Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

Description: Improve I-71 corridor from I-64 to I-265. Approximately 9.1 miles.

Construct weigh station on I-65 near the Kentucky state line, northbound only. Port of Entry near Kentucky state line.

Replace Bridge 51 on Blackiston Mill Dr. over Silver Creek,

Multi Modal Transit Access Plan KIPDA ID # 239. Project Type: STUDY

Oldham County Major Thoroughfare Plan

TRANSPORTATION POLICY COMMITTEE 1:00 p.m., Thursday, June 28, 2007 KIPDA Conference Room

Access Routes from US 101 to the Richmond San Rafael Bridge

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I)

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Route 29 Solutions Projects

GENERAL DESCRIPTION. Page 1 of 5

Glenn Avenue Corridor Traffic Operational Evaluation

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

2040 Long Range Plan Projects Draft October 2011

Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road. October 3, 2017

State Route 160 (Blue Diamond Highway)

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer

STREET AND HIGHWAY PLAN

PRESENTATION WILL BEGIN AT APPROXIMATELY 6:05 P.M. I-90 EXIT 406 INTERCHANGE MODIFICATION STUDY AND ENVIRONMENTAL ASSESSMENT MARKET

FY 2013 Annual Listing of Obligated Projects In the Louisville/Jefferson County, KY-IN MPA

Financial Project ID No(s).: and ETDM No(s).: and 14181

Donahue Drive Corridor Traffic Operational Evaluation

Final Project Prioritization Plan

City of Fairfax, Virginia City Council Work Session

7.0 Preferred Alternative with Service Road Concept

Bluffdale South (SR140) Bicycle/Shoulder Lanes Project Type Bicycle

North Carolina Department of Transportation American Recovery and Reinvestment Act of 2009 Division One Highway Infrastructure Program Summary

Stakeholder Focus Group Meeting #3 January 9, 2013 Cattlemens, 2000 Taylor Road, Roseville

Gwinnett County Department of Transportation SR 324 / Gravel Springs Road at I-85 / SR 403 Interchange Project Number F , PI No.

Figure 1: East West Connector Alignment Alternatives Concept Drawing

Freeway System Considerations

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017

Let s Make I-40 Better Action Team. Friday, March 29, 2019 Hosted by RTP Foundation

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project. Prepared September 6, 2017

Annual Listing of Obligated Projects In the Louisville/Jefferson County, KY-IN MPA. Fiscal Year 2016 (October 1, September 30, 2016)

COMMUNITY WORKSHOP (CW) 3 February 21, 2015

7.0 FREEWAYS CONGESTION HOT SPOT PROBLEM & IMPROVEMENT PROJECT ANALYSIS & DEFINITION

Iowa Highway 58 Corridor Improvement Study

Section Access Control Plan - SH 14 (Mulberry Street)

5. RUNNINGWAY GUIDELINES

I-10 AT SCENIC LOOP RD. Open House

Project Fact Sheet. August 1,

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 3: Draft List of Facilities.

DUNBOW ROAD FUNCTIONAL PLANNING

Current Roadway Projects Wednesday, September 03, 2014

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Project Description Form 8EE

Task Force Meeting #5, August 3, Prepared by DKS Associates

Arlington Public Schools New Elementary School at Thomas Jefferson Site Off-Site Transportation. Thomas Jefferson BLPC / PFRC Meeting July 27, 2016

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for:

Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10

TRASBURG RANSPORTATION

TRANSPORTATION FACILITY PLANNING Waugh Chapel Road Maytime Drive to New Market Lane

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

Fleur Drive Reconstruction

MoPac South: Impact on Cesar Chavez Street and the Downtown Network

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for:

Project Description Form 6V

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

Arterial Management Plan for US Route 250 and State Route 623

Short and Long Term Needs

CITY OF SPOKANE VALLEY Request for Council Action

EXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ %

Non-Motorized Transportation 7-1

Harrah s Station Square Casino

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

2012 PRIORITY TRANSPORTATION PROJECTS

CONGESTION MANAGEMENT PROCESS:

MUMPO TIP Amendments The MPO has adopted the following amendments to the TIP (as of July 2013)

INTERSTATE 540 IMPROVEMENT STUDY

TECH MEMOS #3 & #4 EXISTING AND FUTURE TRAFFIC CONDITIONS TRAVEL FORECASTING APPROACH CITY OF NOVI THOROUGHFARE MASTER PLAN

ROADSOADS CONGESTION HAMPTON SYSTEMYSTEM MANAGEMENT. Part II Roadway Congestion Analysis Mitigation Strategies and Evaluation

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

DRAFT FY 2017-FY 2021 FLORIDA-ALABAMA NON-SIS PROJECT PRIORITIES PROPOSED CHANGES BY ESCAMBIA AND SANTA ROSA COUNTIES

Station 1: Street & Sidewalk Upgrades

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT

PRESENTATION OUTLINE

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

TRANSPORTATION TRAINING TOPICS. April 6, 2010

MDX SR 836/DOLPHIN EXPRESSWAY SOUTHWEST EXTENSION Project Development and Environment PD&E Study Miami-Dade County, Florida

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

Appendix G: Future Conditions Traffic Analysis Memorandum

Purpose + Need. Connect: Thrive: Develop: < Strengthen the spine of our regional transportation system

WELCOME PTH 59N - PTH 101 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, :00 P.M. - 8:00 P.M.

