Romania. Data Coverage Q Highlights. Romania Data Coverage Q Highlights

Similar documents
España, Portugal + Important roads of Europe 2012 FX

APPENDIX 4 PEDESTRIAN FACILITY DESIGN INFORMATION

Interim Results Presentation. June 2013

New Seward and 36 th Avenue Intersection Conceptual Design

EXECUTIVE SUMMARY: TRANSIT-ORIENTED DEVELOPMENT IN SMITHS FALLS, ONTARIO; A COMPARISON BETWEEN TWO SITES

Results presentation. December A central and eastern European property development and investment company

ROMANIA TROUT GAME 2018

TRANSPORTATION & MOBILITY

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Perryville Transit Oriented Development & Greenway Plan

Virginia Street Bus RAPID Transit Extension Project. Environmental Assessment (EA) Presentation Public Hearing June 22, 2017

Current Travel Needs and Operating Conditions (See pages 4 9 of the Discussion Guide)

Bedfordshire County Council Cycle Parking Guidance Annex 1 Development standards Annex 2 Parking dimensions and layouts

Property Owner Survey Results

LEED Pilot Credit Library

Copenhagen Cycling Map. Red Lines Cycling facilities

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

NR. CUI AUTORIZATIE DENUMIRE LOCALITATE JUDET EVALUARI EXPERT TEAM SRL CAMPENI ALBA OMEGA EVAL CONSULT SRL CAMPENI ALBA

NJDOT Complete Streets Checklist

go straight go to right left cross on your right on your left beside next to behind across from in front of

Chapter 14 PARLIER RELATIONSHIP TO CITY PLANS AND POLICIES. Recommendations to Improve Pedestrian Safety in the City of Parlier (2014)

Following are our comments and findings based on the site visit and review of the complete Traffic Impact Study:

ADA Transition Plan. City of Gainesville FY19-FY28. Date: November 5, Prepared by: City Of Gainesville Department of Mobility

DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN

NOTICE OF AVAILABILITY/NOTICE OF COMMENT PERIOD OF A DRAFT EIR/EIS/EIS FOR PUBLIC REVIEW AND HEARINGS

Operationalizing Accessibility

ECONOMIC DEVELOPMENT ELEMENT

Appendix T-2: Transportation Facilities Inventory

2. Context. Existing framework. The context. The challenge. Transport Strategy

Traffic Signs and Signals

Roads and Vehicular Traffic Design Principles. Roads and Vehicular Traffic Recommendations

Motorways (autobahns) Abandoned motorway projects. New roads schemes according to the 2030 Federal Transport Infrastructure Plan

Fairview and Main Local Streets Improvement Plan

ACTIA Programs Annual Compliance Report Reporting Year Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments

The Present State and Future Outlook of Taipei s Traffic

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

HAMILTON BIKING PLAN OUR VISION: A BIKE FRIENDLY CITY

EXISTING CONDITIONS. Chapter General Overview

INTERMODAL TRANSPORTATION PLAN

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

University of Michigan & Urban Land Institute Real Estate Forum. Mary Beth Graebert Michigan State University

The Bike Buzz in Richland. November 2017 Carl Berkowitz

Transportation 2040 Update: Eudora Public Input As of June 1, 2017

APPENDIX B1. CROSS-REFERENCE GUIDE TO THE OHIO REVISED CODE

Intersection Improvement: Sturgeon Road, Silver Avenue and Murray Park Road Roundabout. Welcome. Public Information Session

Ageless Beauty: 20 Ways Bollard Covers Change Facilities & Places Ageless Protection at a Price You Can ALWAYS Afford

and Rural Multimodal Networks 2017 ALTA PLANNING + DESIGN

CITY OF ELKO BICYCLE AND PATHWAY PLAN

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

Regional Commercial District Summary of Allowable Uses

Chapter 138 Attachment 2 - Table of Uses by Zoning Districts; Any Uses Not Listed Are Prohibited. Ballston Lake Waterfront. Ballston Lake Residential

East San Fernando Valley Transit Corridor. Draft EIS/EIR Public Hearing (September 1 thru October 16, 2017

Chapter 13 ORANGE COVE

CPA Hanley Attachment C3. Comparison of Allowed Uses. Current Zone (Urban High Density Residential) (Commercial)

TRANSPORTATION IMPROVEMENT STRATEGY

MASTER BICYCLE AND PEDESTRIAN PLAN

CONNECTING PEOPLE TO PLACES

Project Development & Environment (PD&E) Study Public Hearing January 12 th, 2006

Florida Coalition CTST COMMUNITY TRAFFIC SAFETY TEAMS COLLEGE OF MEDICINE

Nelson City Council Tahunanui Pathways 7 December 2017

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Chapter VISION, MISSION, AND GOALS AND OBJECTIVES. Vision. Mission. Goals and Objectives CONNECTING COMMUNITIES ACROSS THE ST.

