Emergency Response Protocol for Turtle Mountain

Similar documents
New Road Safety Strategy Aims to Ensure Canada Has World s Safest Roads

TOWARDS A BIKE-FRIENDLY CANADA A National Cycling Strategy Overview

SIERRA LEGAL DEFENCE FUND

IGEM/TD/2 Edition 2 with amendments July 2015 Communication 1779 Assessing the risks from high pressure Natural Gas pipelines

GOVERNMENT OF SASKATCHEWAN SUBMISSION TO THE RAILWAY SAFETY ACT REVIEW PANEL

Emergency Action Plans for Dam Safety

Committee Input No. 35-NFPA [ Chapter 1 ] Submitter Information Verification. Committee Statement

TRAFFIC ACCOMMODATION IN WORK AREAS

Automated Traffic Enforcement Technology Guidelines

THE INEVITABLE RIPPLE 2ND OF APRIL TSUNAMI

Economic and Social Council

Climate Change Action Plan: Transportation Sector Discussion Paper: Cycling

SUMMARY OF SAFETY INVESTIGATION REPORT

Highway 1 Kamloops to Alberta Four-Laning Program

for help. jessie leitch

LETTER OF AGREEMENT BETWEEN THE GOVERNMENT AND THE GOVERNMENT OF INDIA FOR THE CO-OPERATION SEARCH AND RESCUE SERVICES

5 AUTOMATED SPEED ENFORCEMENT PROPOSAL

Standard Operating Policy and Procedures (SOPP) 3:

Amendments to the International Convention on Maritime Search and Rescue of 27 April 1979

COUNCIL POLICY NAME: COUNCIL REFERENCE: 06/119 06/377 09/1C 10llC 12/1C INDEX REFERENCE: POLICY BACKGROUND

SITE S7: EMBANKMENT FAILURE WEST OF MILLARVILLE

SCIENCE OF TSUNAMI HAZARDS

CEPA Initiative: Response Time Guideline 2015 EMERGENCY SECURITY MANAGEMENT WORK GROUP

Unit 5: Prioritize and Manage Hazards and Risks STUDENT GUIDE

Understanding safety life cycles

Welcome to the McKenzie Interchange Project Open House!

Vision Zero in Canada. 9 th International Conference on Urban Traffic Safety August 2017

TRAFFIC IMPACT STUDY CRITERIA

November 2, Government takes on the challenge of improving traffic safety

Kelowna Bikeshare Proposal

Geotechnics, Face and Stockpile Operations

MINE SAFETY TARGETED ASSESSMENT PROGRAM. Ground or strata failure NSW metalliferous mines. April

Application of pipeline risk assessment to proposed developments in the vicinity of high pressure Natural Gas pipelines

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design

REPORT OF THE AD HOC COMMITTEE ON THE FEASIBILITY OF A COMMUNITY TRAIL USING THE RAIL CORRIDOR RIGHT-OF-WAY APRIL 28, 2016

Color Coding for Warning Signs & Lights

COAL COMBUSTION RESIDUALS FUGITIVE DUST CONTROL PLAN

Safety zones and other Land Use Planning tools to reduce acute environmental risks

Amendments to the International Convention on maritime search and rescue of 27 April Concluded London, 18 May 1998.

COUNTY ROAD 22 HORSESHOE VALLEY ROAD. Municipal Class Environmental Assessment. simcoe.ca

7TH ANNUAL MEETING OF THE COMMISSION

The Role of Marine Science in Supporting the Implementation of the Canadian Aquatic Invasive Species Regulations Thomas W.

Study of Constructing Asset Management System for Ground Anchor

2.2 TRANSIT VISION 2040 FROM VISION TO ACTION. Emphasize transit priority solutions STRATEGIC DIRECTION

COWLEY COUNTY, KANSAS EMERGENCY OPERATIONS PLAN. ESF9-Search and Rescue

Canadian Sport Institute Pacific and BC Ringette Association Athlete and Coach Nomination Criteria

Pedestrian Safety Campaign

CITY OF VANCOUVER ADMINISTRATIVE REPORT

Thank you for this opportunity to discuss with you how we can work together to make our streets more complete.

