MANITOWOC MODEL TON CAPACITY

Similar documents
MANITOWOC MODEL TON CAPACITY

Chapter 2 Rigging. Cutting Wire Rope. Anchoring Wire Rope to Drum. Winding Wire Rope Onto Drum

M ANITOWOC M-65 W. 65-MTon liftcrane 6,804 6,124. Courtesy of Crane.Market KG CLAMSHELL KG DRAGLINE

View thousands of Crane Specifications on FreeCraneSpecs.com. MANITOWOC M-85W 95-Ton liftcrane 20,000 lb CLAMSHELL 18,000 lb DRAGLINE

Technical Data. Luffing Capacities. Luffing Attachment (supersedes 5784)-1217-U2Luffer

LOAD CHARTS RT540E 85% STABILITY ON OUTRIGGERS 75% STABILITY ON RUBBER

LOAD CHARTS RT890E METRIC DIN / ISO / 75%

Demag TC3000

6000SLX HYDRAULIC CRAWLER CRANE

Crane Rental Heavy Machinery Moving Project Management

LINK-BELT MODEL HC-278H TON CAPACITY

CKE2500 HYDRAULIC CRAWLER CRANE GENERAL DIMENSIONS. Max. Lifting Capacity

Unit shown in luffer configuration

6000SLX SL-N HYDRAULIC CRAWLER CRANE

Heavy-duty power for the most demanding jobs

6000SLX SL-T HYDRAULIC CRAWLER CRANE

Product Guide. Crawler Crane

Lattice Boom Crawler Crane 300-ton (272 mt)

Lattice Boom Crawler Crane 300-ton (272 mt)

Technical data Hydraulic lift crane. LR 1300 sx LR 1300

GROVE MODEL RT58D - 20 TON CAPACITY

National 400B. Certification CraneSafe Certification. CraneSafe + Fulford Harbour Group Tel:

250 ton mt Lattice Crawler Crane

Specifications Testing & Adjusting Disassembly & Assembly

CKE4000 HYDRAULIC CRAWLER CRANE GENERAL DIMENSIONS PRELIMINARY. Max. Lifting Capacity

Technical data Hydraulic lift crane LR 1300 SX

LR Technical data Hydraulic lift crane. Complies with ANSI B Courtesy of Crane.Market

Specifications. Hydraulic reservoir has 424 l (112 gal) capacity and is equipped with breather, clean out access, and internal diffuser.

View thousands of Crane Specifications on FreeCraneSpecs.com LR 1300 SX. Technical data Hydraulic lift crane LR 1300

Hydraulic Crawler Crane

HYDRAULIC CRAWLER CRANE

WINCH USER GUIDE WARN 3000ACI Utility Winch Part Number: 93000

WINCH USER GUIDE WARN 3700 Utility Winch Part Number: 93700

data model 2250 product guide contents features 272 mton (300 ton) capacity mton-m (12,294 ft-kips) Maximum Load Moment

HYDRAULIC CRAWLER CRANE

Counter Weight Lifting Gantry Cylinder Operation INDIA CKE2500, CKE2500-2

Manitowoc Product Guide. Features

HYDRAULIC CRAWLER CRANE

Upperworks. Main and Auxiliary Hoisting. Engine. Mechanism. Controls. Hydraulic System. Swing System

HYDRAULIC CRAWLER CRANE

Hydraulic lift crane. Complies with ANSI/ASME B 30.5 LR enus LR

Load Charts Annotated Instructor s Guide. Module MODULE OVERVIEW PREREQUISITES OBJECTIVES PERFORMANCE TASKS MATERIALS AND EQUIPMENT LIST

Manitowoc Product Guide ASME B30.5 Metric / Imperial

MLC165-1 Product Guide

MODEL SWH10 1,000 LB CAPACITY SWIVEL HOIST

110-ton (99.97 mt) Lattice Boom Crawler Crane

Manitowoc Product Guide. Features. 200 mton (220 ton) capacity. 865 m-ton (6,267 ft-kips) Maximum Load Moment. 89 m (292 ) Heavy-Lift Boom

OPERATION and MAINTENANCE Guide

Manitowoc Product Guide. Features

Technical data Hydraulic lift crane LR 1300 SX. Complies with ANSI/ASME B

Transfer Chain (SA-1002) & Adjustable I-Beam Clamp (SA-1039 or SA-1040) Operating Instructions

Fiber Cable Puller with Tuf-Lugger lite

Wildcat LB Winch Kit. Operator s Manual Installation Instructions Replacement Parts List. With Wireless Control System.

