VISIONZEROPHL.COM #VISIONZEROPHL

Similar documents
MARKET/JFK VISION ZERO PILOT PROJECT FEBRUARY 2019 EVALUATION REPORT

Welcome! San Jose Avenue Open House August 25, 2015

VISION ZERO UPDATE JUNE 2, 2016

Today. Develop Plans. Public Listening Session

MEET IN THE STREET MOVING TO ZERO

Vision Zero & ITE. April 11, Toole Design Group. Jason DeGray, P.E., PTOE. Vision Zero & ITE

PEDALING FORWARD. A Glance at the SFMTA s Bike Program for SFMTA.COM

Vision Zero San Jose. Moving toward zero traffic deaths and providing safe streets for all

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Metro Bike/Bus Interface Study

Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns.

Neighborhood Slow Zone Program Application

UPDATES, SUCCESSES, AND WHAT S AHEAD ON THE ROAD TO ZERO

Bicycle/Bus Conflict Area Study

PROJECT OVERVIEW. 20th Avenue Project Limits (Lincoln Way to Wawona St)

10TH & 13TH STREET ROADWAY RECONFIGURATION & PROTECTED BICYCLE LANE PROJECTS

Governance and Priorities Committee Report For the July 2, 2015 Meeting

PEDESTRIAN ACTION PLAN

FINAL PLAN APPENDIX D CITY OF BERKELEY BIKE PLAN D-1

Vision Zero: No more traffic deaths on Berkeley streets

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

Mayor s Pedestrian Advisory Council. Wednesday, February 15

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

MEMORANDUM. Charlotte Fleetwood, Transportation Planner

CANDIDATE QUESTIONNAIRE

Mayor s Bicycle Advisory Council. Wednesday, December 13 th, 2017

MASTER BICYCLE AND PEDESTRIAN PLAN

The City of Chicago s. Bike 2015 Plan. Nick Jackson, Deputy Director Chicagoland Bicycle Federation RAIL-VOLUTION 2006

City of San Diego Vision Zero Draft Strategic Plan FY 2017

ABOUT THIS OPEN HOUSE

WELCOME Mission-Geneva Transportation Study

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

City of Lafayette Public Meeting Agenda Downtown Street Improvement Master Plan Implementation Committee Thursday, April 21, :00 PM

Beach Cities Living Streets Design Manual and Aviation Boulevard Multimodal Corridor Plan

POLICY STATEMENT: VISION ZERO

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

PEDESTRIAN ACTION PLAN

Better Market Street Project Update. Urban Forestry Council September 17, 2014

PEDESTRIAN ACTION PLAN

Protected Bike Lanes in San Francisco Mike Sallaberry SFMTA NACTO Workshop - Chicago IL

Road Diets FDOT Process

SPEED MANAGEMENT FOR VISION ZERO

Ottewell Traffic Shortcutting Pilot Project

25th Avenue Road Diet Project A One Year Evaluation. Transportation Fund for Clean Air Project #05R07

43 rd Avenue, Skillman Avenue Protected Bike Lanes

Technical Working Group November 15, 2017

Street Design Workshop. Existing cross section Traffic volumes Examine adjacent land uses You design future improvements

Vision Zero Task Force February 28, Collision Landscape Analysis

CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Transportation Planning and Parking Division

Safer Cycling: How the City of Vancouver is Proactively Improving Cycling Safety

Cycling and risk. Cycle facilities and risk management

Do you support funding a Vision Zero approach for pedestrian & cycling safety citywide?

Replace century-old sewer & water pipes Pedestrian-scale sidewalk lighting

How to Develop a Pedestrian Safety Action Plan

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Pennsylvania Avenue (CR 484) Design Alternatives Study

Richmond-Adelaide Cycle Tracks

Pedestrian injuries in San Francisco: distribution, causes, and solutions

Project Goal and Description. Why Broadway? Broadway SFMTA.COM/BROADWAY. The goal of the Broadway Safety Improvement

Polk Streetscape Project

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns.