Lower Churchill Management Corporation. Nalcor Doc. No. MFA-PT-MD-0000-EN-PL

FIRE CHIEF S ASSOCIATION OF BROWARD COUNTY

North Vancouver Community Associations Network. November 15, pm to 9 pm

McKenzie Interchange Project Fall 2015 Engagement. Appendix 2: Engagement Materials and Feedback Form

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Implementing the New Fisheries Protection Provisions under the Fisheries Act

GD 0043/18 ACTIVE TRAVEL STRATEGY

INTERNATIONAL DECADE OF OCEAN SCIENCE FOR SUSTAINABLE DEVELOPMENT ( ) OUTLINE

BSR GPTC Z TR GM References and Reporting Page 1 of 8

Dan Andrews. Expert Advisor to the Ontario Ministry of Tourism, Culture & Sport OPA Ed Conference, Burlington, ON March 1, 2018

Mavis Johnson. Road Safety Specialist

Summary Report: Built Environment, Health and Obesity

Pedestrian Crosswalk Audit

Review of Considerations and Requirements for Automated Enforcement

Bus and Transit Lane Review Update

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

High seas: conservation and management measures to prevent significant adverse impacts on vulnerable marine ecosystems

Project Deliverable Subregional TMC Report Project Deliverable Subregional TMC Schematic Diagrams

University of Cincinnati. Radiation Safety Committee Operations Guidelines Statement of Policy (RSC Guidelines) RSC Guidelines (revision 5)

RESOLUTION MEPC.86(44) adopted on 13 March 2000 AMENDMENTS TO THE GUIDELINES FOR THE DEVELOPMENT OF SHIPBOARD OIL POLLUTION EMERGENCY PLANS

Sea to Sky Natural Resource District

Federal Aviation Administration Safety & Human Factors Analysis of a Wake Vortex Mitigation Display System

SIERRA-SACRAMENTO VALLEY EMS AGENCY PROGRAM POLICY REFERENCE NO. 834

ACCESS CONCERNS AT THE ORANGE COUNTY EMERGENCY OPERATIONS CENTER

Agenda Item 6-ATM Coordination (Airspace restructuring, AIS and SAR agreements)

City of Edmonton Office of Traffic Safety

National Standard for Commercial Vessels

Admiralty Inlet Pilot Tidal Project FERC No Appendix C. Derelict Gear Monitoring Plan

VANCOUVER POLICE DEPARTMENT PLANNING, RESEARCH & AUDIT SECTION

INTRODUCTION UNIFIED COMMAND

Bike to the Future c/o Portage Avenue. Winnipeg, MB. R3B 2B2 Fax:

Staff, Organizations Directly Affected (including but not limited to):

1.0 PURPOSE 2.0 REFERENCES

Our Approach to Managing Level Crossing Safety Our Policy

PROVINCIAL MAINTENANCE STANDARDS FOR MUNICIPAL HIGHWAYS AMENDMENTS 2018 RECOMMENDATION

Scope: This applies to all members of New Kent Fire-Rescue

Tying Off A Belay Plate And Rescuing A Fallen Climber A Sequential Article to Accompany Instruction

A GUIDE TO RISK ASSESSMENT IN SHIP OPERATIONS

All TSOs of the Nordic Capacity Calculation Region Proposal for fallback procedures in accordance with Article 44 of Commission Regulation (EU)

Highway 111 Corridor Study

RESOLUTION OF THE BOARD OF SUPERVISORS OF ORANGE COUNTY, CALIFORNIA. August 8, 2017

Judo BC High Performance Elite & Development Teams Selection Policy and Criteria

Rural Interstate LED Lane Delineation for Low Visibility Conditions (ITS Planning, Deployment, and Sustainability) Authors: David Ludwig, Lead

Manitoba Organizations Want to Know If Walking and Cycling is Going to Get Safer and Easier for Everyone Under the Next Government

Transportation Master Plan Advisory Task Force

NOTES OF MEETING AIRPORT ROAD (KING STREET TO HUNTSMILL DRIVE) ENVIRONMENTAL ASSESSMENT (EA) COMMUNITY WORKING GROUP (CWG) ORIENTATION SESSION

University of Iowa External/Central IRB Reliance Process Standard Operating Procedure (SOP)

Emergency Detour Route Guideline and Best Practices

2. THAT the Mayor and Corporate Officer be authorized to execute all documents related to this matter.

EXECUTIVE SUMMARY TRANSPORTATION LABOUR MARKET OUTLOOK ASIA PACIFIC GATEWAY CORRIDOR

This objective implies that all population groups should find walking appealing, and that it is made easier for them to walk more on a daily basis.

