Eco Snow CO2 Clean System Operation

Similar documents
Vacuum Pumpdown and Venting Procedure, CRaTER Thermal Vacuum System. Dwg. No

MINIBRUTE ANNEAL TUBE STANDARD OPERATION PROCEDURE

5.1.3 Mechanical Hazards Drive assemblies have sufficient power to cause injury. Keep hands, fingers, clothing and tools clear of moving parts.

MJB4 Mask Aligner Operating Procedure. Effective Date: 07/12/2012 Author(s): Jiong Hua Phone:

JETFIRST 150 RTA SYSTEM OPERATING MANUAL Version: 2 Feb 2012

Usage Policies Notebook for NanoFurnace Furnace (EasyTube 3000 System)

LNG Regulator Test Kit

UNLOADING PROCEDURE OF AN AIRFLOW CONTAINER

Instruction presentation Special valves

Procedure for Filling 2 T Bruker Magnet with Nitrogen

University of MN, Minnesota Nano Center Standard Operating Procedure

FAULT CODE TROUBLESHOOTING INDEX

Procedure of Xenon Transfer

Instructions for High Altitude Conversion

Propane Conversion Kit Instructions

KJ4000 Operating Instructions & Parts Manual NSN

KARL SUSS MJB3 MASK ALIGNER STANDARD OPERATING PROCEDURE

COMPRESSOR REPLACEMENT PROCEDURE (R-134A)

Equipment Operating Procedure Glove Box

Inert Air (N2) Systems Manual

SOP for Karl Suss MJB3 #1 Mask Aligner

OPERATING AND MAINTENANCE MANUAL

Warnings: Notes: Revised: January 8,

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack)

Operation of the contact mask aligner Canon PPC 210 Projection Print Camera

6900 Maintenance Instruction System Flush

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

Johnston Invar Coupling Johnston Invar Coupling

APPS-160 Gen 2 User Manual

Concentrate Distribution System (Stand Mounted) A-CDS-70-X & A-CDS-TANK-X-ST Industrial Drive, Orlinda, TN 37141

PERFORM Operating Document

Nitrogen Tyre Inflator Owner s Manual

Usage Policies Notebook for Parylene Coating System

DESIGN DATA. Dry 105a. September 5, 2008

LIQUID OXYGEN. General. Health Effects. Safety Considerations

PERFORM Operating Document

Approved by Principal Investigator Date: Approved by Super User: Date:

3 GALLON, OILLESS PANCAKE COMPRESSOR INSTRUCTIONS. Item #31289

Title: Xactix XeF2 Etcher Semiconductor & Microsystems Fabrication Laboratory Revision: A Rev Date: 03/23/2016

Conversion instructions from natural gas to propane

Plasma Asher: March PX-500 User guide (May-30, 2017)

I. Subject: Medical Gas Systems Utility Failure Interim Procedure III. Purpose:

Issue: H Title: CHA E-Beam Evaporator Page 1 of 7. Table of Contents

Propane Conversion Kit Instruction

4 IN. BALL LAUNCHER Engine Mounted / PTO Driven

Propane Conversion Kit Instruction

256 Pneumatic Pressure Indicator

Approved by Principal Investigator Date: Approved by Super User: Date:

Propane Conversion Kit Instruction

EXOTHERMIC TORCH ADAPTER. Instruction Manual

Procedure for Operating Columbia (Nevis) LHe Electron Bubble Chamber Cryostat. Version 5.1

Liquid Nitrogen Cooling Accessory CE

ABRASIVE REGULATOR II

Installation of Your SprayMaster System

Standard Operating Manual

ABRASIVE REGULATOR II

2 Switching off ECRIS 3. 4 Acquire Beam Spectrum 4. 6 Vent Instrument Chamber 5. 7 Pump down Chamber 5. 8 Baking out Chamber 5.