Premium PowerPoint Presentation. Rigging Review

Technical Data. Specifications & Capacities. HSL Crawler Crane. View thousands of Crane Specifications on FreeCraneSpecs.com

PRESSURE TANKS HANDLING & INSTALLATION INSTRUCTIONS INSTALLATION MANUAL CONTROL VALVES

Crane & Rigging Brain Teasers

8012, 8018 & ,000 LB. CAPACITY HOOK-TYPE CABLE SHEAVES

MLC165-1 Preliminary Product Guide

OPERATIONS/PARTS MANUAL FOR PATTERSON'S WWP75H-10 HYDRAULIC WINCH.

SERIES 2 RAMP OWNER S MANUAL TOOLS REQUIRED: BEFORE YOU BEGIN... Read and understand these instructions before beginning a ramp setup.

Specifications Lattice Boom Crawler Crane. LS 218H II 110 ton* (100 metric ton) HYLAB Series

Warning CABLE REPLACEMENT INSTRUCTIONS. Questions? - Call Telpro Inc. Customer Service at or

Key. counterweight. Lifting capacities on outriggers 360. Superlift

OPERATIONS/PARTS MANUAL FOR PATTERSON'S WWP40M-12 and all WIDE DRUM variations of this HAND OPERATED WINCH.

OPERATIONS/PARTS MANUAL FOR PATTERSON'S WWP50-H-14 HYDRAULIC WINCH.

RIDE Inc. Rigscape Drilling Rig Procedures

Shifting Lever. RAPIDFIRE Plus 11-speed

Heavy Equipment Technician Rigging

Operator s Manual Series 2400 Material Lift

On the Go Swing System Instruction Manual

HYDRAULIC CRAWLER CRANE

September 27, DOE-RL-92-36, Hanford Site Hoisting and Rigging Manual. Wire Rope. Page 1 CONTENTS

Operator s Manual. 2010, 2015, 2020, 2025 Material Lifts

CHAPTER 5 REWIND STARTERS

Operator s Manual. Series 2100 Contractor Lifts

Misaligned Folds Paper Feed Problems Double Feeds Won t Feed FLYER Won t Run iii

Technical Data. Specifications & Capacities. Crawler Crane 200 Ton (181 metric ton) 5452 (supersedes 5416) N5

User Instructions 1789 Parapet Wall Anchor

Manitowoc MLC300 Product Guide ASME B30.5 Imperial

The purpose of this training is to give field technicians awareness training and guidelines on potential hazards they may encounter in the field.

MSA Confined Space Entry Equipment

222 Schwinn Recumbent Exercise Bike Parts List Full Size Hardware Chart Product Illustration Assembly Instructions

SETUP GBW/GBWE SETUP. upper or lower position. Placing the lock in the upper position will provide 1 foot (305 mm) more height.

SAVE THESE INSTRUCTIONS. NOTE: Check all parts for shipping damage. In case of damage, DO NOT use. Contact Carrier/Invacare for further instructions.

WINSAFE Corp. Operating Instructions For Outrigger Davit. Winsafe Part # WSOR208

OPERATIONS/PARTS MANUAL FOR PATTERSON'S MODEL # WWP40M-LPS-6 LOW-PROFILE BARGE CONNECTOR WINCH

On the Go Swing System Instruction Manual

Puyuan. QUY 160 Crawler Crane Technical Manual

Grove RT9130E-2. Product Guide. Features. View thousands of Crane Specifications on FreeCraneSpecs.com. 120 t (130 USt) capacity

Assembly Instructions

VL 2K LIFT D-L WINCH INSTRUCTIONS (Applies to P/Ns , , , , , )

Instruction Sheet. CP2000: 2000 lb Cable Puller IMPORTANT RECEIVING INSTRUCTIONS SAFETY ISSUES