CHAPTER 3: Vision Statement and Goals

CANDIDATE QUESTIONNAIRE

2019 ACTION STRATEGY UPDATE. March 19, 2019

Project Goals Project Limits Boston Bikes Data Existing Conditions Proposed Options Discussion

Designing for Pedestrian Safety

Vision Zero in Canada. 9 th International Conference on Urban Traffic Safety August 2017

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

North Shore Transportation Improvement Strategy

Speed Limits in the Hoddle Grid

Prince George s County plans, policies, and projects

Community Task Force November 15, 2017

Mission Bay Loop (MBL) Public Meeting

Transportation Issues Poll for New York City

REGIONAL SAFETY ADVISORY COMMITTEE North Central Texas Council of Governments Transportation Council Room Friday, October 26, :00 am AGENDA

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Living Streets Policy

Eastern PA Trail Summit October 1, 2018

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

About the study. North Milwaukee Ave. Key goals of this study are to: Achieve Vision Zero* by. Harmonize the space and improve walkability

CANDIDATE QUESTIONNAIRE

Active Transportation Facility Glossary

Complete Streets: Policy Framework Complete Streets: Implementation Plans A more Complete Street: Laurier Bike Lane Pilot Project

FHWA Resources for Pedestrian and Bicycle Professionals

Napier City road trauma for Napier City. Road casualties Estimated social cost of crashes* Major road safety issues.

1 Road and HGV danger in London. Hannah White, Freight & Fleet Programme Manager November 2017

Speed Limits Study and Proposal. Public Input Session: 8/14/13

EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECT

April 30 th, Reducing the Risks to Child Pedestrians

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

THE OFFICIAL GUIDE TO CYCLING SAFELY IN PHILADELPHIA

Traffic Calming Program Update

Rightsizing Streets: The Seattle Experience

May 12, 2016 Metro Potential Ballot Measure Issue Brief: Local Return

Hennepin Avenue Reconstruction Washington Avenue to 12 th Street

NACTO Designing Cities 2014 Dongho Chang, City Traffic Engineer October 23, 2014

122 Avenue: 107 Street to Fort Road

Community Task Force July 25, 2017

We want to hear from you!

Transcription:

What is Vision Zero?

What is Vision Zero? A policy that states clearly that traffic deaths are preventable and unacceptable. CORE PRINCIPLES: Human life takes priority over mobility; Human error is inevitable and unpredictable; People are inherently vulnerable and speed is a fundamental predictor of crash survival; Safe human behaviors, education, and enforcement are essential contributors to a safe system.

Where has Vision Zero been adopted? First adopted as a national policy in Sweden in 1997, over 25 cities across the U.S. have since adopted Vision Zero. U.S. CITIES WITH VISION ZERO POLICIES: Chicago; Boston; New York City; Los Angeles; San Francisco; Seattle, and more

Why Vision Zero in Philadelphia? Every year, there are nearly 10,000 reported crashes on Philadelphia streets. 5-YEAR TREND: 2012: 95 killed / 250 severely injured 2013: 80 killed / 225 severely injured 2014: 82 killed / 223 severely injured 2015: 83 killed / 250 severely injured 2016: 96 killed / 252 severely injured

Why Vision Zero in Philadelphia? Every year, there are over 10,000 reported crashes in Philadelphia.

People involved in crashes 5% People killed in crashes 3% 15% 35% 62% 80% Bicycle Pedestrian Vehicle Data source: PennDOT Bicycle Pedestrian Vehicle Data source: PennDOT

Traffic-related Deaths: Total deaths vs. rate of death per 100,000 residents Data source: NHTSA, 2015

Why Vision Zero in Philadelphia? Traffic crashes do not impact Philadelphians the same. Pedestrian crashes (>18years) Pedestrian crashes (<18years)

Vision Zero principles to priorities

High Injury Network 50% of Killed/Serious Injury Crashes on 12% of Streets

FK & Market Corridor Safety Project

Project background

Where is the project area? High-rise commercial Center City Corridors Buses: 2, 17, 31, 32, 33, 38, 44, 48 (Market only), 62, 124, 125, 414, 417, 555 Four large residential buildings front the streets Over 6 preschools and daycares serve the corridors Main east-west streets in Center City