Transcription:

Emergency Response Protocol for Turtle Mountain 2017 June 2017 Page 1

Acknowledgements The Emergency Response Protocol for Turtle Mountain has been drafted by the Alberta Emergency Management Agency (AEMA) as per the 2015 Alberta Emergency Plan (AEP) with the support of the Alberta Energy Regulator (AER)/ Alberta Geological Survey (AGS) and the Municipality of Crowsnest Pass. If you have questions about this document, please contact: Plans Manager Alberta Emergency Management Agency 14515 122 Ave NW Edmonton, Alberta T5L 2W4 Phone: 780-422-9000 Website: http://www.aema.alberta.ca Copyright 2017 the Crown in the Right of Alberta, as represented by the Minister of Municipal Affairs, Alberta Emergency Management Agency, Edmonton, Alberta, Canada. All Rights reserved. Commercial use strictly prohibited. Modification or reproduction prohibited unless authorized in writing by the copyright owner. Page 2

Record of Amendments List of all amendments made to the plan since inception. Amendment Effective Date Amended By Initials Number (Please print) 2014-01 23 September 2014 Kelly Stewardson KS 2017-02 1 June 2017 Daniel Howlader DH Page 3

Table of Contents Acknowledgements... 2 Record of Amendments... 3 Table of Contents... 4 Background... 5 1.1 General... 5 1.2 Key References... 5 1.3 Acronyms... 5 1.4 Key Terms... 6 Concept of Operations... 7 2.1 Objective... 7 2.2 General Concept... 7 2.2 Lead / Supporting / Coordinating Organizations... 8 Support... 9 3.1 General... 9 3.2 Transport... 9 Control, Coordination, and Communications...10 4.1 Control...10 4.2 Coordination...10 4.3 Communications...10 4.4 Messaging...10 Annex A Turtle Mountain Slide Emergency Protocol Decision Tree...11 Annex B Ground-Based Interferometry Image...12 Page 4

Background 1.1 General In 1903 a catastrophic rock slide at the North Peak of Turtle Mountain buried parts of the town of Frank, killing between 70 and 90 people. Since that time extensive geological studies have been conducted to determine the likelihood of another slide, and have reached the conclusion that the potential exists for another devastating slide from the North, South, or Third Peak of Turtle Mountain. While such a slide cannot be prevented, its potential damage may be mitigated. To that end, the Government of Alberta (GOA) commissioned a project in 2003 to monitor the mountain s stability in real time in order to provide early warning before a potential slide. This project consisted of installing a network of sensors which measure deformation of the rock face in near-real time, and transmit the data to geoscience experts in the Alberta Energy Regulator (AER) / Alberta Geological Survey (AGS) for evaluation and if necessary, informing AEMA of potential hazard.. Sensor emplacement was completed in 2005, and since 2014 the North, South, and Third Peak has been continuously monitored. In 2013, AER/AGS commissioned a panel of distinguished geologists to assess the status of monitoring at Turtle Mountain, and recommend possible changes to the Turtle Mountain Monitoring Program (TMMP) if required. Given the current status of Turtle Mountain s hazard potential, the panel recommended that AER/AGS discontinue the early warning systems and the 24/7 continual on-call status for monitoring, in favour of a near-real-time remote monitoring system. This real-time monitoring system was installed and tested in 2015-16 and is the current functioning system. 1.2 Key References Geotechnical Hazard Assessment of the South Flank of Frank Slide Hillcrest Alberta. BGC Engineering Inc. (February 2000). A Framework for Monitoring the South Peak of Turtle Mountain Final Report. RSRead Consulting Inc. (March 2002). Turtle Mountain Monitoring Project Summary Report. RSRead Consulting Inc. (December 2004). Turtle Mountain Monitoring Project Warning System Development Report. AMEC Earth and Environmental (March 2005). Expert Panel Review of Turtle Mountain Monitoring Program. Lara Harald Blikra, Giovanni Crosta, Jacques Locat (October 2014). 1.3 Acronyms Acronym AEMA AEA AER AGS COPR BPT Full Spelling Alberta Emergency Management Agency Alberta Emergency Alert Alberta Energy Regulator Alberta Geological Survey Common Operating Picture Report Be Prepared To Page 5