User Instruction Manual For Davit Rescue System

BMR 2100XL Operating Instructions Page 1 of 13

RIDE Inc. Rigscape Service Rig Procedures

Unit shown in luffer configuration

OPERATIONS/PARTS MANUAL FOR PATTERSON'S HAND OPERATED WINCH

OPERATING and MAINTENANCE INSTRUCTIONS MAXIS 6K Puller (M6K-M)

PRO Lifting Operations

Transcription:

LIFTING CHARTS - Crawler Cranes ANITOWOC ODEL - TON CAPACITY BOO RIGGING GUIDE ODEL # HEAVY LIFT BOO Table of Contents General... Assist Crane Requirements... Accessing Parts... Installation and Removal Notes... Retaining Connecting Pins... Blocked Crawlers... Handling Components... Boom Rigging Assembly Drawing... Identifying Boom Sections and Pendants... Boom Installation... General... Assemble Boom Sections... Connect Boom Straps... Raise Boom Top Wire Rope Guide... Remove Lower Boom Point Sheaves... Install Upper Boom Point... Install Jib... Connect Boom Butt to Boom... Install Load Line... Install Block-Up Limit Control... Connect Boom Wiring... 0 Pre-Raising Checks... 0 Boom Removal... General... Disconnect Boom Butt From Boom... Disassemble Boom Sections... General Assist Crane Requirements This folio contains installation and removal instructions for all parts of the boom except the boom butt. Boom butt installation and removal instructions are contained in the Crane Assembly and Disassembly Guide in your Operator s anual. Refer to the Jib Rigging Guide in your Operator s anual for jib installation and removal instructions. An assist crane is not required to assemble and disassemble boom components. The can be used to assemble and disassemble its own boom and jib. Refer to the Crane Weights folio in your Operator s anual for weights of boom components. The must be in the following configuration to assemble its own boom and jib. Refer to Figure and the Crane Assembly and Disassembly Guide in your Operator s anual. Counterweight installed. Gantry fully raised. ast arms fully raised. Boom butt and assembly block installed. Crane setup mode selected and confirmed. ast operated between fully extended mast arms and 0 ( ft [. m] radius). ast angles are measured from transport position which is 0. Capacity limited to 0,000 lb ( 0 kg). WARNING Falling Load Hazard! Prevent crane from tipping, wire rope from breaking, or mast from collapsing: Do not exceed ft (. m) radius. Wire rope will hit lacing in mast. Do not lift more than 0,000 lb ( 0 kg). Tipping or structural damage may occur.

BOO RIGGING GUIDE A ast ast Arm ast Strap Gantry Assembly Block Counterweight Installed -Leg Chain Sling Boom Section Crawler Assembly FIGURE Accessing Parts Installation and Removal Notes Some parts of the crane and attachment cannot be reached from the ground. Take necessary precautions to prevent falling off the crane and attachment during component installation and removal. Owner/user must provide workers with approved ladders or personnel hoists in order to access those areas of the crane and attachment that cannot be reached from the ground. Adhere to all regulatory safety standards. Optional boom ladders (stored in boom butt) are available from anitowoc. If your crane has ladders, refer to Boom Ladder Assembly folio in your Operator s anual for instructions. The boom shall be installed and removed by experienced personnel trained in erection and operation of construction cranes. Read and become thoroughly familiar with the instructions in this folio and in Crane Assembly and Disassembly Guide before attempting to install or remove the boom. Contact Service Department at factory for assistance if any procedure is not fully understood. The installation/removal area must be firm, level, and free of ground and overhead obstructions. The area selected must be large enough to accommodate the selected length of boom and jib (if attached), in addition to movement of the. WARNING Read Capacity Charts! Crane must be rigged and operated according to instructions in capacity charts provided with crane. Failing to comply with instructions in capacity charts and in this folio can result in tipping or structural failure of boom and jib.