Market Street, looking east JFK Blvd., looking west

John F. Kennedy Blvd. JFK Blvd., looking east 2 narrow parking/loading lanes 4 extra large motor vehicle lanes

Market Street Market St looking east 2 parking/loading/turn lanes 4 standard motor vehicle lanes

What are the safety issues? Long pedestrian crossings Ideal maximum pedestrian crossing distance = 33 feet or 3 lanes without median 55 feet 65 feet

What are the safety issues? Long pedestrian crossings Ideal maximum pedestrian crossing distance = 33 feet or 3 lanes without median 55 feet 65 feet

What are the safety issues? Weaving and speeding motor vehicles Police said a woman was driving the van west on JFK Boulevard, and tried to switch from a middle lane to the right-hand lane at the intersection with 16th Street, but instead struck the back of a silver Hyundai Santa Fe sport utility vehicle traveling in the right lane.

Past studies Full project Intermediate Protected bike lane, landscaped median, signal work, restripe full roadway Signal work, protected bike lane, flex posts, restripe full roadway $18 million $1.5 million

Pilot project proposal

Market Street pilot Existing Market St. cross section Pilot Market St. cross section

JFK Blvd. pilot Existing JFK cross section Pilot JFK cross section

1900 Block JFK Upgraded SEPTA Shelters Kennedy House Penn Center House Curbside Parking & Loading

How will it impact traffic? Redesign will have negligible impact on traffic flow Left turning lanes will help traffic flow Due to construction, LOVE Park, Sterling House and 1500 Market have been 3 lanes 20 th St JFK Blvd Market St 15 th St

How will it impact SEPTA? Buses: 17, 33, 38, 44, 124, 125

Safety benefits Improves safety for all users of the roadway Decreases sidewalk cycling Supports a healthy and active Philadelphia Makes bicycling more accessible Improves businesses along the corridor

Pilot project timeline Fall/Winter 2017/2018 Meet with stakeholders seeking support for demonstration Finalize plans and secure funding Collect baseline data Spring 2018 Install 9 month pilot Collect data at two points during pilot to measure impact Check in with stakeholders and public Late Fall 2018 Review results of data collection and stakeholder feedback with Council President and public Determine next steps

Measures of success Goal Performance Measure Unit(s) of Measurement Safety Collision Rate Severity and Number of Crashes, Number of Injuries, Crash Rate Speeding Peak and Average Speeds Mobility Vehicle Volume Number Vehicle Travel Time Time from 15-20th Streets Vehicle Median Speeds Bicycle Volume Pedestrian Volume Bus Speeds Number Number in 2 locations along each street Number in 2 locations along each street Speed along 1 location along each street Quality of Life Employees/Businesses Percentage Satisfaction Roadway User Satisfaction Percentage Testimonials Comfort Level Use of Public Spaces Usage # of pedestrian refuge areas along roadway, Usage # of public spaces along corridor

Focused Enforcement Plan Partnership with Police District #9 1. Behavior for Motor Vehicles Red light running Turning vehicles failure to yield to pedestrians Motor vehicle and truck double parking Mixing/Conflict zone yield behavior 2. Behavior for Bicycles Conflict zone yield behavior Red light running Sidewalk and wrong way bicycling

Meetings to date Entity Date(s) Result Kennedy House 8/14/17, 10/10/17, 12/12/18 (Board), 12/12/18 (Council) Neutral Penn Center House 7/19/17, 10/24/17 Support Logan Square Civic Association 1/9/18 Support 9 th Police District 1/11/18 Support One Penn Center 12/12/17 Support 1601 Market 2/7/18 Support 1801 Market 2/6/18 Support Two Penn Center 2/12/18 Support Center City Residents Association 2/13/18 Support

Next Steps 1. Finalize Enforcement, Engagement, and Data Evaluation Plans Final Plans - Late March 2. Finalize Parking & Loading Plan with PPA and Building/Tenant Input Final Plan - Late March 3. Finalize Installation Schedule Target - April

Thank you Kelley Yemen, AICP Jeannette Brugger, AICP Office of Complete Streets jeannette.brugger@phila.gov 215.686.5521