EXISTING (2006) CONDITIONS

Fairfax County Parkway Widening Fairfax County

Chapter 4 Traffic Analysis

Austell Road Access Management Plan Public Meeting February 17, 2009

Proposed Action, Purpose and Need Technical Memorandum

Transportation Committee Project Priority List

INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION ALTERNATIVES ANALYSIS TECHNICAL REPORT SEPTEMBER 2016

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives

Transcription:

Appendix A: PLANNED PROJECTS

Programming Study Sound Barrier along south side of for approx. 2100 feet. Construction Complete $850,000 5 8613.00 Y Y Y Sound Barrier along south side of for 500' west of Cinderella Lane to Smyrna Parkway for approx. 4100 feet. Under Construction $2,255,000 5 8705.00 Y Y Y & 1 65 Construction of 2 new Ohio River bridges, 1 in the downtown (I 65) corridor and 1 in the far east () corridor. Under Construction $2,044,547,000 5 700.00 Y Y Y Reconstruct interchange at I 64, including: NB to WB 2 lane flyover, SB to WB 2 lane ramp and auxiliary lane to tie into KIPDA #197; also includes WB auxiliary lane on I 64 from to Blankenbaker Pkwy. Phase 2 Design Complete Will Move to ROW $64,937,500 5 21.00 Y Y Y Projects that are in the study area and in the 2012 Six Year Highway Plan Reconstruction of the I 72/ interchange including a possible flyover ramp from NB to SB. Improve / KY 61 (Preston Highway) interchange as recommended by KIPDA's interchange study including the addition of 1 NB and 1 SB lane on Preston Highway from Cooper Chapel Road to the EB Ramps. In Phase 1 Design $90,138,113 5 48.30 Y Y Y In ROW and Utility Phase. Spring 2014 Letting $3,524,000 5 263.00 Y Y Y Improve US 31 E South of (Bardstown Road) interchange to provide turn lanes and new access. Under Construction $2,525,000 5 264.10 Y Y Y Reduce congestion and improve safety at the KY 3084 (Old Henry Road) Interchange. Add a left turn lane to NB exit ramp. Milepoints from 28.28 to 29.1. In Phase 1 Design $3,248,800 5 474.00 Y Y Y & TRIMARC improvements on from near the Kennedy Interchange to $6,730,000 5 48.9 N Y Y New Roadway Construct a new 4 lane route from Old Henry Road interchange at to KY 22 in the vicinity of KY 329B. $45,551,485 5 367.00 N Y Y

Programming Study Widen from 4 to 6 lanes from I 65 to US 31E(Bardstown Road). Intent would be to widen inside. Approximately 7.0 miles. $65,796,589 N N Y Projects that are in the study area and are either in the and KIPDA PIFs, the KIPDA MTP, the LRTP, or the KIPDA TIP Widen from 4 to 6 lanes from I 64 to. Intent would be to widen to inside. Approximately 9.25 miles. Widen from 4 to 6 lanes from US 31E (Bardstown Road) to I 64. Approximately 8.0 miles. $103,617,099 N N Y $104,057,094 N N Y Construct a new interchange on at Rehl Road. $31,586,181 N N Y