BOO RIGGING GUIDE Retaining Connecting Pins Blocked Crawlers All connecting pins are retained with cotter pins, safety pins, or keeper plates. Do not operate crane until: All cotter pins are installed and opened. All safety pins are installed and properly retained. All keeper plates are installed and connecting screws are securely tightened. To prevent crane from tipping, some boom and jib lengths must be raised and lowered over blocked crawlers. Refer to capacity charts for blocked crawler requirements and to Crawler Blocking Diagram folio in your Operator s anual for instructions. DANGER Tipping Hazard! Do not attempt to raise or lower boom and jib from or to ground until crawlers are blocked, if required. Otherwise, crane will tip. Handling Components Handle boom sections with care to avoid damaging lacings and chords. All boom sections have lifting lugs (in top chords) designed to provide a balanced load and to prevent damage during lifting. WARNING Falling Load Hazard! Lifting lugs on each insert are designed only for lifting that insert. Do not attempt to lift two or more inserts with lifting lugs on one insert. Lifting lugs may break allowing inserts to fall. When lifting lugs are not used: Lift against chords only, never against lacings. Use nylon lifting slings. If wire rope or chain slings are used, install protective covering (such as sections of rubber tire) between slings and chords. Boom handling with mast straps pinned to wire rope guide on boom butt is limited. Refer to Boom Rigging Assembly Drawing for limitations. WARNING Falling Boom Hazard! Do not attempt to handle more boom with mast than specified on Boom Rigging Assembly Drawing. Structural failure of components can occur, possibly allowing boom to fall. Boom Rigging Assembly Drawing Boom components (top, inserts, butt, straps) must be assembled in proper sequence according to this folio and to Boom Rigging Assembly Drawing in your Operator s manual. Refer to Figure to determine the quantity and length of inserts and straps required for various boom lengths. A minimum boom length of 0 ft (. m) is required for jib attachment (refer to Liftcrane Jib Capacity Chart for boom and jib length limitations).

BOO RIGGING GUIDE Identifying Boom Sections and Pendants Boom sections are marked for proper identification as shown in Figure, View A. Boom straps and links are marked for proper identification as shown in Figure, View B. View A View B Boom or Jib Number #YY anitowoc Part Number anufacturing Code XXXXXX Z-ZZ-ZZ Part Number (both ends) XXXXXX A Chord Edge of Strap or Link FIGURE Boom Installation The crane must be in the setup mode as shown in Figure to assemble its own boom. General. Before you start assembling boom, determine if a fixed jib will be installed. If so, install insert with backstay lugs (Figure, View D) next to boom top.. Read all notes on Boom Rigging Assembly drawing. Refer to Figure for assistance. WARNING Falling Load Hazard! Prevent crane from tipping, wire rope from breaking, or mast from collapsing when handling loads with mast: Do not exceed ft (. m) radius. Wire rope will hit lacing in mast. Do not lift more than 0,000 lb ( 0 kg). Tipping or structural damage to mast may occur.

BOO RIGGING GUIDE This Page Intentionally Blank

BOO RIGGING GUIDE Connecting Pin with Collar and Retaining Pins Straps in Working Position Connecting Pin with Collar and Retaining Pins Links Storage Pin View C Fixed Vertical Pin P Links Storage Pin Connector Jib Backstay Lug View B View A Straps in Stored Position P P0 P View D Refer to Figure A P0 Boom Top Boom Insert Removable Connector Pin Stored View F View G Pin A Lower Boom Point Upper Boom Point Pin B View E P Removable Connector Pin Installed FIGURE

BOO RIGGING GUIDE DANGER Collapsing Boom Hazard! To prevent death or serious injury, do not stand on, inside, or under boom sections during assembly. Always stand outside boom sections when installing connecting pins. Assemble Boom Sections Refer to Figure for following procedure. The boom sections have FACT connectors: The top connectors are joined by fixed vertical pins that hook into holes in the adjacent section (View A). The bottom connectors are joined by removable connector pins (View G).. Assemble boom inserts in proper sequence (Figure ), as follows, starting at butt end of boom: a. Place first insert on blocking at least in. ( mm) high. b. Lift next insert into position and engage top connector holes with fixed vertical pins (View A). c. Lower insert until bottom connector holes are aligned and install removable connector pins (View G). Removable connector pins are stored in pockets on adjacent insert (View F). d. Block under bottom chords at top end of insert.. Repeat steps b d until all inserts and boom top are installed. Connect Boom Straps Refer to Figure for following procedure. The boom straps are shipped from the factory in the stored position on the inserts. Connect the straps, as follows:. Remove storage pins from top holes in strap brackets (View B).. Store storage pins in bottom holes in strap brackets (View C).. Rotate strap links forward and pin to adjacent straps (View C).