Sustainable Mobility in Greater Sudbury NeORA Conference September 25, 2012

Irondale on the Move Public Outreach Summary to Date. July 8, 2015

Elmhurst Metra Station. Public Hearing Wednesday - November 30, 2016

Eric Sundquist Managing Director State Smart Transportation Initiative (SSTI) Urban Sustainability Accelerator

City of Szekesfehervar. Royal traditions Dominant economic role 1000 years of mobility

Non-Motorized Transportation 7-1

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

Tonight is for you. Learn everything you can. Share all your ideas.

3.2 TRANSPORTATION NETWORKS

Transportation Master Plan Advisory Task Force

Fitting Light Rail through Well-established Communities

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway

PRIORITIES RESULTS YOUR PRIORITIES FOR BRIDGEPORT 5% 4% 13% RESIDENTIAL CHOICES TRAILS & PARKS

The North Shore Transportation Improvement Strategy and Western Richmond Terrace 1 : The Forgotten Corridor

APPENDIX E Needs Assessment

ACTIVE TRANSPORTATION Active Community Checklist

Welcome! Public Open House on UBC s Transportation Plan

EuroVelo Overview Route Database

Imperatives Directions

Regional Transportation Needs Within Southeastern Wisconsin

COMMUNITY CHOICES EVENTS High Schools. February 13-22, 2014

Classification Criteria

FOR SALE. 202 Pacific Avenue, Bremerton, WA Historic Bremerton Trust and Savings Building

EMBARQ India Public bicycle sharing scheme for Mysore station locations

West Village Mobility & Integration

Draft North Industrial Area-Wide Traffic Plan

History Recent Problems Alternative Routes

Elon Bicycle, Pedestrian and Lighting Plan. Pedestrian Rail Crossings Study

East Burke Transportation, Safety and Capacity Improvements

Canada s Capital Region Delegation to the Velo-City Global 2010 Conference

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.

All Season Age Friendly Pedestrian Safety and Walkability Checklist *

San Francisco Asian, Inc.

Subject Property SOUTHWEST. Mohave Crossroads. Approximate alignment of proposed Road and new Bridge. y a. w P e u

GIS Based Data Collection / Network Planning On a City Scale. Healthy Communities Active Transportation Workshop, Cleveland, Ohio May 10, 2011

Transcription:

Romania Data Coverage Q1 2013 Highlights. Coverage The area covers the country of Romania. The HERE Map Content of Romania covers 52% of the population as Prime Coverage and the rest of the population as Complete coverage. Address Ranges are present for 48% of the population. General Country Statistics for Romania Population 21,698,181 Area (KM 2 ) 238,391 Municipalities - KM of Road 166,150 Select Content Content features available with the HERE Map Content of Romania: 2D Generalized Junction Visuals 2D Junctions 2D Signs 3D Junctions 3D Landmarks Basic 3D City Models Basic Height Core POI Driver Alert Enhanced Curvature Extended Lanes and Lane Markings Fuel Types Pedestrian Venues Point Addressing Postal Code Boundaries Safety Cameras Speed Limits Traffic Signals and Stop Signs Transit and Pedestrian Content Truck POI Trucks Lonely Planet Travel Guide For POI, this release contains 75 categories, totaling 193,029 POIs. Some key category highlights include: 3,744 2,813 5,464 1,575 DATA_CS_Romania_EUROPE_Q1-13

2 Coverage Romania Population / Area Prime Coverage 11,283,054 Complete Coverage 10,415,127 Network Coverage - City-to-City Coverage - Base Coverage - Total Coverage 21,698,181 Percentage Prime Coverage 52% Complete Coverage 48% Network Coverage - City-to-City Coverage - Base Coverage - Total Coverage Road Network KM Verified Roads 51,671 Integrated Roads 114,479 Total Roads 166,150