Self-operated Pressure Regulators for special applications

2. Determine how the mass transfer rate is affected by gas flow rate and liquid flow rate.

March CS-1701F Reactive Ion Etcher

A/C SYSTEM GENERAL DIAGNOSTIC PROCEDURES

RK-IR Sample Draw Aspirator Adapter Operator s Manual

OPERATING AND MAINTENANCE MANUAL GOLD LINE EXTRACTION CLEANERS M14-M26

Pressure Dump Valve Service Kit for Series 2300 Units

Calcium Reactor. CalcFeeder PRO. User Manual 1.1a. Model. CalcFeeder AC1 PRO CalcFeeder AC2 PRO CalcFeeder AC3 PRO CalcFeeder AC4 PRO

GETZ EQUIPMENT INNOVATORS RECOVERY SYSTEM CLEAN AGENT FE-36 / HALOTRON 1 PART NO. 4G59751 OPERATIONS MANUAL

OPERATION MANUAL RTI RHS650 RTI TECHNOLOGIES, INC East Market Street York, PA Manual P/N

Usage Policies Notebook for AMST Molecular Vapor Deposition System MVD 100

Safe Work Instructions For Oxygen Acetylene Equipment

275 RID Assembly Instructions

Jerry Martin s Co 2 Snow Apparatus

Operation of the mask aligner MJB-55

INSTRUCTION MANUAL FOR POLYKEG DISPOSABLE KEG

Superconducting Susceptometer (MPMS-5S) Quantum Design Room 296 (MPMS)

ABM MASK ALIGNERS. NanoFab 26 March 2009 A Micro Machining & Nanofabrication Facility

CP10 Sensor Installation and Maintenance Instructions

XDF BURNERS DUAL FUEL EXCESS AIR BURNER FEATURES DESCRIPTION EXCESS AIR OPERATION

Technical Operating Instructions for Magnum Cutting Systems. for online instructions

Login to ilab Kiosk. Revised 05/22/2018. Load your sample:

4400 TwinHybrid Gas Seal

In Response to a Planned Power Outage: PPMS EverCool II Shut Down and Re-start Procedure

OPERATING INSTRUCTIONS AND OWNER S MANUAL READ AND FOLLOW ALL INSTRUCTIONS

with O 2 Controller Instruction Manual

INSTALLATION. and INSTRUCTION MANUAL. for QUALITY AIR BREATHING SYSTEMS. Model 50 Systems Outfitted with ABM-725 Monitor C O M P A N Y

450P AUTOMATIC PORTABLE COMPRESSOR EXTREME SERIES

SPUTTER STATION STANDARD OPERATING PROCEDURE

Pressure Dump Valve Service Kit for Series 3000 Units

Installation, Operation, and Maintenance Manual

Glove Box with Gas Purification System and Digital Control VGB-6. MTI Corporation

MODEL NUMBER: PSI AIR SOURCE KIT 200 PSI Compressor on 2.0 Gallon 200 PSI Air Tank

GEN-1e CO2 Generator OVERVIEW INSTALLATION PROPANE GENERATORS ONLY NATURAL GAS GENERATORS ONLY

Installation and Maintenance Manual. ECO Filtration Unit with 6-way-Top-Mount-Valve. Art. Nr

DRAFT. Operating Procedures for the NPDGamma Liquid Hydrogen Target in TA-53, Building MPF-35

Flow Material Length. Weight GPM LPM. Style 3095

Nanofabrication Facility: Sputter Evaporator SOP Rev. 04, June 2007

INSTRUCTION MANUAL. Thanks for purchasing our airbrush compressor and please read this

Technical

Installing ASI Umbilical Delivery Systems

Revised: June 7, 2017

MJB-3 Mask Aligner Property of TAU MNCF August 2012

Transcription:

Eco Snow CO2 Clean System Operation This equipment is to be operated only by individuals that have been trained and qualified by the MNFC staff. Do NOT use or attempt to use this tool unless you are qualified to do so. Contact: Omid Mahdavi Staff Engineer 621 9849 desk omidm@email.arizona.edu Reference Documents Microenvironment (Clean Dry Box) Manual, CDB 100, Eco Snow Systems BOC, 4935A Southfront Rd, Livermore, CA 94500, phone: 925 606 2000 Eco Snow Variable Orifice Jet Spray Gun Manual, Model W 2 Eco Snow Systems, 4935A Southfront Rd, Livermore, CA 94500 Material & Safety Nitrogen (N2) House supply. In high concentrations can replace oxygen in the air and act as an asphyxiant. Liquid Carbon Dioxide (CO2) Research grade 99.999% or higher with a dip/siphon tube. Currently supplied by UA Cryogenics facilities. In high concentrations it is an asphyxiant. Keep bottle in a well ventilated area. Avoid exposure with the liquid emanating from the spray gun as it may result in cold burns/frostbites. 1. Always disconnect the CO2 tank FIRST prior to any maintenance or opening the machine for general cleaning. 2. Unplug the electrical plugs from the bottom right hand side of the machine prior to any maintenance or general cleaning.