DEM ECC GOA MoTI POC TMMP Director of Emergency Management Emergency Coordination Centre Government of Alberta (British Columbia) Ministry of Transportation and Infrastructure Provincial Operations Centre Turtle Mountain Monitoring Program 1.4 Key Terms Condition GREEN (Normal Operations) In the context of Turtle Mountain, Condition GREEN is the normal condition of the mountain where sensors either detect no deformation of the rock face, or provides a warning that is likely caused by instrument error, climatic conditions, or vandalism. No further action is required. Condition YELLOW (Watch) In the context of Turtle Mountain, Condition YELLOW is the condition where a trend of deformation of the rock face is detected by the sensor network. To meet the criteria of Condition YELLOW, these must be a uniform trend of movement over a large portion of the mountain face, signifying a change in the stability of the rock face. In the event of Condition YELLOW, AER/AGS will increase the frequency of data review from the monitoring network, prepare for potential on-site reconnaissance and warn the Municipality of Crowsnest Pass and AEMA of the change. Condition ORANGE (Warning) In the context of Turtle Mountain, Condition ORANGE is declared when deformations of the rock face are accelerating and a slide is imminent. In the event of Condition ORANGE, AGS/AER will conduct a detailed remote assessment at the ECC, warn the Municipality of Crowsnest Pass and AEMA, and provide geotechnical expertise and/or context with respect to evacuations of the predicted runout zone. Condition RED (Failure) In the context of Turtle Mountain, Condition RED is declared when sensor data and visual reconnaissance shows accelerating deformation of the rock face and where there is visual verification that a catastrophic failure is underway. In the event of Condition RED, AER/AGS will warn the Municipality of Crowsnest Pass and AEMA. In addition, evacuation of the potential runout zone will be ordered, highway and rail traffic in the danger zone will be restricted, and emergency response personnel and materials will be pre-positioned to deal with the collapse. Runout Zone Runout zone is defined as the area in which an avalanche decelerates, slide materials are deposited, and the avalanche stops. Page 6

Concept of Operations 2.1 Objective The objective of this plan is to describe the procedures by which a potential catastrophic landslide at Turtle Mountain will be identified, communicated to the residents of the Municipality of Crowsnest Pass and the GOA, and mitigation measures be implemented. 2.2 General Concept Since there is no way to prevent a catastrophic slide, the GOA s efforts in this area are focused on preparation and mitigation. Preparation is centred on obtaining early notification of a slide, while mitigation is centred on damage reduction in the predicted runout zone. AER/AGS received real-time deformation measurements on a 24/7 basis from the completion of the TMMP in 2005 until 2016, when AER/AGS transitioned to a near-real-time remote monitoring system. These measurements continue to enable AER/AGS to evaluate the likelihood of a catastrophic collapse of the mountain, and warn the Municipality of Crowsnest Pass and affected GOA departments. Once AER/AGS detects significant deformation of the rock face, an alert is passed to the Director of Emergency Management (DEM) of the Municipality of Crowsnest Pass, AEMA, Alberta Transportation, and the warning level is raised to Condition YELLOW. At this time AEMA will ensure that the Field Officer with responsibility for Crowsnest Pass is warned of the potential of a catastrophic collapse. Additionally, AEMA will ensure Alberta Transportation, the Canadian Pacific Railway, and the Government Operations Centre (to facilitate federal and CP Railway coordination and communication) are aware of the potential for catastrophic collapse, and that lines of communication are open between the DEM of Crowsnest Pass and the AEMA. At this time AEMA may elevate the operational level of the Provincial Operations Centre (POC). AEMA will also notify Culture and Tourism Staff at the Frank Slide Interpretive Centre and the Leitch Collieries Provincial Historic Site in addition to all relevant departmental Business Continuity and Consequence Management Officers. As the situation develops, the deformation may subside, remain elevated, or worsen. If the deformation subsides, AER/AGS may recommend a return to Condition GREEN and regular monitoring will recommence. If the deformation remains elevated but does not pose an imminent threat, AER/AGS will make a recommendation as to whether the new deformation conditions become Condition GREEN and recommence regular monitoring. If the deformation worsens, AER/AGS may recommend elevation to Condition ORANGE. Upon the adoption of Condition ORANGE, the Municipality of Crowsnest Pass will activate their municipal ECC, and issue a voluntary evacuation notice for the potential runout zone. Alberta Transportation may restrict road traffic on Highway 3 and CP Railway may reduce or re-direct rail traffic on the impacted rail line. Alberta Transportation will also notify the British Columbia Ministry of Transportation and Infrastructure (MoTI) in order to synchronize highway restrictions on both sides of the provincial border. AEMA will elevate the readiness status of the POC (if not already done), and ensure that all potentially affected GOA departments are aware of the situation. Depending upon the analysis of AER/AGS, AEMA may pre-position a Field Officer in the Crowsnest Pass Municipal ECC. It is likely that the Crownsest Pass ECC will be operating on a 24 / 7 basis at this condition. If the conditions continue to worsen, AER/AGS may recommend adoption of Condition RED (a slide is imminent and where there is visual verification that a catastrophic failure is underway). Page 7

