analog representations of gauges as well as digital values. Two modes of measurements are provided; free run testing or data logging. The free run testing mode allows the technician to perform testing of the first and second stages of the regulator while making adjustments. The data logging mode allows the technician to perform diagnostic testing prior to regulator maintenance for evaluation and final testing to verify regulator performance after maintenance. All data values for Flowrate, H.P., I.P. and Vacuum are written to an Excel spread sheet during a data log cycle. Two data log cycles are provided, one for tests emulated at high tank pressure and one for low tank pressure. The data values are displayed in Excels graphics format for easy diagnostic and performance evaluation 6

Getting Started Procedure Preparing to Use the A.I.R. Flow Test Stand Unpacking Open the shipping box and verify that the following items are present: A.I.R. Flow Test Stand with H.P. Hose Adapter USB Interface Cable A.I.R. Flow Test Stand Software Installation CD Power Supply Adapter If an item is missing or damaged, contact Scuba Instruments. An application engineer will guide you through the appropriate steps for replacing missing or damaged items. Once you have unpacked your Test System, check the system requirements, as described in the next section. Note: Keep all packaging materials in case the Test Stand should need to be returned for repair from damages. 7

Checking the System Requirements For reliable operation, your Test Stand requires the following: PC with Pentium 233 MHz (or higher) processor. One or more USB ports (Ver. 1.1 or Ver. 2.0). Windows XP (Professional Edition) operating system. For USB Ver. 2.0 support, make sure that you install Service Pack 2 for Windows XP. In addition, for some systems, you may have to disable standby mode. 64 MB (or more) of RAM; 128 MB (or more) recommended. One or more CD ROM drives. Super VGA (800 x 600 or higher resolution) display monitor. In addition to the requirements listed above, it is recommended that Microsoft Office, Excel 2003 be installed to support the data logging feature of the test stand. Once you have verified that your system meets the system requirements, install the software as described in the next section. 8

Installing the Software To install the software, do the following: 1. Insert the A.I.R. Flow Test Stand Software Installation CD into the CD ROM drive. 2. Go to the My Computer Window and Click the CD ROM drive icon. A list of three file folders appears. 3. Double Click the file folder DTMF Drivers. The setupoemwin32 Setup Launcher appears. 4. Double Click setupoemwin32 Setup Launcher. 6. Click Next. The installer copies the files to the destination directory. 7. Click Finish. 8. Go to the CD ROM Window and Double Click the file folder Regulator Flow Test Stand DP Flow Style B 9. Double click on the Setup icon The installer prompts you for the destination location. 10. Either change the directory path and/or name using Browse or accept the default directory (C:\Programs\Flow Test Stand ), and then click Next. The installer prompts you to begin file installation. 11. Click Next. The installer copies the files to the destination directory. 12. Click Finish. 13. Create and name a file directory that will be convenient to store the data files for the test regulators and copy the Excel Template files AIRLineDataGraph1 and A.I.R.FlowCalibrationTest to that directory. 9

Installing the Test Stand Attaching Test Stand to the Computer To connect the test stand to the computer, do the following: 1. Locate the USB port connection on the test stand and insert the large end of the USB cable into the connector. The connector on the test stand is recessed into the back of the enclosure as shown in the illustration below. 2. Insert the smaller flattened end of the cable connector into the USB port on the computer. If the computer is powered on and this is the first attempt in connecting the test stand to the computer, the new hardware found message will appear and will locate the test stand driver and complete the driver installation. 3. Locate the power connector on the test stand and plug the power converter into the test stand and plug into AC line power as shown in the illustration. Power Converter USB Cable Attaching Test Stand to the Air Supply 1. Locate the Low Pressure (L.P.) Quick Disconnect Male Connector (QDC) on the test stand and connect a low pressure (100 150 psi) source through a mating QDC receptacle. The receptacle is one commonly used for shop air powered tools as shown below. Note: The test stand requires a low pressure (100 150 psi) air supply for the venturi pump operation. This low pressure can be generated by a low pressure port on a diving regulator, a pressure reducing regulator, or a standard low pressure air compressor. 2. Adjust the inlet air pressure on the test stand by turning the regulator adjustment knob clockwise until the pressure gauge reads between 100 to 120 psi. The regulator has a pullto set/push to lock feature to allow locking the adjustment. 10