3 Content Romania ADAS / Trucks Enhanced Geometry: - Enhanced Curvature: Functional Class 1 Functional Class 2 Functional Class 3 Functional Class 4 Enhanced Height and Slope: - Trucks: Functional Class 1 Functional Class 2 Functional Class 3 Functional Class 4 34% 34% Traffic Codes Number of Traffic Codes 2,747 Traffic Nav KFT Visual Content Number of 3D Landmarks 23 Number of Basic 3D City Models 2 Natural Guidance Number of Cities - Transit and Pedestrian Content Number of Pedestrian Cities 1

4 POI Category Total POI Category Total Airport Amusement Park ATM Automobile Dealership Bank Book Store Bowling Centre Bus Station Business Facility Campground Casino Cemetery Cinema City Centre City Hall Clothing Store Coffee Shop Community Centre Commuter Rail Station Consumer Electronics Convenience Store County Council Court House Department Store Embassy Exhibition Centre Ferry Terminal Frontier Crossing Golf Course Government Office Grocery Store Historical Monument Home Improvement Home Specialty Store Hospital/Polyclinic Hotel Or Motel Ice Skating Rink 23 28 5,464 619 6,057 720 14 243 3,798 40 186 3,208 101 13,279 3,230 11,097 2,681 1,965 102 4,462 10,387 64 167 93 108 62 7 29 2 1,566 6,583 737 4,359 2,962 682 1,575 19 Library Marina Medical Service Motorcycle Dealership Museum Nightlife Office Supply & Serv Open Parking Area Other Accommodation Park & Ride Parking Garage Petrol Station Pharmacy Place Of Worship Police Station Post Office Railway Station Recreation Facility Rent A Car Facility Residential Area/Building Rest Area Restaurant School Shopping Centre Ski Lift Ski Resort Specialty Store Sporting Goods Store Sports Activity Sports Centre Theatre Tourist Attraction Tourist Office Truck Dealership University Or College Vehicle Repair Facility Winery 787 2 7,702 2 325 2,170 4,291 6,301 1,068 16 54 2,813 5,574 7,801 3,292 3,678 525 987 100 24 37 3,744 14,341 185 13 1 30,504 521 55 1,013 100 374 11 54 349 6,014 120 Industrial Zone 1,362 Total POIs 193,029 Note: these are GDF statistics which can differ from the specific product statistics.

5 Differences Between Q4/12 and Q1/13 Release Main Enhancements The following cities have been updated: Deva (HD), Ramnicu Valcea (VL), Targu Jiu (GJ). 3D Landmarks have been added to the following cities: Cluj Napoca (15 3D Landmarks), Iasi (10 3D Landmarks), Timisoara (15 3D Landmarks). Via Areas: Via Area coding has been applied to 59 City Via Areas, 11 Border Crossing Via Areas, 1 Ferry Via Area and 3 Street Via Areas. Total: 74 Via Areas. New significant geometry has been added: New FC1 A1 highway between Arad and Remetea Mare. Upgrades and Downgrades of FC network inside the city of Timisoara to improve routing. New FC2 motorway A4 around Constanta, and downgrade of DN3C to FC3. New FC2 A4 highway from Constanta (junction E81/DN3) to Built Up Area Lumina. No U-turns have been added on intersections where Left turn is not allowed (according CSA Romania). Extended Lanes and Lane Markings coding has been applied on FC1-4 in the city of Pitesti () and Constanta (40%). The Navigation Attributes Speed Limits, NAVTEQ Transport, Signs, Signals and Warnings have been updated on approx. 2,750km FC3-4 roads all over the country. The Limited Access Road (YES) attribute has been applied globally to links coded as Controlled Access (YES). Additionally in Romania the Limited Access Road (YES) attribute has been applied on selected roads coded as Controlled Access (NO), representing the non-motorway Controlled Access road network. POI and Other Content Additions/Enhancements Updates: Quarterly update performed on the Auto Dealers. Quarterly update performed on the Truck Dealers. Quarterly update performed on the Motorcycle Dealers. Quarterly update performed on the Auto Service Maintenance. Quarterly update performed on the Auto Service Maintenance Van and Truck. Quarterly update performed on Direct Access. New: New inclusion performed on Truck and Bus Dealers. New inclusion performed on Auto Service Maintenance Truck and Bus.