BOO RIGGING GUIDE Upper Wire Rope Guide Assembly Upper Wire Rope Guide Assembly A Lower Wire Rope Guide Assembly Lower Wire Rope Guide Assembly Boom Top View A Stored Position View B Stored Position Lower Wire Rope Guide Assembly Lower Wire Rope Guide Assembly Stored View C Operating Position FIGURE Raise Boom Top Wire Rope Guide Refer to Figure for following procedure.. If equipped with three boom top sheaves, proceed as follows: a. Support upper wire rope guide with a sling from assist crane and remove pins (, View A). b. Raise upper wire rope guide to operating position and install pins (, View B).. Support lower wire rope guide with slings from assist crane and remove pins (, View B).. Raise lower wire rope guide to operating position (View C) and store pins () in wire rope guide frame.. Remove pins () securing struts () in stored position and pin struts to lugs on boom top (View C).

BOO RIGGING GUIDE Remove Lower Boom Point Sheaves If a luffing jib will be installed, it may be necessary to remove sheaves from the lower boom point. Refer to capacity chart in use to determine boom and jib raising limitations. Refer to Lower Boom Point Installation folio in your Operator s manual for sheave removal instructions. Install Upper Boom Point Refer to Figure for following procedure. If required, install upper boom point as follows:. Lift upper boom point into position at end of boom top.. Align connecting holes and install pins (A, View E).. Install connecting pins (B, View E) after boom and lower boom point are raised clear of ground. NOTE: Upper boom point must be removed prior to jib installation. Install Jib If required, install jib. Refer to Jib Rigging Guide in your Operator s manual for jib assembly instructions. Connect Boom Butt to Boom Remove assembly block, install boom butt, and connect boom butt to boom as instructed in Crane Assembly and Disassembly Guide in your Operator s anual. Connect mast straps to boom straps as instructed in Crane Assembly and Disassembly Guide. ake sure you perform following steps as instructed in Crane Assembly and Disassembly Guide:. Lower mast arms.. Turn on desired crane mode (turn off setup mode) and turn mast bypass handle to off position.. Adjust mast straps to proper length. Install Load Line Refer to Load Line Reeving folio in your Operator s manual for proper routing and reeving of load lines. Install Block-Up Limit Control Refer to Block-Up Limit Installation and Adjustment folio in your Operator s anual for block-up limit control installation and adjustment instructions.

BOO RIGGING GUIDE Connect Boom Wiring Connect electric cord from crane to cable reel on boom butt (refer to Block-Up Limit Installation and Adjustment folio). Connect electric cables from block-up limit switches and all load sensing sheaves to proper receptacles on boom and jib junctions boxes. Refer to wiring diagrams on boom and jib sections or in Boom Wiring, Limits, and Load Indicator Electrical Assembly drawing in Section of your Operator s anual. Pre-Raising Checks DANGER Falling ast/boom Hazard! Prevent mast and boom from collapsing: Fully lower mast arms and turn off mast bypass handle before raising boom. ast will buckle and collapse if it contacts arms with a fully rigged boom attached. Perform following pre-raising checks prior to raising boom and jib: Crane on firm, level surface with crawlers blocked if required per capacity chart. Boom and jib inserts installed in proper sequence per rigging drawing. Strap links securely pinned to straps. All insert and pendant connector pins installed and cotter pins installed and spread. Gantry fully raised. ast arms fully lowered. ast arms bypass handle turned off. Setup mode turned off (desired operating mode selected and confirmed). Boom hoist wire rope spooled tightly onto drum and engaged with proper sheaves. Wire rope securely anchored to wedge socket at gantry. Load lines spooled tightly onto drums and engaged with proper sheaves. Load lines securely anchored to wedge sockets at boom and jib point or at load block and weight ball. All blocking, tools, and other items removed from boom and jib. Automatic boom stop properly installed and adjusted. Electric cable from crane control system connected to cable reel on boom butt. Electric cables in boom and jib connected to proper receptacles on junction boxes. Block-up limit control installed and operational. Load moment indicator installed and operational. Crane and attachment properly lubricated (refer to Lubrication Guide in your Operator s anual). Wind within allowable limits for operation. Capacity chart reviewed to determine boom and jib raising limitations. 0