3. Install the Venturi Pump tuning stack into the outlet of the pump and tighten the nylon set screw. Tuning Stack Pressure Gauge L.P. QDC Pressure Regulator Verifying the Operation of the Test Stand Performing a quick test of the Test Stand and running a calibration check QUICK TEST 1. On the PC, double click the Flow Test Stand icon to start the test program. The Test Stand window will appear along with the Excel window without an Excel file as shown in the illustration below. 11

2. From the Excel window, select File and open up the file previously downloaded to an assigned folder during installation. Select the file name A.I.R.FlowCalibrationTest. The Excel file will appear as shown below and will be used to check the calibration curve of the test stand only. 12

3. Select Flow Test Stand from the Windows status bar to display the main instrument panel as shown below. 4. Click the Start/Stop Free Run Measurement Button on the panel the indicator will turn Green and ensure all dial instruments read zero with digital displays dithering around zero. It is acceptable that the H.P. digital gauges will read as much as 100 psi with zero pressure input. 5. Turn the Flow Control Knob on the test stand counterclockwise and verify the Flow Rate Indicator increases along with the Vacuum Gauge reading. Adjust the flow rate to 25 CFM and verify vacuum gauge reads 2.5 H2O ±0.2. Flow Control 6. Turn the Flow Control Knob clockwise to off and Click the Start/Stop Free Run Measurement Button on the panel the indicator will turn Red and all measurement stops. Note: If the Stop Free Run Measurement is selected during a measurement, all indicators will freeze on the last measured value. 13

Preliminary Conditions: CALIBRATION CHECK To conduct this test accurately, the band seal must not be mounted on the flow tube inlet orifice. If the band seal is mounted, the neck formed by the protruding part of the seal will restrict the air flow and produce a higher vacuum reading for the given air flow rate. The data will fall outside of the acceptable limits and can not be used to recheck the test stand at a later date. Procedure: 1. Select the Reset Data Log button on the panel. 2. Select the Start Data Log Measurement button on the panel. The Data Log Complete indicator will turn Red indicating the data is being recorded. 3. Open the Flow Control Valve (counterclockwise) gradually over the flow range to a maximum of approximately 25 CFM flow rate indication. The data log cycle will take approximately 15 seconds so the manual control from 0 to 25 CFM should be coordinated with this time duration. 4. When the Data Log Complete indicator turns Green, the cycle is complete and the Flow Control Valve can be closed. 5. Select the Excel data sheet from the Windows status bar and verify the Data Stream has been written in the first four columns. 14

6. Examine the A.I.R. Flow graph and verify the calibration curve falls within the min. and max. limits on the graph as shown below. Note: The H.P. and I.P. data is also recorded during the calibration check log cycle and can be used to check the H.P. and I.P. pressure sensors if the ports are connected to pressure sources and precision reference gauges. 15

Using Your A.I.R Flow Test Stand Connecting a Test Regulator to the Test Stand Recommended Preliminary Conditions It is recommended that an H.P. Manager be used and connected to a high pressure supply source that can supply pressures greater that 3000 psi. The H.P. Manager is supplied as an option for the Test Stand. Connecting Regulator First / Second Stages and Regulator H.P. / I.P Hoses 1. Install the first stage to the H.P. Manager tank valve as shown. The first stage shown in the photo uses a yoke style connector. Din connectors can also be fitted to this valve by removing the adapter plug, located in the center of the tank valve face, with an 8mm (5/16ʺ) allen wrench. 2. Mount the second stage mouthpiece shank into the band seal on the inlet of the flow tube orifice. It is important to orientate the second stage so the air flow is directed straight through the flow tube. It may be necessary to swivel the first stage so that it does not pull the second stage out of alignment. 3. Connect a low pressure hose from the I.P. port of the regulator to the I.P. port on the Test Stand. This connection can be accomplished with a standard LP swivel hose end, or a variety of standard QDC adapters available as options for BC hoses. 4. Connect the high pressure hose supplied to the H.P. port on the regulator and attach the QDC coupler on the end of the hose to the QDC connector on the H.P. port of the Test Stand as shown. I.P. Port Second Stage H.P. Port H.P. Manager Tank Valve 16