3. Always turn off the Nitrogen purge and adequately ventilate the system prior to opening it up for maintenance. 4. Always assume that the in sides of the machine are covered in toxic substances and protect yourself accordingly. 5. ALWAYS, open the machine up and wait at least 1/2 hour prior to sticking your head inside the machine. There is a possibility that there are substances in the chamber that may react with air. Set up Note: If electric discharge control is desired then make sure the ion bar is turned on. The switch for the ion bar is under the back panel on the right hand side of the machine. 1. Turn on N2 purge valves in the chase behind the tool and make sure the regulator is set at 40psi. Refer to Fig. 1 and 2. 2. Set the N2 flow for the load lock to 5 SCFH and for the chamber to 50 SCFH. See Fig. 3 for location. 3. Run N2 through the Clean Dry Box (CDB) at least 1 hour prior to introduction of the samples into the chamber. 4. For particle control, turn on blower and set to 50 60% level using controls on the front panel. 5. When placing sample in the load lock wait 5 minutes before introducing it into the chamber. 6. Turn on the platen (see Fig. 5) heat using front panel switch and set to the desired temperature. The hot plate has a range from 30 to 80 deg. C. 7. Allow the platen temperature to equilibrate for about an hour after each temperature adjustment. 8. When changing the nozzle, manually retighten the nut that holds it in place. Don t over tighten the nut. 9. Use the valve inside the Clean Dry Box (CDB) to turn on/off the CO2 flow. Do not use the micrometer for this purpose. The CO2 valve is located in the lower front left corner of the CDB (see Fig. 4) 10. Refer to Gun manual for nozzle change procedures and micrometer settings. 11. Normal micrometer settings for the spray gun are as follows:

Nozzle Nozzle Type Micrometer Setting Range Type of CO2 particle # 882 883 884 885 Aggressive Medium Aggressive Medium Mild 22 40 25 40 25 50 20 30 Hard Snow Particles Medium Hard Medium Mild Snow Each full rotation of the micrometer is equivalent to 25. So that the four full rotations will equal 100 and the inner gauge reading will be 1. 12. Turn on the CO2 at the tank by opening the regulator. The pressure should read greater than 800 psi. If not, the liquid CO2 in the tank may have been depleted and the tank may have to be replaced. 13. Turn on the vacuum pump on the floor if you will be using the platen. Place the substrate on the platen and turn open the labeled vacuum valve inside the CDB to hold substrate in place. Processing Instructions 1. Turn on the CO2 valve and allow the CO2 to flow for about 30 seconds prior to processing. Make sure it has a consistent flow and is not spitting. 2. The nozzle should be held 1 inch from the wafer and at 45 degrees during processing. 3. If the substrate can not be removed from the platen, turn off the vacuum pump. Shut Down Instructions 1. Close the CO2 regulator at the tank. 2. Turn off the vacuum pump. 3. Leave CO2 valve on allow all the CO2 to get purged out of the gun. When regulator pressure drops off to zero, close CO2 valve. 4. Turn off all IR lamps. 5. Turn off the platen heater using front panel switch. 6. Turn off all lights. 7. Turn off blower. 8. Turn off the N2 purge valves behind the tool in the chase of after each use. (See Fig. 1 & 2).

Figure 1 1st Nitrogen Purge Valve and Regulator Figure 2 2nd Nitrogen Purge Valve in the Chase

Figure 3 N2 purge flowmeters on the front panel Figure 4 CO2 Valve

Figure 5 Heated Substrate Platen (vacuum available if needed) Figure 6 Front panel platen temperature control

Figure 7 Variable Orifice Jet Spray Gun Figure 8 IR Lamp1 is turned on

Revision Description of Change Initiator Date of Change 1 Change Add pictures, safety, and more details Omid Mahdavi 12/12/06