BOO RIGGING GUIDE Boom Removal General. Prepare crane and boom as follows: a. Position crane in disassembly area. b. If required per capacity chart, travel front crawler roller and tumbler at boom end of crane onto blocking. Refer to Crawler Blocking Diagram folio in your Operator s anual for blocking requirements. WARNING Tipping Hazard! Prevent crane from tipping. Block crawlers if required per capacity chart before lowering boom.. Lower boom to ground as follows: If equipped with a fixed jib, disconnect jib stops before jib point contacts ground. Refer to Jib Rigging Guide for procedure. If equipped with a luffing jib, disengage jib stop strut pins before maximum boom to luffing jib angle is reached. Refer to Luffing Jib Rigging Guide for procedure. If equipped with an upper boom point, remove lower connecting pins (B, Figure, View E) before upper point contacts ground. CAUTION Avoid Damage! Jib or boom point will be damaged if preceding steps are not performed.. Install blocking approximately in. ( mm) high between ground and bottom connectors at end of boom top.. Continue to lower boom (and mast) onto blocking until boom straps are resting in brackets on boom inserts.. Disconnect load lines from load block and weight ball and spool load lines onto load drums. Disconnect Boom Butt From Boom Disconnect boom butt from boom, remove boom butt, and install assembly block as instructed in Crane Assembly and Disassembly Guide in your Operator s anual.

BOO RIGGING GUIDE Disassemble Boom Sections DANGER Collapsing Boom Hazard! To prevent death or serious injury, do not stand on, inside, or under boom sections during disassembly. Always stand outside boom sections when removing connecting pins. The crane must be in the setup mode as shown in Figure to disassemble its own boom. Disassembly is the reverse of assembly. WARNING Falling Load Hazard! Prevent crane from tipping, wire rope from breaking, or mast from collapsing when handling loads with mast: Do not exceed ft (. m) radius. Wire rope will hit lacing in mast. Do not lift more than 0,000 lb ( 0 kg). Tipping or structural damage to mast may occur. Store boom top wire rope guide as shown in Figure, View A. Store boom straps and links as shown in Figure, View B. Legend for Figure # Boom Components Item Butt 0' (. m) Description Top 0' (. m) Insert 0' (.0 m) (refer to Note A and B) Insert 0' (. m) with or without Jib Backstay Lugs (refer to Note A and C) Insert 0' (. m) with or without Jib Backstay Lugs (refer to Note C) Strap ' " (. m) Strap ' " (. m) (refer to Note D) Strap ' " (. m) (refer to Note D) Strap ' " (.0 m) (refer to Note D) Note A Note B Note C Note D aximum number of inserts () is two. aximum number of inserts () is two. Combination of inserts ( and ) must not exceed: Two inserts () and one insert () or One insert () and two inserts (). ust be equipped with wire guide if auxiliary drum is used Insert with jib backstay lug must be installed next to top, if jib will be used. Each strap has a pair of links. Connect to ast Straps

BOO RIGGING GUIDE 0'.m 0'.m 0'.m 00' 0.m 0'.m 0'.m 0'.m 0'.m 0'.m 0'.m 0'.m 0'.m 0'.m 0'.m 0'.m 0'.m 0'.0m 0'.0m 00'.0m 00'.0m 0'.m 0'.m 0'.m 0'.m 0'.m 0'.m 0'.m 0'.m 0' 0.m FIGURE

BOO RIGGING GUIDE 0'.m 0'.m 0'.m 0'.m 0'.m 0'.m 0'.m 0'.m 0'.m 0'.m 0'.m 0'.m 0' 0.m 0' 0.m FIGURE continued