Pressurizing The Regulator It is always best to pressurize the regulator carefully. This is especially true for any regulator that has been rebuilt. There are two accepted ways to accomplish a ʺsoft pressureʺ start for the regulator. 1. The best method is to ʺreduce the high pressure supplyʺ to the tank valve by turning the pressure reducing regulator of the H.P. Manager adjustment knob counterclockwise until the output gauge reads approximately 300 psi. This procedure practically eliminates any possibility of over pressurizing the IP sensors when the valve is turned on. An additional benefit of this approach to pressurizing the regulator is that the test pressure can be increased slowly to the desired level. As the pressure is increased (clockwise rotation of the pressure reducing regulator knob), watch the IP gauge to be sure that it remains stable. If the IP pressure drifts upward (above the manufacturersʹ specifications) as the pressure is increased, turn the tank valve off. 2. The most common method for soft pressurizing a regulator is simply to open the tank valve slowly while watching the IP gauge. If the IP gauge surges beyond the normal level, the tank valve is shut off immediately. It is obvious that this procedure requires some coordination and is not as foolproof as the preceding method. The other problem with this procedure is that the test pressure must be adjusted prior to turning the tank valve on. Failure to preset this pressure may result in over pressurizing the regulator. Warning! Ensure that the H.P. QDC on the test stand is locked securely in place. Warning! Be advised, that some older regulators were designed to operate at a maximum of 2250 psi. Never exceed the manufacturerʹs recommended working pressure for any regulator. If you are in doubt, call the manufacturer. If a regulator is pressurized beyond its working pressure level, catastrophic failure of the yoke, first stage body, and all related parts and hoses may occur. WARNING! Never exceed 3400 psi (232 Bar) from the pressure reducing regulator to the tank valve mounted on the H.P. Manager. Never pressurize any diving regulator first stage beyond the manufacturersʹ specifications. 17

Conducting Test Sequences on the Test Regulator Performing Free Run Tests 1. From the Excel window, select File and open up the file previously downloaded to an assigned folder during installation. Select the file name A.I.R.LineData Graph1. Note: If a previous file exists in Excel, save and close the file out before selecting a new file. Do not close the Excel program; doing so will detach the link between the Flow Test Stand program and the Excel program and will require exiting the Test Stand program and re initializing. The Excel file will appear as shown below and will be used for logging data on regulators under test. 2. Select Flow Test Stand from the Windows status bar to display the main instrument panel. 3. Click the Start/Stop Free Run Measurement Button on the panel the indicator will turn Green. The gauges will read the static values before flow is initialized. The technician will be able to evaluate and make any adjustments on the regulator under test during this time. 4. Turn the Flow Control Knob on the test stand counterclockwise. At some point during this adjustment, the vacuum will have increased on the second stage to initiate flow from the regulator under test. The levels of vacuum can be measured as well as the I.P. on the gauges with respect to the flow rate for the technician to evaluate and make adjustments. 5. Turn the Flow Control Knob clockwise to off and Click the Start/Stop Free Run Measurement Button on the panel the indicator will turn Red and all measurement stops. Note: If the Stop Free Run Measurement is selected during a measurement, all indicators will freeze on the last measured value. Performing Data Log Tests 1. Select the Reset Data Log button on the panel. 2. Adjust the regulator on the H.P. Manager to simulate high tank pressure (approximately 3000 psi). 3. Select the Start Data Log Measurement button on the panel. The Data Log Complete indicator will turn Red indicating the data is being recorded. 4. Open the Flow Control Valve (counterclockwise) gradually over the flow range to a maximum of approximately 25 CFM flow rate indication. The data log cycle will take approximately 15 seconds so the manual control from 0 to 25 CFM should be coordinated with this time duration. 5. When the Data Log Complete indicator turns Green, the first data log cycle is complete and the Flow Control Valve can be closed. 6. Adjust the regulator on the H.P. Manager to simulate low tank pressure ( approximately 500 psi). 7. Repeat steps 3 to 5 for the second data log cycle. 18

8. Select the Excel data sheet from the Windows status bar and verify the Data Stream has been written in the first four columns. Note that there may be outlier data on the boundaries (beginning and end) of both log cycles due to timing skews in the data read control. This data may be cleared so the graphs will not reflect the erroneous data. The illustration below exemplifies this condition. Outlier Data 9. Examine the A.I.R. Flow graphs and verify the performance of the regulator meets the manufacturers specification or the benchmark data. Note: If a data log cycle is performed in error, you may repeat the log cycle as many times as necessary. In doing so, make sure you select the Reset Data Log button on the panel to ensure the log cycle starts at the beginning of the rows. The new log cycle will write new data over the existing. You may also clear the contents in the data columns if desired by highlighting the data fields and selecting the Clear Contents in the Edit menu. Caution! Do not select Delete. 19