Under Condition RED the Municipality of Crowsnest Pass will fully activate their municipal ECC for 24 / 7 operations, issue mandatory evacuation orders for the potential runoff zone. Alberta Transportation will close Highway 3 in conjunction with BC MoTI. CP Railway may stop all rail traffic on the impacted railway. AEMA will elevate the operational level of the POC in order to coordinate emergency aid and manage information flow for the GOA, pre-position a Field Officer in the Crowsnest Pass ECC (if not already done), and will coordinate pre-positioning of emergency aid and personnel at the request of the Municipality of Crowsnest Pass. Once all measures of Condition RED have been adopted, all GOA departments will stand by to render assistance to the municipality of Crowsnest Pass as required to include recovery operations. A graphical decision tree outlining this plan is attached as Annex A. 2.2 Lead / Supporting / Coordinating Organizations While the Municipality of Crowsnest Pass, as the local authority, retains tactical control of a catastrophic slide of Turtle Mountain, the GOA will provide support assistance through the following: a. Lead Organization Alberta Geological Survey b. Coordinating Organization Alberta Emergency Management Agency c. Supporting Organizations: Community and Social Services, Culture and Tourism, Alberta Environment and Parks, Alberta Health, Justice and Solicitor General, Alberta Transportation Page 8

Support 3.1 General In the event of a catastrophic collapse of the Turtle Mountain, the GOA will provide support to the Municipality of Crowsnest Pass when requested or required. In that access routes to the Municipality of Crowsnest Pass are limited, pre-positioning of emergency aid and personnel may be required once Condition ORANGE is declared. 3.2 Transport Both Highway 3 and the Canadian Pacific Railway fall within the worst-case prediction of the runout zone. In the event of a catastrophic collapse of the Mountain, both routes will be assumed de facto closed until such time that experts can certify their safety. Page 9

Control, Coordination, and Communications 4.1 Control Control at the incident level in the event of a catastrophic slide at Turtle Mountain will be retained by the on-site Incident Commander. The DEM of the Municipality of Crowsnest Pass, or that individual s delegate will continue to exercise their roles and responsibilities. 4.2 Coordination Coordination at all except the local level will be conducted by AEMA through the coordinating mechanism of the POC. 4.3 Communications Communications throughout the response to a catastrophic slide at Turtle Mountain will be as follows (in the order of preference): a. Land lines; b. Cell phones; c. E-mail; d. Satellite phone; and e. Amateur radio. 4.4 Messaging In that a catastrophic slide at Turtle Mountain will generate substantial media interest, even if there is little damage, all internal (GOA) and external (public) messaging will be coordinated by the GOA Public Affairs Bureau. Page 10

Annex A Turtle Mountain Slide Emergency Protocol Decision Tree AER/AGS AEMA Crowsnest Pass Other Organizations (Through POC) Normal monitoring Normal monitoring Normal monitoring N/A Field check sensors as required AER/AGS AEMA Crowsnest Pass Other Organizations (Through POC) Increase frequency of monitoring Warn Field Officer Confirm comms with AEMA Monitor situation Warn AEMA, AB Transportation Coordination Information Centre, DEM of Crowsnest Pass Contact AB Transportation Lethbridge District/Southern Region Confirm comms with DEM of Crowsnest Pass Issue POC Alert to stand up ECC AER/AGS AEMA Crowsnest Pass Increase frequency of monitoring Update AEMA, AB Transportation, DEM of Crowsnest Pass Send geotechnical experts to Crowsnest Pass ECC Elevate POC as required Confirm comms with Crowsnest Pass DEM, AB Transportation Issue POC Alert Updates, COPR Activate municipal ECC Issue voluntary evacuation notice for runout zone Issue AEA Alert AER/AGS AEMA Crowsnest Pass Continue monitoring Warn AEMA, AB Transportation, DEM of Crowsnest Pass Send geotechnical experts to Crowsnest Pass ECC Elevate POC as required Issue POC Alert Updates, COPR Coordinate GOA response Maintain municipal ECC at 24/7 Issue mandatory evacuation notice for runout zone Issue AEA Alert Other Organizations (Through POC) Pre-position Emergency Social Services Pre-position heavy equipment Pre-position emergency personnel Close Highway 3 and railway if required Other Organizations (Through POC) Pre-position Emergency Social Services Pre-position heavy equipment Pre-position emergency personnel Close Highway 3 and railway Protocol Decision Tree Table Legend: X Axis Responsible Organization Y Axis Corresponding colour and assigned decision / task Page 11

Annex B Ground-Based Interferometry Image Source: AER/AGS - Ground-Based Interferometry (GBInSAR) used at Turtle Mountain Page 12