6 Differences Between Q3/12 and Q4/12 Release Main Enhancements Major Cities/Towns and Updates added this release: The following cities have been updated: Pitesti and Sibiu. Point Addressing: Total Point Addressing: 256,907. Other highlights: Via Areas update: Via Area coding applies to 57 City Via Areas, 11 Border Crossing Via Areas, 1 Ferry Via Area, and 3 Street Via Areas, which makes a total of 72 Via Areas. New significant geometry has been added: A3 highway from Bucuresti to Ploiesti. A2 highway from Cernavoda to Murfatlar. Toll Information has been added on all Route Type 3 roads for Romania (with Toll Information Vignette Romania). 2D Landmarks: Approx. 5,800 new 2D landmarks have been added in the city of Timisoara. POI and Other Content Additions/Enhancements Updates: Quarterly update performed on the Auto Dealers. Quarterly update performed on the Truck Dealers. Quarterly update performed on the Auto Service Maintenance. Quarterly update performed on the Truck and Van Service Maintenance. Quarterly update performed on Direct Access. New: New inclusion performed on Auto Dealers. New inclusion performed on Auto Service Maintenance. New inclusion performed on Direct Access. Approx. 1,790 POIs have been added.

7 Differences Between Q2/12 and Q3/12 Release Main Enhancements Major Cities/Towns and Updates added this release: The following cities have been updated: Miercurea Ciuc, Dolhasca, Bacau, Slatina, Cluj Napoca, and Constanta. Point Addressing: Total Point Addressing: 257,032. Discover Cities: Public Transit Access and Public Transit Stop POIs have been added during the ongoing DICI project in the Bucharest area (Bucharest and Otopeni). This project has been finished for this release quarter. City of Bucharest received different data (public transport information, pedestrian crossing, pedestrian geometry in parks and the city center area) which can be used for pedestrian navigation through the city. Other highlights: Via Areas: Via Area coding has been applied to 60 City Via Areas, 11 Border Crossing Via Areas, 1 Ferry Via Area, and 3 Street Via Areas, which makes a total of 75 Via Areas. New significant geometry has been added: New bridge in Bucharest at the intersection with Barbu Vacarescu Boulevard and Soseaua Pipera. A new part of A1 Highway between Timisoara and Arad (which includes also Arad Ring Road). New Ring Road around Drobeta-Turnu Severin. Toll Information has been added on all Route Type 1 and 2 roads for Romania (with Toll Information Vignette Romania). POI and Other Content Additions/Enhancements Updates: Quarterly update performed on the Auto Dealers. Quarterly update performed on the Truck Dealers. Quarterly update performed on the Auto Service Maintenance. Quarterly update performed on the Auto Service Maintenance Van and Truck. Quarterly update performed on Direct Access. New: New inclusion performed on Direct Access. Approx. 6,650 POIs have been added.

8 Differences Between Q1/12 and Q2/12 Release Main Enhancements Major Cities/Towns and Updates added this release: 55 Built Up Areas have received Prime coverage. 2 cities have been updated: Ploiesti and Iasi. Point Addressing: Total Point Addressing: 257,067. Other highlights: Discover Cities: Public Transit Access and Public Transit Stop POIs have been added during the ongoing DICI project in the Bucharest area (Bucharest and Otopeni). This project is continuing. Via Areas: Via Area coding has been applied to 60 City Via Areas (new: Ramnicu Sarat), 11 Border Crossing Via Areas, 1 Ferry Via Area, and 3 Street Via Areas, which makes a total of 75 Via Areas. DERF 94 Industrial Zones outside BUA has been completed for Romania. Synergy Update for 3,057 KM of FC1 and new Synergy attributes for 2,186km of FC2. POI and Other Content Additions/Enhancements Updates: Quarterly update performed on the Auto Dealers. Quarterly update performed on the Truck Dealers. Quarterly update performed on the Auto Service Maintenance. Quarterly update performed on the Auto Service Maintenance Van and Truck. Quarterly update performed on Direct Access. New: Public Transit Access and Public Transit Stop POIs have been added during the ongoing Discover City project for Bucharest.