Programming Study Cooper Chapel Road Phase 1: Reconstruct Cooper Chapel Road from 2 to 3 lanes (3rd lane will be a center turn lane) from KY 61 to Smyran Parkway. Project length is 1.8 miles. $13,125,000 5 403.00 Y Y Y Interim improvement on including addition of NB and SB auxiliary lanes on and I 264. $26,577,134 5 48.20 Y Y Y Construct new interchange on at Salem Road, Section 6 East End approach INDOT Y Y Y Projects not in the study area, but in the vicinity of that will be in the or KIPDA models as their construction will affect traffic Old Henry Road Cooper Chapel Road River Ridge Blvd. Extend Old Henry Road as a 3 lane roadway (3rd lane will be a enter turn lane( from east to Ash Avenue (KY 362). Phase 3: Extend and construct 2 lane roadway with a continuous center turn lane from KY 864 (Beulah Church Road) to US 31E (Bardstown Road) at Bardstown Fall Road. Project will include consideration of bicycle and pedestrian facilities. Addition of NB and SB auxiliary lanes on near the Kennedy Interchange, including operation improvements to the Zorn Avenue Interchange. Project length is 1.5 miles. Construction of a four lane connector road, with center median, that will provide a connection between the proposed Old Salem Road interchange on the extension to State Road 62 at Stacy Road In Phase 2 Design $20,300,000 5 367.1 or 5 367.2 Y Y Y? $30,699,792 5 404.01 Y N Y $24,450,044 5 48.1 Y N Y $180,000,000 N Y Y I 64 Widen I 64 to add 1 travel lane in each direction between I 264 and KY 1747 (Hurstbourne Parkway). $6,404,128 N Y Y I 64 & KY 1747 Reconstruct existing interchange including construct ramp 7 "flyover" from NB KY 1747 (Hurstborune Parkway) to WB I 64 and re time signals along KY 1747 $60,299,200 5 00052.00 N N Y KY 864 Widen KY 864 (Beulah Church Road) from 2 to 3 lanes (3rd lane will be a center turn lane) from Cedar Creek Road to I 265 (Gene Snyder Freeway). $7,204,645 5 481.00 N N Y

Programming Study KY 1819 Widen KY 1819 (Billtown Road) from 2 to 3 lanes (3rd lane will be a center turn lane) from to KY 1819 (Watterson Trail). $21,632,000 N N Y Projects not in the study area, but in the vicinity of that will be in the or KIPDA models as their construction will affect traffic KY 864 I 64 I 64 Reconstruct and widen KY 864 (Cedar Creek Road) from 2 to 3 lanes (3rd lane will be a center turn lane) from Mount Washington Road to Cooper Chapel Road and reconstruct and widen KY 864 (Cooper Chapel Road) from 2 to 3 lanes from Cedar Creek Rd to Beulah Church Rd. Improvements within the I 64 corridor from the Kennedy Interchange to I 264 addressing safety and congestion issues. The improvements may include but are not limited to: consideration of alternative transportation modes, deployments of ITS technology, addition of auxiliary and/or travel lanes, interchange modifications, and installation of traffic safety devices, signs and lighting. None of the potential improvements will involve expansion of the Cochran Hill Tunnel. New interchange and connector road from KY 148 to US 60 (Shelbyville Road) with interchange on I 64. Corridor would be in vicinity of Gilliland Road. $4,653,135 N N Y $68,428,453 N N Y $32,898,294 5 8200.00 N N Y I 264 Reconstruct I 264 interchange at US 42 (Brownsboro Road). $64,041,094 N N Y KY 22 Widen KY 22 from 2 to 5 lanes (5th lane will be a center turn lane) from just east of KY 1694 to Haunz Lane. $12,808,257 N N Y KY 22 Widen KY 22 from 2 to 5 lanes (5th lane will be a center turn lane) from Haunz Lane to KY 329. $14,409,290 N N Y KY 146 Widen KY 146 (LaGrange Road) from 2 to 5 lanes (5th lane will be a center turn lane) from Haunz Lane to KY 329. $3,289,829 N N Y Urton Lane Extend and widen Urton Lane form 2 to 3 lanes (3rd lane will be a center turn lane) $50,432,515 N N Y

Programming Study US 60 Add 1 travel lane in each direction on US 60 (Shelbyville Road) from KY 2747 (Hurstbourne Parkway) to. $39,477,953 N N Y US 60 Add 1 lane in each direction of US 60 (Shelbyville Road) from I 264 to KY 1747 (Hurstbourne Parkway). $24,333,058 N N Y Projects not in the study area, but in the vicinity of that will be in the or KIPDA models as their construction will affect traffic KY 1447 KY 155 Widen KY 2447 (Westport Road) from 2 to 5 lanes (5th lane will be a center turn lane) from Murphy Lane to Collins Lane. Widen KY 155 (Taylorsville Road) from 2 to 3 lanes (3rd lane will be a center turn lane) from I 265 to KY 148. Approximately 2.0 miles. New interchange and connector road from KY 1447 to US 42 with interchange on near Jefferson/Oldham County border. Widening from I 64 to Oldham County line to improve congestion, reduce crashes and improve geometrics (MP 0.00 to MP 11.315). $563,737 N N Y $8,005,161 N N Y $22,021,418 N N N $185,000,000 N N Y Reduce congestion by widening from the Jefferson County line to Henry County line (MP 11.315 to MP 24.727). $205,000,000 N N Y Purpose of the project is to reconstruct the / KY 53 interchange. The current interchange operates at a low level of service and rail in the AM and PM peaks. $35,000,000 N N Y