Managing Data and Records The A.I.R. Flow Test Stand utilizes the standard Windows Excel program which provides a powerful set of features for tracking data and generating graphic reports. The Test Stand program caries in the Excel program during initialization and provides the link for sending all sensor data to an Excel file. The program writes data to specific areas in the spreadsheet (the first 4 columns A D) and is restricted for use. All other areas on the spreadsheet are available for use by the technician to augment and display information as needed to facilitate the complete testing record. It is encouraged that the technician creates file directories and names for the spreadsheets in an organized method that will allow easy reference to records for future needs. This is the most powerful feature the Test Stand has to offer. For example, Benchmark data can be easily run on regulators out of the box New to establish a baseline performance for specific brands and model numbers. By using the statistical features in Excel, one can create an average profile on a series of benchmarks for a give model of regulator to help evaluate the performance when the same model is in for repair. The following illustrations show a few examples of how to organize information. This shows an example of the basic information on customer and regulator make, model, serial numbers, etc. as well as shop information. 20

This is an example of how graphic information can be combined with other spreadsheet information. 21

Troubleshooting General Checklist Should you experience problems using the Flow Test Stand, do the following: 1. Check that your system meets the requirements stated in Section 2. 2. Check that you have installed the device driver properly using the instructions in Section 2. 3. Check that you have installed your hardware properly using the instructions in Section 3. If you still experience problems, try using the information in Table 1 to isolate and solve the problem. If you cannot identify the problem, refer to page 28. 22

Table 1 : Troubleshooting Problems Symptom Possible Cause Corrective Action No response on PC instrument display panel Erratic or negative values on PC instrument display No communications between test stand and PC DC Power Converter is disconnected at Test Sand or at AC receptacle Check USB connection on Test Stand and PC. Note: If USB cable was disconnected during operation, re-initialization will be required after the connection is restored. Connect Power Converter to Test Stand and AC receptacle No Flowrate indication when flow is increased on flow control adjustment knob when other sensor indicators appear to be operating. One or both sensor tube connections to the flow meter are disconnected Check and reconnect tube connections No vacuum indication when flow is increased on flow control adjustment knob when other sensor indicators appear to be operating. No data appears to be written in the columns during a data log cycle.. Vacuum sensor tube connection to the inlet flow tube orifice is disconnected The Data Log was not initialized before a log cycle causing data to be written outside of the data log areas. The Excel program is not linked with the Test Stand program due to inadvertently closing the Excel program during the operation. Check and reconnect tube connection Click the Data Log Rest prior to running data log cycles Re initialize the Test Stand Program and ensure the Excel program is not closed during file changes. 23

Technical Support If you have difficulty using the Test Stand, SCUBA Instruments Technical Support Department is available to provide technical assistance. When requesting technical support, be prepared to provide the following information: Your product serial number A description of the problem you re having Your contract number, if applicable If Your Test Stand Needs Factory Service If your Test Stand must be returned to SCUBA Instruments, do the following: 1. Record the Test Stand serial number, and then contact the Customer Service Department at (661) 702 1183 and obtain a Return Material Authorization (RMA). 2. Using the original packing materials, place the Test Stand in the protective foam packaging along with the accessories (USB Cable, Power Supply) in the shipping container and seal. 3. Return the Test Stand to the following address, making sure the RMA number is visible on the outside of the box. Customer Service Dept. SCUBA Instruments 27520 Ave Hopkins Unit E Valencia, California 91355 24

Specifications Air Flow Generator.Venturi Vacuum Pump Air Supply Requirements 6 CFM at 100 125 psig (Filtered and Dry) Testing Flow Range.. 2.7 25 CFM Open Chanel Vacuum Range 0 2.5 H2O Primary Flow Meter Type and Accuracy*. Differential Pressure, ± 0.5% FS Flow DP Sensor Range and Accuracy* 0 10 H2O, ± 1.0% FS Vacuum Sensor Range and Accuracy*.. 5 0 +5 H2O, ± 1.0% FS I.P. Sensor Range and Accuracy*..... 0 250 psig, ± 0.5% FS H.P. Sensor Range and Accuracy* 0 5000 psig, ± 0.5% FS Power Supply 12Vdc, 1000 ma through 100 240 VAC, 50 60 Hz Power Converter Data Acquisition Resolution and Analog Conversion Accuracy 10 bits, ± 0.05% Data Acquisition Scan Rate 60 msec Data Acquisition Interface.. USB Version 2.0 Note: *Accuracies are stated at reference conditions: 68 F, 14.73psia. Specifications are subject to change without notice. 25